HomeMy WebLinkAbout1992 SOUTHEAST ELEMENTARY SCHOOL - Filed GC-GENERAL CORRESPONDENCE - 2005-05-31October 8, 1991 HAND DELIVERED City of Fort Collins Engineering Dept. P.O. Box 580 Fort Collins, CO 80522-0580 Attn: Mike Herzig, Development Coordinator Subject: PR-1, 1992 Southeast Elementary School CDS Project No. 6986.3 Dear Mr. Herzig: On behalf of Poudre School District R-1, we are submitting herewith, the following documents which relate to approval of drainage report for the above subject project, and also the filling in and piping a portion of the existing City stormwater ditch along the north school property line. As you know, we have separately submitted through your Ted Shepard, the wetland mitigation plan which is associated with filling and piping the ditch. For Drainage Report 1. Three copies of the Drainage Report dated August, 1991. Included are copies of the four exhibits. We understand you will have one copy approved and returned to us. 2. Your red -lined copy of our report and the red -lined exhibits, which were returned to us with your 9/10/91 letter of transmittal. Regarding the City drainage ditch which is to be filled in and replaced with a 42 inch diameter pipeline, the pipeline length has been shortened by 31 feet. This was agreed to at our meeting with City Forester, Tim Buchanan in order to :save the ponderosa pine tree on the northern bank which has been located approximately at the projection of the school's east property line. Also, in conjunction with the above, we have modified the grading immediately north of the pipeline in keeping with the existing northern ditch bank elevation so that runoff from the school property will be collected by the inlets placed over the pipeline. Finally, as requested by the City's Stormwater Department, we have deleted the trash/person rack from the eastern pipe outlet. For Overall School Site Review In accordance with the City's recent request, we have grouped the site drawings related to the Southeast school and are enclosing 10 copies of the following. we understand the City will be furnishing its approval: SD-lA Title Sheet SD-3 Grading Plan SD-3A Stormwater Collector Ditch; Pipe -Plan and Profile SD-31B Wetland Mitigation Plan SD-4 Site Utility and Paving Plans (Shows connection of school building water and sanitary sewer to street mains) SD-8 Irrigation Line Relocation - Plan and Profile SD-10 Erosion Control Plan Five of these drawings have already been reviewed in conjunction with the drainage report, and some are exhibits in the report. We will appreciate your prompt review of these submissions in order to enable PR-1 to meet their 1992 school opening date. Very truly yours, CDS ENGINEERING CORPORATION �tit4 Benjamin M. Hatch, P.E. Project Manager cc: (with enclosure of the seven drawings listed) Dulaney Architecture Attn: W. Pat Dulaney Poudre School District R-1 Attn: Mike Spearnak April 28, 1992 Mr. Mike Herzig Development Engineering Manager City of Fort Collins P.O. Box 580 Fort Collins, CO 80522-0580 Re: Southeast Elementary School Dear Mike, This letter will be to record our conversation of last week regarding the sidewalk along Monte Carlo at the above referenced project. This, sidewalk abuts the curb and is six feet wide except where it will encounter one lighting standard. The sidewalk will be tapered down to miss the lighting standard with approximately fifteen feet of taper on either side of the lighting standard. Once again, this letter is simply to record what we agreed to last week. Sincerely, Dulaney Architecture vat- W. Patrick Dulaney WPD.1, 1 cc: Mike Spearnak, Poudre R-1 School District Bill Carpenter, Baldwin Construction Develop �nt Services Planning Department TO: FROM: Mike Herzig, DATE: ,- w RE: UTILITY PLANS M E M O R A N D U M Development Engineering Manager Submitted for your review and comment are utility plans for: Please respond by: f lt :A,', t 1" (iE_.t _ 2 I IC:"-1 I _�I \ 1' 0 hog :;RU • l oit l0 rJ= -iI;NU • (;U'1) 221 n`U