Loading...
HomeMy WebLinkAboutNEW BELGIUM BREWERY SECOND - Filed GC-GENERAL CORRESPONDENCE - 2005-04-28No Text It August 30, 2001 Sheri Wamhoff Development Review Engineer Engineering Department 281 North College Avenue P.O. Box 580 Fort Collins. CO 80522-0580 RE: New Belgium Brewing Company Brewhause Expansion Dear Sheri: Per your request, we have reviewed the Transportation Impact Study for New Belgium Brewery, by Mattcw J. Dclich, submitted with the Final Development Plan and dated July 9, 1997, (attached), and find it to still be valid for the concems of traffic and employee count. The expansion of the Brcwhausc is to produce more product and is still primarily automated. The major change in traffic will be the new location of the malt storage, which is currently accessed by truck off of Buckingham Street. A new malt storage facility will be built with this portion of work and located on the north side of the facility, which will be accessed from Linden Street. We feel that this will lessen the impact to the neighborhood traffic to the southeast of the facility. If you have any further questions about the logistics of the requested minor amendment proposal please call at (970) 495-6309. Respectfully submitted, Chris Wesche Project Architect Cc: New Belgium Brewing Company File: New Belgium brewery Brewhause Expansion and Malt Silo addition, minor amendment September 24, 2001 City of Fort Collins Engineering Comments I . Is the future fermentation tank expansion a part of this approval? This tank expansion goes over an existing sewer line and easement. If this tank expansion is a part of this approval then the relocation of the sewer line, dedication of new easement and the vacation of the existing easement needs to be a part of this approval also. 2. Need to provide the water easement that is shown on th4e north side of the property. This easement can be accepted with the minor amendment approval process. I need the dedication documents, attorney certification, legal description, sketch and the recording fees in order to put the paperwork together for the: approval process. 3. Will also need to vacate two easements for this project. These can also be done as a part of the minor amendment approval process. I will need approval by stormwater to proceed with the vacation of these two drainage easements. I will also need legal descriptions, a sketch, and filing fees to process this. 4. Both the dedications and vacations require me to produce paperwork, which is reviewed by the City attorneys' office, which documents the vacation and dedication process. This will need to be done before the minor amendment can be approved. 5. How do you plan on getting into the gravel parking lot? Driveway cut in the curbline, a portion of the curb built as roll-over? 6. Where does the new gas line go? It is shown going into the Buckingham Linden intersection but not connecting to anything. Will need a pavement patch to City Standards for any street cut. 7. Need to note that the street cut and patch for the waterline installation shall be to City standards. 8. Provide a new cover sheet that lists all the sheets of this set and has the current applicable general notes on it. Sheets that exist for New Belgium Brewery 2"d filing are as follows: Make sure to add the new sheets into this list. 1. Cover sheet 1. New Belgium Brewery office addition —grading, drainage and utility plan 2. Plat 3. Final drainage and erosion control plan 4. Grading plan 4A. Grading plan —Phase III 4B. Details — Phase III 5. Overall utility plan 6. Sanitary sewer plan and profile 7. Street and storm sewer plan and profile 8. Phasing and striping plan 9. Details 10. Street improvement cross sections 9. Number new pages as marked. 10. Provide detail 22-1 and 7-20A. 11. Return redlined plans with resubmittal. v-