Loading...
HomeMy WebLinkAboutTRAIL HEAD - Filed CS-COMMENT SHEETS - 2005-04-08PROJECT COMMENT SHEET City of Fort Collins REC.D Current Planning DATE: December 23, 2003 TO: Engineering Pavement PROJECT: #43-02A TRAILHEAD PDP — TYPE I (LUC) All comments must be received by Bob Barkeen no later than the staff review meeting: January 14, 2004 Note - PLFASE identify your redlines for future reference sC� Ig ;N T-tteP- � b'L(A ix ru/v L Soo P% R, L �_ PI z-6v16� Name (please print) ZSUJ@�%faWe��t 4.0n,� /V,r f 1000. r CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape City of Fort Collins Topic: Landscape Number: 99 Created: 1 /16/2004 [1/16/041 Remove the contours. Number: 100 Created: 1 /16/2004 [1/16/041 Show all utilities. Number: 101 Created: 1 /16/2004 [1/16/041 Show all easements (sight, emergency, drainage, utility, etc). Topic: Plat Number: 63 Created: 1 /13/2004 [1/13/041 Corrections to the plat language are required. Number: 64 Created: 1 /13/2004 [1113/041 Please provide curve tables. Number: 65 Created: 1 /13/2004 [1113/041 Provide a signature block for the ditch company. Number: 66 Created: 1 /13/2004 [1/13/04] See redlines and comments under General for additional requirements. Number: 90 Created: 1 /16/2004 [1/16/04] Vacate the old ditch easement with the plat. Number: 93 Created: 1 /1612004 [1/16104] From Technical Services: Boundary and legal close. Number: 94 Created: 1 /16/2004 (1116/041 From Technical Services: Subdivision title in dedication statement does not match title. Number: 95 Created: 1 /16/2004 [1/16/04] From Technical Services: East/west portion of Lower Loop Dr needs to be renamed. Number: 96 Created: 1 /16/2004 11/16/041 From Technical Services: Greenfields Street needs to be renamed to "Drive". Number: 97 Created: 1/16/2004 [1/16/041 From Technical Services: Wagon Trail Road needs to break at curve to east and continue with new name. Number: 98 Created: 1 /16/2004 [1/161041 From Technical Services: North Vista Drive need to be renamed. A) No directional in name - "North" is gone B) Vista is already used. Topic: Site Number: 34 Created: 1 /13/2004 [1/13/041 Please show all existing wells that will stay in place with this project so that future homeowners are aware of them before they choose a lot. Topic: Utility Number: 38 Created: 1 /13/2004 (1/13/04] Corrections required to the General Notes. See redlines. Number: 39 Page 3 Created: 1 /13/2004 [1/13/041 The Owner listed on the Utility plans is different than that shown on the Site Plan Number: 40 Created: 1/13/2004 [1/13/04] Mid -block crosspans must be a minimum of 12' wide. See 7.7.5.A. Number: 41 Created: 1/13/2004 [1/13/04] Label the type of curb and gutter being used on the typical local street cross section. Number: 42 Created: 1/13/2004 [1/13/041 No storm sewer facilities were included with the utility plans. Another round of review will be necessary prior to scheduling a public hearing. Number: 43 Created: 1/13/2004 [1/13/041 The minimum CL radius on and Arterial is 1075'. Greenfields currently shows 1000' in one location. Please correct to meet the minimum requirement. Number: 44 Created: 1/13/2004 [1/13/041 The minimum tangent lengths at the intersections do not meet the requirements shown in Table 7-3. Check CL12 for instance. Number: 45 Created: 1/13/2004 [1/13/04] Will need to show dedicated driveways on the narrow lots on the utility plans as well as the plat and site plan. Number: 46 [1/13/041 Please provide curve tables. Created: 1/13/2004 Number: 47 Created: 1/13/2004 [1/13/04] Will need to provide enough design information for the bike trail so that it can be laid out in the field. Please provide dimensions, lengths, widths, curve tables, etc. Number: 59 Created: 1/13/2004 [1/13/04] Need to show the existing irrigation lines on the property and label what they are made of. NO ADS PIPE IS ALLOWED IN ROW. If that is what is out there, it will need to be replaced in all instances it goes under the ROW. No private Tines may be placed in public utility easements. They will need to be placed in their own private easement. This easement must be dedicated on the plat and shown on all plans sets (site/landscape/utility). Number: 61 Created: 1/13/2004 [1113/041 Provide a city signature block on every sheet in the lower right hand corner. Number: 62 Created: 1/13/2004 [1/13/041 Please provide preliminary cross sections (typical) for each street proposed. Number: 83 Created: 1 /16/2004 11/16/041 Provide all applicable details on a detail sheet. Number: 84 Created: 1/16/2004 [1116/04] Provide a striping and signage sheet(s). Number: 85 Created: 1 /16/2004 (1/16/041 Will need off -site grading and construction easements. Number: 88 Created: 1 /16/2004 [1/16/04] Using detail 7-24 as a template, show a detail for each and every street widening on the plan and profile sheets calling out the various Lengths, Rs and Ws so that we can determine whether or not they are in compliance. Page 4 March 2, 2004 Ravindra M. Srivastava, Ph.D., P.E. Boxeldcr Sanitation District General Manager 2217 Airway Ave. 43 P.O. Box 1518-2217 Fort Collins, CO 80522 RE:Trail Head PDP— Type l (LUC) #32-01B&C Dcar Mr. Srivastava: J R ENGINEERING This letter is in response to the staff project review comments dated 01-20-2004. Our responses, in italics, follow the City comments. Number: I Hydraulic analysis conducted by the district (BSD assumptions: 2.5 persons/household, 100 gal/person/day wastewater generation, ASCE peaking factor of { 18+sqrt (popul/l000)]/[4 t sgrt(popul/1000)], pipes <_ 15 in. diameter to flow no higher than half full at peak flow, PVC Manning friction factor 0.014 indicates portions of the sanitary sewer system, as designed, arc undersized. This is a definite problem at MH 2 and downstream pipeline sections, and may be a potential problem from MH 7 and some downstream pipeline sections. Please revisit your hydraulic computations and advise on design changes. A copy of your hydraulic analysis would be appreciated, including design flow assumptions for residential and common/commercial facilities. Response: Comment addressed; rve have analyzed the sanitary server system (see attacked spreadsheet) and capsized several pipes and increased slopes on several runs (see attached handivritten sanitary sewer changes table). Assumptions are also listed on the attached spreadsheet. 2620 1: , 1 90. 1 80525 Number: 2 The sanitary sewer profiles do not incorporate depictions of storm sewer. Thus any potential conflicts between sanitary sewer and storm sewer infrastructure remain unidentified. Please show storm sewer infrastructure location and size in the sanitary sewer plan and profile views. Also, please include in the drawing set, copies of the storm sewer infrastructure plan/profile views. Response: Comment noted and addressed. Number: 3 Sanitary sewer service laterals are not shown. As a result, it is not clear which lot is being served by which sanitary sewer line/manhole. Also, clarification is needed as to how many laterals will be connected to the main line from each multi -family housing unit. Please draw sanitary sewer service laterals in plan view, also indicating the pipeline station where this lateral should connect to the main line. Response: Sanitary sewer service laterals have been drawn in the plan view. Pipeline station will be indicated in the final submittal plans. Number. 4 Commercial/common facilities and flows there from are not identified on the plans. Please indicate on the drawings what proposed buildings/facilities are planned, their potential sanitary sewer service lateral locations, and expected wastewater flows generated by them. Response: Conlin erciallcommoil facilities flows are identified on the plans in table format. Service laterals connecting to the sewer mains at this area will be depicted at final submittal once building layout/loeations are solidified. Number: S Other comments: Cover Sheet: • Notes 10 and 11: Please insert the words "sanitary sewer" before "manhole" Response: Comment has been addressed. Notes Sheet: • Please include Boxelder Sanitation District notes. They are provided on the accompanying floppy disk. Response: Comment has been addressed. Details Sheet: • Boxelder sanitary sewer details are not included. Please incorporate them into the plans. AutoCAD drawings are included on floppy disk sent herewith. Response: Comment has been addressed. Overall Utility Plans: • Please show pipe diameter, pipe length, and slope of sanitary sewer lines (Sheets 11 through 17). Response: Comment has been addressed. For information regarding the slope of the sanitary sewer lines, please refer to the sanitary server plan and profile sheets. Sheet 18. • Move MH 10 just a little to the west, and MH 11 closer to the street center -line. Response: In order to maintain 10' bebveen sanitary sewer lines and water lines MH 10 and H remained in place. MH 9 was moved in order to move the sanitary sewer line out froin under the curb and gutter. Sheet 19. • Pipeline lengths do not match between plan and profile, between MH 4 and existing- MH. Response: Text has been updated to match plan and profile. • Also, MHs 4 and 5 are sticking out of the ground. Response: Rho elevations now reflect proposed ground surface. Sheet 20. • Profile shows an 8" water line conflicting with the sanitary sewer line. Response: All crossings are now shown and all conflicts have been identified and resolved. • Mll 46 to be moved away from flowline. Response: MH 46 has been moved away front the flowline. Sheets 22 and 23. • May be able to eliminate two manholes (e.g., #26 and #22) by having longer pipe length runs (e.g., <_ 400 ft.) and repositioning MH 21. Response: Manhole #26 and #22 are at bends. Therefore, all manholes have remained. • Existing and proposed grade level labels are switched for San 9, sheet 23. Response: Existing and proposed grade level labels have been corrected. • Need to depict proposed commercial/common facilities and their sewer service laterals connecting to sewer mains at San 9 (sheet 23) , San 5, (sheet 25). Response: Service laterals connecting to the sewer mains at San 9 and San 5 will be depicted at final submittal once building layout/locations are solidified. Sheet 24: • Storm sewer should, preferable, cross sanitary sewer perpendicularly and not at a slant. Response: Perpendicular crossing achieved as much as possible. Stormwater and waterline restricted some crossings. • MH 27, 28 too close to stormwater. Response: Location of these manholes to the stormwater is restricted by the size of the storm water pipe and the location of the waterline. Sheet 25: Two manholes and sewer lines located in the triangle between Wagon Trail Road, Yule Drive and Trading Post Road connect to MH 31-B. No plan/profile of such lines is shown. If these lines are built, district would meet utility/access easement 30' wide and a pathway that can withstand vacuum truck weight. Response: This sewer line has been eliminated. Refer to sanitary server system calculations spreadsheet. • Maybe able to eliminate manhole MH 32. Response: MH 3I-B will be eliminated at final submittal.. If you have any questions or concerns, please call me at (970) 491-9888. Sincerely, �� /. -;Zl'�� Timothy Halopoff, JR Engineering 1 of Trail Head Sanitary Sewer Calculations Single Multi Infiltration Infiltration Peaking Peak Peak Accumulated Accumulated Manhole Commercial People Flow Flow Peak Flows Peak Flows Family Family (gpd) (gpm) Factor (gpd) (gpm) (gpm) (cfs) MH-40 MH-39 13 33 1237.5 0.859 4.35 19173 13.31 13.31 0.030 MH-38 7 16 58 2175 1.510 4.25 33021 22.93 36.25 0.081 MH-37 3 8 300 0208. 4.24 4545 3.16 39.40 0.088 MH-52 MH-37 1 0 0 0.000 4.31 1500 1.04 40.44 0.090 MH-36 4 1 10 375 0.260 4.10 121098 84.10 124.54 0.277 MH-51 MH36 3 8 28 1050 0.729 4.36 16308 11.33 11.33 0.025 MH-36 MH-35 0 0 0.000 4.09 0 0.00 135.86 0.303 MH-28 3 8 300 0.208 4.08 4382 3.04 138.91 0.309 MH-46 MH-45 8 20 750 0.521 4.38 11701 8.13 8.13 0.018 MH-44 4 10 375 0.260 3.77 5083 3.53 11.66 0.026 MH-41 1 3 112.5 0.078 3.74 1514 1.05 12.71 0.028 MH-43 MH-42 5 13 487.5 0.339 4.40 7642 5.31 5.31 0.012 MH-41 4 10 375 0.260 4.37 5840 4.06 9.36 0.021 MH-27 8 20 750 0,527 4.27 11436 7.94 30.01 0.067 MH-34 MH 33 3 8 300 0.208 4.42 4723 3.28 3.28 0.007 MH-32 5 8 33 1237,5 0.859 4.33 19104 13.27 16.55 0.037 MH-318 2 4 15 562.5 0.391 4.30 8633 6.00 2254 0.050 MH-31 4 4 20 750 0.521 4.27 11436 7.94 30.48 0.068 A MH-30 3 8 300 0.208 4.26 4564 3.17 33.65 0.075 MH 29 8 20 750 0.521 4.24 11347 7.88 41.53 0.093 MH-28 3 8 300 0.208 4.23 4530 3.15 44.68 0.100 MH-27 0 0 0.000 4.02 0 0.00 183.59 0.409 MH-7 0 0 0.000 3.98 0 0.00 213.60 0.476 Future MH-54 MH-6B 15 38 1425 0.990 4.34 22027 15.30 15.30 0.034 Future MH-55 MH-6B 15 38 1425 0.990 4.34 22027 15.30 15.30 0.034 Future MH-56 MH-6A 12 30 1125 0.781 4.35 17455 12.12 12.12 0.027 Future MH-57 MH-6A 19 48 1800 1250 4.32 27710 19.24 19.24 0.043 Future MH-58 MH-4 13 33 12375 0.859 4.35 19173 13.31 13.31 0.030 Future MH-59 MH-4 17 43 16125 1.120 4.33 24873 17.27 17.27 0.038 MI I-5'i MH-1.1 5 13 487.5 0.339 440 7642 5.31 5-31 0-012 MIi-7G 3 8 300 0208. 