HomeMy WebLinkAboutUS 287 - SH 14 ACCESS MANAGEMENT PLAN - Filed STR-STREETS - 2010-06-173/23/2010
Original copy of the Amendment to the US 287 / SH
14 Access Management Plan which amends the Long
Range Access for the section of US 287 between
Willox Lane and the Larimer and Weld Canal.
Transportation Planning also has an original copy in
their files.
No Text
No Text
City Of 01%�
F6rt Collins
/`O,�
Memo
Date: January28, 2010
To: Darin Atteberry, City Manager
off- �M�
SJ _ ve-�
Thru: Diane Jones, Deputy City Manager
Jeff Scheick, Director or Planning, Development, and Transportation IN
Helen Migchelbrink, City Engineer/''
Rick Richter, Capital Projects Manager
From: Matt Baker, Street Oversizing Program Manager itf-fil
Kyle Lambrecht, Civil Engineer 4 L
RE: CollegeNVillox Roadway Improvements Project
Amendment of the US 287/SH 14 Access Management Plan/Project Update
Attached for your signature is an amendment to the US 287/SH 14 Access Management
Plan for North College Avenue, from Willox Lane to the northern City limits. The Access
Management Plan must be amended to accurately reflect the improvements to North College
Avenue planned for the North College Marketplace development.
In order to enact this amendment, the Colorado Department of Transportation (CDOT),
Larimer County, and the City of Fort Collins must sign the access amendment
documentation. To date, both CDOT and Larimer County have reviewed and signed the
access amendment documentation. To complete this amendment, the City of Fort Collins
must also sign. Staff has reviewed the attached access amendment documents and
recommends that these documents be authorized through signature.
Staff has worked with CDOT and the City's Development Review Engineering group to locate
and consolidate accesses as necessary along North College Avenue between Willox Lane
and the northern City limits. Along with the updated access locations, a parallel roadway
system within the development was established, meeting the long term goals of CDOT's US
287/SH 14 Access Management Plan. The access management plan must be amended to
correctly reflect these improvements. With CDOT, Larimer County, and the City of Fort
Collins comfortable with the access locations and the long-term parallel roadway system
within the Marketplace Development, an access plan amendment was developed. Please
see the attached documentation regarding this updated plan.
Construction of the North College Marketplace site is underway, and the College/Willox
Roadway Improvements project team is also preparing for construction activities in this area.
It is anticipated that roadway construction will begin in spring of 2010 and will be completed in
1/28/10 Memo: College/Willox Roadway Improvements Project
the fall. This is an important project, both serving as the first roadway project for the City's
Urban Renewal Authority (URA) and acting as the City's northern gateway along College
Avenue. The project design has been through a collaborative effort of several City
departments, the URA, CDOT, the North Fort Collins Business Association (NFCBA),
adjacent property owners, and the developer of the North College Marketplace, with the
Engineering Department serving as the lead.
The roadway engineering design transitioned to the Engineering Department from the North
College Marketplace developer with approximately half of the roadway plans developed.
From this point forward, the project team finalized the roadway engineering design,
developed project specifications, a cost estimate, and a unique urban design element for the
North College corridor. Each step of the design process involved all the various interests and
a consensus was reached for the urban design elements within this project. The NFCBA has
expressed its interest in the planned median design of College/Willox be incorporated into the
North College Phase II project when these can be constructed.
With the design phase of the project concluding, staff is excited to bid and construct this
important project. Not only will this project address vehicle and multimodal safety issues
along this section of North College, but it will also add a unique identity to the North College
corridor; one that can be continued in future projects south of these planned improvements.
Although this will be a difficult project, impacting both the travelling public and existing
businesses in the area for several months, the final product will create a safe and aesthetic
roadway that will set the standard for the area.
-2-
DEPARTMENT OF TRANSPORTATION
REGION 4 TRAFFIC
1420 Second Street
Greeley, Colorado 80631
(970)350-2148
(970) 350-2198 fax
November 13, 2009
To Whom It May Concern:
US 287/SH 14 AMP
Fort Collins
Attached is the final version of the amendment(s) for the US 287/SH 14 Access Management Plan which amend the Long
Range Access for the section of US287 between Willox Lane and Larimer and Weld Canal.
Your signature below signifies approval of the proposed amendment(s).
The Colorado Department of Transportation appreciates your cooperation and involvement in the amendment process.
City of Fort Collins Date
La er County Date
#o1or Department of Transportation Dane
Sincerely,
Gloria Hice-Idler
Permit Manager
(970) 350-2148
xc: ACP Plan
file
INTSRWEST CONSULTING GROUP
July 17, 2009
Ms. Gloria Hice-Idler
CDOT Region 4
1420 2°d Street
Greeley, Colorado 80631
Ms. Sheri Langenberger
281 North College
Fort Collins, Colorado 80522-0580
RE: College and Willox Improvements Project — Access Plan Amendment
Dear Gloria and Sheri,
We have prepared the attached documents for your review as they relate to access between Willox and the
Larimer and Weld Canal on College Avenue (US 287). These have been prepared based on our meeting on
July 1, 2009. Following is a description of the attachments:
1. A summary table of the existing accesses on the corridor and how the existing accesses will be
changed with the project. The tables also include a listing of the access locations, widths and
types after project construction. Addresses from the Larimer County Assessor are included for
your use.
2. Language amending the IGA between CDOT, the City and Larimer County. Please note that the
IGA does not discuss the connecting parallel roadway to Spaulding, that language is only in the
Access Management Report.
3. Language amending the Access Management Report.
4. Amended Figures 3-18 and 3-19 (Long -Range Access Control Plan — North College Avenue).
These revised figures would need to be in both the IGA and the Report.
5. A plan showing the project improvements related to access. This is basically the "interim"
condition created with the project that is more than the Short -Range Plan and less than the Long
Range Plan.
