Loading...
HomeMy WebLinkAboutPRESTON CENTER AT WILD WOOD BUSINESS PARK - Filed CS-COMMENT SHEETS - 2005-06-09`r LA DATE: June 15, 1999 DEPT: Engineering PROJECT: Harmony Road Improvements for Preston Center, First Filing All comments must be received by Tim Blandford no later than Monday, July 5, 1999 MAJOR COMMENTS: note: refer to the individual sheets for specific comments and concerns Harmony Road Plan View Please modify all of the signature blocks. Locate the sawcut along a lane line rather than in the middle of a travel lane. Make sure to coordinate the access permit and the A -line amendment with CDOT. Please show stationing and/or dimensions of the left -turn lane at CR 9. Enlarge the return at Harmony and CR 9 to match what is going to be constructed on the Celestica side. Include the sidewalk and the access ramps on these plans. See the plan views for more detailed comments. Harmony Road Cross Sections Please show the meandering sidewalk location on the cross sections. Label the proposed cross slopes on the portions being widened. Make sure the 4:1 slopes you are proposing are complying with the State Highway Access Code. Please see the cross sections for more detailed comments. Date: lo• 15,99 Signature: Please send copies of marked revisions _Plat _ Site ✓ itility _Landscape PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: February 18, 1998 TO: Mapping PROJECT: #90-850 the Preston Center at Wildwood Business Park, 1st Filing - (LDGS) Amended Preliminary and Final All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, March 25,1998 i. .TA,- wa �e. G t�GYd C4 YOQ,/ be 4 Pra%iP� E 1- L�7Me1- �P Yvi CP.S, 3. Ike �oII` �aSewleh�S neeidl� �lwle�n1Sia e� IIuq�eY�rJ�� l ota u� �"n2 Ylew �lTo rtiey`S 4>7 d 1/0, y, — 5+ UC��G.q �'ip yi PC Y1N O/ C 4 /O v/ L� / hl6 L csC� 4 c_ 7�o cs !Uo � n%n Tel-/ Sl.5WATu n 7< /,�,� uJp T� g nl�.2ria Li ✓� /vu/ /q Date: Signatu 7-'4 s r `'.4- i &'�'l '-4n CHECK HERE IF YOU'WISH TO RECEIVE COPIES OF REVISIONS _PIS _Site —DmW RqW Oda — _ Utility _ Reline Utility _ Landscape mmok�— Plannina DATE: / - PROJECT ._. COMMENTSHEET DEPARTMENT: ,E.vGr. PROJECT: Pr -es Ce, l«- 4 -1 44J,1.1 w..44 - Prc 11 r PLANNER: 7-e el SAe14 A�dl All comments must be received by: ❑ No Problems aPrclblems or Concerns (see below) Prelim. Plat 1. Will need a minimum 15' utility easement along C.R. 9. Prelim. Grading and Drainage Plan 1. Transportation Dept. Is not in favor of the Bank outlet onto Corbett and right in / right out location on C.R.9 . Prelim. Utility (Plan 1. Public sidewalks along the 2 arterials need to be completely within ROW's or access easements and need to remain parallel to the ROW's within 60' of an 2. Additional 12' of ROW needed for a continuous accel / decel lane from Corbett to C.R. 9. 3. Please contact Kathleen Reavis @ 221-6608, Transportation Dept., to coordinate the development with Harmony Road bike lane plans. Date! --2q-9G Signature: - CHECK IF YOU WISH TO RECEIVE PLO COPIES OF REVISIONS: SITE [}� LANDSCAPE UTILITY DEVELOPMENT SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 PLANNING DEPARTMENT (303(221-6750 PROJECT COMMENT SHEET City of Fort Collins Current Plannint DATE: DEPARTMENT: PROJECT: 6. 1,r% GP 4c, Uwoo J PLANNER: Td 54?4, d All comments must be received by: ❑ No Problems [9'� Problems or Concerns (see below or attached) • Preliminary Plat 1. Provide drainage easements for the detention ponds. 2. Right in / Right out only at Preston Center Court and Harmony intersection. 3. Need to see: State Highway 68 sign and paint drawing; Code issues. • Preliminary Utility Plan 1. Traffic circle to be reviewed further by city staff. 2. Access to businesses to be taken from interior streets not multiple, closely spaced accesses from an arterial. 