Loading...
HomeMy WebLinkAboutPROSPECT PARK EAST PUD - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-06-10Transportation Services I ni inecring Department Citv of Fort Collins City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: ��` - U ' Issuance Date: ,1,7/ f f ,ZC'c-4' Project Name: _Prospect East business Park PUD Advanced Energy Buildings 7 and 8 (Timberline Road and Midpoint Drive right -in right -out construction Project A.K.A.: Advanced Energy Buildings 7 and 8 Project Location: Midpoint Drive and Timberline Road - 2424 Midpoint Drive Permittee: Michael D. Blank, Rincon Development City and developer contacts: See attached Exhibit "A"for names and phone numbers of all contact persons for this project Fees: Permit Application Fee $ 300.00 Construction Inspection Fee (paid prior to issuance of this permit) S 410.50 Total $ 710.50 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 31,823.70 Form of security deposited with the City: PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in confolrmance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 11 ;r1h (nllrpr A�cni-ic • N) IIox 580 • Pnrl ( oIIin" CO(970) FAX19711) 221 11 Ci,.�� of fort Collin-, Transportation Services Lnginerrim, Department City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT �- 1 -,r Permit Number: t r Issuance Date: R'W Project Name: Prospect East business Park PUD. Advanced Ener v Buildings 7 and (Timberline Road and Midpoint Drive right -in right -out constructs a, h- work onlvl g Project A.K.A.: Advanced Energy Buildings 7 and 8 Project Location: Midpoint Drive and Timberline Road - 2424 Midpoint Drive _ Permittee: Michael D. Blank, Rincon Development City and developer contacts: See attached Exhihit "A"for names and phone numhers of all contact persons for this project. Fees: Permit Application Fee S 300.00 Construction Inspection Fee (paid prior to issuance of this permit) S 410.50 Total S 710.50 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 31,823.70 Form of security deposited with the City: PERFORMANCE, REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide -as-constructed" plans prepared by an Engineer prior to the 0tv's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) � `, rli, C ollr,,o vv cnu� �'.�. lies >�U i-<1.- LoILn�, � l) Al_.t:r� S��§d • (°-0; �i-E�(zf'l� t.tl'tdf)5'l) -'-1-OJT H w,e w.ci-tort-a>Itin �.co-us� Citv of Fort Collins Transportation Services Engineering Department MEMORANDUM TO: WWR Real Estate Services, LLC FROM: Sheri Wamhoff, Development Review Civil Engineer / AMF. DATE: May 1, 2000 RE: Initiate Development Bond Account for Prospect East Business Park PUD Advanced Energy Buildings 7 & 8 This memo is to acknowledge the receipt of development bond funds in the amount of $31,823.70 to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. When improvements to the Right -of -Way are completed, please call our inspection recorder at 221-6609 to request an inspection (please allow 24 hours for the inspection to take place). Once the improvements have passed inspection, the funds in development bond will be released to you. Development bond funds have been received from: WWR Real l Estate Services, LLC 4875 Pearl East Circle, Suite 300 Boulder, CO 80301 (303) 442-8687 cc: Initiate Escrow file Judi Vos, Accounts Payable Clerk \orlli Cnll�'}',r :Ac( Ime • PO Rov 5h0 • I or1 Collins. CO R05'_3-05N0 • (970) 221-6605 • F;A\ (971))2'1.6'78 tti �c�..ei.h>rt-cullins.cn.uc Tr:1r,5-1nrtition Serti•iCr S �irV Di fort-offIIls MEMORANDUM TO: WWR Real Estate Services. LLC FROM: Sheri Wamhoff, Development Review Civil Engineer / AMF. DATE: May 1, 2000 RE: Initiate Development Bond Account for Prospect East Business Park