HomeMy WebLinkAboutPARAGON POINT PUD - Filed CS-COMMENT SHEETS - 2005-05-09PROJECT
COMMENT SHEET
City of Fort Collins
DATE: 7 Jan 92 DEPARTMENT: It,I /.�2.ti n
ITEM: 48-91B Paragon Point PUD, Phase 1-Final
Please respond to this project by Friday, January 17, 1992
Planner: Steve Olt
No Problems
� Problems or Concerns (see below)
Date: Signature:
CHECK IF REVISIONS REQUIRED: b
d
0
E
PLAT
SITE
LANDSCAPE
UTILITY
PLANNING DEPARTMENT 281 NORTH COLLEGF, P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750
PROJECT
City of Fort Collins COMMENT SHEET
DATE: 29 oct 91 DEPARTMENT: "►rW r'9
ITEM: #48-91 FOSSIL RIDGE PUD
Overall Development Plan
Please respond to this project by Friday, November 8, 1991
Planner: Steve Olt
No Problems
Problems or Concerns (see below)
- y� a access
4 4, Ter cr /y��� - l xArli� oN L'e!l
lie Levx� ia%a
y
Date: j���/q/ Signature:
CHECK IT, RF,VISIONS REQUIRED:El
❑
J
PLAT
SITE
LANDSCAPE
UTILITY
PLANNING DI:PAIZ ND:NT 2S1 NORT11 COLLEGE P.0.6OS 580 FORT COLLINS, COLORVDO 80522-0580 (303)271-6T0