HomeMy WebLinkAboutSAGE CREEK - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-06-22Citv of Fort Collins
Transportation Services
Fngineering Department
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 01-15 Issuance Date: `' l t'I
Project Name: Sage Creek, PDP, Phase 4 (T-if"T>,It�))
Project Location: A tract of land located in the East Half of Section 5, Township 6 North,
Rangc 68 West of the 6`' P.M., City of Fort Collins, County of Larimer, State of Colorado.
Permittee: The James Company, Inc., a Colorado Corporation
City and developer contacts: See attached Exhibit 'A "for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee (paid for Phase 4) $(300.00)
1?rosion Control Deposit (Paid 08/07/00, Rec. 92107) S(66,300.00)
Construction Inspection Fee
Phase 4 $13,029.00
Total $13,029.00
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
S377,393.50 (for Phase 4)
Form of security deposited with the City: Development Bond
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for all revisions
to the utility Plans and related documents. The Permittee shall have an Engineer represent, as
required by the City in the Development Agreement, that the improvements are constructed in
conformance with the approved Utility Plans and the standards and specifications of the City. The
Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance
of the constructed public improvements. (All references above to the terns "Project Engineer" and
281 tirrth C:.,ll �� ^ -enu_ • CC7. Bps Hsu
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Sage Creek, PDP
City Staff Contact Persons:
Development Engineer: Mark McCallum, City of Fort Collins, 281 N. College
Avenue, Fort Collins, CO 80522
970/221.6605 ext.7656
Construction Inspector: Lance Newlin, City of Fort Collins, 281 N. College Avenue,
Fort Collins, CO 80522
970/221.6605
Current Planner: Cameron Gloss, City of Fort Collins, 281 N. College
Avenue, Fort Collins, CO 80522
970/221.6750
Water Utilities Engineer: Roger Buffington, 700 Wood Street, Fort Collins, CO
80521
970/221.6854
Stormwater Engineer: Jay Barber, 700 Wood Street, City of Fort Collins, CO
80521
970/221.6063
Erosion Control Inspector: Bob Zakely, 700 Wood Street, City of Fort Collins, CO
80521
970/221.6063
Natural Resources: Kim Kreimeyer, City of Fort Collins, 281 N. College
Avenue, Fort Collins, CO 80522
970/221.6750 ext. 6641
Traffic Operations: Ward Stanford, 700 Wood Street, City of Fort Collins, CO
80521
970/221.6820
Transportation Planning: Kathleen Reavis, 210 East Olive Street, City of Fort Collins,
CO 80524
970/224.6140
Forestry: Tim Buchanan, City of Fort Collins, 281 N. College Avenue,
Fort Collins, CO 80522
970/221.6361
Light and Power: Doug Martine, 700 Wood Street, City of Fort Collins, CO
80521
9701224.6152
Developer's Contact Persons:
Project Manager: Merle Bush, James Company, 2919 Valmont Rd., Ste. 204,
Boulder, CO 80301
Office: 303/443.6666
Mobile: 303/588.7429
fax: 970/223.2786
Developer: Jim Postle, James Company, 2919 Valmont Rd., Ste. 204,
Boulder, CO 80301
Office: 303/443.6666
Fax: 303/443.6777
Architect/Planner: Eldon Ward, Cityscape Design, 3555 Standford Rd., Fort
Collins, CO 80525
Office: 970/226.4074
Project Engineer: Stan Meyers, The Sear -Brown Group, 209 South Meldrum
Street, Fort Collins, CO 80521
Office: 970/482.5922
fax: 970/482.6368
e-mail: stan-meyers@searbrown.com
PE Lis. #: 18060
General Contractor: Merle Bush, James Company, 2919 Valmont Rd., Ste. 204,
Boulder, CO 80301
Office: 303/443.6666
Mobile: 303/588.7429
fax: 970/223.2786
City of Fort Collins
Transportation Services
Fn;;inieerin., Dehsrhn2ri`---- —
Development Construction Permit, Page 1/6
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 00-19 Issuance Date: ! t
Project Name: Sage Creek, PDP, Phases I & 2
Project Location: A tract of land located in the East Half of Section 5, Township 6 North,
Range 68 West of the 6t" P.M., City of Fort Collins, County of Larimer, State of Colorado.
Permittee. The James Company, Inc., a Colorado Corporation
City and developer contacts: See attached Exhibit `A "for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee (paid for Phase 1) $(300.00)
(paid for Phase 2) $(300.00)
Erosion Control Deposit (Paid 08/07/00, Rec. #2107) $(66,300.00)
Construction Inspection Fee
Phase 1 $9,665.40
Phase 2 $18,368.10
Excavation Permit Fee $25.00
Total $28,058.50
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$756,662.10 (for Phases 1 & 2)
Form of security deposited with the City: Letter of Credit
Letter of Credit overview:
Letter of Credit: $756,662.10
(Phase 1, $305,695.00; Phase 2, $450,967.10)
Account for: The James Construction Company
Irrevocable Letter of Credit #3175
From: First National Bank
HI ADrib Coll: ^c AN cn,u Coain,, CO9f 53 = IFS I (0711) °.2 t (-of F
Development Construction Permit, Page 2/6
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Pennittee
shall have an Engineer prepare revised design drawings and secure City approval for all revisions
to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as
required by the City in the Development Agreement, that the improvements are constructed in
conformance with the approved Utility Plans and the standards and specifications of the City. The
Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance
of the constructed public improvements. (All references above to the terns "Project Engineer" and
"Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
3. Construction tine restrictions: Regular Construction Hours
4. The applicant understands that additional permits may be required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations
or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there
is no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance ofthe first building permit.
