Loading...
HomeMy WebLinkAboutNATURAL RESOURCES RESEARCH CENTER - Filed CS-COMMENT SHEETS - 2005-04-26PROJECT COMMENT SHEET City of Fort Collins ENGINEERING DATE: October 8, 1998 PROJECT: NRRC @ C.A.T. DEPT: ENGINEERING PLANNER: Ted Shepard, Wednesday October 14, 1998 ENGINEER: Dave Stringer Intergovernmental Agreement Advisory Review 1. Would be helpful to City if this property was platted. 2. Driveway access points are part of Centre Ave. design coordinate design, and show detail with this plan also. 3. Show on this plan the sidewalk connection from parking lot to Centre Ave. as shown on site plan. Coordinate these plans 4. Show temporary access roadway and construction staging areas. 5. Show dimensions of parking lot layout, drive isles, parking spaces etc. 7. Need to dedicate parking lot as access, utility and drainage easement. 8. Cross sections of swales would be helpful 9. See other comments on red lined plans Date:: Signature - PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLAT �} -SITE UUTILITY O--LANDSCAPE DATE: November 9, 1998 TO: Engineering PROJECT: #53-85AU NRRC @ C.A.T. - Site Plan Advisory Review All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, November 18,1998 ❑ No Comment ffProblems or Concerns (see below or attached) GENERAL COMMENTS: s; Make sure that all necessary easements are dedicated and recorded, i.e. offsite grading, offsite construction, etc. Please show the limits of construction along Centre Avenue. r Please provide a cross section of where the temporary access road crosses the swale/ditch. Provide dimensions, slopes, elevations, etc. You will have to provide Type III Barricades at the access points off of Centre Avenue until Centre Avenue is constructed. Include a detail of the barricades and label on the plans. J, You will need to provide a 15 foot utility easement along the frontage of the property. The utility easement is located at the back of the walk. Date: 11 CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _✓Site Drainage Repod _ Otk ✓ Utility ✓Redline Utility ✓undscape REVISION COMMENT SHEET DATE: January 12, 1999 DEPT: Engineering PROJECT: 453-85AU NRRC @ C.A.T. - Advisory Review All comments must be received by Tim Blandford no later than the staff review meeting: Wednesday, January 27, 1999 GENERAL COMMENTS: Please note that the driveway entrances need to be constructed with concrete to the property line per City standards. Date: 1 /2e /99 Please send copies of marked revision Signature: s _Plat _ Site _Utility _Landscape City of Fort Collins PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: March 10, 1999 DEPT: ENGINEERING PROJECT: #53-85 AU NRRC @ C.A.T. — Site Plan Advisory Review PLANNER: Ted Shepard ENGINEER: Tim Blandford All comments must be received by. 3.10.99 MAJOR COMMENTS If any rip rap is being used for bank stabilization, it will need to be buried and the area re -seeded. u - Please provide the City with a boundary survey, since this project is not being platted. Date: g•b-99 Signature: PLEASE SEND COPIES OF MARKED REVISIONS: ❑ PLAT ❑ SITE ❑ UTILITY ❑ LANDSCAPE PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: September 28, 1998 TO: bi3- ?Vm+. - Rick 9. PROJECT: #52-98 NRRC @ C.A.T. Site Plan Administrative Advisory Review as per Intergovernmental Agreement Between City & C.S.U. All comments must be received by Ted Shepard no later than the staff review meeting: Wednesday, October 14,1998 0(c RUc- PROJECT =' COMMENT SHEET City of Fort Collins Current Planning DATE: September 28, 1998 TO: MA4 &Pf, �S PROJECT: #52-98 NRRC @ C.A.T. Site Plan Administrative Advisory Review as per Intergovernmental Agreement Between City & C.S.U. All comments must be received by Ted Shepard no later than the staff review meeting: /Wednesday, October 14, 1998 J / J / «/« l�k� / ri 7, 707. 0v 6,4-w- /�}r.er�cu �.�vs¢ �e /cous@�� D @o// ,�freR��� 8/✓a GL cue ` //� `/l � COh 57�UC�vti �dS cut' 1/5 `� /�!i' ( .{ T r G/ /,e / "