4.42 4723 3.28 3.28 0.007 MH-74 10 25 9375 0651 4.35 14525 10.09 13-37 0.030 - - - M H 9 23 8625 0.599 4.30 13238 9.19 2256 0.050 -23 MI-2 11 28 10-)0 0.729 426 15972 11.09 33.65 0.075 MH-2 6 15 562.5 0.391 424 8521 5.92 39.57 0-088 1 MI113 10 25 937.5 0.651 4.22 14115 280 49.37 0.110 Flow Calculations Sanitary Calcs-rls 2/20/2004 JTC 2 of 2 MH-20 5 MH-19 MH-18 4 MH-17 3 MH-16 6 MH-15 13 MH-14 14 MH-13 6 MH-12 5 MH-3 MH-11 MH-10 3 MH-9 2 MH-8 7 MH-7 15 MH-6B MH-6A MH-5 8 3 5 13 487.5 0.339 4.40 7642 5.31 5.31 0.012 10 375 0.260 4.37 5840 4.06 9.36 0.021 8 300 0.208 4.35 4652 3.23 12.59 0.028 15 562.5 0.391 4.32 8666 6.02 18.61 0.041 33 1237.5 0.859 4.27 18852 13.09 31.70 0.071 35 1312.5 0.911 4.23 19808 13.76 45.46 0.101 15 562.5 0.391 4.20 8435 5.86 56.62 0.126 0 0 0.000 4.10 0 0.00 106.00 0.236 33 1237.5 0.859 4.08 18064 12.54 118,54 0.264 8 300 0.208 4.42 4723 3.28 3.28 0.007 5 187.5 0.130 4.40 2939 2.04 5.32 0.012 18 675 0.469 4.35 10468 7.27 12.59 0.028 38 1425 0.990 4.28 21776 15.12 27.71 0.062 0 0 0,000 3.95 0 0.00 241.31 0.538 0 0 0.000 3.92 0 0.00 271.90 0.606 0 0 0.000 3,89 0 0,00 303.27 0.676 0 0 0.000 3.89 0 0.00 303.27 0.676 0 0 0.000 3.87 0 0.00 333.86 0.744 20 750 0.521 3.77 10182 7.07 459.47 1_024 0 0 0.000 3.77 0 0.00 459.47 1,024 0 0 0.000 3.77 0 &00 459.47 1.024 Total 217 158 2 951 35662.5 24.766 661631 459.47 Residential Peak Flow Factor Equation (PF): Assume: 2.5 People/Dwelling (18 +.%P ) Daily Use: 125 Gallons per Capita per Day IT - Where: P is the population in thousands Infiltration Factor: 0.3 (4+,) Commercial Pool/Club House Assume: 100 Guests/Staff Daily Use: 10 Gallons per Capita per Day Pool Release Rate. 114,592 gpd (4" PVC Running Full for Pool Drainage) Day Care Assume. 50 Students/Staff Daily Use: 30 Gallons per Capita per Day Flow Calculations Sanitary Calcs As 2/20/2004 JTC 1 of Trail Head Sanitary Sewer Calculations Accumulated Accumulated Pipe Proposed Full Full Depth ft O Depth Manhole Peak Flows Peak Flows Size Slope Capacity Velocity 010�„1, 9F d/D Velocity (fVs) (gpm) (cfs) (in) (ft/ft) (cfs) (ft/s) (in) MH-40 1331 0.030 8 0.0050 0.857 2A54 0.035 0.085 1.020 0.128 1.15 MH-39 3625 0.081 8 0.0050 0.857 2.454 0.094 0.139 1.668 0.209 1.54 MH-38 MH-37 39A0 0.088 8 0.0050 0.857 2.454 0.102 0.144 1.728 0.216 1.58 MH-7 40.44 0.090 8 0.0150 1_484 4.251 0.061 0.111 1.332 0.167 2.34 MH 7 3 MH-36 124.54 0.277 8 0.0050 0.857 2.454 0.324 0.261 3A32 0.392 2.19 MH-51 MH-36 1133 0.025 8 0.0135 1.408 4.033 0.018 0.062 0.744 0.093 1.54 MH-36 135.86 0.303 8 0.0070 1.014 2.904 0.299 0.250 3.000 0.375 2.53 MH-35 MH-28 138.91 0.309 8 0.0070 1.014 2.904 0.305 0.253 3.036 0.380 2.54 MH-46 813 0.018 8 0.0065 0.977 2.799 0.019 0.063 0.756 0.095 1.08 MH-45 11.66 0.026 8 0.0075 1.049 3.006 0.025 0.072 0.864 0.108 1.27 MH-44 MH-41 12,71 0.028 8 0.0063 0.962 2.756 0.029 0.078 0.936 0.117 1.22 MH-43 5.31 0.012 8 0.0075 1.049 3.006 0.011 0.050 0.600 0.075 1.00 MH 42 9.36 0.021 8 0.0050 0.857 2.454 0.024 0.072 0.864 0.108 1.03 MH-41 MH-27 30.01 0.067 8 0.0040 0.766 2.195 0.087 0.133 1.596 0.200 1.35 MH-3 3.28 0.007 8 0.0120 1.327 3.802 0.006 0.034 0.408 0.051 1.03 MH-33 1655 0.037 8 0.0050 0.857 2.454 0.043 0.095 1.140 0.143 1_22 MH-32 2254 0.050 8 0.0050 0.857 2.454 0.059 0.109 1.308 0.164 1.34 MH-31 B 30.48 0.068 8 0.0050 0.857 2.454 0.079 0.127 1.524 0.191 1.46 MH-31A 33.65 0.075 8 0.0075 1.049 3.006 0.071 0.121 1.452 0.182 1.74 MH-30 41.53 0.093 8 0.0075 1.049 3.006 0.088 0.134 1.608 0.201 1.85 MH-29 44.68 0.100 8 0.0127 1.365 3.912 0.073 0.122 1.464 0.183 2.28 MH-28 183.59 0.409 8 0.0338 2.228 6.382 0.184 0.194 2.328 0.291 4.85 MH-27---- MH-7 21360 OA76 10 0.0040 1.389 2.547 0.343 0.337 4.044 0.404 2.30 - Future MH-54 15.30 0.034 8 0.0350 2.267 6.494 0.015 0.057 0.684 0.086 2.35 MH-6B Future MH-55 15.30 0034 8 0-0350 2267 6 494 0.015 0.057 0.684 0-086 2.35 MH 66 Future MH{,Fi MH 12 0.027 8 0.0350 2267 6.494 0.012 0.051 0.612 0.077 2.20 GA12 - RdF MH-S7 MFI-6A 2 194 0.043 8 0.0 350 2.267 6.494 0.019 0.064 0.768 0.096 2.53 Future MH SR 13.31 0.030 8 0.0350 2.267 6.494 0.013 0.054 0.648 0.081 2.27 MH 4 Future H M 17,27 0.038 8 0.0350 2.2 37 6.494 0.017 0.060 0.720 0.090 2.43 -4 ___ MH-53 Mfl 5 31 0.012 8 0.0185 1_648 4.721 0.007 0.041 0,492 0-062 1.37 -14 --- MII-2G____ Mill 25 328 0.007 8 0,0120 1-327 3.802 0.006 0.034 0.408 0.051 1-03 13-37 0.030 8 00065 0.977 2799 0-030 0-080 0-960 0.120 126 MH 24 225t, 0.050 8 0.0065 0.977 2.799 0-051 0.103 1 236 0.155 1-47 MH-23 - 3J.65 0-075 8 0.0100 1.212 3.471 0.062 0.113 1.356 0-170 1.92 MH 22 - 39.57 0.088 8 0.0108 1259 3.607 0.070 0.119 1.428 0-179 2.07 MH21 49 37 0.110 8 0.0300 2-099 6012 0.052 0-104 1.248 0.156 3.17 MH VI - Pipe Size, Capacity 8 Depth Sanitary Calcs xis 2,'20/2004 JTC 2 of MH-20 5.31 0.012 8 0.0075 1.049 3,006 0.011 0.050 0.600 0.075 1.00 MH-19 9.36 0,021 8 0.0050 0.857 2,454 0.024 0.072 0.864 0,108 1.03 MH-18 12,59 0.028 8 0.0050 0.857 2.454 0.033 0.083 0.996 0,125 1.12 MH-1 18,61 0.041 8 0.0050 0,857 2,454 0.048 0.099 1.188 0.149 1.26 MH-16 31.70 0.071 8 0.0050 0.857 2.454 0.082 0,130 1.560 0.195 1.48 MH-15 45A6 0.101 8 0,0150 1,484 4,251 0.068 0,118 1.416 0.177 2.42 MH-14 56.62 0.126 8 0.0175 1.603 4.592 0.079 0.127 1.524 0.791 2.73 MH-13 106.00 0.236 8 0.0075 1.049 3.006 0.225 0.215 2,580 0.323 2,42 MH- 118.54 0.264 8 0.0178 1.617 4.631 0.163 0.182 2,184 0.273 3.41 MH-3 MH-11 3,28 0.007 8 0,0120 1_327 3.802 0.006 0,034 0.408 0.051 1M MH-10 5.32 0.012 8 0,0075 1.049 3.006 0.011 0.050 0,600 0,075 1M MH-9 1259 0.028 8 0.0040 0,766 2.195 0.037 0.087 1,044 0.131 1.04 MH-8 27.71 0.062 8 0.0050 0.857 2.454 0.072 0.128 1.536 0.192 1.32 MH-7 241.31 0.538 10 0.0040 1.389 2.547 0.387 0.360 4.320 0,432 2.38 MH-68 27190 0,606 10 0.0040 1.389 2.547 0.436 0.386 4.632 0.463 2.46 MH-6A 303.27 0.676 10 0.0040 1.389 2.547 0.486 0.411 4.932 0.493 2.52 MH-5 303.27 0.676 10 0.0040 1.389 2,547 0.486 0.411 4.932 0.493 252 MH-4 333,86 0.744 12 0.0040 2.259 2.877 0.329 0.396 4.752 0.396 2.57 MH-3 459.47 1.024 12 0.0065 2.880 3.667 0.355 0.413 4.956 0.413 3.35 MH-2 459.47 1.024 12 0.0060 2.767 3,523 0.370 0.422 5.064 0.422 3.25 MH-1 459.47 1.024 12 0.0083 3.255 4.144 0.315 0.386 4.632 0.386 3,66 Mannings Coefficient = 0,013 Pipe Size, Capacity & Depth Sanitary Calcs.As 2/20/2004 JTC PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: December 23, 2003 TO: Technical Services PROJECT: #43-02A TRAILHEAD PDP — TYPE I (LUC) All comments must be received by Bob Barkeen no later than the staff review meeting: January 14, 2004 S, Note - PLEASE identify your redlines for future reference L l 5 �, 'u7Di d� s`� n Ti ;�c" :r. ��^r� ''� 5�i�7c—�E✓T 7JoEs ✓oT rvf7, z� 7T, zr/,fA/ zjVE r S_ �fIbOW %/L �a /S/D� To17 <17p CU 41i, %J d�'�J,�i`/-/ ��Ti� 1��• A/i�b5 7,72 A - 7i/it--erl6A,.d4-insN4M,e7rY Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _Site _Drainage Report _Other _Utility _Redline Utility _Landscape 4:i 1 "MM City of Fort Collins 1'rojcct: �_ Jot) No: q t U S. I l Client: _ By: =J Chk. By: Date. ZIZ� to i J•R ENGINEERING A Westri an Company Subject. Sheet No: of _ SPC) vhN -> f-kkA wow g" .� Iz" rYI 9 - I -n M N - Z �,.� c.,a 8 � � W t'- Mt4-2 I Ak k - U --0 VGA.0 - 5 Was 1 " V^ w 1 O " n1N s ram+-caa ,oa n4 N - CPS Al to CO / p i IA{lt- 1 lnti N $ �aS O•So (, taw O.go`u Cl-" U`(y ItnN- � -� n�k l u c�e,s �•6oto rvw O. �s� IN Ft -to a USN-1t W.s O.so`/� Iww 1 Zak SPoz-19 n��-2o w� o.solP ��� o.�s�� SPO 3 r� ta- z� IU -z3 was l9 % row I.00% Mla-ZS—F�IUl4'2Ca l.Jn-S O•(os`Yo /tew I. SfOk &k R,IH-ZT 00, �" KOCO (D YV�'cE- 33 -t> ✓�� H -34 0-,) S 0•So9'o v.u�, 1. zoo(o SPCC VUH-UZ nOOD Number: 75 Created: 1 / 14/2004 [1/ 14/04] Please contact Craig Foreman in the Parks Dept. to determine the easement width required for a regional trail. Response: Comment addressed. Number: 76 Created: 1/ 14/2004 [1/14/04] Additional connections to the proposed regional trail is required off of North Vista Drive and Wagon Trail Road (see redlines for suggested locutions). These suggestions only apply if the proposed trail alignments are approved by the Parks Department. Response: Conmcent is no longer applicable. Bike path configuration has been: changed after discussions with Transportation planning and parks department Number: 78 Created: 1/] 4/2004 [1/1-1/04] In order to achieve pedestrian level of service as identified in the TIS, the sidewalk alum, Vine Drive will need to connect to the sides%°alk along Waterglcn's frontage. This may require discussions with the Waterglcn HOA to determine who bears the cost. Response: Comment has been addressed. The developer intends to build the connection. Numbcr: 79 Created: 1 / 14/2004 [1/14/04] Sidewalks are required to be a minimum 6 feet in width where parked cars overhang. Response: Comment is no longer applicable. Former multi family layouts have been removed from this plan set. Areas are platted as tracts for future multi family development. Number: 80 Created: 1/ 14/2004 [1/14/04] Does the proposed location of the trail underpass of Vine Drive align with the proposed development to the south? Response: Yes, the proposed location of the trail underpass of Vine Drive aligns with the proposed development to the south. Number: 81 Created: 1/14/2004 [1/14/041 Directional access ramps are required at the intersections with Vine Drive. If the Street doesn't continue to the south or doesn't align to a street to the south, than the directional ramps should only go east to west. Response: Continent has been noted IN Number: 7.5 Created: 1/14/2004 [1/14/04] Please contact Craig Foreman in the Parks Dept. to determine the easement width rcquired for a regional trail. Response: Comment addressed. Number: 76 Created: 1/14/2004 [1/14/04] Additional connections to the proposed regional trail is required off of North Vista Drive and Wagon Trail Road (see redlines for suggested locations). These suggestions only apply if the proposed trail alignments are approved by the Parks Department. Response: Connment is no longer applicable. Bike path configuration has been changed after discussions with Transportation planning and parks department Number: 78 Created: 1/14/2004 [1/14/04] In order to achieve pedestrian level of service as identified in the TIS, the sidewalk along Vine Drive will need to connect to the sidewalk along Waterglen's frontage. This may require discussions with the Waterglen HOA to determine who bears the cost. Response: Continent has been addressed. The developer intends to build the connection. Numhcr: 79 Created: 1/14/2004 11/14/041 Sidewalks are required to be a minimum 6 feet in width where parked cars overhand. Response: Cononent is no longer applicable. Former multi fancily layouts have been removed from this plan set. Areas are platted as tracts for future nculti family development. Number: 80 Created: 1/14/2004 [ 1/14/04] Does the proposed location of the trail underpass of Vine Drive align with the proposed development to the south? Response: Yes, the proposed location of the trail underpass of Vine Drive aligns with the proposed development to the south. Numbcr: 81 Created: 1/14/2004 [ 1/14/04] Directional access ramps are required at the intersections with Vine Drive. If the Street doesn't continue to the south or doesn't align to a street to the south, than the directional ramps should only go east to west. Response: Comment has been noted. 18 Number: 75 Created: 1/14/2004 [1/14/041 Please contact Craig Foreman in the Parks Dept. to determine the easement width required for a regional trail. Response: Comment addressed. Number: 76 Created: 1/14/2004 [ 1/14/04] Additional connections to the proposed regional trail is required off of North Vista Drive and Wagon Trail Road (see redlines for suggested locations). These suggestions only apply if the proposed trail alignments are approved by the Parks Department. Response: Comment is no longer applicable. Bike path configuration has been changed after discussions with Transportation planning and parks department Number: 78 Created: 1/14/2004 [1/14/04] In order to achieve pedestrian level of service as identified in the TIS, the sidewalk along Vine Drive will need to connect to the sidewalk along Wate-glen's frontage. This may require discussions with the Waterglcn HOA to determine who bears the cost. Response: Comment has been addressed. The developer intends to build the connection. Number: 79 Created: 1/14/2004 11/14/04] Sidewalks are required to he a minimum 6 feet in width where parked cars overhang. Response: Conmuent is no longer applicable. Former multi family layouts have been removed from this plan set. Areas are platted as tracts for future multi family development. Number: 80 Created: 1/14/2004 [1/14/04] Does the proposed location of the trail underpass of Vine Drive align with the proposed development to the south? Response: Yes, the proposed location of the trail underpass of Vine Drive aligns with the proposed development to the south. Number: 81 Created: 1/14/2004 [1/14/041 Directional access ramps are required at the intersections with Vine Drive. If the Street doesn't continue to the south or doesn't align to a street to the south, than the directional ramps should only go east to west. Response: Comment has been: noted. 18 Nu mbcr: 75 Created: 1/14/2004 [1/14/04] Please contact Craig Foreman in the Parks Dept. to determine the easement width required for a regional trail. Response: Comment addressed. Number. 