3. Access easements needed for all public sidewalks not inside Harmony Rd., C.R.9 and Timberwood Dr. r-o-w's. 4. Right turn lane possible at C.R.9 and Timberwood Dr. • Site and Elevation Plan 1. See Prelim. Utility Plan comments. Date: .2-/S,`95S Signature: CHECK IF YOU WISH TO RECEIVE PLAT COPIES OF REVISIONS SITE LANDSCAPE [� UTILITY PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: February 18, 1998 TO: Engineering Pvmnt PROJECT: #90-850 the Preston Center at Wildwood Business Park, 1st Filing - (LDGS) Amended Preliminary and Final All comments must be received by Ted Shepard no later than the staff review meeting: Date: Wednesday, March 25,1998 - ✓vel-ec-1, ;kd :So e 6 P z S- 96 CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS -Pit _ Sik _ LhaiW Report _ Ok — Utility _Redline Utility — Landscape City of Fort Collins REVISION COMMENT SHEET Current Planning DATE: May 31, 2006 TO: Engineering PROJECT PLANNER: Ted Shepard #90-85R HILTON GARDEN INN AT PRESTON CENTER MAJOR AMENDMENT - TYPE II THIRD ROUND OF REVIEW Please return all comments to the project planner no later than the staff review meeting: June 14, 2006 Note - Please identify Your redlines for future reference ❑ No Problems ❑ Problems or Concerns (see below, attached, or DMS) Name (pleaseprint) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report _Other _Utility _Redline Utility _Landscape Harmony Road Plan View (Ultimate) There should be double left -turns on all legs of the Harmony RoadICR 9 intersection. . Provide a pedestrian refuge on the west side of the Harmony/CR 9 intersection. • Provide a left -turn lane at the Corbett Drive intersection. CR 9 is classified as an arterial street according to the Master Street Plan. Please show 2 thru lanes in each direction along CR 9. Harmony Road Cross Sections (Ultimate) • Provide room for the turn lanes at the Corbett and CR 9 intersections. • The cross slopes need to be a minimum of 2 percent per City standards. Indicate: that the irrigation channel will be either relocated or undergrounded. Details Move the sawcut to the lane line. Please provide a cross section at the Harmony Road/CR 9 intersection showing the double left -turns. PROJECT COMMENT SHEET City of Fort Collins Current DATE: 9 June, 1998 DEPT: Engineering PROJECT: Preston Center * Wildwood P.U.D., I" Filing PLANNER: Ted Shepard ENGINEER: Tim Blandford All comments must be received by: 1 July, 1998 GENERAL COMMENTS: Sheet 1 of 14: Cover Sheet Please modify the General Notes as stated on the utility plans. Sheet 1 of 2: Final Plat Please modify the Attorney's Certification to reflect the new language. Refer to the attached sheet. Please_ see sheet 1 for additional comments and concerns. Please see sheet 2 for additional comments r► Date: 7I71, e Signature CHECK HERE IF VOU WISH TO RECEIVE COPIES OF REVISIONS _x Plat _x Site _Drainage Report _x_Other _x_Utility _x_Redline Utility _x_Landscape Comments continued from sheet I... Sheet 2 of 2: Final Plot The easements along Harmony Road will need to be combined to include the pedestrian access easement because the sidewalk meanders in and out of all of the easements. Please clarify the easements along Corbett Drive. Sheet 4 of 14: Overall Utility Plan The median crossing in Harmony Road will need to be closed by this development and riot by others. In the last round of comments, I had said to change the radii at the intersection of Gifford Court and Harmony Road to 20 feet (something like that), but I was wrong. After talking with Eric Bracke, the radii of the curb returns need to be 50 feet. The centerline radii of the meandering sidewalk needs to be a minimum of 90 feet. There are a couple of areas that don't seem to meet this. Please check and modify as necessary. After talking with Eldon Ward about the medians at the entrances to the site, since they do not meet our street standards, yet Transportation Planning wants them pulled up, we have compromised the location of the nose. Please refer to the Site and Landscape Plans for the revised location. You will still need to provide a variance letter to the attention of the Director of Engineering stating why the standards cannot be met. Please make sure that the phase lines standout from the rest of the project. Make the phase lines bold. You could even provide a separate phasing plan. Shade those portions of Timberwood Drive that are