Development Construction Permit, Page 3/6
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. At the time that Ziegler Road is constructed all construction traffic related to this development
shall use Ziegler Road as opposed to Kecther Road. If a situation should arise that does not make
it practical for construction traffic to use Ziegler Road, then the City Inspector shall use discretion
In authorizing the use of Kechter Road for construction traffic for this development.
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property,
as defined in Section 1-2 of the City Code; and including common areas legally connected to or
associated with the property which is the subject of this application) without whose consent and authority
the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant Project Manager's Signature: -o Date:
PrintN me:% _ flif:l:;;<t
Approva/for issuance:
City Engineer Approval: c "kja_� Date: T
Cam McNai (Permit Issuance Date)
Development Construction Permit, Page 4/6
I�cuar�_vi
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Sage Creek, PDP
City Staff Contact Persons:
Development Engineer: Mark McCallum, City of Fort Collins, 281 N. College
Avenue, Fort Collins, CO 80522
970/221.6605 ext. 7656
Construction Inspector: Jeff Baldwin, City of Fort Collins, 281 N. College Avenue,
Fort Collins, CO 80522
970/217, 8901
Current Planner: Ron Fuchs, City of Fort Collins, 281 N. College Avenue,
Fort Collins, CO 80522
970/221.6750 ext. 2138
Water Utilities Engineer: Roger Buffington, 700 Wood Street, Fort Collins, CO
80521
970/221,6854
Stormwater Engineer: Jay Barber, 700 Wood Street, City of Fort Collins, CO
80521
970/221.6063
Erosion Control Inspector: Bob Zakely, 700 Wood Street, City of Fort Collins, CO
80521
970/221.6063
Natural Resources: Kim Kreimeyer, City of Fort Collins, 281 N. College
Avenue, Fort Collins, CO 80522
9701221.6750 ext. 6641
Traffic Operations: Ward Stanford, 700 Wood Street, City of Fort Collins, CO
80521
970/221.6820
Street closures: Syl Mireles
Transportation Planning: Kathleen Reavis, 210 East Olive Street, City of Fort Collins,
CO 80524
970/224.6140
Development Construction Permit, Page 5/6
Forestry: Tim Buchanan, City of Fort Collins, 281 N. College Avenue,
Fort Collins, CO 80522
970/221.6361
Light and Power: Doug Martine, 700 Wood Street, City of Fort Collins, CO
80521
970/224.6152
Developer's Contact Persons:
Project Manager: Merle Bush, James Company, 2919 Valmont Rd., Ste. 204,
Boulder, CO 80301
Office: 303/443.6666
Mobile: 303/588.7429
fax: 970/223.2786
Developer: Jim Postle, James Company, 2919 Valmont Rd., Ste. 204,
Boulder, CO 80301
Office: 303/443.6666
Fax: 303/443.6777
Architect/Planner: Eldon Ward, Cityscape Design, 3555 Standford Rd., Fort
Collins, CO 80525
Office: 970/226.4074
Project Engineer: Stan Meyers, The Sear -Brown Group, 209 South Meldrum
Street, Fort Collins, CO 80521
Office: 970/482.5922
fax: 970/482.6368
e-mail: stan-meyers@searbrown.com
PE Lis. #: 18060
General Contractor: Merle Bush, James Company, 2919 Valmont Rd., Ste. 204,
Boulder, CO 80301
Office: 303/443.6666
Mobile: 303/588.7429
fax: 970/223.2786
Outside Contact Persons:
U.S. West Janine Harris, 3351 Eastbrook Drive, Fort Collins, CO
80525
970/377.6408
TCI of Fort Collins Dennis Greenwalt, 1201 University Avenue, Fort Collins,
CO 80521
970/226.3104
Development Construction Permit, Page 6/6
Public Service Company Jim Slagle, 1901 East Horsetooth Road, Fort Collins, CO
80525
970/225.7843
Poudre Fire Authority Ron Gonzales, 102 Remington Street, Fort Collins, CO
80524
970/221.6570
"Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
3. Construction time restrictions: Regular Construction Hours
4. 1'hc applicant understands that additional permits may be required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations
or Section 2.63(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant mist re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations. whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there
is no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City:. and (_3) required certifications from the licensed professional engineer that improvements
are completed to City, standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
I I. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property,
as defined in Section 1-2 of the City Code: and including common areas legally connected to or
associated with the property which is the subject of this application) without whose consent and authority
the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so staled in this permit.
