Loading...
HomeMy WebLinkAboutSCARPELLA REPLAT LOT 3 - Filed GC-GENERAL CORRESPONDENCE - 2005-06-2310/ 1 R/2000 To: Matt Baker Dear Matt, As per our conversation several days ago. I would appreciate your figuring the amount I would need to submit f-or the contribution in aid for curb, gutter. sidewalk and pavement at 2400 West prospect St. to secure my subdividing that property into two lots. As the attached plat indicates_ there is 100 ft of frontage on Prospect St. I would appreciate it if I could get this figure from you as it has a direct barring on my decision to go forward with this project. Please call me at 223-291 G when you have this figure. I am delivering what Phil Robinson and I think are the final revisions to Ted Shepard today. I also need to know il' 1 wif) be responsible for a repay to the city for any improvements that were made on livcrgrecn Court. I believe my dad paid for his portion of Evergreen when he did the original development. I may have asked you this before. but 1 do not remember, nor did I make any notes. I appreciate your patience and willingness to help me. Sincerely, Mick Scarpella October 30, 2000 Mick Scarpella 2937 Skimmerhorn Street Fort Collins, CO 80526 RE: Local Street Portion for Prospect Road Improvements Dear Mick Here is the estimate for your local street portion of the road improvements to Prospect Road. I have included both the original estimate we spoke of yesterday and a revised estimate showing your final amount due. As you will note, the embankment (fill) figure has dropped considerably and lowers the estimate a little over $300. After we spoke on the phone last Wednesday, I drove by the property and discovered that I had overestimated the amount of fill required to bring the sidewalk area up to grade. Once the City of Fort Collins has received your contribution in aid, you will be exempt from any future road improvements to Prospect Road along your property line. Please let me know if I can be of further assistance. My telephone number is 221-6605, extension 7729. Sincerely, Susan Joy Project Engineer Street Oversizing Program LOT 3, SCARPELLA SUBDIVISION LOCAL STREET PORTION ESTIMATE Spec/Item Contract Estimated Engineer's Number DescriptionEngineer s 203-01 Embankment(CIP) 8 Cy $ 5.50 $ 4481 301-01 Plant Mix Bituminous Base - Grading G (6" Depth) 47 TON $ 31.00 $ 1 450.80 304-01 Aggregate Base Course - (CL 5 or 6) 6" Depth (CIP) 47 TON $ 1200. $ 561.60 403-01 Hot Bituminous Pavement - Grading C (3" Depth) 23 TON $ 33.00 $ 772.20 608-07 608-02 4.5' Concrete Sidewalk (4") Concrete Drive Approach (F) 450 1 SF EA $ 2.60 $ 2,100.00 $ 1,17000 $ 2,100.00 609-01 Vertical Curb and Gutter 68 LF $ 9.00 $ 612.00 Subtotal Construction: CONTRACT TOTAL $ 8,221.48 Project Contingency (10%) $ 822.116 PROJECT TOTAL $ 9,043.63