HomeMy WebLinkAboutTIMNATH TAP TRI STATE GENERATION AND TRANSMISSION - Filed CS-COMMENT SHEETS - 2005-04-11dw PROJECT i•••� COMMENT SHEET City of Fort Collins Current Planning DATE: June 17, 2004 TO: Technical Services PROJECT: #21-04 Timnath Tap PDP — Type I (LUC) All comments must be received by Steve Olt no later than the staff review meeting: July 14, 2004 Note - PLEASE identify your redlines for future reference CUo/cs jcu,o � �L�ti 1 Name (please print) HECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat site _Drainage Report _Other _Utility _Redline Utility _Landscape is STAFF PROJECT REVIEW City of Fort Collins Tri-State Generation and Transmission Date: 11/02/2004 c/o Mark Murray / Jerome Bensing 1100 West 116th Street Westminster. CO. 80234 Staff has reviewed your submittal for TIMNATH TAP, FINAL PLAN - TYPE I (LUC), and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: General Number: 29 Created: 11/2/2004 [11/2/04] The information provided on the Site Plan dated 10/18/04 (included in the utility plan set) is more acceptable. Please make revisions as shown on Engineering's red -lined Site Plan and re -number the plan so that it can be recorded separate from the utility plan. Department: Engineering Issue Contact: Susan Joy Topic: General Number: 27 Created: 10/29/2004 [10/29/04] Ready for mylars provided that the remaining items are addressed - see redlines. Number: 28 Created: 10/29/2004 [10/29/04] Please provide a separate mylar for the Site Plan so that it can be signed and filed separately from the Utility plans. It is ok to keep it in the utility plan set as you are doing now. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970)221-6341. Yours Truly, i Steve Olt, City Planner cc: Susan Joy JR Engineering / Mike Brake Page 1 �Project Comments Sheet Selected Departments Citvof Dort Collins Department: Stormwater Utility Date: July 15, 2004 Project: TIMNATH TAP PDP - TYPE I (LUC) All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: July 14, 2004 Note - Please identify your redlines for future reference Issue Contact: Wes Lamarque Topic: Stormwater Number: 10 Created: 7/15/2004 [7/15/041 Please provide documentation showing how much new impervious area (buildings, concrete pads, etc.) is being added with each phase. If the area of hard surfaces being added is under 1000 SF, no detention will be required. 7- Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other J� Utility Redline Utility Landscape Page 1 CIL - Tte.Je Project Comments Sheet Selected Departments Department: Engineering Date: July 16, 2004 Project: TIMNATH TAP PDP - TYPE I (LUC) All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: July 14, 2004 Note - Please identify your redlines for future reference Issue Contact: Susan Joy Topic: General Number: 6 Created: 7/13/2004 [7/13/041 These plans were not submitted in accordance with the Larimer County Urban Area Street Standards. Will need a cover, notes, grading, & details sheet. Will need to show phasing if any. I can email you a checklist that will help you if you send me an email at sjoy@fcgov.com Number: 7 Created: 7/13/2004 [7/13/04] Will need to see the access road to the site, what it's made out of, etc. Also, do you have an access easement from the neighboring property? Do you need one? Number: 8 Created: 7/13/2004 [7/13/041 Please contact PFA asap for their emergency access requirements. They may need an emergency access easement dedicated to and through the site. L/ Dat CHECK HERFAF YOd WISH TO RECEIVE COPIES OF REVISIONS Plat _�-- Site ? Drainage Report Other_ Utility _o -r Redline Utility �_ Landscape Page 1 STAFF PROJECT REVIEW Cih, of Fort( ollin, Tri-State Generation and Transmission Date: 07/20/2004 c/o Mark Murray/Jerome Bensing 1100 West 116th Street Westminster, CO. 80234 Staff has reviewed your submittal for TIMNATH TAP, PDP - (TYPE I, LUC), and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: Architectural Number: 14 Created: 7/20/2004 [7/20/04] Detailed architectural elevations for the new Control Buildiiag. A 24" x 36" drawing, showing all four sides, should indicate the height, materials, a-d colors of the building. Topic: Site Plan Number: 11 Created: 7/20/2004 [7/20/041 What are the surface ma erials for the Original Site and the Proposed Site Addition, within the existing and proposed fences? This should be shown on the Site Plan. Number: 12 Created: 7/20/2004 [7/20/041 What is the Additional Gravelled Area, outside of the fence at the northwest corner, to be used for? Please indicate this on the Site Plan. Number: 13 Created: 7/20/2004 [7/20/041 The Site Plan should show how the access road from the Frontage Road connects to this facility. Number: 15 Created: 7/20/2004 [7/20/04] The Site Plan should show the City Limits and how they relate to the existing and proposed site and facility. Number: 16 Created: 7/20/2004 [7/20/04] A Vicinity Map must be added to