Loading...
HomeMy WebLinkAboutPRESTON CENTER AT WILD WOOD BUSINESS PARK - Filed GC-GENERAL CORRESPONDENCE - 2005-06-09J R ENGINEERING February 21, 2001 Ms. Katie Moore City of Fort Collins — Engineering -Development Review 281 North College P.O. Box 580 Fort Collins, Colorado 80522-0580 RE: Lot 2, Preston Center at Wild Wood Business Park, First Filing Application for Vacation of ROW or Easement JR Project 9177.15 Dear Katie: The purpose of this letter is to provide you with the justification for the proposed easement vacation as shown on the attached legal description exhibit as required in step one of this application process. The 90.15-foot wide access and utility easement shown on the recorded plat of Preston Center at Wild Wood Business Park, First Filing includes a 10-foot by 10-foot area within Lot 2. This 10-foot by 10-foot area was provided in the First Filing to accommodate utility services. A 1-foot by 10-foot area along the westerly line of this 10-foot by 10-foot area is being vacated because the proposed build footprint encroaches into this area. If you should have any questions or comments, please contact me at 491-9888. Thank you again for your assistance on these issues. Sincerely, Randall K. Provencio Project Manager cc: Ric Johnsen, The Neenan Company X:A3910000.allA3917715VCorrespondALettersVLOT2 APP COVER.doc Last printed 02/21/01 2:58 PM 2620 r,a i Pmzpw Road, Suit, 190, Pan Collins, CO 80525 9-0.491 9888 • Maxi 971L4191 �1984 • www.jrcnginecring.com From: "Greenwalt, Dennis" <Dennis_Greenwalt@cable.comcast.com> To: "Dan DeLaughter" <ddelaughter@fcgov.com> Date: 4/28/2006 B:52:41 AM Subject: RE: Utility easement at Hilton Garden Inn Dan I see no conflicts for Comcast at this time. Dennis -----Original Message ----- From: Dan DeLaughter [mailto:ddelaughter@fcgov.com] Sent: Friday, April 28, 2006 8:42 AM To: Greenwalt, Dennis; Doug Martine; Roger Buffington; Rob Irish; ]Dpjohn2@gwest.com; lspence@qwest.com; len.hilderbrand@xcelenergy.com Cc: Tricia@NorthstarDesignInc.com Subject: Utility easement at Hilton Garden Inn Hi all, I would like to hear any feedback you may have regarding a retaining wall encroachment in a utility easement. The issue is on Hilton Garden Inn at Preston Center, a project that we are currently reviewing. It is located at the south corner of Timberwood Dr. and Gifford Ct. The easement in question is the grayed 9' utility easement just behind the sidewalk on the north side of Timberwood Dr. (Please refer to the attached figure). It is my understanding that Tricia Kroetch with Northstar will be coordinating with the Qwest folks regarding your existing telephone line, but I would like to know if any other utilities will be using the easement, and if the proposed design would be acceptable to you. If I do not hear back Friday, May 12th, I will assume that there are no comments. Thanks! Dan DeLaughter Civil Engineer City of Fort Collins Engineering (970)-221-6605 ddelaughter@fcgov.com From: Doug Martine To: Dan DeLaughter Date: 4/28/2006 9:06:37 AM Subject: Re: Utility easement at Hilton Garden Inn Dan, Light & Power's plans are to cross perpendicularly through the easement just on the east side of the driveway, extending to the transformer location shown. We have no plans to install electric facilities in the easement other than that. Doug >>> Dan DeLaughter 04/28/2006 8:42 AM >>> Hi all, I would like to hear any feedback you may have regarding a retaining wall encroachment in a utility easement. The issue is on Hilton Garden Inn at Preston Center, a project that we are currently reviewing. It is located at the south corner of Timberwood Dr. and Gifford Ct. The easement in question is the grayed 9' utility easement just behind the sidewalk on the north side of Timberwood Dr. (Please refer to the attached figure). It is my understanding that Tricia Kroetch with Northstar will be coordinating with the Qwest folks regarding your existing telephone line, but I would like to know if any other utilities