76 Created: 1/14/2004 [1/14/041 Additional connections to the proposed regional trail is required off of North Vista Drivc and Wagon frail Road (see redlines for suggested locations). These suggestions only apply if the proposed trail alignments are approved by the Parks Department. Response: Continent is no longer applicable. Bike path configuration has been changed after discussions with 7'rattspot4ation platning and parks department Number: 78 Created: 1/14/2004 [1/14/04] In order to achieve pedestrian level of setvice as identified in the TIS, the sidewalk along Vine Drive will need to connect to the sidewalk along Waterglen's frontage. This may require discussions with the Watcrglen HOA to determine who bears the cost. Response: Comment has been addressed. The developer intends to build the connection. Number: 79 Created: 1/14/2004 [1/14/041 Sidewalks arc required to be a minimum 6 feet in width where parked cars overhang. Response: Continent is no longer applicable. Former multi family layouts have been removed from this plan set. Areas are platted as tracts for future ntniti family development. N umhcr: 80 Created: 1/14/2004 11/14/04] Does the proposed location of the trail underpass of Vine Drive align with the proposed development to the south? Response: Yes, the proposed location of the trail underpass of Vine Drive aligns with the proposed development to the south. Number: 81 Created: 1/14/2004 [ 1/14/041 Directional access ramps are required at the intersections with Vine Drive. If the Street doesn't continue to the south or doesn't align to a street to the south, than the directional ramps should only go east to west. Response: Continent has been noted 18 F::1ip1ey s=­A ­ Landscape Archltecwra Urban Design March 2, 2004 Bob Barkeen City of Fort Collins City Planner 281 N. College Avenue P.O. Box 580 Fort Collins, CO 80522-0580 Planning RE: Trail Head PDP— Type 1 (LUC) #32-01B&C Dear Mr. Barkeen: This letter is in response to the staff project review comments dated 01-16-2004. Our responses, in italics, follow the City comments. ISSUES: Department: Advance Planning Topic: Site Number: 60 Northeast comer of site: 4 lines will converge in a very compressed, unusual way right at or near the comer of the site plan drawing, and what happens at the pinch point is not shown. (The lines are the railroad, the canal, Greenfields Street, and a regional trial to/from the northwest, not shown. A power line is a 5'h, but I assume it simply spans all the other lines). On the site plan or a supporting context plan, at the same or larger scale, these lines need to be shown to demonstrate how they all make it through the pinch point. Greenfields Street and the railroad t—i, eh i t t,P PxtPnded nonhward on the drawing; the canal should be more clearly shown: and Issue Contact: Clark Mapes Created: 111312004 the trail should be shown in a possible configuration to cross all 3 of the other lines. Response: Comment addressed; see sheet 6 of 6 in Plan Set 4. Number: 68 Created: 111312004 Please refer to Parks and Recreation comments regarding the proposed trail alignment. Response: We had a meeting with Parks and Recreation on 1130104 regarding the trail alignment. Everyone concurred that the trail would enter the project boundary near the southwest corner and continue through the neighborhood park to Greenfields Drive. There will be a below -grade crossing under Greenfields. The trail will continue on the east side of Green fields and go south to Vine Drive. The trail will go along Vine to Campfire Drive, where there will be another below -grade crossing underneath Vine to allow the trail to go south. r Inc `370214.GE 21; Fax g701, 24 ' G62 qpl VVasl MounVdn A" Swte 201 Furl Collins. CO 805E1-26g4 r�r,lry-1_0m Department: Current Planning Issue Contact: Bob Barkeen Topic: Site Number: 104 Created: 1/16/2004 [1/16/04] Street trees will need to be shown along streets. Response: We have added trees along any street frontage that has open space or where we know that there will be no driveways. JR Engineering will be providing detailed typical layouts for the lots, which will illustrate driveway locations, trees, water, sewer, electric, and gas. Fence type(s) and location will need to be included on the PDP. Fences will need to comply with the criteria in Section 3.8.11 of the LUC. Response: Fencing details have been added to the plans. The fencing will be similar to that of the adjacent Waterglen Development. There is a 4-foot three -rail fence with wire mesh and either a five or six foot high solid wood privacy fence. All fencing will be controlled by a design review committee. Ground cover material will need to be included on the landscape plan (irrigated sod, non - irrigated sod, mulch, etc.) Response: We are showing turf areas on the revised landscape plans and have shown more detail on the daycare and clubhouse buildings. Building setbacks will need to be shown on the site plan. Parking dimensions, including drive aisles, and walkways will need to be shown as well. Response: Comment is no longer applicable for the multi family areas.. Former multi family layouts have been removed from this plan set. Areas are platted as tracts for future multi- family development. We have added the building setbacks for the clubhouse and daycare sites. Could the day care building incorporate similar architectural features as the clubhouse building? Use of similar building materials, window and fascia trim, etc. The sq. ft. of the day care building should be included as well. Response: We have added a stone wainscot and indicated lap siding to the daycare building to better match the clubhouse building. Can the detached garage elevations be included with the PDP (perhaps as typicals?) Response: We are now showing typical detached garage elevations. Is it possible to loosen up the detention pond in the southeast corner of the site? Perhaps a little more naturalistic grading. Landscape groupings could provide a more natural design as well. Response: Adequate pond volume necessitates pond size and shape. Landscaping can be modified to provide a more natural design. The Block of lots 59-84 and 181-206 are greater than 700 feet, a pedestrian connection will need to be provided to the bike path along the rear of these lots. Response: Comment is no longer applicable. Bike path configuration has been changed after discussions with Transportation Planning and Parks Department. Can the north -south alley below Lower Loop Circle be dedicated as a local street? This block also exceeds 700 feet and will need a pedestrian connection between the two streets. Response: Comment has been addressed; please refer to Tracts O and P. Landscaping will need to be shown on the landscape plan, including the parkways adjacent to the arterial streets, the neighborhood park, and other open space tracts. Response: We were indicating trees on the landscape plan. We have now shown turf areas and more detail on the revised plans. Department: Current Planning Issue Contact: Ginger Dodge Topic: Street Names Number: 2 Created: 12/29/2003 Flagstaff Court is not an acceptable name — Flagstaff Place already exists in Latimer County. Response: Comment is no longer applicable. Former multi family layouts have been removed front this plan set. Areas are platted as tracts for future multi family development. North Vista Drive is not an acceptable name - cardinal directions are not allowed to be used in street names. Response: North Vista Drive has been changed to Campfire Drive. Greenfields Street is not an acceptable name — Greenfields Court is already existing in Latimer County. Response: Greenfields Street has been changed to Greenfields Drive. Lower Loop Circle is not an acceptable name. This is a directional change from Lower Loop Drive. Directional changes of approximately 90 degrees require a street name change. Response: Lower Loop Drive has been changed to Three Forks Drive. Trading Post Court and Green Lake Court are not acceptable names. The names Trading Post Road and Green Lake Drive should be continued to the cul-de-sacs. Response: Comment is no longer applicable. Former multi family layouts have been removed from this plan set. Areas are platted as tracts for future multi family development. The following names are reserved in the Latimer County Street Naming Database: Wagon Trail Road, Yule Trail Drive, Trading Post Road, Three Forks Drive, Bear River Court, Green Lake Drive, Roaring Creek Drive, Lower Loop Drive, and Glacier Creek Drive. Response: Thank you. Department: Engineering Issue Contact: Susan Joy Topic: General Number: 29 Created: 1/13/2004 [1/13/04] The Ditch Company will need to sign off on the plat, site and utility plans. Please provide the appropriate signature blocks. Response: Since the Ditch Company will only have an easement (which will be granted by a separate document) the Ditch Company can not sign the Subdivision plat as they will have no ownership interest in the property. Number:30 Created:111312004 [1/13/041 Need to dedicate all sight distance triangles on the plat. Must show all sight distance triangles on all plan sheets (Utility, Site and Landscape). Response: All sight distance triangles have been dedicated on the plat. All easements are shown on all plan sheets. Number:31 Created: 111312004 [1/13/041 See Appendix E6 for scanability requirements. Please correct all overlapped labeling. Response: Comment has been addressed and noted. N b 32 Created: 1/ 13/2004 um er. [1/13/04] Alleys may only be used in conjunction with a narrow street. Those proposed must be Private Drives if the applicant wishes to keep the local street width. Private Drives must be placed in a tract and be dedicated on the plat as a utility, public access and drainage easement. Response: Comment has been addressed; please refer to Tracts O and P. 4 Number: 33 Create& 111312004 [1/13/04] Additional easements are required of the project. PFA requires afire lanein the MF areas. A public access easement, both on and off site, is required for the future city bike trail shown on the site plan. Need to show all Natural Resource buffers and easements (emergency access, trail, etc) on all plan sets (Utility, Site Landscape). Response: On -site public trail easements are shown; off -site easements are yet to be determined. The 25 foot natural resource buffer has been added to the plans. Number:35 Created: 111312004 [1/13/04] A grade separated crossing is required where the future bike trail crosses Greenfield. This Project is responsible for the design and possible the construction of this underpass. Please coordinate with Craig Foreman in Parks Planning. Response: Comment had been addressed. Number: 36 Created.• 111312004 [1/13/041 Engineering will require an interim and ultimate road design for Vine Drive. The TIS shows the need for a right turn lane from Vine to Greenfields in the long range. This project is responsible for dedicating the additional ROW and designing it in the ultimate design. This project is also responsible for construction of Vine Drive along their frontage, however, the City's Street oversizing Dept. prefers to construct the entire length of Vine when it's realigned at some point in the future. This project will only construct the sidewalk along their frontage and install the landscaping. A Contribution in Aid will be accepted for the rest of their local street portion. An estimate prepared by JR Engineering will be required prior to drafting the Development Agreement so that this amount can be added to the DA. Response: Comment noted. Number: 37 Created.• 111312004 [1/13/04] The variance request for Lower Loop Drive was approved. Please list the variance under line 48 of the General Notes in the Utility Plans. Response: Thank you. Variance for Lower Loop Circle is now listed underline 48 of the General Notes in the Utility Plaits. Number:52 Created:111312004 [1/13/04] High volume driveways must be a minimum of 150' from an intersection. Several do not meet the standard. Response: Comment is no longer applicable. Former multi family layouts have been removed ,from this plan set. Areas are platted as tracts for future multi family development. J Project Comments Sheet Selected Departments Department: Engineering Date: January 13, 2004 Project: TRAILHEAD PDP - TYPE I (LUC) All comments must be received by Bob Barkeen in Current Planning, no later than the staff review meeting: January 14, 2004 Note - Please identify your redlines for future reference Issue Contact: Susan Joy Topic: General Number: 29 Created: 1 /13/2004 (1/13/041 The ditch company will need to sign off on the plat, site and utility plans. Please provide the appropriate signature blocks. Number: 30 Created: 1 /13/2004 [1/13/041 Need to dedicate all sight distance triangles on the plat. Must show all sight distance triangles on all plan sheets (Utility, Site, and Landscape). Number: 31 Created: 1 /13/2004 [1/13/041 See Appendix E6 for scanability requirements. Please correct all overlapped labeling. Number: 32 Created: 1 /13/2004 (1/13/041 Alleys may only be used in conjuction with a narrow street. Those proposed must be Private Drives if the applicant wishes to keep the local street width. Private Drives must be placed in a tract and be dedicated on the plat as a utility, public access and drainage easement_ Number: 33 Created: 1 /13/2004 [1/13/041 Additional easements are required of this project. PFA requires a fire lane in the MF areas. A public access easement, both on and off site, is required for the future city bike trail shown on the site plan. Need to show all Natural Resource buffers and easements (emergency access, trail, etc) on all plan sets (Utility, Site, Landscape). Number: 35 Created: 1 /13/2004 [1/13/041 An underpass is required where the future bike trail crosses Greensfield. This project is responsible for the design and construction of this underpass. - Number: 36 Created: 1 /13/2004 [1/13/04] Arterial/Arterial intersections require right turn lanes. This project is responsible for dedicating the additional ROW and designing and constructing a right turn lane from Vine Drive to Greensfields. Number: 37 Created: 1 /13/2004 Signatare Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Utility Redline Utility Landscape Page 1 Number:53 Created:1113/2004 [1/13/04] The sidewalk shown along Greenfield is not in the proper location. The back of walk must line up with the ROW. Response: Now that the bike trail is located on the east side of Greenfields Drive, it makes sense to detach and meander the alignment of the walk. We feel that the west side of the street should match. Number: 55 Create& 1113/2004 [11131041 The private drive off Glacier Creek must lineup with Lower Loop Circle. Response: The private drive off of Glacier Creek now lines up with Lower Loop Circle. Number: 56 Created: 1/13/2004 [1/13/04] The future bike trail is shown in a tract dedicated as a private access easement only. The bike trail must be located in a Public Access Easement. Is the Ditch Co allowing improvements of any kind in their easement? Response: Comment is no longer applicable. Bike path configuration has been changed after discussions with Transportation Planning and Parks Department. Number: 57 Created.