Loading...
HomeMy WebLinkAboutPARAGON POINT PUD - Filed CS-COMMENT SHEETS - 2005-05-09PROJECT COMMENT SHEET City of Fort Collins DATE: 7 Jan 92 DEPARTMENT: It,I /.�2.ti n ITEM: 48-91B Paragon Point PUD, Phase 1-Final Please respond to this project by Friday, January 17, 1992 Planner: Steve Olt No Problems � Problems or Concerns (see below) Date: Signature: CHECK IF REVISIONS REQUIRED: b d 0 E PLAT SITE LANDSCAPE UTILITY PLANNING DEPARTMENT 281 NORTH COLLEGF, P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750 PROJECT City of Fort Collins COMMENT SHEET DATE: 29 oct 91 DEPARTMENT: "►rW r'9 ITEM: #48-91 FOSSIL RIDGE PUD Overall Development Plan Please respond to this project by Friday, November 8, 1991 Planner: Steve Olt No Problems Problems or Concerns (see below) - y� a access 4 4, Ter cr /y��� - l xArli� oN L'e!l lie Levx� ia%a y Date: j���/q/ Signature: CHECK IT, RF,VISIONS REQUIRED:El ❑ J PLAT SITE LANDSCAPE UTILITY PLANNING DI:PAIZ ND:NT 2S1 NORT11 COLLEGE P.0.6OS 580 FORT COLLINS, COLORVDO 80522-0580 (303)271-6T0