being constructed at a later time (or before this project is constructed) so that it is not mistaken to be constructed in conjunction with this project. Please see sheet 4 for additional comments and concerns. Sheet 5 of 13: Grading Plan Please provide us with the necessary offsite easements. The easement documents need to be original documents, i.e. no copies or faxes will be allowed and they need to have original signatures. Sheet 8 of 14: Gifford Court - Plan and Profile You may want to consider constructing the curb returns along Gifford Court for the third filing of this project. This will prevent you from tearing up the newly constructed Gifford Court. Chances are, if you did go back and tear up the street, we would have the developer repave the entire street at his cost. Please see sheet 8 for additional comments and concerns. Please see sheet 3 for additional comments &+ Comments continued from sheet 2... Sheet 9 of 14: Corbett Drive Street Plan & Profile, and Signing & Striping Plan. It doesn't appear that you have provided enough storage and lane length for the left turn lane at Harmony Road. Please modify per City standards. You may want to confirm this with Eric Brocke. -> Remove the utilities from the striping plan. O Label l the different types of striping. Include any signing on this sheet as well and label properly. Please see sheet 9 for additional comments and concerns. Sheet 10 of 14: Harmony Road Plan & Profile, and Signing & Striping Plan. We will need to see how the proposed lanes align with the existing lanes both east and west of the site. Please show for 500 feet in both directions. Please contact Kathleen Reavis regarding the placement of bike lanes. Please remove the utilities from the striping plan. Sheet 11 of 14: Harmony Road Plan & Profile, and Signing & Striping Plan. Please see the previous sheet for comments and concerns. Sheet 12 of 14: Harmony Road Cross -Sections The State is going to want to see full cross sections for the design of Harmony Road showing both temporary and ultimate improvements. You may want to hold off providing any cross sections until you actually submit the design of Harmony Road. Chances are, the cross sections are going to change drastically. REVISION COMMENT SHEET DATE: April 27, 1998 TO: Engineering PROJECT: #90-850 Preston Center @ Wildwood PUD, 1st Filing - (LDGS) Amended Preliminary/Final Review All comments must be received by Ted Shepard no later than the staff review meeting;: Wednesday, May 20,1998 GENERAL COMMENTS: Sheet 1 of 13: Cover Sheet O Please modify the General Notes as stated on the utility plans. e Please reference the current soils report. Please see sheet t for additional comments and concerns. Sheet 1 of 2: Final Plat Please modify the Attorney's Certification to reflect the new language. Refer to the attached sheet. Please see sheet t for additional comments and concerns - please see sheet 2 for additional comments '+ Date: CHECK HERB IF YOU WISH TO RECEIVE COPIES OF REVISIONS ✓ Plat _✓ Side _ Drainage Report _ Ofber ✓ Utility ✓ Redfine Utility ✓ Landscape Comments continued from sheet 1... Sheet 2 of 2: Final Plat (e� Please: recheck the legal description. There seems to be some inconsistencies with it. <, The public access easements should be contained within a public access easement. Please label the surrounding properties. You will need to provide offsite easements for the construction of Gifford Court and the storm sewer. N) Please: see sheet 2 for additional comments and concerns. Sheet 4 of 13: Overall Utility Plan c9 You will need to provide an acceleration lane on Harmony Road between Corbett and County Road 9 (CR 9). e, Please provide a 10 foot bike lane along Harmony Road between Corbett and CR 9. Please_ dedicate the appropriate amount of right-of-way (ROW) along Harmony Road to account for a major arterial, i.e. 3 travel lanes, a 10 foot bike lane, and an acceleration/deceleration/right turn lane. Please provide "no parking" signs along Gifford Court as there will be no parking allowed. cam) Please reduce the curb