will be using the easement, and if the proposed design would be acceptable to you. If I do not hear back Friday, May 12th, I will assume that there are no comments. Thanks! Dan DeLaughter Civil Engineer City of Fort Collins Engineering (970)-221-6605 ddelaughter@fcgov.com From: "Hilderbrand, Len"<Len.Hilderbrand@XCELENERGY.COM> To: "Dan DeLaughter" <ddelaughter@fcgov.com> Date: 4/28/2006 2:14:26 PM Subject: RE: Utility easement at Hilton Garden Inn Xcel Energy has no current plans to utilize the 9' easement along the south edge of Blk 1 lot 2. We have a separate easement between blk 1 lot 1 and blk 1 lot 2 where we have install gas main to serve both lots. Len -----Original Message ----- From: Dan DeLaughter [mailto:ddelaughter@fcgov.com] Sent: Friday, April 28, 2006 8:42 AM To: Dennis Greenwalt@cable.comcast.com; Doug Martine; Roger Buffington; Rob Irish; bpjohn2@qwest.com; lspence@gwest.com; Hilderbrand, Len Cc: Tricia@NorthstarDesignInc.com Subject: Utility easement at Hilton Garden Inn Hi all, I would like to hear any feedback you may have regarding a retaining wall encroachment in a utility easement. The issue is on Hilton Garden Inn at Preston Center, a project that we are currently reviewing. It is located at the south corner of Timberwood Dr. and Gifford Ct. The easement in question is the grayed 9' utility easement just behind the sidewalk on the north side of Timberwood Dr. (Please refer to the attached figure). It is my understanding that Tricia Kroetch with Northstar will be coordinating with the Qwest folks regarding your existing telephone line, but I would like to know if any other utilities will be using the easement, and if the proposed design would be acceptable to you. If I do not hear back Friday, May 12th, I will assume that there are no comments. Thanks! Dan DeLaughter Civil Engineer City of Fort Collins Engineering (970)-221-6605 ddelaughter@fcgov.com M J R ENGINEERING March 2, 2001 Ms. Katie Moore City of Fort Collins — Engineering -Development Review P.O. Box 580 Fort Collins, Colorado 80522-0580 RE: Lot 4, Preston Center at Wild Wood Business Park, First Filing Application for Vacation of ROW or Easement JR Project 9315.00 Dear Katie: The purpose of this letter is to provide you with the justification for the proposed easement vacation as shown on the attached legal description exhibit as required in step one of this application process. The proposed building location for Lot 4 as shown on the revised Minor Amendment for this lot encroaches on the 41.85-foot wide access and utility easement shown on the recorded plat of Preston Center at Wild Wood Business Park, First Filing. This encroachment necessitates the vacation of a portion the access and utility easement. If you should have any questions or comments, please contact me at 491-9888. Thank you again for your assistance on these issues. Sincerely, Randall K. Provencio. Project Manager cc: Ted Beers, Sinnett Builders, (1) each, US Mail Matt Rankin, Vaught -Frye, (1) each, US Mail X:A3930000.allA3931500ACouespondALettersVLOT4 APP COVER.doc Last printed 03/02/01 2 25 PM 2620 Lm P,,,pca ILrad, 8uim 190, Fna Collies, CO 80525 970-491 9888 • lax 970-491 `1984 • vnnv.jmnkinrering.mm n Services Engineering Department City of Fort Collins October 19, 2000 Tess M.Jones Region Access Manager Department of Transportation Region 4 - Traffic 1420 2°d Street Greeley, Colorado 80631 Re: Time extension request for C )T Permit No. 499094 Access to Preston Center at Gi 8 VVV Dear Ms Jones: In our meeting of October 19, 2000, we observed that the above referenced access permit will soon expired. The purpose of this letter is to request that a time extension be granted for this permit as allowed in Paragraph I, Permit Expiration. In accordance with Paragraph 1, this permit will expire on October 27, 2000, the permit issue date. The anticipated construction date for this permit is April, 2001 Your consideration of this time extension would be most appreciated. Sincerely, � � r David