Loading...
HomeMy WebLinkAboutPARK SOUTH COMMERCIAL PLAZA THIRD - Filed CS-COMMENT SHEETS - 2005-05-18PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: 12.28.00 DEPT: ENGINEERING PROJECT: #37-94C PARK SOUTH COMMERCIAL PLAZA (LOTS 3A-3D) PDP—TYPE H (LUC) PLANNER: TROY JONES ENGINEER: KATIE MOORE All comments must be received by: l .24.01 ❑ No Problems © Problems or Concerns (see below or attached) Comments: • is this the 2`1 filing? • Please correct plat wording, general comments. and typos. • Please include current curb, gutter, and sidewalk detail and driveway detail. • Please dedicate emergency access easements on the plat and clearly define all existing and proposed easements and right-of-way. Emergency access radii need to be 25' interior and 50' exterior. • Please label adjacent properties on the plat. • Please include keys/legends on plan sheets. • Driveways should be noted as concrete up to the edge of ROW. • Vertical curb and gutter is required along Manhattan. Please show plan and profile of improvements. • On the cover page, the following Indemnification Statement should be provided: These plans have been reviewed by the City of Port Collins for concept only. The review does not imply responsibility by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities required. "['he review shall not be construed in any reason as acceptance of financial responsibility by the City ofFort Collins for the additional quantities of items shown that may be required during the construction phase. • On the cover page, please provide the names, addresses_ and phone numbers for the Developer(s), Owner(s), and Consultant Engineer. • On the cover page, please reference the updated/current soils report. • Please extend contours on the grading plan a minimum of 50' offsite and tie into existing contours. Date: January 26, 2001 Signature: PLEASE SEND COPIES OF MARKED REVISIONS ❑ Plat 0 Site 0 Utility ❑ Landscape ❑ Drainage Report ❑ NO COMMENTS -SUBMIT MYLARS VKW ECT i...� COMMENT SHEET City of Fo,t Collins Current Planning DATE: December 20. 2000 TO: Technical Services PROJECT: #37-94C PARK SOUTH COMMERCIAL PLAZA(LOTS 3A - 3D) PDP— TYPE 11(LUC) All comments Must be received by Troy Jones in Current Planning no later than the staff review meeting: January 24, 2001 Note- Please identify your redlines for future reference Signature CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS ✓flat __Site Drainage Report _Other Utility Redline Utility _Landscape Citv of Fort Collins REVISION COMMENT SHEET DATE: February 27, 2001 TO: Technical Svs PROJECT: #37-94C PARK SOUTH COMMERCIAL PLAZA (LOTS 3A-3D) PDP -TYPE II (LUC) ,� I All comments must be received by Troy Jones in Current Planning no later than the staff review meeting: March 21, 2001 No Comment Problems or Concerns (see below or attached) "*PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** 1, Pia r ? �EGA� l coSE, I'ZAT � T <nf7rcf/, L016 7E I iNC, Q F CAST T�i �� Slick �C �v '� �QY� bU nWv�1llLCi4� 4 �Q�C� pp ! V`I IrtDT' SU �� -c \ 111Y� Ft� 5! CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Dar,9ility______.jtedineUtilty— —=_landscape Sigrrature:_. REVISION COMMENT SHEET DATE: 3.14.01 DEPT: ENGINEERING PROJECT: #37-94C PARK SOUTH COMMERCIAL PLAZA (LOTS 3A-3D) PDP —TYPE H (LUC) PLANNER: TROY JOKES ENGINEER: KATIE MOORE All comments must be received by: 3.21.01 ❑ No Problems 2 Problems or Concems (see below or attached) Continents: • Please correct general comments item number 6. • Please adjust easement boundaries on the south edge of the development so that the emergency access easement does not extend outside the fence. Emergency access radii need to be 25' interior and 50' exterior measured from the same point. • Vertical curb and gutter is required along Manhattan. Please show stationing, grading, driveway cuts, elevations, etc. on plan and profile of improvements. • Please extend contours on the grading plan a minimum of 50' offsite and tie into existing contours. • On the utility plans, please show new curb and gutter as such, please show ramps and design driveway cuts according to standards, showing new grading as changed by these cuts and the curb and gutter. • Please show flow arrows on the drainage plans. • Please see plans for additional comments Date: March 23, 2001 Signature':-- a- (D V ' ` V v It PLEASE SEND COPIES OF MARKED REVISI N Z Plat Z Site El Utility 0 Landscape 11 Drainage