• 1/13/2004 [1/13/04] Will need to discuss the private drive/bike trail combination with transportation planning and parks department. This configuration may not be acceptable. Response: Comment is no longer applicable. Bike path configuration has been changed after discussions with Transportation Planning and Parks Department. Number:58 Created:111312004 [1/13/041 Drive cuts off an arterial require radial returns. The curb cut shown on the north end is not allowed. Response: Driveway has been removed. Number:67 Created:1113/2004 [1/13/04] Please provide additional ped/bike connections from North Vista Drive to the future bike trail in lieu of street connectivity requirements. Response: Comment is no longer applicable. Bike path configuration has been changed after discussions with Transportation Planning and Parks Department. Number: 86 Create& 111612004 [1/16/04] Will need to dedicate an access easement for all shared driveways and this easement will need to be shown on all plan sets (landscape/site/utility/plat). Response: Comment has been addressed. N Number:87 Created:111612004 [1/16/04] Parking setbacks in MF and cul-de-sacs must be in accordance with current street standards. Response: Comment is no longer applicable. Former multi family layouts have been removed from this plan set. Areas are platted as tracts for future multi family development. Number:89 Created: 111612004 [1/16/04] Need to lineup the ramps with the trails and sidewalks. Ramps must be the same width as the sidewalk or trail it lines up with. Response: JR Engineering will meet with Parks/Trails and Engineering to discuss this matter. Number:91 Created:111612004 [1/16/04] Glacier Creek will not need to be constructed to the property line per the discussion at Staff Review, January 14`h. Cash in lieu of will be accepted so that the street can be built as some point in the future. An estimate will be required from JR Engineering for the City's review and approval so that the dollar amount can be included in the DA. Response: Comment noted. Thank you. An estimate will be included in the final submittal. Number:92 Created:111612004 [1/16/04] From Rick Richter/Pavement Management: Will need a mitigation plan for swelling soils in the pavement design. Swell consolidation testing should run at 500 PSF not 1,000. Response: Comment noted and will be addressed in the Final Soils Report. Topic: Landscape Number: 99 Created: 1/16/2004 [1/16/04] Remove the contours. Response: Contours have been removed exceptfor the detention ponds and the ditch, which we feel need to be shown for reference. Number: 100 Created: 1/16/2004 [1/16/04] Show all utilities. Response: Comment has been addressed. Number: 101 Created: 1/16/2004 [1/16/04] Show all easements (sight, emergency, drainage, utility, etc). Response: Comment has been addressed. 7 Topic: Plat Number: 63 Created: 1/13/2004 [1/13/04] Corrections to the plat language are required. Response: Corrections have been applied. Number: 64 Created: 1/13/2004 [1/13/04] Please provide curve tables. Response: Curve tables are now provided. Number: 65 Created: 1/13/2004 [1/13/04] Provide a signature block for the Ditch Company. Response: Since the Ditch Company will only have an easement (which will be granted by a separate document) the Ditch Company can not sign the Subdivision plat as they will have no ownership interest in the property. Number: 66 Created: 1/13/2004 [1/13/041 See redlines and comments under General for additional requirements. Response: Comment has been addressed. Number: 90 Created: 1/16/2004 [1/16/04] Vacate the old ditch easement with the plat. Response: To be vacated by separate document. Number: 93 Created: 1/16/2004 [1/16/04] From Technical Services: Boundary and legal close. Response: Comment has been addressed —boundary and legal close. Number: 94 Created: 1/16/2004 [1/16/041 From Technical Services: Subdivision title in dedication statement does not match title. Response: Comment has been addressed —titles now match. Number: 95 Created: 1/16/2004 [1/16/04] From Technical Services: East/west portion of Lower Loop Drive needs to be renamed. Response: East/west portion of Lower Loop Drive has been renamed to Lower Loop Circle. 0 Number: 96 Created: 1/16/2004 [1/16/04] From Technical Services: Greenfields Street needs to be renamed to "Drive". Response: Greenfields Street has been renamed to Greenfields Drive Number: 97 Created: 1/16/2004 [1/16/04] From Technical Services: Wagon Trail Road needs to break at curve to east and continue with new name. Response: Wagon Trail Road breaks at curve and continues east with Switchback Road Number: 98 Created: 1/16/2004 [1/16/04] From Technical Services: North Vista Drive need to be renamed. A) No directional in name — "North" is gone. B) Vista is already used. Response: North Vista Drive has been renamed to Campfire Drive. Topic: Site Number: 34 Created: 1/13/2004 [1/13/04] Please show all existing wells that will stay in place with this project so that future homeowners are aware of them before they choose a lot. Response: All existing wells are now shown on the plat and site plan. Topic: Utility Number: 38 Created: 1/13/2004 [1/13/04] Corrections required to the General Notes. See redlines Response: Corrections to the General Notes have been made. Number: 39 Created: 1/13/2004 [1/13/041 The Owner listed on the Utility plans is different than that shown on the Site Plan. Response: Comment has been addressed, owner listed matches the updated site and utility plans. Number: 40 Created: 1/13/2004 [1/13/04] Mid -block cross pans must be a minimum of 12' wide. See 7.7.5.A. Response: All mid -block cross pans have been changed to a minimum of 12' wide. Number: 41 Created: 1/13/2004 [1/13/04] Label the type of curb and gutter being used on the typical local street cross section. Response: The type of curb and gutter being used is now labeled on the typical local and 2- lane arterial street cross sections. E Number: 42 Created: 1/13/2004 [1/13/04] No storm sewer facilities were included with the utility plans. Another round of review will be necessary prior to scheduling a public hearing. Response: Storm sewer facilities are now included in this submittal. Number: 43 Created: 1/13/2004 [1/13/04] The minimum CL radius on an Arterial is 1075". Greenfields currently shows 1000' in one location. Please correct to meet the minimum requirement. Response: The minimum CL radius on Greenfields has been changed from 1000' to 1075'. Number: 44 Created: 1/13/2004 [1/13/04] The minimum tangent lengths at the intersections do not meet the requirements shown in Table 7-3. Check CL 12 for instance. Response: All minimum tangent lengths at the intersections have been checked and now conform to Table 7-3. Number: 45 Created: 1/13/2004 [1/13/04] Will need to show dedicated driveways on the narrow lots on the utility plans as well as the plat and site plan. Response: Dedicated driveways on the narrow lots will be shown on the utility plans as well as the plat and site plan on the final submittal. Number: 46 Created: 1/13/2004 [1/13/04] Please provide curve tables. Response: Curve tables are now provided. Number: 47 Created: 1/13/2004 [1/13/04] Will need to provide enough design information for the bike trail so that it can be laid out in the field. Please provide dimensions, lengths, widths, curve tables, etc. Response: Design information for the bike trail including dimensions, lengths, widths and curve tables will be provided in the final submittal. 10 Number: 59 Created: 1/13/2004 [1/13/04] Need to show the existing irrigation lines on the property and label what they are made of. NA ADS PIPE IS ALLOWED IN ROW. If that is what is south there, it will need to be replaced in all instances it goes under the ROW. No private lines may be placed in public utility easements. They will need to be placed in their own Private easement. This easement must be dedicated on the plat and shown on all plans sets (site/landscape/utility). Response: Placed a Private Utility Easement over the top of the Public Utility easement. We have also submitted the original Waterglen design of the irrigation lines for information purposes only. Number: 61 Created: 1/13/2004 [1/13/04] Provide a city signature block on every sheet in the lower right hand corner. Response: Comment addressed. Number: 62 Created: 1/13/2004 [1/13/04] Please provide preliminary cross sections (typical) for each street proposed. Response: Preliminary cross sections (typical) for each street proposed are provided on the cover sheet of the utility plans. Number: 83 Created: 1/13/2004 [1/13/041 Provide all applicable details on a detail sheet. Response: Applicable details are now provided on detail sheets. Number: 84 Created: 1/13/2004 [1/13/04] Provide a striping and signage sheet(s). Response: Striping and signage sheet is now included. Number: 85 Created: 1/13/2004 [1/13/04] Will need off -site grading and construction easements. Response: Off -site grading and constriction easements will be provided during the final submittal. Number: 88 Created: 1/13/2004 [1/13/041 Using detail 7-24 as a template, show a detail for each and every street widening on the plan and profile sheets calling out the various lengths, Rs and Ws so that we can determine whether or not they are in compliance. Response: Street widening on the plan and profile sheet will be detailed for the final submittal. 11 Department: Light and Power Topic: General Number: 22 Issue Contact: Alan Rutz Created: 1/12/2004 [1/12/04] Show existing electric system. including vaults and electric cabinets, along Vine Dr. on a Utility Plan. If existing electric system needs to be relocated, system modification charges will apply. Response: Utility lines are currently being located on Vine Drive and will remain in place. Design will accommodate the existing utilities. Number: 23 Created: 1/12/2004 [1/12/04] Show water and sewer services on Utility Plan. Electric vaults will be placed on the lot line throughout the subdivision. Response: Water and sewer services are now shown on the Utility Plan. Number: 24 Created: 1/12/2004 [1/12/04] Need electric load information for clubhouse and daycare. Will three-phase power be required? Response: It is unknown at this time what the electric load information is for the daycare building since an end user has not been identified yet. The clubhouse will definitely be utilizing three-phase power. Number: 25 Created: 1/12/2004 [1/12/04] A 40' clearance between trees and streetlights is required along public roads. Response: We will be setting up a meeting with Light & Power. If we have a street light pole layout, we can adjust the landscape accordingly. Number: 26 Created: 1/12/2004 [1/12/04] An electric service will be stubbed out for each lot. The house meter must be located on the same side as the electric service. Response: Electric services are now shown for each lot. Number: 28 Created: 1/12/2004 [1/12/04] Electric meters for town homes will be ganged on one side of the building. The gas meters should be located on the opposite side of the building. Response: Gas and electric services are shown for each lot. 12 Department: Natural Resources Topic: General Number: 3 Issue Contact: Doug Moore Created: 1/2/2004 [ 1/2/041 A 50' natural habitats and features buffer zone standard will be required along the Larimer and Weld Canal. Due to the realignment of the ditch sign of wildlife movement may not be as obvious on this project site. However, the Larimer and Weld Canal provides for wildlife movement along most of it's reach and provides links to many different habitats, such as the Cooper Slough and the Boxelder. Irrigation ditches play role in the bigger picture of connecting habitats together. 