PUD. Advanced Energy Buildings 7 & 8 This memo is to acknowledge the receipt of development bond funds in the amount of $31,823.70 to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. When improvements to the Right -of -Way are completed, please call our inspection recorder at 221-6609 to request an inspection (please allow 24 hours for the inspection to take place). Once the improvements have passed inspection, the funds in development bond will be released to you. Development bond funds have been received from: WWR Real Estate Services, LLC 4875 Pearl East Circle, Suite 300 Boulder, CO 80301 (303) 442-8687 cc: Initiate Escrow file Judi Vos, Accounts Payable Clerk T l�1St�t t"3 �3I_ Ti Services 1�Ji7 Ci�','(irl d !'1i117ti _ _ City of Port Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT t Permit .Number �� - � " Issuance Date: Project Name: Prospect Fast business Park PtJD. Advanced Fri rav Buildings 7 and LTimberlinc Road and Midpoint Drive right -in right -out eonstructi work only) _ r� Project A.K.A.: Advanced Energy Buildings 7 and 8 Project Location: Midpoint Drive and Timberline Road - 2424 Midpoint Drive Permittee: Michael D. Blank. Rincon Development City and developer contacts: See attached Exhibit "A"for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee $ 300.00 Construction Inspection Fee (paid prior to issuance of this permit) S 410.50 Total S 710.50 Development Bond or other approved security: ,amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 3l.823.70 Form of security deposited with the City: PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. "fire Permittee shall have in Fngineer prepare revised design drawings and secure City approval for all revisions to the I ftility Plans and related documents. The Permittee shall have an Engineer represent. as required by the City in the Development Agreement. that the improvements are constructed in Conlormance with the approved Utility Plans and the standards and specifications of the (_its. "I he Permittee shatl provide "as -constructed" plans prepared by an F nuincer prior to the Cites acceptance of the constructed public improvements. (All references above to the terms "Project 1-:nginec{- and "Engineer" shall mean a Professional Engineer licensed in Colorado.) Transportation Services I_ngincering Department City of Bolt Collins City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: L_, "C'/ Issuance Date: Project Name: Prospect East business Park PUD Advanced Energy Buildings 7 and 8 (On Site work only) ProjectA.KA.: Advanced Energy Buildings 7 and 8 Project Location: 2424 Midpoint Drive southeast corner of Timberline Road and Prospect Permittee: Jerry Lee Sharp Point LLC City and developer contacts: See attached Exhibit "A"for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee ($300.00) $ paid Street Cut Fee (paid prior to issuance of this permit) $ 3,625.00 Construction Inspection Fee (paid prior to issuance of this permit) S 4,630.80 Total $ 8,255.80 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 120,945.00 Form of security deposited with the City:LAIR ck cf_e� PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 'NI ,' ,nth ( d1h r,r Acrnor • I'll lion ),0 1 olr Collin', W 8W3 22-€&j O ti]9701 22I-Fib(.a6 IA. (97Gl) "I-6378 �c�� X"', 1-tort-collins.co.u, 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction time restrictions: MA 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit . 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City ; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 2 10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: 1 This permit is for the on site construction work at 2424 Midpoint Drive only. Permit C C -( Y Has also been issued for the work in Midpoint Drive at Timberline Road required to be constructed by this proiect Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, 1 hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Signatur • Dater Approval for issuance: City Engineer Approval:'. �ti _- �� �► t�- �2 Date::-5 1-- (Permit Issuance Date) EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Prospect East Business Park PUD, Advanced Energy Buildings 7 and 8 (On Site work only) Project A.K.A.: Advanced Energy Buildings 7 and 8 Name, address and numbers City Staff Contact Persons: Development Engineer: Sheri Wamhoff 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6750 x7140 Construction Inspector: Wayne Lenard 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6605 Cell (970) 222-6824 Current Planner: Steve Olt 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6750 Water Utilities Engineer: Roger Buffington 700 Wood Street, Fort Collins, Co 80521 (970)221-6854 Erosion Control Inspector: Bob Zackley 700 Wood Street, Fort Collins, Co 80521 (970) 224-6063 Natural Resources: Kim Kreimeyer 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6641 Traffic Operations: Eric Bracke 625 Ninth Street, Fort Collins, Co 80524 (970)224-6062 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, Co 80524 (970) 221-6815 Exhibit "A" page 1 of 2 Transportation Planning: Kathleen Reavis 210 E. Olive, Fort Collins, Co 80524 (970)224-6140 Forestry: Tim Buchanan 281 N. College, Fort Collins, Co 80524 (970) 221-6361 Light and Power: 700 Wood Street, Fort Collins, Co 80521 (970)221-6700 Developer' Contact Persons: Project Manager: Michael D. Blank Rincon Development, Inc. 4875 Pearl East Circle, Suite 300 Boulder, Co 80301 (303) 442-8687 Fax (303) 442-8757 Cell (303) 591-5913 Developer/Owner: Jerry Lee Sharp Point, LLC 4875 Pearl East Circle, Suite 300 Boulder, Co 80301 (303) 442-8687 Fax (303) 442-8757 Email: ilee2wwreynolds.com Project Engineer: Mike Jones, Northern Engineering Services 420 S. Howes, Suite 202 Fort Collins, Co 80521 (970)221-4158 Fax (970) General Contractor: Michael D. Blank Rincon Development, Inc. 4875 Pearl East Circle, Suite 300 Boulder, Co 80301 (303)442-8687 Fax (303) 442-8757 Cell (303) 591-5913 or All Other Contractors: Concrete/ Flatwork: Landscape: Other: Exhibit "A" page 2 of 2 O o 0 0 0 0 O O O O O O O O O O O O O O O O O C$ Z O O O O O O O t0 N O O O 0 0 0 0 O O O O w N O -CD: O. •7 O O O O O O N O O O 0 0 0 O O O O N M O O '.O, � a •7 f9 fH � N EA r W N N Vi O M t0 tp 69 b9 f9 Ql V (D EA 'M' {� fA 1A fA EA b9 fA EA EA EA fA EA ;.Q.. N W K ? LL 000000 Z O ID O O O O tp (O (D O O O O O O O M N N OD ". o0vicioo 0000000000 0 000 w:- K fA V3 Vi M ( M ( M M M fA b9 fR fA fA M w aL ILLii � O-, LL O O o O O O O O O O O O O o 0 0 O O O O O O O x~.i C, 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o W o. 0M0 o oma0000000 00000�rio -a., vi �.� O ID f9 fA O fA LL� V O O b9 O O N O ER fA ERN O m fR y; m N N �A (O V (O 7 0 O O M I� r O O z O. r�•v m� n�vu6 ui u6't'� van o- �..... M fA di E9 f9 fA fA EA fA fR fA J N:' Hl Z8 O 0 0 0 0 0 0 O O O O o 0 0 0 0 0 O O O O o h 0 (ni O Z O IN O O O O O O N O O o 0 0 0 0 O O O cD O M O 0. O MfA M O O fA � � 0 0 fA O O r to M fA fA fA N f!� fA a:, 41 fR b9 N vi EA N N O o M EA pl �Z cq LU C W fAC4 bN9 EAL6 0 0 0 0 0 0 O O o 0 0 0 0 0 0 0 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O 0 0 o 0 Co O O t0 r N N O N N O O O O (D N O (l < fM0 M O ] N L � , 11 IL %% Q Q LL LL LL Q Q Q Q Q Q Q fn i 11 LL LL J .J U C)W W J J J W W W W W W W J C,6 J J J w In N � n U 2 y c H N a � � o a o v 0 in o y E U ��a ca3ic �c dU �_.d5 �U c O E O L@ Q C C -y N U C c (0 _ .