Applicant/Project Manager's Signature: Date: �/ ✓i
Print Name:
H ppro va! for issuance:
City Engineer Approval: �� cti� Date: f
Cam McNair I (Permit Issuance Date)
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Sage Creek, PDP
City Staff Contact Persons:
Development Engineer: Mark McCallum, City of Fort Collins, 281 N. College
Avenue, Fort Collins, CO 80522
970/221.6605 ext. 7656
Construction Inspector: Lance Newlin, City of Fort Collins, 281 N. College Avenue,
Fort Collins, CO 80522
970/221.6605
Current Planner: Cameron Gloss, City of Fort Collins, 281 N. College
Avenue, Fort Collins, CO 80522
970/221.6750
Water Utilities Engineer: Roger Buffington, 700 Wood Street, Fort Collins, CO
80521
970/221.6854
Stormwater Engineer: Jay Barber, 700 Wood Street, City of Fort Collins, CO
80521
970/221.6063
Erosion Control Inspector: Bob Zakely, 700 Wood Street, City of Fort Collins, CO
80521
9701221.6063
Natural Resources: Kim Kreimeyer, City of Fort Collins, 281 N. College
Avenue, Fort Collins, CO 80522
970/221.6750 ext. 6641
Traffic Operations: Ward Stanford, 700 Wood Street, City of Fort Collins, CO
80521
970/221.6820
Transportation Planning: Kathleen Reavis, 210 East Olive Street, City of Fort Collins,
CO 80524
970/224.6140
Forestry: Tim Buchanan, City of Fort Collins, 281 N. College Avenue,
Fort Collins, CO 80522
970/221.6361
Light and Power: Doug Martine, 700 Wood Street, City of Fort Collins, CO
80521
970/224.6152
Developer's Contact Persons
Project Manager: Merle Bush, James Company, 2919 Valmont Rd., Ste. 204,
Boulder, CO 80301
Office: 303/443.6666
Mobile: 303/588.7429
fax: 970/223.2786
Developer: Jim Postle, James Company, 2919 Valmont Rd., Ste. 204,
Boulder, CO 80301
Office: 303/443.6666
Fax: 303/443.6777
Architect/Planner: Eldon Ward, Cityscape Design, 3555 Standford Rd., Fort
Collins, CO 80525
Office: 970/226.4074
Project Engineer: Stan Meyers, The Sear -Brown Group, 209 South Meldrum
Street, Fort Collins, CO 80521
Office: 970/482.5922
fax: 970/482.6368
e-mail: stan-meyers a searbrown.com
PE Lis. #: 18060
General Contractor: Merle Bush, James Company, 2919 Valmont Rd., Ste. 204,
Boulder, CO 80301
Office: 303/443.6666
Mobile: 303/588.7429
fax: 970/223.2786
Cite of Fort Collins
Transportation Services
Fngineering Department
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 01-11 Issuance Date: 3I 11l t
Project Name: Sage Creek, PDP, Phase 3
Project Location: A tract of land located in the East Half of Section 5, Township 6 North,
Range 68 West of the 6m P.M., City of Port Collins, County of Larimer, State of Colorado.
Permittee: The James Company, Inc., a Colorado Corporation
City and developer contacts. See attached Exhibit 'A "for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee (paid for Phase 3) $(300.00)
Erosion Control Deposit (Paid 08/07/00, Rec. 92107) $(66,300.00)
Construction Inspection Fee
Phase 3 $9,997.10
Total $9,997.10
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$433, 687.20 (for Phase 3)
Form of security deposited with the City: Cash
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for all revisions
to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as
required by the City in the Development Agreement, that the improvements are constructed in
conformance with the approved Utility Plans and the standards and specifications of the City. The
Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance
of the constructed public improvements. (All references above to the terms "Project Engineer" and
0
CID
--t- m
cm
N �
U
�
O
F
�
C
¢
*
�6
*
*
m �
*
S1
N
`o
v
p
x
t0 ,�
0o O
i
I�
p
x
cn
Z?
mm N
m I
Y �
�
O
�
O
N
�
M
N
�
N
w
�
❑
SI
�
ro
O
�4
W
U H
a)
44
o
Z c
N
N
�
N
p
m o
Ul
ri JJ
Z
O
a) O
S
O F U
m
+4 ro m
fn a
Z°�M*
w a) x o
O,�1
O U O U
V z07L
G W
(n�¢m*
CO
W
>oZ*
UGa a4v
Q �0*
MOT,
J
N Q1 4 y
��.•
r�w
aom
o
�M
"Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
3. Construction time restrictions: Regular Construction Hours
4. The applicant understands that additional permits maybe required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations
or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3 2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specify times for completion of public improvements, or if there
is no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
place and inspected 'by the City Erosion Control Inspector before any land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property,
as defined in Section 1-2 of the City Code; and including common areas legally connected to or
associated with the property which is the subject of this application) without whose consent and authority
the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
Applicant/Project Manager's Signature: _ f ! /z. Date:
Print 'ame: N\-YaLF L,
Approval for issuance:
r\ q
City Engineer Approval:
Date:
Cam McNair (Permit Issuance Date)