Report 0 NO COMMENTS -SUBMIT MYLARS REVISION COMMENT SHEET DATE: April 18, 2001 TO: Tech Svs PROJECT: #37-94C Park South Commercial Plaza, Lots 3A- 3D, - PDP — Type 11(LUC) All comments must be received by Ted Shepard in Current Planning no later than the staff review meeting: May 2, 2001 No Comment ❑ Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** 1. Baump,, eY j LEGAL G vSE, pr CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Dat'&t Site _ Drainaee Rqc t Signatuf2lbzr _ _ Utility Rcdhe Utility _ Landscape REVISION y DATE: 4.24.01 DEPT: ENGINEERING PROJECT: #37-94C PARK SOUTH COMMERCIAL PLAZA (LOTS 3A-3D) PDP — TYPE H (LUC) PLANNER: TROY JONES ENGINEER: KATIE MOORE All comments must be received by: 5.2.01 ❑ No Problems 0 Problems or Concerns (see below or attached) Comments: • Change to an earlier comment I made: please extend driveway flares to sidewalk as shown in detail. • Plat: Please adjust easement botmdaries on the south edge of the development so that the emergency access easement does not extend outside the fence. (repeat comment) • Utility plan cover sheet: please make date legible, please correct typo on item 6. • Overall utility plan: • Please show street cuts and add note: Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with city street repair standards. • Please label 9' utility easement. • Please remove fencing from within the 9' utility easement • Please show adjusted emergency access easement along south edge of property. • Please remove curb from driveway cuts. • Grading/Drainage/Erosion control plan: • Please increase font size for erosion control notes . • Please move/increase in size the construction sequence graph at the top of the page. • Sidewalk ramps are not needed at driveway cats — see detail on details page. • Landscape plan: driveway flares are shown as grass, should be concrete. Also, please correct typo on plant note number 8. • Site plan: please remove building envelopes from easement areas. • Please see plans for additional comments Date: April 24, 2001 Signature: ( i / Grtl PLEASE SEND COPIES OF MARKED REVISIONS 0 Plat 10 Site 0 Utility 21 Landscape 13 Drainage Report ❑ NO COMMENTS -SUBMIT MYLARS 001, PROJECT 1061r�--021 COMMENT SHEET City of FDA C011ins Current Planning DATE: June 20, 2001 TO: Technical Services PROJECT: #37-94D PARK SOUTH COMMERCIAL PLAZA, LOTS 3A-3D -FINAL COMPLIANCE (LUC) All comments must be received by Troy Jones in Current Planning no later than the staff review meeting: July 5, 2001 Note- Please identify your redlines for future reference Nance (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat ---Site _Drainage Report Other _Utility _Redline Utility Landscape Citv of Fort Collins Project Comments Sheet Selected Departments Citvof Fort Collins Current Planning DATE: June 29, 2001 PROJECT: PARK SOUTH COMMERCIAL PLAZA LOTS 3A-3D, PDP/EC, I #37- 94CID All comments must be received by TROY JOKES in Current Plannine no later than the staff review meeting: Note - Please identify your redlines for future reference Dept: Engineering Issue Contact Katie Moore Utility plan cover sheet: Please correct general notes as redlined. 2 Issue Contact: Katie Moore Plat: The line separating the utili* and emergency access easement and the utility easement doesn't quite connect or really separate the two easements. 3 Issue Contact: Katie Moore Overall utility plan: Please correct the relined typos. 4 Issue Contact: Katie Moore Site Plan: There are still some small areas where the building envelopes encroach into the emergency access easement. The driveway flares on the site and landscape plans do not match the utility plans. 5 Issue Contact: Katie Moore Manhattan ave plan and profile: typical section, sawcut area will need a full - depth patch, not a mill and patch. 1 of 2 6 Issue Contact Katie Moore Manhattan Ave cross -sections: calculating from these cross -sections, the values for the flowline grades do not match what is portrayed on sheet 5. Near sta 5+61, the slope is nearer 0.2% than the required 0.4%. There are 4 other areas where the minimum grade is not met, as well. Please note that in a previous round of review, the concession was made to go with the smaller cross -slopes on Manhattan, but only if the minimum flowline grades were being met. Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS X Plat X Site _ Drainage Report — Other X. Utility K Redline Utility Landscape 2 of 2