the Site Plan, possibly in the upper right-hand corner (see enclosed red - lined Site Plan). Page 1 Department: Engineering Issue Contact: Susan Joy Topic: General Number: 6 Created: 7/13/2004 [7/13/041 These plans were not submitted in accordance with the Larimer County Urban Area Street Standards. Will need a cover, notes, grading, & details sheet. Will need to show phasing if any. I can email you a checkl_st that will help you if you send me an email at sjoy9fcgov.com Number: 7 Created: 7/13/2004 [7/13/041 Will need to see the access road to the site, what it's made out of, etc. Also, do you have an access easement from the neighboring property? Do you need one? Number: 8 Created: 7/13/2004 [7/13/041 Please contact PFA asap for their emergency access requirements. They may need an emergency access easement dedicated to and through the site. Department: Light & Power Martine Topic: Light & Power Number: 1 [6/21/04] No Comments Department: Natural Resources Topic: General Number: 9 [7/14/041 No issues. Issue Contact: Doug Created: 6/21/2004 Issue Contact: Doug Moore Created: 7/14/2004 Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Stormwater Number: 10 Created: 7/15/2004 [7/15/041 Please provide documentation showing how much new impervious area (buildings, concrete pads, etc.) is being added with each phase. If the area of hard surfaces being added is under 1000 SF, no detention will be required. Department: Zoning Issue Contact: Peter Barnes Topic: Zoning Number: 2 Created: 6/23/2004 [6/23/041 Need to show the new building on the site plan. The site plan should also show a "City Limits" line so that we can tell what's in the city and what's in the County. Page 2 Number: 3 Created: 6/23/2004 [6/23/04] Need a vicinity map on the site plan. Number: 4 Created: 6/23/2004 [6/23/041 Need to provide detailed architectural elevations Number: 5 Created: 6/23/2004 [6/23/041 Per Section 3.8.11(B)(1)(2)&(3) of the Land Use Code, the lowest strand of barbed wire must be at least 10' above the ground and exterior area security lighting must be provided. This completes staff (and outside reviewing agencies) review and comments at this time. Another round of staff review is determined to be necessary. This proposal is subject to the 90-day revision re -submittal requirement (from the date of this comment letter, being July 20, 2004) as set forth in Section 2.2.11(A) of the Land Use Code. Be sure and return of your red -lined plans when you re -submit. The number of copies of each document to re -submit is shown on the attaches. Revisions Routing Sheep. all If you have any questions regarding these_ssues or any other issues related to this project, please feel free to call me at (970) 221-6750. Yours Truly, � ; �y Steve 01t City Planner cc: Susan Joy Peter Barnes Current Planning File #21-04 Page 3 TRI-STATE GENERATION AND TRANSMISSION ASSOCIATION, INC. HEADQUARTERS: P.O. BOX 33695 DENVER, COLORADO 80233-0699 303-452-6111 August 31, 2004 Mr. Steve Olt City Planner City of Fort Collins 281 North College Avenue Fort Collins, CO 80524 Dear Mr. Olt: Re: Timnath Tap Expansion Project - Fort Collins, Colorado Tri-State Generation and Transmission Association, Inc. Thank you for the information that you provided during our telephone conversation last Wednesday. As you are aware, we received your Staff Project Review dated July 20, 2004, regarding Tri-State's Timnath Tap Expansion Project. Your comments and the red -lined marked plans were reviewed in Tri-State's Engineering and Land Departments. The following clarification and additional information is provided to obtain permit approval and begin construction of this much needed Project as soon as practical. As I am sure you are aware, this Project is necessitated by the substantial growth in the Fort Collins area and to further support Tri-State's Member Company, Poudre Valley Rural Electric Association. Enclosed are new drawings S1011-Al-003, rev. B and S1011-C2-002, rev. 1, which have been revised to incorporate your Staff Project Review comments. As you requested, the red -lined prints returned to Tri-State with your Staff Project Review comments are also enclosed. In addition, an additional copy of the site plan is provided for your transmittal to Larimer County Planning, as we had also discussed in your offices. The following response is provided to each your comments: 1. Topic: Architectural — Comment Number 14 — We have revised Tri-State drawing no. S1011-C2-002, rev. 1. This drawing provides the elevations of all four sides of the new control building. Also included on the drawing is a height dimension, building materials and color description of the building. This should provide a more complete description of the new control building. Subject to your approval of our application, Tri-State will be ordering the new control building from Parkline, Inc. Additional information in the form of Parkline's catalog sheets is available if required. A N FOUA1. OPPC)e'I IN- GFr11V4IIVC l fEl. it, C,YEP CRAIG STATION ESCALANTE STATION NUCLA STATION P.O. BOX 1307 P.O. BOX 572 P.O. BOX 698 rnudlsCnnr E eLKy CooEIC[HLNB CRAIG, CO 81626-1307 PREWITT. NM 97045 NUCLA, CO 81424-0698 1 970-824-4411 505-826-2271 920-864J316 k` Mr. Steve Olt Page 2 2. Topic: Site Plan — Comment Number 11 — The surface material is a crushed rock surface which is shown on Section A of both the Grading Plan and Site Plan. The crushed rock surface is necessary to provide safety for electrical step potential within the substation in case there is an electrical fault. We consider this material as impervious. 