Loading...
HomeMy WebLinkAboutPROSPECT PARK PUD - Filed CS-COMMENT SHEETS - 2005-06-10Plannina DATE: PROJECT COMMENTSHEET DEPARTMENT: ��� PROJECT: PLANNER: All comments must be received by: 0 No Problems a Problems or Concerns (see below) ILr��`> �4 cc" 1, .1 r1c�•Cc�l I �- �.A vo Lc�U_1 �2 C '41 Date: I�I��% ��<' Signature: CHECK IF YOU WISH TO RECEIVE ❑ PLAT COPIES OF REVISIONS: ❑ SITE ❑ LANDSCAPE ❑ UTILITY DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 PLANNING DEPARTMENT (303(221-6750 PROJECT; COMMENT SHEET City of Fort Collins Current Plannin, DATE:10-24-96 DEPT: ENGINEERING PROJECT: Prospect Park P.U.D. PLANNER: Ted Shepard All comments must be received by: o Problems Problems or Concerns (see below or attached) • PLAT 1. Need to dedicate more access easement for west access drive. 2. Need to dedicate more ROW on Prospect and Shields for right turn lanes and sidewalks. • UTILITY PLANS 1. Provide a striping plan for the west access lane. 2- Need to provide, as an absolute minimum, 1' between manhole structure and maintenance road pavement. 3. All accesses to be concrete from flowline to property line. 4. Prospect Road striping needs to indicate the 6' N. bike lane and an I F eastbound right turn lane. 5. New sidewalk section and ramp area adjacent to Prospect access is to be designed as detached sidewalk. 6. Prospect Road cross -sections need more data (see plan) and need to hold cross slopes to max. of 4%. 7. Adjust Shields St. median dimensions as shown on the plan and add more curvature to the porkchop to direct traffic more. 8. Balance longitudinal slopes and cross slopes better on Shields St. ****** See other comments throughout plans ******** Date: y-9G. Signature: A PLEASE SEND COPIES OF MARKED REVISIONS: PLA / /J TE . T'/e,4 SCE 44 C1,, e /f %��a [UTILITY A �j f,1--fANDSCAPE PROJECT COMMENT SHEET City of Fort Collins Current Plannine DATE: 7-11-96 DEPT: PROJECT: Prospect Park P.U.D. PLANNER: Ted Shepard All comments must be received by: ENGINEERING ❑ No Problems Lam' Problems or Concerns (see below or attached) Reconfigure the layout of the Shields St. access to force Right -outs direction more and to improve Left -in truck turning needs (my checks were done using small semi truck size w/ 40' wheel base (WB-40). I'm assuming this supply truck size based on the type of proposed tenants.). Shields St. lane width improvements: 12' right turn (asphalt or concrete), 5' bikelane (same as r.t. lane), 2 - I I' thru lanes, 2' median, 1 - I I' left turn lane, all others to remain as shown (in black ink) on the plans. Prospect Rd. area improvements: widen right turn lane to 12% reduce sidewalk width to 5' and detach sidewalk by 10' (full length), increase ROW to 15' beyond flowline, re -stripe lanes according to your plan (red numbers). Radius West corner of Stone Creek and improve/stripe as called out in the traffic study. Realign the 8' concrete bike/maintenance path as shown on the plans. See additional comments on the plans, and please be sure to make related changes thru-out the plans. Date: %- f/- Gl I Signature: PLEASE SEND COPIES OF MARKED REVISIONS: PEAT 5e) EA —:eed TY �e F 5 e - ��NDSCAPE 07 7II" e6e- r�%es Yn `l ] PROJECT COMMENT SBEET Citv of Fort Collins Current Planning DATE: q!Z Q� `q49 DEPARTMENT: gaj&l PROJECT: IPOoa spe4— 1::;p _ p 21-q&-,4 PT ' —N- ER: —ram 'Sh�'Pa Q a Ali COMI—le'lls must be receives bv: r(24 C>Aj I r— , ►2„0( El No F:cbie -!s problems or Conce-ns (see below 9? attached 4/J • General 1. Please be sure signature blocks on each sheet except Plat. 2. See General Notes for additions. 