Loading...
HomeMy WebLinkAboutPOUDRE RIVER BUSINESS PARK SECOND - Filed CS-COMMENT SHEETS - 2005-05-31Project Comments Sheet Selected Departments City of fort Collins Current Planning DATE: June 8, 2001 PROJECT: POUDRE RIVER BUSINESS PARK FINAL PLAT REVIEW #24-99 All comments must be received by CAMERON GLOSS in Current Planning no later than the staff review meeting: Note - Please identify your redlines for future reference Dept: Engineering 1 Issue Contact: Dave Stringer Add type III barricades at end of sidewalk and street 2 Add Rip Rap at end of curb and gutter Issue Contact: Dave Stringer 3 Issue Contact: Dave Stringer Engineering ready for Mylar Signature•.l_ CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site — Drainage Report Other Utility Redline Utility Landscape 1 of PROJECT i■ COMMENT SHEET City of Fort Collins Current Planning DATE: June 26, 2000 DEPT: ENGINEERING PROJECT: Poudre River Business Park, Second Filing ENGINEER: Mark McCallum All comments must be received by: Wednesday, July 19, 2000 General Comments See redlined comments on all sheets of the utility, site, and landscape plans. More specific comments will be mentioned below. If you have any questions please call me (Mark McCallum) at 221-6605. C Date � �-"°"r- Signature -- PLEASE SEND COPIES ❑ PLAT OF MARKED REVISIONS: ❑ SITE ❑ UTILITY" aNO COMMENTS — SUBMIT MYLARS 0 LANDSCAPE REVISION COMMENT SHEET DATE: June 26, 2000 TO: Mapping PROJECT: #24-99 Poudre River Business Park —Final Plat Review - (LUC) All comments must be received by Ron Fuchs no later than the staff review meeting: Wednesday, July 19, 2000 ® No Cornment ❑ Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE" Date: Signature: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _ Site _ Drainage Report _ Met Utility Rcdliae Utility _ Landscape Citv of Fort Collins PROJECT ■ COMMENT SHEET City of Fort Collins Current Planning DATE: August 24, 1999 DEPT: ENGINEERING PROJECT: #24-99 Poudre River Business Park Final Plat ENGINEER: Mark McCallum All comments must be received by Ron Fuchs no later than the staff review meeting: Wednesdav, September 8, 1999 ❑ No Problems ."roblems or Concerns (see below or attached) Plat Comments ♦ Please show the date of the plat. ♦ Once again the "Official Plat Language has changed. Please include the new "Official Plat Language' as shown on the nett page on the Plat. ♦ Please show how the casements along the west property Tine are delineated. As it is shown presently, it is hard to determine where one easement ends and the other begins. Date: 4 3/ 9,9 Signature: —��/� -- PLEASIi SEND COPIES PLAT � t; OF MARKED REVISIONS: SITI? ❑ UTILITY INO C OMMEN I S -- SUBMIT MYLARS ❑ L.ANDSCAPI[ lArqm PROJECT [Effe"I COMMENT SHEET City of fort Collins Current Plannine DATE: August 24, 1999 TO: Mapping/Drafting PROJECT: #24-99 Poudre River Business Park Final Plat Review All comments must be received by Ron Fuchs no later than the staff review meeting: Wednesday, September 8,1999 hH � � L (, 4 G L 0 1 C�- Date: Signature: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Utility Redline Utility Landscape PROJECT joam-ft COMMEN T SHEET City of Fort Collins Current Planning DATE: July 18, 1999 DEPT: ENGINEERING PROJECT: Poudre River Business Park, Second Filing ENGINEER: Mark McCallum All comments must be received by: August 16, 1999 ❑ No Problems M,Problems or Concerns (see below or attached) General Comments ♦ See redlined comments on all sheets of the utility_ site, and landscape plans. More specific comments will be mentioned below. If V°ou have ariv questions please call me (Mark McCallum) at -'_ 1-660�. Utility Plans Comments Cover Sheet; Sheet 1 of 6: ♦ Minor revisions to the General Comments. ♦ Add a Poudre River Drive Plan & Profile sheet. See comments below for more information. Parking Lot Expansion Layout Plan, Sheet 3 of 6. The City recognizes that Poudre River Drive will not need to be constructed at this time. but the City will at this time require a design for Poudre River Drive. In order to delay the Date: � /oAy Signature: PLEASE S1;ND COPIES PLAT OF MARKED REVISIONS: CT SITE a UTILITY NOCOMMENTS— S('BMff MYLARS Pr, LANDSCAPE construction of PoLid re Ricer Drive to a later date. the City will specify when the construction Of Poudre River Drive shall be completed in the Development Agreement for this project. 1❑ regard to the design, please show the design of Poudre River Drive to the City's new Street Standards for a connector on both sides of the dedicated right-of-way. The design will include a street plan and profile, detached sidewalk, parkway, curb cf gutter, and a typical cross section. For your reference. the criteria mention below is Section 24-95 from the Municipal Code and is the basis for the requirements stated above. Sec. 24-95. Obligation for construction. (a) The construction of the local portion of a public street adjacent to undeveloped real property is hereby declared to be the obligation of the owner of the adjacent property at the time such property is developed or redeveloped. The timing of the construction shall be as specified in the development agreement for such property or, if not specified, it shall be required at the time of issuance of the first building permit upon such property. (b) fhe local portion of such street shah include, without limitation, the construction of curb, gutter, pavement and sidewalk. All such construction shall conform to the "Design and Construction Criteria, Standards and Specifications for Streets, Sidewalks, Alleys and Other Public Ways" as adopted by the City Council by ordinance or resolution. (c) If the city has constructed such local portion of a public street adjacent to undeveloped property or property that may be redeveloped. the city may require, at or before the time of issuance of any building permit for new development or change of use, that the owner of such adjacent property repay to the city its cost in constructing such local portion of such street. The amount of reimbursement to be paid to the city under this paragraph shall be no less than the original cost of the improvements plus any mutually agreed upon amount to reflect the effects of inflation, if any. These adjustments may be based on the construction cost index for Denver. Colorado. as published monthly by the Engineering News Record. The original cost of the improvements shall mean the cost of financing, engineering, construction and any other costs actually incurred by the city which are directly attributable to the improvements. (Code 1972, § 95-98; Ord. No 32-1988. § 2, 3-I5-W Ord, No, 97, 1996, §§ 4, 10. 7-16-96) Plat Comments ♦ Please show the date of the plat. ♦ Please show hove the easements along the west property line are delineated. As it is shown presently, it is hard to determine where one easement ends and the other begins.