3. Topic:: Site Plan — Comment Number 12 — The area around our facility is a corn field and the additional graveled area outside the fence is a buffer not to be farmed. It is also for weed control around our facility. The area outside the substation fence will also contain three wood poles and guy wires for the electrical connection of the incoming transmission line to the substation. We are aware of the 24-inch water line which runs through this area and prefer that it not be within the substation fence. ELCO Water District will continue to have unrestricted access to the water line. 4. Topic:: Site Plan — Comment Number 13 — The Vicinity Map is shown on drawing no. S1011-Al-003, rev. B. This vicinity map indicates the access road from the 1-25 Frontage Road to the substation site. 5. Topic: Site Plan — Comment Number 15 — The Fort Collins City Limits have been included as a revision on drawing no. S1011-Al-003, rev. B. As has been explained and you can see from the drawing, the city limits exclude the existing substation site. The addition to the substation is within the city. 6. Topic: Site Plan — Comment Number 16 — Same as Comment Number 13 see item No. 4. 7. Topic: General — Comment Number 6 — The plans were not submitted in accordance with Larimer County Urban Area Street Standards because there are no streets involved with this Project. The access road is a gravel farm road through the farm yard, along the Larimer and Weld Canal (also known as the Eaton Ditch), to the existing transmission lines, and then to the Timnath Tap Substation. Tri-State has had an Easement for the Access Road and a Right of Way Easement for the transmission lines since 1974. A copy of the Access Easement is enclosed for your information. 8. Topic: General — Comment Number 7 — The access road is shown on drawing no. S1011-Al-003, rev. B, see Vicinity Map. Comments provided in item No. 7 above apply. Western Area Power Administration has an access agreement for the transmission line as well. 9. Topic: General — Comment Number 8 — PFA has advised that our plans are acceptable as submitted and have indicated that they would enter their approval into the computer system. A Touchstone Energy` Cooperative ��,.` Mr. Steve Olt Page 3 10. Topic: Stormwater — Comment Number 10 — The impervious area of the buil6ng and foundations is 993 sq. ft. The cable trench has an open bottom and is not considered an impervious area. No detention is required. 11. Topic: Zoning — Comment Number 2 — A copy of drawing no. S1 01 1-Al-003, rev. 13, is provided showing the city limit boundary. 12. Topic: Zoning — Comment Number 3 — This comment has been addressed on drawing no. S1011-Al -003, rev. B and in item No. 4 above. 13. Topic: Zoning — Comment Number 4 — This comment has been addressed in item No. 1 above, see drawing no. S1011-C2-002, rev. 1. 14. Topic: Zoning — Comment Number 5 — This comment may be addressed by changing the three strand barbed wire along the top of the fence to a three strand smooth wire as discussed with you recently. The existing fence around the substation has the three strand barbed wire. Drawing no. S1011- A1-004 was submitted in the initial package so the entire fence around the site would be consistent. 15. Mr. Bill Cowan, Tri-State Engineer, has been working with Susan Joy of your office to satisfy this requirement. We have indicated that the only utility is electrical service station provided within the Substation or as an external source from our member company, Poudre Valley Rural Electric Association. Should you have questions or require additional information, please let us know. You indicated that an additional Staff Review meeting would be required and we will be happy to attend to address any further questions that you or your staff may have. Please advise of the date and time at your earliest convenience. We would also appreciate your scheduling the required public meeting at your earliest convenience. Thank you for your assistance and attention to this Project. Sincerely, Jerome J. Berl -sing Land Management Consultant to Tri-State Attach. cc: Mr. William Cowan, Tri-State Civil Engineer Mr. Mark Murray, Tri-State Land and Permitting Manager A Touchstone Energy` Cooperative.