return radii at Gifford Court and Harmony Road to 20 feet. c_) Please re -analyze the traffic at the intersection of Harmony Road and Corbett. Provide us with the proper documentation for our records. e3 Because the sidewalk along Corbett Drive is outside of the ROW, you can either dedicate additional ROW or include the sidewalk in a pedestrian access easement. Provide a preliminary design of Harmony Road for 1000 feet beyond the construction limits. The design shall include both interim and ultimate conditions, i.e. median design, etc. You will need to provide for a left turn lane, thru lane, and right turn lane at Corbett and Harmony. Please eliminate the "porkchop" at the intersection of Gifford Court and Harmony Road. The median crossing in Harmony will need to be eliminated/closed. c) The noses of the medians at the entrances to the site need to be a minimum of 20 feet from the flowline of the intersecting street. eD Please see sheet 4 for additional comments and concerns. Sheet 5 of 13: Grading Plan Please provide us with the necessary off site easements. The easement documents need to be original documents, i.e. no copies or faxes will be allowed and they need to have original signatures. Please see sheet 3 for additional comments �* Comments continued' from sheet 2... Sheet 8 of 13: Gifford Court - Plan and Profile Please indicate whether flowline or centerline stationing is being used. %) Please reference all details used throughout the plan set. Provide references on all sheets. O Please provide a vertical scale for the profiles. Please provide a typical cross-section and include the following: Dimensions ROW limits Cross -slopes Name of the street(s) Label curb, gutter, sidewalk, etc. Indicate that the depths of the pavement will be determined after the subgrade preparations have been completed. 5tation all PC's in the plan view with both station and elevation. ;) Include curve information for curb returns at the entrances into the center. 1=) Please see sheet 4 for comments on Gifford Court. (9) Please see sheet 8 for additional comments and concerns. Sheet 9 of 13: Street Plan and Profile. O The design of Harmony will need to reflect the ultimate cross-section along the property frontage as well as 1000 feet beyond the construction limits. e Please provide cross -sections for every 100 feet along Harmony Road. Please see sheet 9 for additional comments and concerns. Sheet 10 of 13: Street Plan and Profile. Please see sheet 10 for comments and concerns. Sheet 11 of 13: Street Cross -Sections O What street are the cross -sections for? o What direction are they being viewed from? East or West? City of Fort Collins Current Planning DATE: 3/301/98 PROJECT COMMENT SHEET DEPT: ENGINEERING PROJECT: Preston Center at Wild Wood Bus. Park PLANNER: Ted Shepard ENGINEER:: Mike Coley Plat: * A 15' utility easement is needed adjacent to Harmony Road. Overall utility plan: c' The sidewalk along Harmony Road needs to be parallel to the roadway for 60' from each intersection. An acceleration lane is needed east of Corbett Dr. * Is the existing concrete irrigation ditch within an easement? Should it be? * The sieht distances from both access drives onto Corbett Drive need to be examined. * Driveway entrances onto Timberwood Drive need to Line up across the street. * Provide adequate pedestrian crossings and access ramps at the traffic circle. • Sidewalk along Harmony needs to be within an access easement. • The flared end sections at Gifford Court and Harmony seem too close to the sidewalk. *The northern access drives onto Gifford Court need at least a 25' median to comply with City standards. Drainage Plan: I* An offsite drainage easement is needed near the comer of Gifford and Timberwood. Harmony Road cross sections: • Maintain constant cross slopes (i.e. match existing). • The drainage at and around Station 9 seems odd. Do you want an asphalt seam in a v-pan? **See redline utility plans for additional comments** Date: 3 /30 //q 8 Signature: PLEASE SEND COPIES OF MARKED REVISIONS: AT El SITE ® UTILITY ® LANDSCAPE