HomeMy WebLinkAboutTIMNATH TAP TRI STATE GENERATION AND TRANSMISSION - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-04-11Permit Number:
Project Name:
Project A.K.A.:
DEVELOPMENT CONSTRUCTION PERMIT
aJf
_A04-36 Issuance Date: T,
Project Location: _ SE corner of 1-25 and Mountain Vista Drive. Take the fronta-,e road
south, then private drive approximately I mile east.
Permittee:
City and developer contacts: See attached Exhibit "A" for names and phone numbers of fill
contact persons for this proiect.
Fees: Permit Application hee (paid at the time of application) $ NA
Construction Inspection Fee (paid prior to issuance of this permit) $ __
Total $
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
S NA
Form of security deposited with the City:
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permitice shall he responsible to require their Project Engineer to incorporate into all design
drawings and spccitcat ions the certification ofatI materials testing by an Engineer. The Permittee
hall have an Gnginccr prepare revised design drawings and secure City approval for all revisions to
the Utility Plans and related doCWllents. 'I he Permittceshall have an Engineer represent, as required
by the City in the Development Agreement, that the improvements are constructed in conformance
with the approved Utility Plans and the standards and specifications of the City. The Permitice shall
proeidc 'as-00n5nUCled" plans prepared by an Lin,ineer prior to the CitY's acceptance of the
consuuciecl public improvements. (All references above to the terms "Project In(ineer' and
" lingincer" shall mean a Professional Engineer licensed in Colorado.)
?. AII contractors wfio perform work on this project must be bonded and licensed in conformance
with City requirements.
Paving contractor:
Individual Name: NOTE No p ving
Company Name : —
Address:
Phone number(s):
Office: _
Cellphone:
Fax number:
Ismail:
Landscape contractor:
IndlVldual Name: NO "I E No landscaping
Company Name : —
Address: _
Phone nLn11be1(5):
Office: _
C'ellphone
Fax number:
Finail:
Other contractors and parties involved in the project:
SUBMIT TIIE FOLLOWING ITEMS (Required for all projects):
• 81/2"xI I" copy ofthe Site Plan
Proposed Project Schedule
Project quantities and cost estimate for all of the public improvements to be constructed. In
addition, include all private improvements that arc required to be inspected by the City
Construction Inspectors. This information must be submitted in the format shown on the
attached form titled "Project Quantities and Cost Estimate Sheet."
ADDITIONAL SUBMITTALS (Required if checked):
u Trat lic control plants) for the project
u Proposed haul routes shown on a City map
u Shop drawings
u Other
CONSTRUCTION ('OORDINATION MEETING: A construction coordination meeting to discuss
plans and special requirements for your project, is required for all development projects. The people
requircCI to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land
Planner and t ieneral Contractor (if no General Contractor, representatives for each of the contractors
expected to work on this project)
People to Attend: List the peoples names and titles for those who will attend the pre -
construction meeting:
Name
Title
ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: pro%ide the estimated value of
all public inhastructurc improvements that will he constructed and accepted by the City to omi and
maintain In addition prov-ide the value of all private infiastructurc improvements that the City will
nspect and require certification for. The estimate shall be in the same format as the attached sheet titled
"Project (Zuantities and Cost Estimate Sheet."
Public infrastructure, estimated cost: S 0.00
Private infrastructure, estimated cost: $See Building Permit Applicat on
I certify that the information on this permit application along with the required additional submittals are
true and correct to the best of my knowledge, and that in filing this application I am acting with the
knowledge, consent, and authority of the owners of the property (including all owners having legal or
cquitahle interest in the real property, as defined in Section 1-2 of the City Code; and including common
areas legally connected to or associated with the property which is the subject of this application) without
whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said
authority, I hereby permit City ofllcials to enter upon the property to[- purposes of inspection and, it
necessarv, to enter up:m such property to perform work required of the applicant if the applicant were to
Dail to pci lbnn the iequirCd vv01It
Applicant Sign uwq: Date: November 3, 2004
Mark M/�cray
l�
DS
m ;D >
0
Z
W
It
V
MAP
F IT
.7.