Stringer�� cc: Jim B. Wright �1 JR Engineering 2620 East Prospect Suite 190 Ft. Collins, Co 80525 t�� IN 4, � � 281 North College Avenue - PO. Box 580 - Fort Collins, CO 80522-0580 - (970) 221-6605 - FAX (970) 221-6378 www.ci.fort-collins.co.us Transportation Services Engineering Department City of Fort Collins it April 5, 2001 Tess Jones, Access Coordinator Colorado Department of Transportation, Region IV 1420 2nd Street Greeley, Co. 80631 RE: Preston Center 3`d Filing Dear Tess: Enclosed are the Contractors Insurance certificate for work with in the r'�aa.,�t�� .11 6t�19 14. rights -of -way ^1 adjacent to the State Highway 68 (Harmony Road)) Between Corbett Dri Ziegler Road in Fort Collins. I believe this was the remaining item prior to the State issuing the tice to proceed. The City will insure that a Traffic Control Plan has been approved prior allowing any construction work in public rights -of -way. Sincerely -� David Stringer Development Review Supervisor 281 North Collegc Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 Transpoi ion Services Engineering Department City of Fort Collins August 20, 1999 JR Engineering, Ltd. Attn: Mr. Robert Almirall, P.E. 2620 East Prospect Road, Suite 190 Fort Collins, Colorado 80525 SUBJECT: HARMONY ROAD BIKE LANE STRIPING Dear Robert: This letter concerns the striping of the bike lanes along Harmony Road adjacent to the Preston Center, First Filing and Preston Center, Third Filing ("Preston Center') projects. As you know, it is the City's policy to construct and stripe bike lanes on certain streets within the City in accordance with our street standards and the standards set forth by the City's Transportation Planning Department. Harmony Road, although categorized as State Highway 68, is also classified under the City's standards as a major arterial street. Because of this, the City is requiring the Developer of the Preston Center to construct the necessary bike lanes required. After a series of meetings and negotiations among you, your clients and City staff, it was determined that Harmony Road would be striped as indicated on the approved Utility Plans for the Preston Center. Because you have expressed concerns about the safety of the approved striping plan, I want to assure you that the City of Fort Collins accepts the responsibility and holds you and JR Engineering harmless of any wrong doing or professional negligence in the design of the proposed bike lanes. I hope this addresses your concerns regarding the striping of the bike lanes on Harmony Road. If you should have any questions concerning this matter, please contact this office at 970/221- 6605. Sincerely, A/PL I,V-� Cam McNair, PE City Engineer CM/trb cc: file '81 North Collef;e Av enue • P.O. Bnx ;8(1 • Fort Collins. CO 80522-0580 • (970) 221-6605 Development Review Engineering Department August 1, 2000 Western Property Advisors Attn.: Mr. Stan Whitaker 3555 Stanford Road Fort Collins, CO 80525 Re: The Development Construction Permit for the Harmony Road Improvements Dear Mr. Whitaker, Please find enclosed an application for the Development Construction Permit ("DCP") associated with the Preston Center, 151 Filing project. This DCP pertains to the construction of the Harmony Road Improvements between Corbett Drive and Ziegler Road. The application should be completed in its entirety and returned to the City of Fort Collins Development Review Engineering Department at your convenience:. For your information, the DCP cannot be issued until the A -line issues have been resolved, the State Highway Access Permits have been approved and the Notice -To -Proceed has been issued by the State. Currently the! A -Line amendment is scheduled for 2nd reading on August 15, 2000 and the State Highway Access Permits have been completed and approved by the State pending the approval of the A -Line amendment. Hence, I feel we can still hold the DCP meeting, since the plans have been approved, but the City would not issue the DCP until the above