HomeMy WebLinkAboutNEW BELGIUM BREWERY SECOND - Filed CS-COMMENT SHEETS - 2005-04-28PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: _z!g/�?? DEPT: Engineering PROJECT: ls�v r�Qi �L;yl " r���r c _ PLANNER: ENGINEER: SNo Problems Problems or Concerns (see below or attached) New Belgium Brewery December 8, 1997 Site Plan • Show and label sidewalk on Buckingham as a 5 foot sidewalk with an 8 foot parkway. Landscape Plan • The indication that Row improvements on Buckingham are future improvements should be removed. Thev are to be done with this project. Sidewalk on Buckingham needs to be a 5 foot sidewalk with an 8 foot parkway with the street trees in the parkway. • A handicap ramp needs to be provided across from the first street intersection on Buckingham. Plat Indicate what the reception number is for the vacation of the drainage easement that is indicated is. Also need to provide the reception number for the utility easement that was recorded by separate document. The 9 foot utilitv and easement along Buckingham also needs to be an access easement since it appears that the walk when placed in its proper place will be outside of the Row. (Continued on next page) Date: PLEASE SEND COPIES OF MARKED Signature: REVISIONS: ❑ PL ❑ SITE ❑ UTILITY ❑ LANDSCAPE New Belgium Brewery (page 2 of 2) December 8, 1997 Plat (cont) • Indicate that the drainage easement is to be vacated by this plat. • Provide the off -site drainage easement. Utility Plans • Show the transit pad on the utility plans. It is currently shown on the site plan. Per the standards it should be a I3 foot concrete pad with an adjacent 5 foot walk (totaling 18 feet). • The new wall: on Buckingham Street shall be 5 feet in width with an 8 foot parkway in accordance with the standards for a collector. • A handicap ramp needs to be provided on Buckingham that lines up with 1 st Street. • Add a note to the grading plans that Revisions to the grading plans showing the realignment of the ditch to provide for the Row improvements on Buckingham Street shall occur prior to phase III construction. Street Plan and Profiles • A low spot is now provided on Linden Street at the access drive with no apparent outfall. Assuming it drains into the site it is not acceptable to have the drainage flows crossing the pedestrian path. • Provide an entrance detail for the access off of Linden Street. Need to indicate the entrance radii, concrete to property line. • Indicate that a type III barricade is to be provided at the end of the improvements. • Need to indicate the limits of pavement removal, limits of overlay, what is to remain? How are the improvements to be tied into existing improvements? What kind of temporary conditions are we getting? • Provide stationing on the plan views. • Provide a no with the Buckingham improvements that indicates the limits of improvements to be completed with the first phase. Per the development agreement it should be all be the last 50 feet to the property line. • Show on the plan and profile(?) Improvements being completed to the property line for Buckingham. • Provide a striping plan for both streets. How is the striping to be modified from what is existing? Cross sections • Where the improvements have already been constructed along New Belgium Brewery property should be that/ ultimate improvements and not labeled as interim. • So how does the matching of the interim improvements occur from the edge of the final improvements? How far out is work needed to match existing and how does this look? • Show the parkway and sidewalk on Buckingham. • Note on the Buckingham Profiles indicates that both sides have the same flowline. This is not truly reflected in the cross sections. PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: C�' -° DEPT: Engineering PROJECT: PLANNER: ENGINEER. F1No Problems . Problems or Concerns (see below or attached) New Belgium Brewery First Filing October 6, 1997 Plat 1. Need to remove the portion of the drainage easement that was vacated from the existing easements on the plat. Label vacated and reference reception #. Utility Plans 2. Need to show curb and gutter on Buckingham. This will need to be constructed with this project. And show transitions from new pavement edges to existing pavement. 3. Entrances off of Linden Street need to show concrete to the Property line. Plan and Profiles Linden Street 4. Provide the slope information for the West side of the street that is existing. 5. The vertical curve is not adequate for a 40 mph design. 6. Need to provide cross sections. 7. Need to indicate what pavement needs to be removed. Where to overlay and where all new construction is to occur. 8. Need to indicate where the centerline of the street is and if and where it transitions. (Continued on next page) Date: �,� Signature: r PLEASE SEND COPIES OF MARKED REVISIONS: �❑ PLAT SITE 0 UTILITY ❑ LANDSCAPE New Belgium Brewery First Filing (page 2 of 2) October 6, 1997 Buckingham Street 9_ Need to provide a design for the south side of the street or indicate that it is the same as the north flowline design. 10 The note is wrong and needs to be deleted. This portion of improvements will need to be constructed with this project. 11. Provide cross sections. 12. Extend design out far enough to show that the proposed flowline meets with the existing grades or provide enough information on the x-sections to show that the future design works. 13 Provide barricades at the end of the work and show pavement transitions. 14 Provide entrance drive detail. With curb radii, x-section, etc.