HomeMy WebLinkAboutPROSPECT PARK PUD - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-06-10City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 99-34 Issuance Date: r �M
Project Name: Prospect Industrial Park, Lot 15
Project Location: Lot 15, Prospect Industrial Park; Situated in the northwest '/4 of Section
20, Township 7 North, Range 68 West of the Sixth P.M.. City of Fort Collins, County of
Larimer, State of Colorado
Permittee: Doug Dohn, Commercial Ventures, LLC
City and developer contacts: See attached Exhibit `A "for names and phone numbers qf all
contact persons for this project.
Fees: Permit Application Fee (paid at the time of application) ($300— Paid)
Erosion Control Deposit (receipt from Stormwater Utility) ($1,248 - Receipt)
Construction Inspection Fee (paid prior to issuance of this permit) $2,113.80
Excavation Permit Fee (paid prior to issuance of this permit) $1,225.00
Total $3338.80
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$33,162.11
Form of security deposited with the City: Bond
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an 1ngineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
the C'ity's acceptance of the constructed public improvements. (All references above to the terms
"Project Friginecr" and "Engineer" shall mean a Professional ingineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
3. Construction time restrictions: Normal Business Hours
4. The applicant understands that additional permits may be required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, Whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancies will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D)of the Land Use Code or
Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable,
are met. I f the Development Agreement does not specify times for completion of public
improvements, or if there is no Development Agreement, then the improvement requirements
specified in Section 24-95 of the City Code shall apply, which provides that construction of all
improvements shall be required prior to the time of issuance of the first building permit .
8. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City : (2) punch list items from the final inspection are completed and
accepted by the City_ and (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans and the
"as -constructed" plans have been received and accepted by the City.
9. The warranty or, street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.l(C)(2), and 3.3.2(C) of
the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMP's) that can be installed prior to
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property..
as defined in Section 1-2 of the City Code: and including common areas legally connected to or
associated with the property which is the subject of this application) without whose consent and authority
the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
i
i i ,
Applicant/Project Manager's Signature:/ l Date:
Approval for issuance:
CityEngincerApproval: �((�)�� <<��` Date:
(Permit Issuance Date)
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Lot 15, Prospect Industrial Park
City Staff Contact Persons:
Development Engineer: Mark McCallum, City of Fort Collins, 281 N. College
Avenue, Fort Collins, CO 80522
970/221.6605 ext. 7656
Construction Inspector: Lance Newlin, City of Fort Collins, 281 N. College Avenue,
Fort Collins, CO 80522
970/221.6605
Current Planner: Steve Olt, City of Fort Collins, 281 N. College Avenue, Fort
Collins, CO 80522
970/221.6750 ext. 6341
Water Utilities Engineer: Roger Buffington, 700 Wood Street, Fort Collins, CO
80521
970/221.6854
Stormwater Engineer: Jay Barber, 700 Wood Street, City of Fort Collins, CO
80521
970/221.6063
Erosion Control Inspector: Bob Zakely, 700 Wood Street, City of Fort Collins, CO
80521
970/221.6063
Natural Resources: Kim Kreimeyer, City of Fort Collins, 281 N. College Avenue, Fort
Collins, CO 80522
970/221.6750 ext. 6641
Traffic Operations: Ward Stanford, 700 Wood Street, City of Fort Collins, CO
80521
970/221.6820
Street closures: N/A
Transportation Planning: Kathleen Reavis, 210 East Olive Street, City of Fort Collins,
CO 80524
970/224,6140
Forestry: Tim Buchanan, City of Fort Collins, 281 N. College Avenue,
Fort Collins, CO 80522
970/221.6361
Light and Power: Doug Martine, 700 Wood Street, City of Fort Collins, CO
80521
970/224.6152
Developer's Contact Persons
Project Manager: Doug Dohn, Dohn Construction, 132 Commerce Drive #1,
Fort Collins, CO 80524
Office: 970/490.1855
Mobile: 970/566.0261
fax: 970/490.6093
Developer/ Owner(s) Commercial Ventures, LLC, 132 Commerce Drive #1, Fort
Collins, CO 80524
Office: 970/490.1855
Mobile: 970/566.0261
fax: 970/490.6093
Project Engineer: Dick Rutherford, Stewart's and Associates, P.O. Box 429
Fort Collins, CO 80522
Office: 970/482.9331
fax: 970/482.9382
Prof. Lic. Colo. 5082
General Contractor: Doug Dohn, Dohn Construction, 132 Commerce Drive #1,
Fort Collins, CO 80524
Office: 970/490.1855
Mobile: 970/566.0261
fax 970/490.6093
Outside Contact Persons:
U.S. West Joyce Takemoto, 124 W. Magnolia, Fort Collins, CO
80521
970/224.7473
TCI of Fort Collins Dennis Greenwalt, 1201 University Avenue, Fort Collins,
CO 80521
970/226.3104
Public Service Company Jim Slagle, 1901 East Horsetooth Road, Fort Collins, CO
80525
970/225.7843
Poudre Fire Authority Ron Gonzales, 102 Remington Street, Fort Collins, CO
80524
970/221.6570
2
City of Fort Collins, Coioradu
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 99-34 Issuance Date: to ISI9q(
Project Name: Prospect Industrial Park, Lot 15
Project Location: Lot 15, Prospect Industrial Park; Situated in the northwest''/4 of
20, Township 7 North, Range 68 West of the Sixth P.M.. City of Fort Collins, County of
Larimer, State of Colorado
Permittee: Doug Dohn, Commercial Ventures, LLC
City and developer contacts: See attached Exhibit "A "for names and phone numbers q;
contact persons for this project.
Fees: Permit Application Fee (paid at the time of application) ($300 — Paid)
Erosion Control Deposit (receipt from Stormwater Utility) ($1,248 - Receipt)
Construction Inspection Fee (paid prior to issuance of this permit) $2,113.80
Excavation Permit Fee (paid prior to issuance of this permit) $1,225.00
Total $3338.80
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$33,162.11
Form of security deposited with the City: Bond
CITY
FORT
COLLINS
ENGINEERING
DEPARTMENT
281 NORTH COLLF
(303) :21-66C`_
10-08-99 Hi
OV341123 21'1.3.:
PM322903 25.
PM322903 !L00.
GU7TI
#2.76'
TOTAL 3338.t
CHECK 3338.'
CHANGE 0.
CLERK04 1961 1'
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance of the constructed public improvements. (All references above to the terms
"Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.)
82-2611070 - - 2762
OOHN CONSTRUCTION, INC. = 011826197
1701 SERRAMONTE DR. 4901855 -06 f
_FT. COLLINS, CO 80524 - �- - -
PAY 'ro THE
ORDER OP_
k..
®First
National
Mt,V
Bank
ron wow Co M$nm78
1: 10 7000 26 21: 0 1
to
DOL ARS��
18 26 l n■ _e276 2
i
Recei
RF EIVED FROM
.l
cash
ACCOUNT
ENT'
c eck
{
money
BALINCE DUET i
n,Hpr
ARS