conditions have been met. Please do not hesitate to contact me at 970/221.6750 and/or e-mail: tblandford(c ci.fort-collins.co.us, should you have any further questions or concerns. Si Timothy R. Blandford Development Review Engineer City of Fort Collins Cc: file Ted Shepard, Current Planning Enclosures 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • 970/221.6750 FAX: 970/221.6378 • TOD: 970/224,6002 Development Review Engineering Department City of Fort Collins July 21, 2000 Mr. Stan Whitaker 3555 Stanford Road Fort Collins, CO 80525 Re: The Development Construction Permit Application and Development Agreement Information Sheet Dear Mr. Whitaker, Please find enclosed an application for the Development Construction Permit and an information sheet used to prepare the development agreement associated with the Preston Center, 3rtl Filing project. Both items should be completed in their entirety and returned to the City of Fort Collins Development Review Engineering Department at your convenience. Please do not hesitate to contact me at 970/221.6750 and/or e-mail: tblandfordeci.fort-collins.co.us, should you have any further questions or concerns. Si er Timothy R. Blandford Development Review Engineer City of Fort Collins Cc: file 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • 970/221.6750 FAX 970/221,6378 • TDD: 970/224.6002 Transpoi ion Services Engineering Department City of Fort Collins May 29, 1998 Patricia Kroetch, P.E. JR Engineering, Ltd. 2620 East Prospect Rd. Suite 190 Fort Collins, 'CC 80525 Re: Timberwood Drive variance request Dear Miss Kroetch: Thank you for submitting the variance request for Timberwood Drive at the Preston Center. The current street standards state that whenever a residential or collector street intersects another street, a tangent length shall be provided for safe sight distance and safe traffic operation. Since Timberwood is a collector street, the standards state that the minimum tangent length at the intersection of two streets shall be a minimum of 150 feet. However, after reviewing the traffic study and analyzing the sight distance, the City of Fort Collins' Engineering Department feels that the intersection of Timberwood Drive and Corbett Drive will operate safely and therefore will grant your request to vary the tangent length. If you should have any questions or concerns regarding this matter, please do not hesitate to contact this office at 221-6605. Since Tim R. Blandford Engineering Department City of Fort Collins 281 North College Avenue • P.O. Bos 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 JREngineering, Ltd. 2620 Last Prospoct Rd. L'U tc 1911 Fnrt Cnlllns, ( olorado 80525 (1)70) 491-988P • FA), (970) 491.998d cvww_jrtung.ann May 18, 1998 Dave Stringer City of Fort Collins :Planning Dept. 281 N. College Ave. Fort Collins, CO 80521 Mr. Stringer: On behalf of LGT Real Estate Advisors, we are requesting a variance in the Preston Center Development. The variance from City design criteria is related to the tangent length of Timberwood Drive approaching the intersection with Corbett Drive. The minimum allowable tangent length stated in the City of Fort Collins Design and Construction Criteria is 150' and we are proposing a tangent length of approximately 25'. The layout that is currently shown was approved with the Preliminary P.U.D. (which provides approval of layout and density) and the property to the south of Timberwood was sold based on this preliminary approval. Requiring a revision to the layout at this point in the process would create a hardship for both owners of the adjacent properties and require considerable revisions to the site plan that was approved with the Preliminary P.U.D. Please call if you have questions. Sincerely, I i Patricia Kroetc�E. Project Manager -p)l�,ADrib sulk til reel -- 6020Gmenwood I'laia Blvd. (1 rti I Nc-I (AL,rad til Bin„�,(ll iiI�KP)lo F:ml r ,nd, Col iilonfllll Ilu.(n 1 ,''ll ;`� ._, �,•L.AA 1; I11 - 'Snell l�pi]-lll) i:.1�1A1031 :71-'/nl