�. d U 5= C Ul N N U N � U - C 0 t0 @ IO N (O l6 �p N % lU L N N N 0_ i-r2m>2ii� cDaUoaaU 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction time restrictions:_ 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. "This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit . 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City ; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 2 No Text m m M N N O Y \ p G U Of w a _N N (h � O � L m C O N V m a o n m > > 7 m a 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a. 6 E N m m 8 N V V LL � F .- IL .0 LL J J C 0 FL- iL- � !- F - - N N - n a o - � 3 3 T N N N N T N N T N Vl T N m m m m b T j N N N � N N [O t0 N t0 tD y� m G ry O m C c c' L U tm- vni a E LL v d E n c o m m m a 0 o m E N c E " -m m a uo m o K F- Z to O d C7 N w � N LL N LL LL �. m N K = LL d F o0 N a Q N a®® a� �3 rn °' m � m ao Citv of Fort Collins Transportation Services Lngineering Department City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: (-C' - C`1 Issuance Date: Project Name: Prospect East business Park PUD. Advanced Energy Buildin>4s 7 and (On Site work only) Project A.K.A.: Advanced Energy Buildings 7 and 8 Project Location: ?424 Midpoint Drive southeast comer of Timberline Road and Prost Permittee: Jerry Lee Sharp Point LLC t' I T f C0L5-1 Er ,IiM--[ ( [ ;I_ City and developer contacts: See attached Exhibit "A"for names and phone numbers of all contact persons for this project. LF Fees: Permit Application Fee ($300.00) $ paid Street Cut Fee (paid prior to issuance of this permit) $ 3,625.00 Construction Inspection Fee (paid prior to issuance of this permit) S 4,630.80 Total $ 8,255.80 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 120,945.00_ Form of security deposited with the City: I ,& Pk C%e� PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the Citv. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer' shall mean a Professional Engineer licensed in Colorado.) _ftl Aunh C-n11(-4(Uc I"-). Hoy=NU Fnri CAIim, Q) �2-G £,o `to?UI--1.i+b(TS t;yl.tSzU`l1 31-[,3T w�c�c n_ror:-Collins-co.Lis Credit and the Uniform Commercial code, the Uniform Customs and Practice for Documentary Credits, 1993 revisrit�n, ICC publication number 500. +j3 This Letter of Credit will be automatica4ly extend,ed,without amendments for one year from the present, and each future, expiration data thereof, unless Issuer delivers written notice at least sixty (60) days prior to any such expiration date to the City of Fort Collins of its intent not to renew this Letter of Credit. Any such notices shall be in writing and shall be delivered with an acknowledged receipt, either in hand or by certified mail. Any amendments to this Letter of Credit shall be made in the form of Exhibit 2 hereto. The City may at any time request that the Bank amend this Letter of Credit by submitting to the Bank a fully executed certificate in the form of Exhibit 2. The Bank shall thereafter promptly issue an amendment to the Letter of Credit corresponding to the change or changes requested in such certificate. This Letter of Credit is not transferable. This Letter of Credit sets forth in full our undertaking, and such undertaking shall not in any way be modified, amended, amplified or limited by reference to any document, instrument or agreement referred to herein, except only the certificate and draft(s) referred to herein; and any such reference shall not be deemed to incorporate herein by reference any document, instrument or agreement except for such certificate or draft(s). Sirkcer-ly, James H. Trupp v Vice President -Real Estate First National Bank STATE OF COLORADO) COUNTY OF LARIMER) Subscribed and sworn to before me this day of by as Vice President, First National Bank. Witness my hand and