0
Em
5 e�f
--------- -
-------------------- -------------- I L ----------------
-- --- ---- - -- - ------ - --- ---- ---- --------
oil a
lop
r 1 .�� ar
MUM TAP
TRI-STATE
"M
Development Construclion Permit, Page 2;'S
3. COnslrnCtiOn lrmC restrictions:
4. I'hc applicant understands that additional permits maybe required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, with
plan, development agreement, soils report, pavcmcntdesign, uafFic
study, drainage report, plat casements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 ofthe Transitional Land Use Regulations or
Section 2.6.3(K) of -the Land (Jse Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of' tills
permit. this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
h. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration dale.
Such application shall contain information sufficient to justifythe granting ofthe extension.
An extension may be granted for up to six months.
7. Building permitsrindcertificatesofoccupancywillonlybcissuedwhenallconditionscontained
in the Development Agreement and Sections 3.3.2(C) and (D) ofthc Land Use Code or Sections 29-
078 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agrccmcnt does not spcci fy times for completion ofpublic improvcmcnts, or if there is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that Construction ofall improvcmcnts shall be required prior
to the time of issuance of the First building permit.
S. Acceptance by the City of the public improvements shall be after (I) Final inspection has been
conducted by the City; (2) punch list items from the final inspection arc completed and accepted by
the Cilv: and (3) required certifications from the licensed professional engineer that improvements
arc completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. 'file warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvcmcnts, in accordance with Sections 29-13 and 29-14 of the Transitional
I .and t !se Regulations and/or Sections 2 2 3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
COLIC, as applicable.
10. 1he City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
Development Construction Permit, Page 3/5
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
place and inspected by the City Erosion Control Inspector before any land disturbing activity begins.
I I . No wort: (including grading) shall be started in State Highway right-of=way until a permit is
issue(] by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
Permittee's acknowledgment signature:
I3y signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of'
the ownets of the properly (including all owners having legal or equitable interest in the real property, as
defined in Scclion 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
rcqucstcd action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also ❑cknowlcdge that I have read this permit document with all its requirements and
conditions, and I agree to all of the terms and conditions so stated in this permit.
/) /Y
Applicant/Project Manager's Signature: Date
Approval for issuance:
City Engineer Approval: 0jz--
4� (Permit issuance Date)
Development Construction Permit_ Pagc 4/5
EXHIBIT "A"
DEVELOPMENT PRO.IECT CONTACT PERSONS
Name, address and numbers
Project Name: Timnath Tap
Project A.K.A.: NA
Cite Staff Contact Persons:
Development Engineer: Susan Joy, 281 N. College Ave., Fort Collins, CO 80521
Office 970-2,.1-6605 Fax 970-221-6378
Email: sjoOi Icgo%.conl
Construction Inspector: .Joe Crabill, 281 N. College Ave., Fort Collins, CO 80521
Office 970-221-0605 Cell 970-222-1134 Fax 970-221-6378
Lmail: jcmbill'u IcvoN cone
Current Planner: Steve Olt, 281 N. College Ave., Fort Collins, CO 80521
Office 970-22 1 -6750 Fax970-416-2020
Email: tshelmid(a fc-m.cotn
Water Utilities Engineer:
Frosion Control Inspector: Bob Zakely, 700 Wood Street, Fort Collins, CO 80521
Office 970-224-6063 Fax 970-221-6619
Finail: hrakely'i-fcgop.com
Natural Resources: Doug Moore, 281 N. College Ave., Fort Collins, CO 80521
