HomeMy WebLinkAboutOAKRIDGE BUSINESS PARK TWENTYFOURTH - Filed CS-COMMENT SHEETS - 2005-05-04PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE:rz.l�
PROJECT: OPLc2l0GE
PLANNER: ,E)DaR L--
ENGINEER: S u� I
DEPT: Engineering
J
❑ ,No Problems
Problems or Concerns (see below or attached)
Oakridge BP, 24th filing - Executive Village April 10, 1997
Plat-
t. The drainage easement on lot 1 should be extended across the utility easements to the property
lines
2.. Provide the 20 foot off -site drainage easement. This will be needed prior to the plans being
signed.
3. The easement going across lot 25 needs to be labeled or the easement line continued to make it
clear what this is 1
dI � L �
Date: Signature:
PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLA
❑ SITE
❑ UTILITY
❑ LANDSCAPE
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: 40
761, 97
DEPT: ENGINEERING
PROJECT:�-
PLANNER:�
All comments must be received by:
;a No Problems
Problems or Concerns (see below or attached)
Oakridge Business Park, 24th Filing January 29, 97
By the way it is McMurry not McMurray and it is an Avenue not a Drive.
Site Plan
1. With the game room there is only 46 garage spaces and not 48.
2 There are a few places where you have set back lines indicated, but there are easements that
create a greater set back than you have shown.
Plat
3_ Add note 2. Tracts A, B, C and D are to be owned by the Homeowners Association.
4. Provide Row to the back of the walk on both streets.
5. The site plan indicates a 17 foot utility and pedestrian easement along McMurry.
6 The drainage easement between lots 1 1 and 12, how does this easement sit in relation to the
property lines.
Utility Plans
Overall Utility Plan
7. Label the sidewalk and parkway widths along McMurry Ave and Innovation Drive. Provide a
note that indicates that the sidewalk shall be tapered down to 4 feet at the southern end of the
Property.
Sheet 7 and Sheet 9
8. The radius at the private drive entrances can have a maximum of a 15 foot ra igs. This is what
J)Rgbow for driveway accesses. I Signature:
PLEASE SEND COPIES OF MARKED REVISIONS: ❑' PLA Ir
13' SITE
13--1JTILITY
❑ LANDSCAPE
PROJECT
COMMENT SHEET
City of Fort Collins
01
Current Planning
DATE: November 27, 1996 DEPT: Enginering
PROJECT: #13-82BU Oakridge Business Park PUD, 24th
Filing, Oakridge Executive Village - P&F
PLANNER: Mitch Haas
All comments must be received by: Monday, December 16, 1996
Oakridge Business Park PUD. 24th Filing, Oakridge Executive Village - P & F
Dec 20, 1996
Site Plan
1. A 5 foot sidewalk detached 8 feet is to be provided along McMurry Drive and
a 4.5 foot sidewalk detached 6 feet is to be provided along Innovation Drive.
2- Note states that the 12 foot utility easement along the private drive is also to
be the building set back line. Reminder that no eaves, windows, ledges etc. can
not extend into the easements so this line is not necessarily the building wall
line.
3. You are counting 48 garage spaces, but there are not 48 spaces with the
game room. If the game room is being proposed then the number of garage
parking spaces needs to reflect the loss of those with this use.
Plat
4. Indicate who is to own and maintain the Tracts.
5. Provide Row to the back of the walks and the easements shown behind that.
Utility Plans
Cover sheet
6. Note 1 should be modified to reference the development agreement date and
note the date of plan approval.
(Continued on next page) 1�
IJ r
t
Dater �� Signatures'`
Y�
CHECK 1F YOU WISH TO RECEIVE ❑ PLAT
COPIES OF REVISIONS ❑ SITE
❑ LANDSCAPE
❑ UTILITY
Oakridge Business Park PUD, 24th Filing, Oakridge Executive Village - P & F
(page 2 of 2) Dec 20, 1996
Grading plan
7 Show sidewalk ramps on both sides at the entrances. These ramps do not
need to angle out to the corner, but can say at the property line.
8. The sidewalk along McMurry needs to be a 5 foot walk with an 8 foot
parkway. The transition to a 4 foot walk and a 5 foot parkway should be shown
on the south end of the property. The sidewalk along Innovation Drive needs to
be a 4.5 foot walk with a 6 foot parkway. No transition is needed for this walk
due to the undeveloped lot to the east.
9. There is outflow curb and gutter shown surrounding the sidewalk culvert
between buildings 11 and 12. How is the water expected to be directed to the
culvert
Overall Utility Plan
10- It would be helpful for overall utility coordination if the services are shown
going to the buildings.
Private Drive Plan and Profile
11. This plan does not show how the stormwater gets to the sidewalk culvert. If
this section of parking conforms to the typical detail then the water will have to
pool until it gets high enough to go through the culvert. If this section of parking
slopes toward the culvert water will still pool in the concrete pan.
Details
12. Make modifications as shown
13. See plans for additional comments.