official seal. Notary Public My Commission Expires: The Neenan Company BY: " / P Randolph P. EXHIBIT 2 Request for Amendment to Letter of Credit # The City of Fort Collins certifies that the person signing below is authorized to execute this request for amendment to Letter of Credit on behalf of the City of Fort Collins, and further certifies with respect to the provisions contained in the Development Construction Permit dated , and /or the Development Agreement dated between the City of Fort Collins (Beneficiary) and (Developer), the following: (Check applicable boxes) 0 The Letter of Credit is to be reduced to $ The expiration date of the Letter of Credit is revised to be The 60-day automatic one-year renewal provision (contained in the Letter of Credit is no longer in effect). In witness whereof, the undersigned has executed this certificate on behalf of the City of Fort Collins this day of CITY OF FORT COLLINS, COLORADO A Municipal Corporation By: Name and Title Engineering Department 281 North College Avenue Fort Collins, CO 80524 PAone: (970) 221-6605 Fax: (970)221-6378 Permit #: Application Date: /fI EXCAVATION ON PUBLIC PROPERTY (Right -of -Way) (Minimum of 5 Days Required for City Engineer's Approval) EXPIRATION: 30 DAYS FOR DATE OF APPROVAL Applicant Use Applicant Name: Company: Phone: Address: City/State/Zip: Does contractor possess license & proper endorsement to work in the Public Right -of -Way? Yes No Sub -Contractor: Phone: Does the sub -contractor possess licenses & proper endorsement to work in the Public Right -of -Way? Yes No Is this a City project? Yes No If so, what is the Project Manager's Name: Field Contact Name & Phone #: Scheduled Start Date: Temp. Patch Date: Excavation Address: Excavation Type: Open Cut: Excavation Size: Width Length -Total Sq. Ft. Pavement Removed: Back Fill: Final: Boring: Sq. Ft* Depth Existing Surface Type: Asphalt Concrete Purpose of Excavation: Water _ Sewer Gas Other Departments to be notified: Gravel Telephone _Electric Communications Utilities Yes No 700 Wood St., 221-6700 (Coordination of new utilities with existing utilities) Traffic Yes No 625 Ninth St,, 221-6630 (Traffic control plan submitted, also coordination of underground traffic) Parks (if applicable) Yes No o 413 S. Bryan, 221-6660 Maintenance (Any work in the park system) Parking Yes No 210 E. Olive, 221-6617 (In Down Town or C.S.U. area) Forestry Yes. No 413 S. Bryan, 221-6660 (for trees, shrubs or other vegetation) City Use Non -Refundable App. Fee: $25.00 Pd. Yes No *Inspection Fee: $45.00/Per 1000 Sq. Ft. of Excavation -Pavement Impact Fee: Sq. Ft, 9'. -' X - (Fee — See Below) Pavement Age: t Pavement Impact Fee Sg.Ft. of Excavation Cost per So. Ft. I to 100 $3.50 101 to 500 $2.50 501 to 3,000 $2.00 Over3,000 $1.50 Fee Tripled if Pavement is less than S Years Total Fees: Non -Refundable $ 25.00 Inspection Fee $ Pavement Impact Fee (Tripled if less than 5 years) Other Fees: $ Sub -Total $ Less the Non -Refundable Fee Paid @ Time of Application -$ 25.00 Total Fee Due At Issuance $ Field verification of excavation size Cash _ Check # Account # Engineering Approval: Date: Conditions: Emergency Excavations, a permit may be obtained next business day. Upon application, applicant agrees to provide the Department of engineering with an original active or continuous surety bond in the amount of $20,000 and also a $10,000 endorsement bond, issued by a surety company authorized to do business in the State of Colorado (see reverse for certain provisions of the City Code that are or may be applicable to this license). Insurance is.also re- quired for licensing for the Engineering Dept of the City of Fort Collins. Applicant has read this permit and agrees