Office 970-221-6750 Fax 970-416-2020
Email dmoorc(a fcgo%.a:m
Traffic Operations:
Street closures: Syl Mireles, 626 Linden Street, Fort Collins, CO
Office 970-221-6815 Fax 970-6282
Email smn'cics(c: fcgm.com
Transportation Planning: David Averill, 215 N. Mason, Fort Collins, CO 80521
Office 970-416-2643 Fax 221-6239
Finail da\c dI(a Ic ov.com
Devefoptnent Construction Permit, Pagc 5!5
Forestry: Ralph Zcntz, 215 N. Mason, Fort Collins, CO 80521
Office970-224-6302 Fax 970-221-6586
Email: rrcnV rlcgo_.com
Light and Power: Doug Martine, 700 Wood Street, Fort Collins, CO 80521
Office 970-224-6152 Fax 970-221-6619
Email dmaiullc'u Ccgoc,cgm
Developer's Contact Persons:
Project Manager: William Cowan, Tri-State Generation and Transmission Association,
Inc. , 1100 W 1 16°' Avc, PO Box 33695, Deriver, Colorado 80233-0695
Office 303-452-61 11 x3141 Fax 303-254-6068
Finail: wcowan(cctristategt.org
Developer: William Cowan, Tri-State Generation and Transmission Association, Inc. ,
1 100 W 1 16°i Ave, PO Box 33695, Denver, Colorado 80233-0695
Office 303-452-6111 x3141 Fax 303-254-6068
Email: wcowan(u)tristategt.org
Owner: Tri-State Generation and Transmission Association, Inc. , 1 100 W 1 16°i Avc,
PO Box 33695, Denver, Colorado 80233-0695
Office 303-452-611 1 Fax 303-254-6068
Architect/Planner: William Cowan, Tri-State Generation and Transmission
Association, Inc. , 1100 W 1 16"' Avc, PO Box 33695, Denver, Colorado 80233-0695
Oflice 303-452-611 I x3141 Fax 303-254-6068
Email: wcowan((Jtristatcgt.org
Project Engineer: William Cowan, Tri-State Generation and Transmission Association,
Inc. , 1100 W 1 16°i Ave, PO Box 33695, Denver, Colorado 80233-0695
Office 303-452-0111 x3141 Fax 303-254-6068
Email: wcowan(i>,tristatcgt.org
Grading Contractor: Dale Lyle, Left Hand Excavating, 3756 Eureka Way, Frederick,
Colorado 80516 Office 303-833-3326
Concrete Contractor for Flat Work: Glen TCondt, 16 Sunset Circle, Longmont, CO
80501 Office 303-776-6195
Concrete Contractor for Structures: Glen Troudt, 16 Sunset Circle, Longmont, CO
80501 Office 303-776-6195
DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(2/ 16/99)
For City use only: Application Number: '� ' , Application Date:.
Permit application fee: S 150.00 :=4!%i . -�6
INSTRUCTIONS:
1. Complete this form (some questions may not apply to you) and attach all necessary documents and
submit to the Development Engineering Section of the City.
2. If you have any questions contact the Development Engineer, Susan Joy , at 221-6605.
3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 N.
College Avenue.
PRO.IECT INFORMATION:
Project Name (as approved by the City):
Timnath Tap
Project A.K.A. (Marketing name if different from Project Name):
Project Location: Situated in West One -Half of Section 3 Township 7 North, Range 68 West of the Sixth
Princi an 1 Meridian City of Fort Collins, County of Latimer State of Colorado.
Property Owner(At the time of this permit issuance):
Individual Name: N/A
Company Name : Tri-State Generation and Transmission Association, Inc.
Address: _ 1 100 W. 1 161' Ave P.O. Box 33695. Denver, Colorado 80233-0695
Phone number(s):
Office:303-452-6111
Cel 1phone:
Fax number:
Email
Applicant/Project Manager (The primary contact person for all matters regarding this project, and the
person responsible for all matters referencing "thc Developer" in the Development Agreement for this
project):
Individual Name: William C. Cowan
Company Name: Tri-State Generation and Transmission Association, Inc.
Address: _ 1100 W. 116°i Ave.. P.O. Box 33695. Denver, Colorado 80233-0695
Phone number(s):
Office: 303-452-611 1 extension 3141
Cellphone: N/A
Fax number: 303-254-6068
Email: wcowan(attristateet.org
DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(2/ 16/99)
1'or City use only: Application Number:
Application Date:
Permit application fee: $ 150.00
INSTRUCTIONS:
1. Complete this form (some questions may not apply to you) and attach all necessary documents and
submit to the Development Frigincering Section of the City.
