Loading...
HomeMy WebLinkAboutLOFTS AT CAMPUS WEST - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-04-20Farr' City of Fort Collins, Colorado DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 1-1-J Issuance Date: Project Name: The Lofts at Campus West Project A. K_A.: Project Location: 816 City Park Avenue (Northeast corner of City Park Avenue and Elizabeth Street) Permittee: John Donaldson, Campus Properties, LLC City and developer contacts: See attached Exhibit "A"for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $ 300.00 Excavation Permit Fee (paid prior to issuance of this permit) $ 655.00 Construction Inspection Fee (paid prior to issuance of this permit) $ 2,623.60 Total $ 3,578.60 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 37,772.00 Expiration date: �: - - _ z Form of security deposited with the City: t ,` c `J�y'' � PERFORMANCI; REQUIREMENTS OF THIS PERMIT: 1. The Project Engineer shall be responsible to certify, or have certified, materials testing and other tests as required; shall, as required by the City in the Development Agreement, certify that the improvements are constructed in accordance with the approved Utility Plans and the standards and specifications of the City; shall revise and secure City approval of all revisions to the utility plans and related documents; and shall prepare and submit to the City "as -constructed" plans prior to the C'ity's acceptance of "the constructed" public improvements. 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction time 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, Whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancies will only be issued when all conditions contained in the Development Agreement and Sections 3.3 2(C) and (D)of the Land Use Code or Sections 29-678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit . 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City ; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 1 o. The City Erosion Control Inspector must be notified at least twenty four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 2 12. Other conditions: The McDonalds Drive Thru shall remain open per letter of consent from McDonalds - Contact the Permittee if this is not being accomplished. Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that l have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager's Signature: r�; Date:_ Approval for issuance: 1^1^ City Engineer Approval �_V1j�,� _-V - dV�Date: (Permit Issuance Date) I EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Name, address and numbers Project Name: The Lofts at Campus West Project A.K.A.: City Staff Contact Persons: Development Engineer: Sheri Wamhoff 291 N. College Avenue, Fort Collins, Co 80524 (970) 221-6750 0140 Construction Inspector: Matt Hill 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6605 Cell (970) 217-8901 Current Planner: Bob Blanchard 281 N. College Avenue, Fort Collins, Co 80524 (970)221-6765 Water Utilities Engineer: Roger Buffington 700 Wood Street, Fort Collins, Co 80521 (970)221-6854 Erosion Control Inspector: Bob Zackley 700 Wood Street, Fort Collins, Co 80521 (970)224-6063 Natural Resources: Kim Kreimeyer 281 N. College Avenue, Fort Collins, Co 80524 (970) 221-7293 Traffic Operations: Street closures: (970) 625 Ninth Street, Fort Collins, Co 80524 (970) Transportation Planning: Kathleen Reavis 210 E. Olive, Fort Collins, Co 80524 (970)224-6140 Forestry: Tim Buchanan 281 N. College, Fort Collins, Co 80524 (970)221-6361 Light and Power: Doug Martine 700 Wood Street, Fort Collins, Co 80521 (970)224-6152 Developer' Contact Persons: Project Manager: John Donaldson 4529 South Stover Street, Fort Collins, Co 80525 (970)204-0125 Fax (970) 204-0310 Developer: Campus Properties, LLC 4529 South Stover Street, Fort Collins, Co 80525 (970) 204- 0125 Fax (970) 204-0310 Owner(s): Campus Properties, LLC 4529 South Stover Street, Fort Collins, Co 80525 (970) 204- 0125 Fax (970) 204-03 10 Architect/Planner: Dana Lockwood Lockwood Architects 420 S. Howes, Fort Collins, Co 80521 (970)493-1023 Project Engineer: Brian Shear Shear Engineering Corporation 4836 South College Ave, Suite 912, Fort Collins, Co 80525 (970)226-5334 Fax (970) 282-0311 General Contractor: John Sinnett Sinnett Builders, Inc 2926 E. Mulberry Street, Fort Collins, Co 80522 (970) 493-1770 Fax (970)482-4537 or All Other Contractors: Engineering Department 281 North College Avenue Fort Collins, Co 80524 Phone: (970) 221-6605 Fax: (970)221-6378 Pei iait4: 771 C Application Date: EXCAVATION ON PUBLIC PROPERTY (Right -of -Way) (Minimum of 5 Days Required for City Engineer's Approval) EXPIRATION: 30 DAYS FOR DATE OF APPROVAL Applicant Use Applicant Name: - f f—ci'-;,,, -.1, ;c.•- t < �. Comports, Phone: _ Address: CltyiState/Llp: Does contractor possess license & proper endorsement to work in the Public Right -of -Way?_ Yes No __z ;1 Sub-Contractor. r=s= Does the sub -contractor possess licenses &proper endorsement to work in the Public Right -of -Way? ;Yes' No C ;--„-" %.' r",r I'✓ Is this a City project? Yes No If so, what is the Project Manager's Name: Field Contact Name & Phone k: Scheduled Start Date: Back Fill: Temp. Patch Date: Final: _ Excavation Address: %t:•- % : Excavation Type: Open Cut: Boring: Excavation Size: Width _tom -Length -Total Sq. Ft. Pavement Removed: Existing Surface Type: %N.Asphalt i `) Z. Sq. Ft.* c Depth Concrete Gravel Purpose of Excavation: Water _Sewer _Telephone _Electric Gas Other Communications Departments to be notified: Utilities Yes No 700 Wood St., 221-6700 (Coordination of new utilities with existing utilities) Traffic Yes No 625 Ninth St., 221-6630 (Traffic control plan submitted, also coordination of underground traffic) Parks (if applicable) Yes No 413 S. Bryan, 221-6660 Maintenance (Any work in the park system) Parking Yes No 210 E. Olive, 221-6617 (In Down Town or C.S.U. area) Forestry Yes No 413 S. Bryan, 221-6660 (for trees, shrubs or other vegetation) City Use Non -Refundable App. Fee: $25.00 Pd. Yes No *Inspection Fee: $45.00/Per 1000 Sq. Ft. of Excavation -Pavement Impact Fee: Sq. Ft X • �' (Fee— See Below) Pavement Age: Sa.Ft. of Excavation 1 to 100 101 to 500 501 to 3,000 Over 3,000 Pavement Impact Fee Cost per Sq. Ft. $3.50 $2.50 $2.00 $1.50 Fee Tripled if Pavement is less than S Years Total Fees: Non -Refundable $ 25.00 Inspection Fee $ ^l%H Pavement Impact Fee $ (Tripled if less than 5 years) Other Fees: $ Sub -Total $ (.- Less the Non -Refundable Fee Paid Ca Time of Application-S-25.00 Total Fee Due At Issuance Field verification of excavation size Cash Check # `xe<J! Account # Engineering Approval: t Y C_' Date: �I It Conditions: i Emergency Excavations, a permit may be obtained next business day. Upon application, applicant agrees to provide the Department of engineering with an original active or continuous surety bond in the amount of S20,000 and also a $10,000 endorsement bond, issued by a surety company authorized to do business in the State of Colorado (see reverse for certain provisions of the City Code that are or may be applicable to this license). Insurance is also re- quired for licensing for the Engineering Dept. of the City of Fort Collins. Applicant has read this permit and! agrees to abide by the City of Fort Collins Standard Plans and Specifications and to such spe- cial conditions, restrictions, and regulations as may be imposed by the Director of Engineering. Applicant agrees to telephone the Engineering Inspection Recorder at 221-6609 48 hours prior to any construction in the public right-of-way. Applicant's Signature: Date: i ifhae— Engineering Green —Applicant 1e?low—Inspection Gold —Revenue