to abide by the City of Fort Collins Standard Plans and Specifications and to such spe- cial conditions, restrictions, and regulations as may be imposed by the Director of Engineering. Applicant agrees to telephone the Engineering Inspection Recorder at 221-6609 48 hours prior to any construction in the public right-of-way. Applicant's Signature: Date: , While — Engineering Green —Applicant Yellow — Inspection Gold —Revenue 10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: 1. This permit is for the construction work at Timberline Road and Midpoint Drive only. Permit LC -C rl Has also been issued for this site for the work at the Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. 1 also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Signature: 1 Date: 5v Approval for issuance: City Engineer Approval—�L-- Date: �5 ! (Permit Issuance Date) 3 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Prospect East business Park PUD, Advanced Energy Buildings 7 and 8 (Timberline Road and Midpoint Drive right -in right -out construction work only] Project A.K.A.: Advanced Energy Buildings 7 and 8 Name, address and numbers City Staff Contact Persons: Development Engineer: Sheri Wamhoff 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6750 x7140 Construction Inspector: Wayne Lenard 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6605 Cell (970) 222-6824 Current Planner: Steve Olt 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-6750 Water Utilities Engineer: Roger Buffington 700 Wood Street, Fort Collins, Co 80521 (970)221-6854 Erosion Control Inspector: Bob Zackley 700 Wood Street, Fort Collins, Co 80521 (970)224-6063 Natural Resources: Kim Kreimeyer 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6641 Traffic Operations: Eric Bracke 625 Ninth Street, Fort Collins, Co 80524 (970)224-6062 Street closures: Syl Mireles 625 Ninth Street, Fort Collins, Co 80524 (970)221-6815 Exhibit "A" page 1 of 2 Transportation Planning: Kathleen Reavis 210 E. Olive, Fort Collins, Co 80524 (970)224-6140 Forestry: Tim Buchanan 281 N. College, Fort Collins, Co 80524 (970)221-6361 Light and Power: Developer' Contact Persons: Project Manager: Developer/Owner: Project Engineer: General Contractor: or All Other Contractors: Concrete/ Flatwork: Landscape: Other: 700 Wood Street, Fort Collins, Co 80521 (970)221-6700 Jerry Lee Sharp Point, LLC 4875 Pearl East Circle, Suite 300 Boulder, Co 80301 (303) 442-8687 Fax (303) 442-8757 Email: jlee@wwreynolds.com Jerry Lee Sharp Point, LLC 4875 Pearl East Circle, Suite 300 Boulder, Co 80301 (303) 442-8687 Fax (303) 442-8757 Email: jlee(cilwwreynolds.com Don Park, Park Engineering 1240 Main Street Longmont, Co 80502 (303) 651-6626 Fax (303) 651-0331 Jim Hayes The Neenan Company 2620 E. Prospect Road, Suite 100 Fort Collins, Co 80525 (970)493-8747 Fax (970) 493-5869 Exhibit "A" page 2 of 2 } Q I Z O F UJ O LU wi H N Z OZ - D UW wa a mw zw —LL 0 W Q z � Z F j NO W W 7 a w z z O Z U d W ir U w m Q� w U 0 U' Z C a (n 0 0 0 o ter, u�i O 0 0 co (Ni O tfJ (A O Q to C M M O CD 0 0 0 0 0 0 0 0 O W 0 0 0 O N 0 0 0 0 t n r W In tJ O to � n to n O M LL tto t� t0M V t�0NN (�O aND Z M f 9 (AtM 60 M M M M M M � M p W IL U) Z_ J Q 0 O 00 ou�iv u�i0000 N tJ to to 0 N to N to 0MHM t9 V U M M M M r to 0 w F- U 7 [C H Z Z_ J Q W tf NLLi LLNN LL%' O J ltl H Lu W 1 J 7 U Z O i a o w w a- U 0 J= Z wz O 'n 0 J Q Y m Z K U w = LL Q D W w 0(] (~q LL O W �U(n N Diu tTnO�z�O~�� gyp[] IL L, LU U Q< �T 0K X Z F-ww On w=O W U U W 0 W 77 ��¢Q(an?QOO (n w co U(D W LLQLLLL UU 03/15/2000 16:16 19705323792 RKY MTN SAFETY PAGE 01 LO'd LSEle 889 LO£ sw� vzl:it 00-51-avw 03/15/2000 16:16 19705323792 RKY MTN SAFETY PAGE 02 ZO'd LS$b 8e9 40C ssu wzl=Lt 00-St-.Rey