HomeMy WebLinkAboutNEW BELGIUM BREWERY SECOND - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-04-28i.i iv o1 1 on Coil in. -
Transportation Services
='_ns;s eun Department
City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
i t/.-7:),
Permit Number: CI `�l- Issuance Date: f' i
Project Name: New Belgium Brewery Brewhause Expansion and Malt Silo Addition, Minor
Amendment
Project A.K.A.:
Project Location: Northeast corner of Buckingham Street and Linden Street
Permittee: Dennis Shippee, New Belgium Brewery, 970-221-0524
City and developer contacts: See attached Exhibit `A' for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee ($300.00) ($150 paid 10/4/01) $ 150.00
Construction Inspection Fee (paid prior to issuance of this permit) $ 1,885.26
Excavation Permit in Row (paid prior to the issuance of this permit) $ 235.00
Total of 2,270.26
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 42,581.60
Form of security deposited with the City:
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer
represent, as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance of the constructed public improvements. (All references above to the terms
"Project Engineer" and "Engineer' shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
;_'d � 11-s(1 ` -�. Fn S ,�Ic; ,C [)hlh'"`�i) • ,1 7q)2^7 v,6')- • 1 A\f97U)2'_1 o37t+
._s�c.;egov.cc;m
Transportation Services
Engineering Department
ns
City of Fort Collins, Colorado
DEVELOPMENT CONSTRUCTION PERMIT
tuber: C 1— `7` �i � Issuance Date: � ! Y r'!
C i
ane: New Belgium Brewery Brewhause Expansion and Malt Silo Addition. N_
it
eject A.K.A.:
cation: Northeast corner of Buckingham Street and Linden Street
Dennis Shippee, New Belgium Brewery, 970-221-0524
City and developer contacts: See attached Exhibit `A' for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee ($300.00) ($150 paid 10/4/01) $ 150.00
Construction Inspection Fee (paid prior to issuance of this permit) $ 1,885.26
Excavation Permit in ROW(paid prior to the issuance of this permit) S 235_00
Total S 2,270.26
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 42,581.60
Form of security deposited with the City:
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all
design drawings and specifications the certification of all materials testing by an Engineer. The
Permittee shall have an Engineer prepare revised design drawings and secure City approval for
all revisions to the utility Plans and related documents. The Permittee shall have an Engineer
represent_ as required by the City in the Development Agreement, that the improvements are
constructed in conformance with the approved Utility Plans and the standards and specifications
of the City. The Permittec shall provide "as -constructed" plans prepared by an Engineer prior to
the City's acceptance of the constructed public improvements. (All references above to the terms
"Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in
conformance with City requirements.
:'orthC dl e:vvont C.Bm AO • :nt��IBns,'� ail-liaS0 •;�7f1�_� �60" iV 70) l h�7H
3. Construction time restrictions: N/A
4. The applicant understands that additional permits maybe required for this development
project and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design,
traffic study, drainage report, plat easements and any other official documents), shall be kept on
the development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use
Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration
date. Such application shall contain information sufficient to justify the granting of the
extension. An extension may be granted for up to six months.
7. Building permits and certificates of occupancy will only be issued when all conditions
contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or
Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable,
are met. If the Development Agreement does not specify times for completion of public
improvements, or if there is no Development Agreement, then the improvement requirements
specified in Section 24-95 of the City Code shall apply, which provides that construction of all
improvements shall be required prior to the time of issuance of the first building permit .
8. Acceptance by the City of the public improvements shall be after (1) final inspection has
been conducted by the City ; (2) punch list items from the final inspection are completed and
accepted by the City; (3) required certifications from the licensed professional engineer that
improvements are completed to City standards, specifications and approved Utility Plans; and (4)
the `as -constructed' plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the
City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the
Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of
the Land Use Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to
any planned construction on this project. All required perimeter silt fencing and other
erosion/sediment control best management practices (BMP's) that can be installed prior to
construction must be in place and inspected by the City Erosion Control Inspector before any
land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property,
as defined in Section 1-2 of the City Code: and including common areas legally connected to or
associated with the property which is the subject of this application) without whose consent and authority
the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and cotditions so stated in this permit.
i� /.,e' ;` �c
Applicant/Project Manager's Signature: .S
� C
Date:
Approval for issuance:
City Engineer Approval: L01—bate:
(Permit Issuance Date)
Exhibit `A' page 3 of 5
EXHIBIT `A'
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: New Belgium Brewery Brewhause Expansion and Malt Silo Addition, Minor
Amendment
Project A.K.A.:
Name, address and numbers
City Staff Contact Persons:
Development Engineer: Sheri Wamhoff
281 N. College Avenue, Fort Collins, Co 80524
(970)221-6750 x7140
Construction Inspector: Dave Burke
281 N. College Avenue, Fort Collins, Co 80524
(970)221-6605
Cell (970) 218-1740
Current Planner: Ted Shepard
281 N. College Avenue, Fort Collins, Co 80524
(970)221-6750
Water Utilities Engineer: Roger Buffington
700 Wood Street, Fort Collins, Co 80521
(970)221-6681
Erosion Control Inspector: Bob Zackley
700 Wood Street, Fort Collins, Co 80521
(970)224-6063
Natural Resources: Doug Moore
281 N. College Avenue, Fort Collins, Co 80524
(970)221-6143
Traffic Operations: Eric Bracke
625 Ninth Street, Fort Collins, Co 80524
(970)224-6062
Street closures: Syl Mireles
625 Ninth Street, Fort Collins, Co 80524
(970)221-6815
Transportation Planning: Kathleen Reavis
215 N. Mason St., Fort Collins, Co 80524
(970)224-6140
Exhibit `A' page 4 of 5
Forestry:
Light and Power:
Developer's Contact Persons:
Project Manager:
Developer/Owner:
Project Engineer:
Architect/Planner:
General Contractor:
Tim Buchanan
215 N. Mason St., Fort Collins, Co 80524
(970)221-6361
700 Wood Street, Fort Collins, Co 80521
(970)221-6700
Dennis Shippee
New Belgium Brewing Co.
500 Linden St, Fort Collins, Co 8052_
(970)221-0524
Cell (970)
Fax (970) 221-0535
dshippee@newbelgium.com
New Belgium Brewing Co.
500 Linden St, Fort Collins, Co 8052_
(970)221-0524
Cell (970)
Fax (970) 221-0535
dshippee@newbelgium.com
JR. Engineering; Dan Matson
2620 E. Prospect, Suite
(970) 491-9888
Cell (970)
Fax (970) 491-9984
Jrenineering.com
190, Fort collins, Co 80525
Dan Tweeton
The Neenan Company
2620.E. Prospect, Suite 100, Fort Collins, Co 8052_
(970)493-8747
Cell (303) 210-2405
Fax (970)493-5869
Dan.tweeeton(.a�neenan.com
Exhibit `A' page 5 of 5