3.4.1(E), 3.4.1(E)(1)(b), 3.2.1(F)(2) Response: A combination of 25' to the south and 75'+ to the north of the canal of buffer has been provided. Number: 4 Created: 1/2/2004 [1/2/04] If native vegetation is not established within the 25' natural habitats and features buffer zone surrounding the existing farmstead windbreak then the project will be required to restoration the buffer zone vegetation to Fort Collins native plant material. We recommend that a temporary irrigation system be installed to help improve and establish the native species within the buffer quicker. Inspection and monitoring for establishing the revegetated areas will be included in the DA for the project and the landscaping escrows will be held until the revegetation has met City NRD establishment requirements that will be listed in the DA. Response: 25' buffer is provided along the native vegetation. Department: PFA Issue Contact: Michael Chavez Topic: General Number: 9 Created: 1/5/2004 [1/5/04] Streets: Street names shall be verified and reviewed by the City Planning Department prior to being put in service. Note: Several street names are in question. Response: Street names have been changed under City Planning Department recommendation. Number: 10 Created: 1/5/2004 [1/5/04] Addressing: Address numerals shall be visible from the street fronting the property, and posted with a minimum 6-inch numerals on a contrasting background. (Bronze numerals on brown brick are not acceptable). Multi -family buildings more than one floor in height shall abide by the following addressing requirements: First -floor units shall be designated with 100's, second -floor units with 200's, third -floor units with 300's, and so on. Some multi- family layouts may require address postings from the back side as well as the front side of buildings. A clockwise addressing pattern shall be maintained whenever possible. Note: An addressing scheme shall be submitted to the fire department for approval prior to being posted on the buildings. UFC 901.4.5.; 901.4.4 Response: Comment has been noted. 13 Number: 11 Created: 1/5/2004 [1/5/04] Water Supply/Commercial: No commercial buildings can be greater than 300 feet from a fire hydrant. Fire hydrants are required with a maximum spacing of 600 feet along an approved roadway. Each hydrant must be capable of delivering 1,500 gallons per minute at a residual pressure of 20 psi. If a fire hydrant cannot be provided, fire sprinklers shall be required. 1997 UFC 901.2.2.2 Response: Comment has been noted. Number: 12 Created: 1/5/2004 [1/5/04] Water Supply/Residential (Outside GMA): No residential buildings can be greater than 400 feet from a fire hydrant. Fire hydrants are required with a maximum spacing of 800 feet along an approved roadway. Each hydrant must be capable of delivering 500 gallons per minute at a residual pressure of 20 psi. If a fire hydrant cannot be provided, fire sprinklers shall be required. 1997 UFC 901.2.2.2 Response: Comment has been noted. Number: 13 Created: 1/5/2004 [1/5104] Fire Lane: A fire lane is required. The fire lane shall be visible by painting and signage, and be maintained unobstructed. The fire lane shall be platted as an "Emergency Access Easement" on the final plat. 1997 UFC 901.2.2.1; 901.4.2; 902.2.1; FCLUC Response: Comment is no longer applicable. Former multi family layouts have been removed from this plan set. Areas are platted as tracts for future multi family development. Number: 14 Created: 1/5/2004 [1/5/04] Aerial Access: Buildings three or more stories in height must have access to a 30-foot unobstructed access roadway on at least one side for aerial operations. Note: Please submit proposed elevations (number of stories) for multi -family dwellings. PFA Policy 85-5 (B) Response: Comment is no longer applicable. Former multi family layouts have been removed from this plan set. Areas are platted as tracts for future multi family development. Number: 15 Created: 1/5/2004 [1/5/04] Sprinklers: Fire sprinklers may be required. When any portion of the facility or any portion of an exterior wall off the first story of the building is located more than 150 feet from fire apparatus access as measured by an approved route around the exterior of the building or facility, it shall be fire sprinklered. Note: Buildings that are fire sprinklered shall have a minimum 6-inch fireline unless hydraulic calculations can support a smaller fireline. 1997 UFC 902.2.1 Response: Comment has been noted. 14 Number: 16 Created: 1/5/2004 [1/5/04] Fire Alarm: A fire alarm system may be required for the day care center. Response: Comment has been noted. Number: 17 Created: 1/5/2004 [1/5/04] Knox Box: Poudre Fire Authority requires a Knox Box to be mounted on the front of every new building equipped with a required fire sprinkler system or fire alarm system. 1997 UFC 902.4; PFA Policy 88-20 Response: Comment has been noted. Number: 18 Created: 1/5/2004 [1/5/04] Hazardous Materials: This comment pertains to the club house and swimming pool. Corrosive, flammable, reactive or toxic materials (as defined in the Uniform Fire Code), if used, stored or handled on site, must have a Hazardous Material Impact Analysis (HMIA) completed and supplied to the fire department and Planning Department. FCLUC 3.4.5 (C) Response: Comment has been noted Department: Police Issue Contact: Joseph Gerdom Topic: General Number: 77 Created: 1/14/2004 [1/14/04] Need complete lighting/photometric coverage for multi -family. Also, need detailed planting plan. Response: Multi family has been removed from plans. We have provided more detailed landscaping for the clubhouse and daycare buildings. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage Number: 48 Created: 1/13/2004 A SWMM model is required for sites larger than 20 acres at preliminary PDP stage to size the detention ponds. This is needed before hearing to verify volume provided for detention. Response: A SWMM model has been utilized to size all detention and water quality ponds, please refer to the Drainage Report. Number: 49 Created: 1/13/2004 Please describe in the text the outfall for basin 16 in detail and show on the plans. Offsite drainage easements will be required until drainage intersects a natural drainage path. Letters of intent for these easements will be required before a hearing can take place. Response: Please refer to Drainage Reportfor Drainage Acceptance Letter. 15 [1/13/04] The variance request for Lower Loop Drive was approved. Please list the variance underline 48 of the General Notes in the Utility Plans. Number: 52 Created: 1 /13/2004 [1/13/041 High volume driveways must be a minimum of 150' from an intersection. Several do not meet the standard. Number: 53 Created: 1 /13/2004 [1/13/041 The sidewalk shown along Greenfields is not in the proper location. The back of walk must line up with the ROW. Number: 54 Created: 1 /13/2004 [1/13/041 There are two locations on Greenfields that may require an enhanced pedestrian crosswalk to safely allow pedestrians to cross an arterial. Please contact Tom Reiff with Transportation Planning regarding the placement and design of the crossings. Number: 55 Created: 1 /13/2004 [1/13/041 The private drive mustoff Glacier Creek must line up with Lower Loop Circle. Number. 56 Created: 1 /13/2004 [1/13/041 The future bike trail is shown in a tract dedicated as a private access easement only. The bike trail must be located in a Public Access Easement. Is the Ditch co allowing Improvements of any kind in their easement? Number: 57 Created: 1 /13/2004 [1/13/041 Will need to discuss the private drive/bike trail combination with transportation planning and parks department. This configuration may not be acceptable. Number: 58 Created: 1 /13/2004 (1/13/041 Drivecuts off an arterial require radial returns. The curb cut shown on the north end is not allowed. Number: 67 Created: 1 /13/2004 [1/13/04] Please provide additional ped/bike connections from North Vista Drive to the future bike trail in lieu of street connectivity requirements. Topic: Plat Number: 63 Created: 1 /13/2004 [1/13/041 Corrections to the plat language is required. Number: 64 Created: 1 /13/2004 [1/13/041 Please provide curve tables. Number: 65 Created: 1 /13/2004 11/13/041 Provide a signature block for the ditch company. Number: 66 Created: 1 /13/2004 [1/13/041 See redlines and comments under General for additional requirements. Topic: Site Number: 34 Created: 1 /13/2004 (1/13/04] Please show all existing wells that will stay with this project so that future homeowners are aware of them before they choose a lot. Topic: Utility Number: 38 Created: 1 /13/2004 [1/13/04] Corrections required to the General Notes. See redlines. Number: 39 Page 2 Created: 1 /13/2004 Number: 50 Created: 1/13/2004 The preliminary plan should show how the site will conform with the basin's Mater Plan and the Waterglen PUD in greater detail. Any easements, swales, etc., on the Waterglen property that Trailhead proposes to drain into should be shown on the plans and discussed in the report. Offsite easements and improvements that will be proposed should be shown on the plans and discussed in the report as well. Response: Please refer to Drainage Report and Stormwater Plan and Profile sheets for reference to drainage easement. Number: 51 Created: 1/13/2004 The historic drainage calculations in the text of the drainage report do not match the tables in the appendix. Please revise. Response: Drainage Report text has been revised to match table in the appendix. Number: 102 Created: 1/ 16/2004 Just an FYI — The site's sub -basins should all drain into a detention and water quality pond. If this is difficult for some outer lying basins, the release rate for this sub -basin should still count towards the sites release rate and be subtracted from the pond's release rate. Response: Comment has been noted. All sub -basins now drain into a detention and water quality pond. Topic: Erosion/Sediment Control Number: 103 Created: 1/16/2004 Comments will be presented at next submittal, or when an erosion control design is presented. Response: Comment has been noted. Department: Traffic Operations Contact: Eric Bracke Topic: Traffic Number: 1 Created: 12/26/2003 [12/26/03] A TIS has been submitted with the project and has been deemed acceptable. The project will "squeak" by on the APF issue at the intersection of Vine and Lemay with traffic engineering improvements to the traffic signal operations Response: Thank you. 16 Department: Transfort Issue Contact: Garold Smith Topic: General Number: 7 Created: 1/5/2004 [1/5/04] No Comments. Response: Thank you. Department: Transportation Planning Issue Contact: Tom Reiff Topic: Transportation Number: 70 Created: 1/14/2004 [1/14/04] An ADA accessible ramp from the Vine Drive sidewalk to the trail underpass will need to be included in the design of Vine Drive and the underpass. Response: Comment has been addressed. Number: 71 Created: 1/14/2004 [1/14/04] Locations where bike and pedestrians are intended to share the same facility, such as trails or trail connections, require a minimum 8' width. Response: Comment has been addressed; width is 10' Number: 72 Created: 1/14/2004 [1/14/04] The sidewalks along Greenfields need to be pulled closer to the street and stay within public ROW. Or a little meandering is permitted but the walks would then have to be placed in a public access easement. Lighting levels for the side walk also need to be considered if they are outside of the ROW. Response: Now that the trail is located on the east side of Greenfields Drive, it makes sense to detach and meander the alignment of the walk. We feel that the west side of the street should match. Number: 73 Created: 1/14/2004 [1/14/041 No parking stalls are allowed to block access to ramps. Please review the ramp locations and the proposed on -street parking on Green Lake Court. Response: Comment is no longer applicable. Former multi family layouts have been removed front this plan set. Areas are platted as tracts for future multi family development. Number: 74 Created: 1/14/2004 [1/14/04] What is the intention of Greenfields Street at the north end of the property? Additional information is required to determine if the proposed alignment of Greenfields can fit between the tracks and ditch. Response: Comment addressed; see sheet 6 of 6 in Plan Set 4. 17 Number: 75 Created: 1/14/2004 [1/14/04] Please contact Craig Foreman in the Parks Dept. to determine the easement width required for a regional trail. Response: Comment addressed. Number: 76 Created: 1/14/2004 [1/14/04] Additional connections to the proposed regional trail is required off of North Vista Drive and Wagon Trail Road (see redlines for suggested locations). These suggestions only apply if the proposed trail alignments are approved by the Parks Department. Response: Comment is no longer applicable. Bike path configuration has been changed after discussions with Transportation planning and parks department Number: 78 Created: 1/14/2004 [1/14/04] In order to achieve pedestrian level of service as identified in the TIS, the sidewalk along Vine Drive will need to connect to the sidewalk along Waterglen's frontage. This may require discussions with the Waterglen HOA to determine who bears the cost. Response: Comment has been addressed. The developer intends to build the connection. Number: 79 Created: 1/14/2004 [1/14/04] Sidewalks are required to be a minimum 6 feet in width where parked cars overhang. Response: Comment is no longer applicable. Former multi family layouts have been removed from this plan set. Areas are platted as tracts for future multi family development. Number: 80 Created: 1/14/2004 [1/14/04] Does the proposed location of the trail underpass of Vine Drive align with the proposed development to the south? Response: Yes, the proposed location of the trail underpass of Vine Drive aligns with the proposed development to the south. Number: 81 Created: 1/14/2004 [1/14/04] Directional access ramps are required at the intersections with Vine Drive. If the Street doesn't continue to the south or doesn't align to a street to the south, than the directional ramps should only go east to west. Response: Comment has been noted. 