HomeMy WebLinkAboutPROSPECT INDUSTRIAL PARK - Filed GC-GENERAL CORRESPONDENCE - 2005-06-134C construction company, inc.
909 FAST SXTY-SECOND AVENUE • DENVER, COLORADO 80216 • (303) 287-5525
January 12. 200'
Sheri Wamhoff
Engineering
City of Fort Collins
281 North College Ave.
P.O. Box 580
Fort Collins, CO 80522
Re: Midpoint Self -Storage Project @ Prospect Industrial Park
#28-98 Lot 32, Type II (Luc)
Dear Ms. Wamhoff
Upon receipt of your staff comments. dated December 6, 2000, we have worked
to respond to each of those comments. We would request that our submittal be
reviewed within the City of Fort Collins guidelines and be used to submit to
formal Zoning Commission for hearing and approval. The following responses
coordinate directly with your November 28. 2000 comment letter. Please find the
following response:
❑ Site plan
❑ Refer to revised plan for indicated emergency access drive.
❑ The access drive has been revised to meet section 3.6.2(L)(2)(e)
❑ The curb cuts across Midpoint Drive is further up street and do not pose
any conflicts.
❑ Refer to revised plan for indicated new and existing walk.
❑ Yes, the 9'-0" utility easement takes into account the added 3 feet of
ROW.
a The curb cut at the corner has been removed as requested.
❑ Utility plan
1. The general notes have been updated.
2. The drives across the street are far from aligning. The ones across the
street are located further up street.
3. Refer to revised civil plan for location of curb cut.
4. The driveway details match 3.6.2(L)(2)(e) and the approach detail is on
the new drawings.
5. Each site walk has been indicated as of new or existing on plans.
6. The planning department has indicated a plat is on record at the City and
is not needed to be submitted.
construction professionals since 1964
7. Refer to plan for added new and labeled existing easements.
8. Refer to revised plans for added dimensions for setback distances.
9. The fence has been relocated to not cross over the Swale. Gates will be
provided to provide access for landscape care.
10. The rear of the site has been revised. The gravel has been removed to
clean up the transition to the turf.
11. These easements are being prepared for for the off -site grading and
drainage pipe.
12. Refer to revised plan.
A letter addressing the TIS has been provided for your review.
Please review our package and call me directly with any comments or questions.
Please provide an update on anticipated comment return and zoning hearing.
We look forward to working with you to complete this process. Thanks for all your
assistance.
Vice Pfesident of Design
dcb .Construction Co. Inc
construction professionals since 1964
n
4
MARCH, MARCH, MYATT, KORB & CARROLL
ATTORNEYS AND COUNSELLORS AT LAW
ROBERTSON BUILDING
110 EAST OAK STREET
ARTHUR E. MARCH
P05T OFFICE BOX 469
ARTHUR E. MARCH, JR.
FORT COLLINS, COLORADO 80522
RAMSEY D. MYATT
MARK L. KORB
JOSEPH T. CARROLL, JR. November 28, 1980
Mr. Maurey Rupel
City Engineering Department
City of Fort Collins
Post Office Box 580
Fort Collins, Colorado 80522
Dear Maurey:
TELEPHONE
AREA CODE 303
462-4322
I talked to you on the telephone on November 26 concerning
access for Poudre Pre -Mix through Prospect Industrial Park. As I
explained, an option which was given to Poudre Pre -Mix long before
Prospect Industrial Park was platted (on September 29, 1975),
provided for an access -way from the Poudre Pre -Mix site through
Shari Point Drive in Prospect Industrial Park. I am enclosing
hereiwth a copy of that option agreement. The specific provision
is contained after the description on Exhibit "A". Poudre Pre -Mix
has now exercised their option and the property together with the
access -way has been conveyed to them. This closing was completed
on June 30, 1980.
If you need anything further in order to show the right of
access over Sharp Point Drive for this property, please let me
know.
By:
AEMjr/ph
cc: Dave Osborn
Dan Bailey
Sincerely Y906,
MARCH, 47WH,
& CARROLL
ENGINEERING SERVICES
December 4, 1980
Mr. Arthur E. March, Jr.
March, March, Myatt, Korb & Carroll
P.O. Box 469
Fort Collins, CO 80522
Dear Art:
Your letter of November 28etDr=
Rupel indicates that Poude Pre -
Mix will be us Sharp as access to it's site south of
ustrias I indicated on the telephone, the
us Sharp Point Drive by fully loaded gravel and concrete trucks
will lead to the early failure of this street since it was not design-
ed for this kind of traffic.
I don't believe that the City was informed of this possibility at the
time that the plat was approved for Prospect industrial Park. It
seems to me that either Prospect Industrial Park or Poudre Pre -Mix
will have to provide an treet section for
ype Of loads
anticipated before the City could accept this street tfortmaintenanee.
Mauri and I will be happy to discuss this situation with you.
Sincerely,
. Bingman
Director of Engineering Services
cc: Lucia Liley
Roger Krempel
xMauri Rupel
Dan Bailey
sko