DATE: June 26, 1998 DEPT. Engineering: Pavement
PROJECT: Poudre School District -information Technology Center
ENGINEER: Sheri Wamhoff
All comments must be received by: July l7, 1998
A preliminary and final soils report as well as a pavement design report will be required for public
improvements.
1
Date:— -- Signature:l
CHECK IIERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _site Drainage Report _Other
_Utility _Redline Utility _Landscape
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: June 26, 1998 DEPT: Engineering
PROJECT: Pourlre School District - Information Technology Center
ENGINEER: Sheri Wamhoff
All comments must be received by: July17, 1998
Poudre R-I Addition - Information Technology Center July 6, 1998
• No design has been provided for Laporte Ave. Plan and profile of the street is needed with the
following: Centerline profile. What are the slopes of the road being tied into. Of site design to
the west far enough to know that future improvements can be built to standards. Cross sections
every 50 feet.
• How much Row exists? Where is the Row line? Is it at the Back of walk? Laporte is a Minor
Arterial, therefore there should be 42 feet of Y Row.
• It is not indicated what the parkway or sidewalk widths are. A 6 foot sidewalk and 10 foot
parkway are required.
• Is the sidewalk tying into existing sidewalk?
are needed at the end of the walk.
If so show it. If it does not than type III barricades
• A sidewalk culvert is needed across the concrete pan on the west side of the property and the
sidewalk should be extended to the property line.
• What is the width of the proposed driveways? What is the entrance radii? They should be a
maximum of 15 feet unless a variance is granted. No detail has been provided for these. These
need to be built with concrete to the property line. The drives needed to be located in reference
to property limes or shown on the profile with stationing.
• The concrete channel is too wide. It will appear like a curb cut. It appears that you are showing
bollards to be placed here. What are they to look like? No detail provided. How are they to be
placed - distance behind curb'?
• The following details should be provided: Sidewalk detail. Connection to existing sidewalk
detail. Entrance drive detail(s)_ Handicap ramp detail.
Date: --+ qX Signature:��
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Play Site _Drainage Report _Other
Utility ,%*edline Utility _Landscape
REVISION
COMMENT SHEET
DATE: - TO: Engineering
PROJECT:
All comments must be received by 's�:ino later than the staff
review meeting:
t
1 �{!
4t,
-
A
ee a,*che4 leycf. -o Sclwol
V;�kf;&.
Date:
Signature: --