18 Number: 82 Created: 1/14/2004 [1/14/04] Provide walkway connections from the end of the Green Lake Crt and Flagstaff Crt cul-de-sacs out to Vine Drive. See red lines for suggested alignments. Response: Comment is no longer applicable. Former multi family layouts have been removed from this plan set. Areas are platted as tracts for future multi family development. Department: Zoning Contact: Jenny Nuckols Topic: Zoning Number: 5 Created: 1/5/2004 [1/5/04] Remove topo lines from final site plan. Response: The topo has been removed from the plans, exceptfor the irrigation ditch and the detention ponds. Number: 6 Created: 1/5/2004 [1/5/04] We don't need/want to see the floor plans on the elevations pages, don't want/need to see floor plans for single family units. Response: We have removed the floor plans from the elevation sheets. Number: 8 Created: 1/5/2004 [1/5/04] Please note the lot square footages on each lot on the final plat. Response: Lot square footages are now noted on the final plat. Number: 19 Created: 1/6/2004 [1/6/04] Note building height on elevations. Response: Building height has been added to the elevations. Number: 20 Created: 1/6/2004 [1/6/04] Need to show street trees along roads where not fronted by lots —for example— open space areas where there are no lots at corner of Wagon Trail and Glacier Creek. Response: Comment has been addressed. Number: 21 Created: 1/6/2004 [1/6/04] Typical planting plans need to call out in detail, numbers, species, locations, etc.................. Response: Comment has been addressed. 19 If you have any questions or concerns, please call me at (970) 2245828. Sincerely, VF RIPLEY ASSOCIATES Cathy Mathis Project Manager 20 REVISION REC.D '64% COMMENT SHEET DATE: March 3, 2004 TO: Technical Services PROJECT: 443-02A Trailhead PDP — Type II (LUC) All comments must be received by Bob Barkeen no later than the staff review meeting: March 17, 2004 ❑ No Comment Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** T7-h,1 L �FLFAT. A3 u� To �R� _ 3�17�oy —TN �5 ARNor f n/ C/t, Lau��L we P c�i /YET �3b .<i C/�CLE— C1/K Tf/ � /�!.�-v ���s Tii� w�T u�✓c as-- �. � / Szz. Di�.y�D � 7 4��47-/� �ii= > v Syir/13oL i.v T✓�q Cy /%V /� •� r tj � 5'DE � GiS ' /3 - q� 1 Name (please print) Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS �� Plat --Site _Drainage Report _Otherkw� Utility Redline Utility Landscape Gty of Fort Collins Project Comments Sheet Selected Departments Cityof Port Collins Department: Transportation Planning Date: March 18, 2004 Project: TRAILHEAD PDP - TYPE I (LUC) All comments must be received by Bob Barkeen in Current Planning, no later than the staff review meeting: March 17, 2004 Note - Please identify your redlines for future reference Issue Contact: Tom Reiff Topic: Transportation Number: 72 Created: 1 /14/2004 [3/18/041 After conversations with the Transportation Service Area it was determined that the sidewalk along Greenfields should be constructed to City standards and within the ROW. Please correct for next submittal. [12/26/03] The sidewalks along Greenfields need to be pulled closer to the street and stay within public ROW. Or a little meandering is permitted but the walks would then have to be placed in a public access easement. Lighting levels for the sidewalk also need to be considered if they are outside the ROW. Number: 81 Created: 1 /14/2004 [3/17/041 Please see red lines for additional access ramp locations throughout the development. Also the details sheet needs to include the standard detail for directional access ramps for detached sidewalks. The center radial ramp detail included in the plans is not required since all the sidewalks are detached. It is also recommended that the crosswalks that lead to the Daycare Center and Club House be striped to highlight the pedestrian crossing to motorists. [1 /14/041 Directional access ramps are required at the intersections with Vine Drive. If the street doesn't continue to the south or doesn't align to a street to the south, than the directional ramps should only go east to west. Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat / Site Drainage Report Other_ Utility Redline Utility / Landscape Page I Number: 127 Created: 3/17/2004 [3/17/041 The standard width for bike lanes on a 2-Lane Arterial is 8' in width, not 6' as shown. Please correct for the next submittal. Number: 128 Created: 3/17/2004 [3/17/041 The Greenfields/Vine Drive intersection needs to be designed as a standard arterial / arterial intersection if a roundabout design is determined to be unsatisfactory. This means dedicated turn lanes in all directions, or adequate space for future turn lanes, pedestrian enhanced crosswalks with minimum 6' median refuges, directional access ramps and continuous bike lanes through the intersection. Page 2 Project Comments Sheet Selected Departments CitN, of I�oit Collins Department: Engineering Date: March 19, 2004 Project: TRAILHEAD PDP - TYPE I (LUC) All comments must be received by Bob Barkeen in Current Planning, no later than the staff review meeting: March 17, 2004 Note - Please identify your redlines for future reference Issue Contact: Susan Joy Topic: East Vine Drive Number: 152 Created: 3/19/2004 [3/49/041 This must be a stand alone set, so they will also need all the same notes and details as the main set. Please provide construction notes, erosion control, etc. Please provide all appropriate details. Corrections are required to the General Notes, Owner Name, and Stormwater contact. Number: 155 Created: 3/19/2004 13/19/041 Add "From _ to " in the title so that anybody looking for these plans will know immediately where this design is occurring along Vine. Number: 156 Created: 3/19/2004 [3/19/04] Plan and Profile sheet 3 - Remove note 2. Need to show existing grade and proposed grades. These can be adjusted in the future but we need to have the assurance that what you're proposing will basically work. Number: 157 Created: 3/19/2004 [3/19/041 Sheet 5 - 3/4 access at Lower Loop Drive. Number: 158 Created: 3/19/2004 13/19/041 Sheet 6 - Right In Right Out only at Wagon Trail and Vine. Number: 159 Created: 3/19/2004 [3/19/04] Sheet 7 - Need to Identify what station these are equal to in the other set of plans, otherwise you will need to provide all of the design here. Number: 160 Created: 3/19/2004 [3/19/04] Sheet 9 - Note number 2 states that insufficient lengths were available for the taper lenghts and that modifications were made. Variance requests will be necessary, please see 1.9.4. Number: 161 [3/19/041 Sheet 10 - Please detail 1608.-h- , 1 Created: 3/19/2004 the details shown and/or asked for on sheets 83-85. In addition, please Ovid D CHECK HERE F U WISH TO RECEIVE COPIES OF REVISIONS Plat % Site Drainage Report / Other Utility y, Redline Utility Landscape 17 Page 1 Topic: General Number: 29 Created: 1 /13/2004 [3/16/041 The ditch easements can be filed by separate document but the reception number of the separately recorded document will need to be noted on the plat and utility plans. However, the ditch company may need to sign off on the utility plans if any grading is being done around their ditch. Please see comments from Stormwater. [1/13/04] The ditch company will need to sign off on the plat, site and utility plans. Please provide the appropriate signature blocks. Number: 31 Created: 1/13/2004 [3/16/041 The plans (site/plat/utility/landscape) are not scanable. Please see Appendix E6 for minimum font sizes, etc. Please correct all overlapped labeling. [1/13/041 See Appendix E6 for scanability requirements. Please correct all overlapped labeling. Number: 33 Created: 1 /1312004 (3/16/041 Your response is acknowledged. This item will remain open until resolved. (1/13/041 Additional easements are required of this project. PFA requires a fire lane in the MF areas. A public access easement, both on and off site, is required for the future city bike trail shown on the site plan. Need to show all Natural Resource buffers and easements (emergency access, trail, etc) on all plan sets (Utility, Site, Landscape). Number: 35 Created: 1 /1312004 [3/19/041 Please provide the ultimate design for the underpass in accordance with LCUASS. [1/13/041 An grade separated crossing is required where the future bike trail crosses Greensfield. This project is responsible for the design and possibly the construction of this underpass. Please coordinate with Craig Foreman in Parks Planning. Number: 36 Created: 1 /13/2004 [3/19/04] Repeat comment. [1/13/041 Engineering will require an interim and ultimate road design for Vine Drive. The TIS shows the need for a right turn lane from Vine to Greensfields in the long range. This project is responsible for dedicating the additional ROW and designing it in the ultimate design. This project is also responsible for construction of Vine Drive along their frontage, however, the City's Streeteverslzing Dept prefers to construct the entire length of Vine when it's realigned at some point in the future. This project will only construct the sidewalk along their frontage and install the landscaping. A Contribution in Aid will be accepted for the rest of their local street portion. An estimate prepared by JR Engineering will be required prior to drafting the Development Agreement so that this amount can be added to the DA. Number: 37 Created: 1 /13/2004 [3/16/041 Thank you for adding the note, however, it needs to be a little more specific in that the note needs to state the code, what it requires, and then what the variance was granted for. [1/13/041 The variance request for Lower Loop Drive was approved. Please list the variance under line 48 of the General Notes in the Utility Plans. Number. 45 [3/16/041 Repeat comment. Created: 1 /13/2004 [1/13/041 Will need to show dedicated driveways on the narrow lots on the utility plans as well as the plat and site plan. Number: 53 Created: 1 /13/2004 [3/16/041 Repeat comment. This project was taken to Transportation Coordination on 3/18/4 and it was determined that the sidewalk should not meander in these locations and that a variance request would not be approved. Please place the bow at the back of row. [1/13/041 The sidewalk shown along Greenfields and Vine is not in the proper location. The bow needs to be at the back of ROW. Page 2 [1/13/041 The Owner listed on the Utility plans is different than that shown on the Site Plan Number 40 Created: 1/13/2004 [1/13/04] Mid -block crosspans must be a minimum of 12' wide. See 7.7.5.A. Number: 41 Created: 1/13/2004 [1/13/04] Label the type of curb and gutter being used on the typical local street cross section. Number: 42 Created: 1/13/2004 [1/13/041 No storm sewerfacilities were included with the utility plans. Another round will be necessary prior to scheduling a public hearing. Number: 43 Created: 1/13/2004 [1/13/04) The minimum CL radius on and Arterial is 1075'. Greenfields currently shows 1000' in one location. Please correct to meet the minimum. Number: 44 Created: 1/13/2004 [1/13/04] The minimum tangent lengths at the intersections do not meet the requirements shown in Table 7-3. Check CL12 for instance. Number: 45 Created: 1/13/2004 [1/13/041 Will need to show dedicated driveways on the narrow lots on the utility plans as well as the plat and site plan. Number. 46 Created: 1/13/2004 [1/13104] Please provide curve tables. Number: 47 Created: 1/13/2004 [1/13/041 Will need to provide enough design information for the bike trail so that it can be laid out in the field. Please provide dimensions, lengths, widths, curve tables, etc. Number: 59 Created: 1/13/2004 [1/131041 Need to show the existing irrigation lines on the property and label what they are made of. NO ADS PIPE IS ALLOWED IN ROW. If that is what is out there, it will need to be replaced in all instances it goes under the ROW. No private lines may be placed in public utility easements. They will need to be placed in their own private easement. This easement must be dedicated on the plat and shown on all plans sets (site/landscape/utility). Number: 61 Created: 1/13/2004 [1/13/04] Provide a city signature block on every sheet in the lower right hand corner. Number: 62 Created: 1/13/2004 [1/13/041 Please provide preliminary cross sections (typical) for each street proposed. Number: 91 Created: 1/16/2004 [3/18/041 Just keeping this comment alive until we do the DA. [1/16/041 Glacier Creek will not need to be constructed to the property line per the discussion at Staff Review, January 14th. Cash in lieu of will be accepted so that the street can be built at some point in the future. An estimate will be required from JR Engineering for the City's review and approval so that the dollar amount can be included in the DA. Number: 130 Created: 3/18/2004 [3/18/04] Wagontrail and Vine is limited to a right -in, right -out only. Number: 132 Created: 3/18/2004 [3/18/041 Please place a note on the Plat and Site plan limiting the "alley" loaded lots to rear access only and that no driveways allowed off the front. Number. 