2. 1 f you have any questions contact the Development )engineer, _Susan Joy , at 221-6605.
_ . Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 N.
Cullcec Avenue.
PROJECT INFOR MA'rION:
Project Name (as approved by the Cite):
I imnath Tap
Project A.K.A. (Marketing name if different from Project Name):
Project Location: Situated in West One -Half of Section 3 "township 7 North Ranee 68 West of the Sixth
Principal Meridian, Cif of Port Collins, County of Larimer, State of Colorado.
Property Owner(At the time of this permit issuance):
Individual Name: N/A
Company Name Tri-State -Generation and 'I ransmission Association 1� nc.
Address: 1 100 W. 1 16 "' Ave., P.O. Box 33695 Denver, Colorado 80233-0695
Phone number(s):
Office: 303-452-6111
C'cllphone _
Fax number:
Finail:
Applicant/Project Manager (The primary contact person for all matters regarding this project, and the
pet son responsible Im a I I matters relclell cung "the Developer" in the Development Agreement tier this
project):
Individual Name William C. Cowan
Company Name: Tri-State Generation and Transmission Association. Inc.
Address: 1100 W. 116°i Ave.. P.O.Box 33695 Denver Colorado 80233-0695
phone number(s):
Office: 303-452-6111 extension 3141
Cellphone: N/A
Fax number: 303-254-6068
Ismail: wco _anrrutristale*t.or
Permittee (Person who is to sign the Development Construction Permit):
Individual Name: Mark Murray
Company Name: "I-r Gel3critinn 1111d r-in- -..inn A �qnciqljou Inc
Address: 11O0 W. 116'k Ave., P.O. Box 33695. Denver. Colorado 80233-0695
phone number(s):
Office: 303-452-6111 extension 3211
Cellphone: .
Fax number: 303-452-6063
lanail: mmurravgu trtstateg<_crr�
Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person,
responsible lot the design of this project, responsible for certification that improvements are constructed
in accordance with approved plans, responsible for making revisions to plans with City approval and for
providing as -constructed plans):
Individual Name: William C. Cowan
Company Name: Tri-State Generation and Transmission Association, Inc.
Address: _ 1 100 W. 116°i Ave.. P.O. Box 33695 Denver Colorado 80233-0695
Phone number(s):
Office: 303-452-61 11 extension 3141
Cellphone:
I ax number: 303 254-6068
Ifniail: wcowanLy trtstate_+:t.org
1'rofcssional License Number: Colorado 16253
Architect/Planner ('I he person responsible for the site design of this project)
Individual Name SAME. AS ABOVE.
Company Name : —
Address: _
Phone numbcr(s):
Office
Cellphone:
Fax number:
Email:
Developer (The party or parties referenced in the Development Agreement who are responsible for the
Developer's obligations contained in the Agreement —add additional names below):
Individual Name: SAME; AS ABOVE
Company Name
Address:
Phonc number(s):
Office:
Cellphone Fax number:
(:mail:
General Contractor (The contractor in overall charge of the public infrastructure construction)
Individual Name: NOTE No public
Company Name :
Address:
Phone number(s):
Office
Ccllphone: __ - --- -
Fax number:
Email:
If you have no General Contractor, list all other contractors below.
Grading contractor:
Individual Name: Dale Lvle
Company Name : t eft ttanri Excavating
Address: 3756 Eureka Way, Frederick Colorado 80516
Phonc number(s):
O ft icc: 303-833 -3 326
Cellphonc:
Fax number:
Email:
Utility contractor:
Individual Name:
Company Name : —
Address:
Phonc numher(s):
Office:
Cellphonc:
Fax number:
Ismail:
Concrete contractor for flat work:
Individual Name: Glen Troudt
Company Name : Glen Troudt
Address: _ 16 Sunset Circle Lonq,,mont Colorado 80501
Phone number(s):
Officc: 303-776-6195
CeI Iphone:
hax number:
Email:
Concrete contractor for structures:
Individual Name: SAME AS ABOVE
Company Name :
Address: _
Phonc numbcr(s):
Office
Ccllphone: -
Fax number:
Email: