Loading...
HomeMy WebLinkAboutLODGE AT MIRAMONT PUD - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-04-20Transportation Services Engineering Department Development Construction Permit, Page 1/3 City of Fort Collins DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 01-24 Issuance Date: ? - 17 - u _4 Project Name: The Lodge at Miramont Project Location: west of Lemay and North of Boardwalk / Northeast corner of intersection Permittee: Michael Backlund City and developer contacts: See attached Exhibit A for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) PAID $300.00 Construction Inspection Fee (paid prior to issuance of this permit) $8962.00 Erosion Control fee (paid prior to issuance of this permit) Total $8962.00 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $90,016.00 Form of security deposited with the City: L PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide as -constructed plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms 'Project Engineer and engineer shall mean a Professional Engineer licensed in Colorado.) 281 North C0I10g('AvCnUC • P.O. Boa ;SO • Fort Collins, CO 80532-07;80 • N) 0)'21-660-) Development Construction Permit, Page 2/3 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction time restrictions: Normal work hours 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the Aas-constructed@ plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and Development Construction Permit, Page 3/3 3.3.2(C) of the Land Use Code, as applicable 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMPs) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: No Public Curbs, gutters, sidewalks or street paving shall occur until a Pavement Design Report has been submitted to and approved by the City Permittees acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manger Signature: /�'Z t—r`� QDate: Approval for issuance: City Engineer %� /� / Approval: L t� C. !C� �' Date: (Permit Issuance Date) EXHIBIT A Project Name: Lodge at Miramont Project AKA: City Staff contacts: Development Engineer: Dave Stringer 281 N. College Ave. Fort Collins, Co. 80524 970 221- 6765 Construction Inspector: Lance Newlin 281 N. College 970 221-6605 970 222- 0854 Water utilities Engineer: Roger Buffington 700 Wood Street 970 221- 6854 Erosion Control Inspector: Bob Zakley 700 Wood Street 970 221- 6063 Traffic Operations: Street Closures: Transportation Planner: Forestry: Light & Power: Ward Stanford 625 Ninth Street 970 221 - 6615 Sly Mireles 625 Ninth Street 970 221- 6815 Kathleen Reavis 210 E. Olive 970 221- 6140 Tim Buchanan 281 N. College 970 221- 6361 700 Wood Street 970 224 — 6700 US West: Eric Handcock- 970 377- 6401 Utility Contractor: Name: Gerrard Excavating{ Inc. — Gary Gerrard Address: 1739 County Road 13 C, Loveland, CO. 80537 Phone number(s): Office: (970) 669-1463 Cellphone: Fax number. (970) 669-1964- Email: Concrete contractor for flat work Name: Address: Phone number(s): Office: _ Cellphone: _ Fax number. Email: Concrete contractor for structures: Name: Address: _ Phone number(s): Office: Cellphone:_ Fax number. Email: Paving contractor. Name:LaFarge — Mark Stanley Address:1800 N. Taft Hill Road, Fort Collins, CO. 80522 Phone number(s): Office: (970) 407-3600 Cellphone: Faxnumber. (970) 407-3900 Email: Landscape contractor. Name: Bath Nursery and Garden Center — Kevin Laman Address: 2000I E. Prosepct, Fort Collins, CO. 80525 Phone number(s) Office: _(970) 484-5022 Cellphone:. Faxnumber. (970) 484-3718 Email: Other contractors and parties involved in the project: Project Engineer (A Colorado licensed professional engineer who is the civil engineer the person responsible for the design of this project, responsible for certification that improvements are constructed in accordance with approved plans, responsible for making revisions to plans with City approval and for providing as -constructed plans): Name: TSTInc. - Mr. Steve Humann Address:748 Whalers Way Bldg. D, Fort Collins, CO. 80527 Phone number(s): Office: (970) 226-0557 Cellphone: Fax number. (970) 226-0204 Email: Professional License Number. Developer (The party or parties referenced in the Development Agreement who are responsible for the Developer's obligations contained in the Agreement -add additional names below): Name: Michael Markel Address: 5723 Arapahoe Avenue 7A, Boulder, CO. 80303 Phone number(s): Office: (303) 449-8689 Cellphone: Fax number. (303) 444-2798 Email: General Contractor (The contractor is overall charge of the public infrastructure construction): Name: Drahota Construction Co. Address:P.O. Box 272269 Ft. Collins, CO. 80527 4700Innovation Dr. Bldg. C Phone number(s): Fort Collins, Co. 80525 Office: _ (970) 264-0100 Cellphone: Fax number..(970) 204-0200 Email: mikeWdrahotacoustruction.com If you have no General Contractor, list all other contractors below. Grading contractor: Name: Gerrard Excavating - Cary Gerrard Address:1739 County Road 13 C, Loveland, CO. 80537 Phone number(s): Office: (970) 669-1463 Cellphone: Fax number. (97(f) 669-1964 Email: Utility contractor: 2