Please review and let me know if you have any questions or comments. I would like to go through these
documents with Gloria the next time she is in Fort Collins if possible.
Sincerely,
mt'-�ai 6at-11,
Michael Oberlander, PE, LEED AP
Project Manager
1218 W. ASH, SUITE C, WINDSOR, COLORADO 80550
TEL. 970.674.3300 - FAX 970.674.3303
College/Willox Improvements Project
US 287 Access Modification Summary
July, 2009
Exlstina Accesses - East Side of US 287
Pro ect Station
Milepost
Owner
Description
10+00
348.04
Willox Intersection - Section Corner
Janet Haas, 1256 Red
Mountain Drive, Longmont, CO
North College Motors continuous drive to be
348.06
80501
removed.
1802 North College
Investments, LLC, 1802 N
College Ave, Fort Collins, CO
Pobre Ponchos South Drive to be removed.
348.07
80524
1802 North College
Investments, LLC, 1802 N
College Ave, Fort Collins, CO
Pobre Ponchos North Drive to be removed.
348.07
80524
348.09
Developer
Removed by developer.
348.10
Developer
Removed by developer.
348.11
Developer
Removed by developer.
348.20
Developer
Removed by developer.
Grape Street - to be removed and replaced by
new public drive into development at STA
348.22
17+33 see bellow).
348.23
1Ditch
Road to Remain
Proposed Accesses - East Side of US 287
Project Station
Milepost
Owner
Description
10+00
348.04
Willox Intersection - Section Corner
New 30' RI/RO Commercial Access Drive -
14+04
348.11
requires CDOT Access Permit
Relocation of Grape Street with 30' 3/4
Commercial Access Drive - requires CDOT
17+33
348.18
lAccess
Permit
19+56
348.23
1Ditch
Road to Remain
College/Willox Improvements Project
US 287 Access Modification Summary
July, 2009
Existing Accesses - West Side of US 287
Project Station Milepost Owner Description
10+00 348.04 Willox Intersection - Section Corner
Deloris M Weber Revocable Mini -Mart Drive - will remain in same location
Trust, DTD 5-13-97, PO Box but rebuilt to 30' wide with no porkchop island
348.08 215 York Nebraska 68467 remains RI/RO
Lamplighter Lodging, Inc.,
1809 North College Avenue,
Lamplighter South Drive to be removed.
348.09
Fort Collins, CO 80524
Lamplighter Lodging, Inc.,
Lamplighter North Drive - to be removed and
1809 North College Avenue,
replaced by new 30' RI/RO drive at STA 14+20
348.12
Fort Collins CO 80524
Shared
Legends Holdings, LLC, 1845
Legacy Auto Sales South Drive - to be removed
North College Avenue, Fort
and replaced by new 30' RI/RO drive at STA
348.13
Collins CO 80524
14+20 Shared
Legends Holdings, LLC, 1845
North College Avenue, Fort
Legacy Auto Sales North Drive - will remain in
348.15
Collins CO 80524
same location but rebuilt to 30' RI/RO
Legends Holdings, LLC, 1845
Existing Field Access (NOT SHOWN ON THE
North College Avenue, Fort
ACCESS MANAGEMENT PLAN), will be
348.16
Collins, CO 80524
relocated to STA 18+19 with 16' wide drive
348.22
Ditch Road to Remain
Proposed Accesses - West Side of US 287
Project Station
Milepost
Owner
Description
10+00
12+02
348.04
348.08
Willox Intersection - Section Corner
Mini -Mart Drive - 30' RI/RO
14+20
348.12
30' RI/RO drive (Shared between Lampighter
and Legacy Auto
15+74
348.15
Legacy Auto Sales North Drive - 30' RI/RO
18+19
348.20
16' Field Access
19+10 1
348.22
Ditch Road to Remain
US 287/SH14 Access Management IGA Amendment
VII. INDIVIDUAL ACCESS POINT DESCRIPTIONS
Long -Range Plan - North College Avenue
Page 13
The 101h paragraph of Page 13 is amended as follows:
Interwest Consulting Group
July, 2009
Provide public street or public drive connections to the parallel street /
drive system approximately 450 feet north of Willox Lane (both sides of
North College Avenue). These streets / drives would be limited to RIRO
movements at North College Avenue. See PRU.
The 22"d paragraph of Page 13 is amended as follows:
Public Drive 740 feet north of Willox Lane (east side) shall become a 314
movement. Grape Street (east) shall be removed. Ditch Road (east and
west) shall remain, but will be limited to RIRO with construction of raised
median. See PRU.
US 287/SH14 Access Management Report Amendment
Interwest Consulting Group
July, 2009
3.6 Access Control Plan
Long -Range Plan Recommendations
Corridor -Wide Improvements
Page 41
The 2nd paragraph of Page 41 is amended as follows:
East Side of North College Avenue — Develop parallel Collector Street
system between Vine Drive and Bristleeone Drive, and a parallel public
access drive north of Willox Lane reconnecting to College Avenue
approximately 740 feet north of Willox (south of the Larimer and Weld
Canal). No connection to Spaulding Lane will be made on the east side of
287.
US 2871SH14 Access Management Report Amendment
Interwest Consulting Group
July, 2009
3.6 Access Control Plan
Long -Range Plan Recommendations
Location -Specific Improvements
Page 42
The 10`h paragraph of Page 42 is amended as follows:
Provide public street or public drive connections to the parallel street / drive system
approximately 450' north of Willox Lane (both sides of the street). These streets /
drives would be limited to RIRO movements with North College Avenue.
The 11`" paragraph of Page 42 is amended as follows:
Construct a left turn deceleration lane in the median for access to the new public drive
connection south of the Larimer and Weld Canal.