3. Need a 15' utility easement around property adjacent to the arterial streets. If combined with existing easements please provide copies of existing easements and signatures from all using utilities to verify knowledge of and acceptance of location. 4. All sidewalk adjacent to the arterials need to be completely within the r-o-w or an access easement. • Plat 1. Need an access easement for the pedestrian and vehicle path along wetlands. 2. The Shields access should be 26 to 28 feet wide if its intended for large truck traffic. 3. Prospect Road access area will need to be altered. Sia ature: � �`- / � ��Y/ CHECK IF YOU WISH TO RECEIVE PLAT COPIES OF REVISIONS SITE 13 LANDSCAPE EU— UTILITY • Prospect Road and Shields Street Widening Plan and Profile 1. Please redesign the access area so the "porkchop" does not extend into Prospect Road. 2. Please show existing grades, on all sides, for 150' beyond project construction limits. 3. Please add grade break locations to correspond with the slopes on the center line profile. 4. Please tie the Shields and Prospect flowlines together so to see how the whole corner will function. 5. Need to have a minimum 12" wide area along both sides of all public sidewalk, with a slope no greater than 2%. 6. Explain purpose for the Shields Street access design, i.e., the large compound entrance curve and the "porkchop". • Cross -Sections, Both Streets 1. Need to provide all data necessary to evaluate the cross -sections, i.e., slopes, elevations, r- ow indications, tie-ins to existing grades, existing and proposed data, etc.. o S,fc P1Aa 1 r (. eeCOC Iq Progp 4 T24DAd Ew�v -A-4CC %o IteeP Pof- kJtvp o * irospec4 1Zor+.1 . vrArr.✓ of ff!.e s s{. Ac«<s 3 . AIre-zO n u SrauIA-ILC kPl,kArtN4 4-a f 4e '4r-ter1^Ir a be Pt Jl e S It � A...r r V IF (< c c � D r Air, / A / >< � o4 /n� Gv/ r �itw�f Ntteps 4"s Arnt 'dcetSS F.k$rwess/r S • M 1q� CeL. S//r 01 Ge rN 0rG RAMPrN *ems NAr.'rc AV Sr-fe �� v Du�t'�h�S Mce esc / ` %rat 06cj II AnIS'or f et Ir��• w if rtNt �ort 7. rM L An,J 6e A() iw'� Sr f 1 • &! !A(�t 0. Mte�^Pie- a it Q/ J -( �t PROJECT COMMENT SHEET CurrentPlanning DATE: 24 April 1995 DEPARTMENT:rlL�� PROJECT: 21-95 PROSPECT PARK PUD - Preliminary PLANNER: Steve Olt All comments must be received by: Friday, 5 May 1995 ❑ No Problems vProblems or Concerns (see below) Site Plan • Add North arrow and scale to vicinity map • Show ramps and street sidewalks • Show access to landmark apartments • Show easements • Show meets and bounds at boundary Plat • Errors in boundary -surveyor to check • Error in area calculation - should not subtract Prospect Rd dedication (Continued) ; Date: Signature: CHECK IF YOU WISH TO RECEIVE COPIES OF REVISIONS; PLAT SITE LANDSCAPE GI' UTILITY COMMUNITY PLANNING and ENVIRONMENTAL SERVICES... 281 NORTH COLLEGE, P.O.ROX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 CURRENT PLANNING DEPARTMENT • Add legal • Add signature blanks • Add lawyer and surveyor disclaimers Utility drawings Overall Utility Plans, sheet 2 • Identify size and type of storm pipe south of MH A-1 • Describe easement along south boundary via meets and bounds since it wanders • Median on Shields may need to be extended further south • Show location of bus stops on both streets Preliminary Grading Plan, sheet 3 and Preliminary Drainage Plan, sheet 4 • Show boundaries of the canal importation channel