163 Created: 3/19/2004 [3/19/041 Site/Landscape/Utility/Plat - please coordinate the comments so that all plan sets present the same information. Topic: Greensfields Arterial Number: 162 Created: 3/19/2004 [3/19/041 Comment number 152 applies here as well. Topic: Landscape Number: 125 Created: 3/16/2004 [3/16/04] Please see comments under General. Number: 126 Created: 3/16/2004 [3116/04] The plans show a project entry feature at Vine Drive. No other details given, but just a reminder - no structures of any kind are allowed in the utility easement. Topic: Plat Number: 63 Created: 1 /13/2004 [3/16/041 Repeat comment. [1113/04] Corrections to the plat language are required. Number: 65 Created: 1 /13/2004 [3/16/041 If you are providing a ditch easement by separate document, then a note to the plat/utility plans will have to be added that includes the reception number of the separately recorded document. The easement will need to be recorded with the County before we can approve the mylars. [1/13/04] Provide a signature block for the ditch company. Number: 90 Created: 1 /16/2004 (3/16/04] Your response notes that the vacation is being done by separate document and that is ok, but the vacation will need to be filed and recorded with the County and the reception number placed on the plat/utility plans before we can approve the mylars. (1/16/041 Vacate the old ditch easement with the plat. Number: 94 Created: 1 /16/2004 [3/16/04] The term "POP" needs to be taken out of the title and the dedication statement. POP is actually just the process the project goes through. I'm sorry, I should have added this comment to the one below. [1/16/04] From Technical Services: Subdivision title in dedication statement does not match title. Page 3 Number: 95 Created: 1 /16/2004 [3/16/041 Lower Loop Drive can not be a Circle. Check with PEA for direction. [1 /16/04] From Technical Services: East/west portion of Lower Loop Or needs to be renamed. Number: 111 Created: 3/16/2004 [3/16/04] Please provide a tract table that includes what each tract is for, who owns it, and who maintains it Number. 113 Created. 3/16/2004 [3/16/041 From Technical Services: Basis of bearings do not match between legal and plat. Number: 114 Created: 3/16/2004 [3/16/04] From Technical Services. As of today, 3/17/4, this area is not in the city. Number: 115 Created: 3/16/2004 [3/16/04] From Technical Services: How was the west line of Sub and 1/4 section determined? Number. 116 Created: 3/16/2004 [3/16/041 From Technical Services: Industrial and Gas easement not locatable on plat. Number: 117 Created: 3/16/2004 [3/16/041 From Technical Services: What is the "W" symbol in Tracts B and T? Please add to the legend. Number: 118 Created: 3/16/2004 [3/16/041 From Technical Services: Add "SDE" and UPAE" to the Legend. Number: 119 Created: 3/16/2004 [3/16/04] From Technical Services: SW corner needs to be upgraded to state standard. Number: 133 Created: 3/19/2004 [3/19/04] See redlines for other comments. Topic: Site Number: 120 Created: 3/16/2004 [3/16/041 Please provide a legend for all symbols and abbreviations. Number: 121 Created: 3/16/2004 [3/16/041 See comments under General. Number: 123 Created: 3/16/2004 [3/16/041 Dimension all sidewalks. Number: 124 Created: 3/16/2004 [3/16/041 Remove the word "Alley" and call them "Private Drives' instead. Topic: Traffic Study Number: 129 Created: 3/18/2004 [3/18/04] A roundabout analysis is required at all arterial/arterial intersections, in this case, Greensfield and Vine Drive. Topic: Utility Number: 38 Created: 1/13/2004 [3/16/04] Please see redlines. [1/13/041 Corrections required to the General Notes. See redlines. Number: 41 Created: 1 /13/2004 [3/16/04) Please correct the typical street section to read 53' of ROW, not 51'. Page 4 [1/13/04] Label the type of curb and gutter being used on the typical local street cross section Number: 47 Created. 1 /13/2004 [3/16/041 Your response is acknowledged. This item may be addressed in Final Compliance and will remain open until then. [1/13/041 Will need to provide enough design information for the bike trail so that it can be laid out in the field. Please provide dimensions, lengths, widths, curve tables, etc. Number: 59 Created: 1/13/2004 [3/19104] Private easements can not be placed over a public easement. We may need to get together and discuss this. [1/13/04] Need to show the existing irrigation lines on the property and label what they are made of. NO ADS PIPE IS ALLOWED IN ROW. If that is what is out there, it will need to be replaced in all instances it goes under the ROW. No private lines may be placed in public utility easements. They will need to be placed in their own private easement. This easement must be dedicated on the plat and shown on all plans sets (site/landscape/utility). Number: 83 Created: 1 /16/2004 [3/19/041 Please provide details 707, 1108, 1606. [1/16/04] Provide all applicable details on a detail sheet. Number: 85 Created: 1 /16/2004 13/16/041 Repeat comment. All off -site easements will require at minimum, a letter of intent from the effected property owner before going to hearing. The actual easement can be provided during final compliance, however, the mylars will not be approved until they have been submitted. [1/16/041 Will need off -site grading and construction easements Number: 88 Created: 1 /16/2004 [3/16/041 Your response is acknowledged. This item may be addressed in Final Compliance and will remain open until then. [1/16104] Using detail 7-24 as a template, show a detail for each and every street widening on the plan and profile sheets calling out the various Lengths, Rs and Ws so that we can determine whether or not they are in compliance. Number. 112 Created: 3/16/2004 [3/16/04] The street names on the utility plans do not match the names on the plat. Number: 131 Created: 3/18/2004 [3/18/04] Cover Sheet: Correct the Stormwater contact name on the bottom to read Glen Schlueter 224-6065. Number: 134 Created: 3/19/2004 [3/19/04] Sheet 14 - Lot 27 does not have the utility service to lot 6. Number: 135 Created: 3/19/2004 13/19/041 Sheet 15 - Rotate label for legibility, see redlines. Number. 136 Created: 3/19/2004 [3/19104] Sheet 16, 17- Legibility and scanning issues, see redlines. Number: 137 Created: 3/19/2004 [3/19/041 Sheet 18 - Lot 2 does not show the driveway or the utilities. Number: 138 Created: 3/19/2004 (3/19/04] Sheet 20 - Lot 6 does not show the driveway or the utilities. Number: 139 Page 5 Created: 3/19/2004 [3/19/04) Sheet 21- Lot 5 does not show the driveway or the utilties. Number: 140 Created: 3/19/2004 13/19/041 Sheet 28 -No inlets allowed in curb returns. This one looks close but maybe out of the way. There are several areas like this and I've circled them throughout the plans just to call your attention to it. I really should have circled this on the storm water plan and profiles but you get the idea. Later when you do curb return profiles with the inlet 'info, I'll be ahle to verify these in final compliance- Sidehill is a great example if you want to see how they presented the Information there. Just wanted to make you aware of this early to possibly save you some work later. Thanks' Number: 141 Created: 3/19/2004 (3/19/041 Sheet 30 - No services shown to lot 5. Number: 142 Created: 3/19/2004 [3/19/041 Grading Sheets - Please label all slope ratios. Max slope allowed is 4:1, there are several areas graded at 3.1. Number. 143 Created: 3/19/2004 [3/19/041 Grading sheets - these are unscanable in general and may spot elevations are illegible. Please rotate all labeling to the reader. Number: 144 Created: 3/19/2004 [3/19/041 Sheet 56 - Some kind of identification system is needed so that one can quickly identify which drawing is from where. Maybe numbering them like you have on other sheets and placing that number in the key map as well? Number: 145 Created: 3/19/2004 [3/19/041 Sheet 57, 58 - Put the numbers in the key map by the corresponding drawing. How will the storm design at Campfire and Vine work with the underpass? Number: 146 Created. 3/19/2004 [3/19/04] Legend - Remove the word "tentative" from the driveway locations and remove Note number 3. The driveways need to be finalized on both the utility plans and plat now because of the narrow lots and are not flexible. Number: 147 Created: 3/19/2004 [3/19/041 Sheet 64 - Please provide detail 1413 on the detail sheet and reference the sheet number where shown on this sheet. Number: 148 Created: 3/19/2004 [3/19/04] Sheet 68 - Please see detail 7-24 for the correct way to dimension the street widening details. See redlines. Number: 149 Created: 3/19/2004 [3/19/04] Sheet 70 - continuance of grade and ground lines for Glacier Creek Drive must be shown for 500' beyond the proposed construction. Number: 150 Created: 3/19/2004 [3/19/04] Sheet 71 -See comment #148. Number: 151 Created: 3/1912004 [3/19/04] See redlines for other comments. Number: 153 Created: 3/19/2004 [3/19/041 Please provide the interim condition as well as the ultimate on all street plan and profile sheets. Please see Sidehill for a great example of how this was done. Number: 154 Created: 3/19/2004 [3/19/041 Need to show how the project's interior local streets will connect to Vine in the interim. Sidehill is a good example to look at - they have the same set of circumstances happening where all their locals connect to Timberline. Page 6 Number: 164 Created: 3/19/2004 13/19/041 See the redlines on Appendix E4 for other comments. Most of them do not need to be done until Final Compliance but it is always your option to work on them anytime. Page 7 PLANNING AND ENGINEERING 6Z RESPONSE TO COMMENTS C ih' of tort iullln+ City of Fort Collins. Date: 04/14/2004 Bob Barkeen 281 North College Ave. FT. COLLINS, CO 80522 VF Ripley Assoc. and JR Engineering have addressed and commented on City of Fort Collins review comments dated 3/22/2004 for TRAILHEAD PDP - TYPE I (LUC). This submittal is scheduled to be reviewed as a final preliminary review; however, we are requesting that this submittal be treated as a first final review with design and engineering aspects addressed. We appreciate the cooperation that the City has provided us on the unique review process that the TrailHead project has required. ISSUES: Department: Current Planning Issue Contact: Bob Barkeen Topic: Plat Number: 122 Created: 3/16/2004 [3/16/041 Additional landscaping will need to be provided around the club house and day care buildings. Old comment — addressed with previous submittal. Topic: Stormwater Number: 168 Created: 3/22/2004 [3/22/04] The fence sections along Greenfields Drive will need to meet the design standards in Section 3.8.11 of the LUC. Additional shrub beds will need to be incorporated in front of the fence. The rear lot lines along Greenfields frontage have been revised to meet the fencing design standards. We have provided offsets in the rear lot lines and pockets of more formal landscaping. Number: 169 Created: 3/22/2004 [3/22/04] Landscaping along the recreation trail will need to be shown (especially for bank stabilization) or noted if it will be planted concurrent with the multi -family parcels. This will be coordinated with Parks and Rec. once more is known about the design of the trail. Department: Engineering Issue Contact: Susan Joy Topic: East Vine Drive Number: 152 Created: 3/19/2004 [3/19/04] This must be a stand alone set, so they will also need all the same notes and details as the main set. Please provide construction notes, erosion control, etc. Please provide all appropriate details. Corrections are required to the General Notes, Owner Name, and Stormwater contact. All appropriate details, corrections, notes, etc. have been provided. Number: 155 Created: 3/19/2004 [3/19/04] Add "From _ to in the title so that anybody looking for these plans will know immediately where this design is occurring along Vine. Notation has been added. Number: 156 Created: 3/19/2004 Page I [3/19/041 Plan and Profile sheet 3 - Remove note 2. Need to show existing grade and proposed grades. These can be adjusted in the future but we need to have the assurance that what you're proposing will basically work. As per our preliminary discussions with Matt Baker, the preliminary Ultimate Vine Drive Design needed only to be designed horizontally west of the Burlington R&R crossing to CO 9E, the vertical design would be completed at later date by others. The currently design provides preliminary horizontal and vertical design for 1000' beyond the west property line. Number: 157 Created: 3/19/2004 [3/19/041 Sheet 5 - 3/4 access at Lower Loop Drive. The traffic impact study provided by Mathew Delich for the Trailhead property indicates that all intersections function as full movement intersections in the interim and ultimate design conditions with one exception. Campfire Rd. will be limited to right in/right out movements for the ultimate design. The plans as currently designed reflect the recommendations of the Traffic Impact Study. If additional intersections are to be limited in movements (Lower Loop and Wagon Trail) please provide an explanation. Number: 158 Created: 3/19/2004 [3/19/041 Sheet 6 - Right In Right Out only at Wagon Trail and Vine. See comment response 157. Number: 159 Created: 3/19/2004 [3/19/041 Sheet 7 - Need to identify what station these are equal to in the other set of plans, otherwise you will need to provide all of the design here. Stationing is equivalent to the 1998 Plan set. A station equation has been added. Number: 160 Created: 3/19/2004 [3/19/041 Sheet 9 - Note number 2 states that insufficient lengths were available for the taper lengths and that modifications were made. Variance requests will be necessary, please see 1.9.4. Interim taper at Campfire Rd. meets minimum design criteria of 8:1. Number: 161 Created: 3/19/2004 [3/19/041 Sheet 10 - Please provide all the details shown and/or asked for on sheets 83-85. In addition, please provide detail 1608. Complete for Ultimate design, interim design is limited to details required for widening only. Sidewalk construction will be a part of the Trailhead development see plan set 1. Topic: General Number: 29 Created: 1 /13/2004 [3/16/04] The ditch easements can be filed by separate document but the reception number of the separately recorded document will need to be noted on the plat and utility plans. However, the Ditch Company may need to sign off on the utility plans if any grading is being done around their ditch. Please see comments from Stormwater. Document not yet recorded. Changed language to specify Reception #. [1/13/04] The Ditch Company will need to sign off on the plat, site and utility plans. Please provide the appropriate signature blocks. Number: 31 Created: 1 /13/2004 [3/16/04] The plans (site/plat/utility/landscape) are not scanable. Please see Appendix E6 for minimum font sizes, etc. Please correct all overlapped labeling. Pagc 2 Site plan is now shown at a scale large enough for text to be scanable. Overlapping labels have also been corrected. [1/13/041 See Appendix E6 for scanability requirements. Please correct all overlapped labeling. Number: 33 Created: 1 /13/2004 [3/16/04] Your response is acknowledged. This item will remain open until resolved. On this plat, there are no MF areas [1/13/04] Additional easements are required of this project. PFA requires a fire lane in the MF areas. A public access easement, both on and off site, is required for the future city bike trail shown on the site plan. Need to show all Natural Resource buffers and easements (emergency access, trail, etc) on all plan sets (Utility, Site, Landscape). Number: 35 Created: 1 /13/2004 [3/19/041 Please provide the ultimate design for the underpass in accordance with LCUASS. Ultimate design for the underpass has been provided. 11/13/04] A grade -separated crossing is required where the future bike trail crosses Greenfields. This project is responsible for the design and possibly the construction of this underpass. Please coordinate with Craig Foreman in Parks Planning. Number: 36 [3/19/041 Repeat comment. Created: 1 /13/2004 Interim and Ultimate road design for Vine Drive has been provided. [1/13/04] Engineering will require an interim and ultimate road design for Vine Drive. The TIS shows the need for a right turn lane from Vine to Greenfields in the long range. This project is responsible for dedicating the additional ROW and designing it in the ultimate design. This project is also responsible for construction of Vine Drive along their frontage, however, the City's Street oversong Dept prefers to construct the entire length of Vine when it's realigned at some point in the future. This project will only construct the sidewalk along their frontage and install the landscaping. A Contribution in Aid will be accepted for the rest of their local street portion. An estimate prepared by JR Engineering will be required prior to drafting the Development Agreement so that this amount can be added to the DA. Number: 37 Created: 1 /13/2004 ]3/16/04] Thank you for adding the note, however, it needs to be a little more specific in that the note needs to state the code, what it requires, and then what the variance was granted for. Note is now more specific. [1/13/04] The variance request for Lower Loop Drive was approved. Please list the variance under line 48 of the General Notes in the Utility Plans. Number: 45 Created: 1 /13/2004 [3/16/041 Repeat comment. Dedicated driveways on the narrow lots are now shown on the utility plans as well as the plat and site plan. [1/13/041 Will need to show dedicated driveways on the narrow lots on the utility plans as well as the plat and site plan. Number: 53 Created: 1 /13/2004 [3116/041 Repeat comment. This project was taken to Transportation Coordination on 3118/4 and it was determined that the sidewalk should not meander in these locations and that a variance request would not be approved. Please place the bow at the back of row. The bow is now placed at the back of the ROW. Page 3 [1/13/041 The sidewalk shown along Greenfields and Vine is not in the proper location. The bow needs to be at the back of ROW. Number: 91 Created. 1 /16/2004 [3/18/04] Just keeping this comment alive until we do the DA. Comment noted. [1/16/041 Glacier Creek will not need to be constructed to the property line per the discussion at Staff Review, January 14th. Cash in lieu of will be accepted so that the street can be built at some point in the future. An estimate will be required from JR Engineering for the City's review and approval so that the dollar amount can be included in the DA. Number: 130 Created: 3/18/2004 [3/18/04] Wagontrail and Vine is limited to a right -in, right -out only. Comment noted. See comment response 157. Number: 132 Created: 3/18/2004 [3/18/041 Please place a note on the Plat and Site plan limiting the "alley" loaded lots to rear access only and that no driveways allowed off the front. This item was addressed in item #45. Number: 163 Created: 3/19/2004 [3/19/041 Site/Landscape/Utility/Plat - please coordinate the comments so that all plan sets present the same information. Acknowledged Topic: Greensfields Arterial Created: 3/19/2004 Number: 162 [3/19/041 Comment number 152 applies here as well. Comment has been addressed. Topic: Landscape Number: 125 Created: 3/16/2004 [3/16/041 Please see comments under General. Comment noted. Number: 126 Created: 3/16/2004 [3/16/041 The plans show a project entry feature at Vine Drive. No other details given, but just a reminder - no structures of any kind are allowed in the utility easement. Comment noted Topic: Plat Number: 63 Created: 1 /13/2004 [3/16/041 Repeat comment. Corrections have been incorporated. [1/13/04] Corrections to the plat language are required. Number: 65 Created: 1 /13/2004 Page 4 [3/16/04] It you are providing a ditch easement by separate document, then a note to the plaUutility plans will have to be added that includes the reception number of the separately recorded document. The easement will need to be recorded with the County before we can approve the mylars. Comment has been addressed. [1/13/041 Provide a signature block for the Ditch Company. Number: 90 Created: 1 /16/2004 [3/16/04] Your response notes that the vacation is being done by separate document and that is ok, but the vacation will need to be filed and recorded with the County and the reception number placed on the plat/utility plans before we can approve the mylars. Comment noted [1/16104] Vacate the old ditch easement with the plat Number: 94 Created: 1 /16/2004 [3/16/04] The term "PDP" needs to be taken out of the title and the dedication statement. PDP is actually just the process the project goes through. I'm sorry, I should have added this comment to the one below. Comment addressed. "PDP" has been removed. [1/16104] From Technical Services: Subdivision title in dedication statement does not match title. Number: 95 Created: 1 /16/2004 [3/16/04] Lower Loop Drive can not be a Circle. Check with PEA for direction. Comment noted. [1/16/04] From Technical Services: East/west portion of Lower Loop Dr needs to be renamed. Number: 111 Created: 3/16/2004 [3/16/041 Please provide a tract table that includes what each tract is for, who owns it, and who maintains it. Tract table provided on Sheet 1 of 6 Number: 113 Created: 3/16/2004 [3/16/04] From Technical Services: Basis of bearings do not match between legal and plat. Basis of bearings now match between legal and plat. Number: 114 Created: 3/16/2004 [3/16/04] From Technical Services: As of today, 3/17/4, this area is not in the city. Comment noted. Number: 115 Created: 3/16/2004 [3/16/041 From Technical Services: How was the west line of Sub and 1/4 section determined? Monument has been added. Number: 116 Created: 3/16/2004 [3/16/04] From Technical Services: Industrial and Gas easement not locatable on plat. Puce 5 Project Comments Sheet 10"w�° Selected Departments Citv of Fort Collins Department: Transportation Planning Date: January 14, 2004 Project: TRAILHEAD PDP -TYPE I (LUC) All comments must be received by Bob Barkeen in Current Planning, no later than the staff review meeting: January 14, 2004 Note - Please identify your redlines for future reference Issue Contact: Tom Reiff Topic: Transportation Number: 70 Created: 1 /14/2004 [1 /14/04] An ADA accessible ramp from the Vine Drive sidewalk to the trail underpass will need to be included in the design of Vine Drive and the underpass. Number: 71 Created: 1 /14/2004 [1/14/041 Locations where bike and pedestrians are intended to share the same facility, such as trails or trail connections, require a minimum 8' width. Number: 72 Created: 1 /14/2004 [1/14/041 The sidewalks along Greenfields need to be pulled closer to the street and stay within public ROW. Or a little meandering is permitted but the walks would then have to be placed in a public access easement. Lighting levels for the sidewalk also need to be considered if they are outside of the ROW. Number: 73 Created: 1 /14/2004 [1/14/041 No parking stalls are allowed to block access to ramps. Please review the ramp locations and the proposed on -street parking on Green Lake Court. Number: 74 Created: 1 /14/2004 [1/14/041 What is the intention of Greenfields Street at the north end of the property? Additional information is required to determine if the proposed alignment of Greenfields can fit between the tracks and ditch. -7 Signature CHECK HERE IF YOU WISH TO RECEIVE COPIES Plat Site Drainage Report Utility Redline Utility Landscape l Page 1 I lL Date OF REVISIONS Other These easements are located by reference to reception number. Showing only a portion (the bearings and distances) of elements contained in a legal document creates ambiguity and a potential for misinterpretation. Number: 117 Created: 3/16/2004 [3/16/041 From Technical Services: What is the ''W" symbol in Tracts B and T7 Please add to the legend. "W" symbol has been added to the legend. Number: 118 Created: 3/16/2004 [3/16/041 From Technical Services: Add "SIDE" and UPAE" to the Legend. "SDE" and "UPAW" has been added to the legend. Number: 119 Created: 3/16/2004 [3/16/04] From Technical Services: SW corner needs to be upgraded to state standard. SW corner has been upgraded to state standard. Number: 133 Created: 3/19/2004 [3/19/04] See redlines for other comments. See title page (1 of 6) for table of tracts. Topic: Site Number: 120 Created: 3/16/2004 [3/16/04] Please provide a legend for all symbols and abbreviations. We have added a legend to the site and landscape plans. Number: 121 Created: 3/16/2004 [3/16/04] See comments under General. Acknowledged. Number: 123 Created: 3/16/2004 [3/16/041 Dimension all sidewalks. Walk dimensions have been labeled. Number: 124 Created: 3/16/2004 [3/16/041 Remove the word "Alley" and call them "Private Drives" instead. "Alley" has been changed to "Private Drive." Topic: Traffic Study Number: 129 Created: 3/18/2004 [3/18/041 A roundabout analysis is required at all arterial/arterial intersections, in this case, Greenfields and Vine Drive. A roundabout analysis will be provided in the Traffic Study. Topic: Utility Number: 38 [3/16/041 Please see redlines. Page 6 Created: 1 /13/2004 Redlines addressed. [1/13/041 Corrections required to the General Notes. See redlines. Number: 41 Created: 1 /13/2004 [3/16/04] Please correct the typical street section to read 53' of ROW, not 51'. Street section has been corrected. [1/13/04] Label the type of curb and gutter being used on the typical local street cross section. Number: 47 Created: 1 /13/2004 [3/16/04] Your response is acknowledged. This item may be addressed in Final Compliance and will remain open until then. Comment noted. [1113/041 Will need to provide enough design information for the bike trail so that it can be laid out in the field. Please provide dimensions, lengths, widths, curve tables, etc. Number: 59 Created: 1 /13/2004 [3/19/041 Private easements can not be placed over a public easement. We may need to get together and discuss this. We have scheduled a Utility Coordination Meeting for April 14th, 2004 in order to work through this issue. [1/13/04] Need to show the existing irrigation lines on the property and label what they are made of. NO ADS PIPE IS ALLOWED IN ROW. If that is what is out there, it will need to be replaced in all instances it goes under the ROW. No private lines may be placed in public utility easements. They will need to be placed in their own private easement. This easement must be dedicated on the plat and shown on all plan sets (site/landscape/utility). Number: 83 Created: 1 /16/2004 [3/19/04] Please provide details 707, 1108, 1606. Details have been provided. [1/16/041 Provide all applicable details on a detail sheet. Number: 85 Created: 1 /16/2004 [3/16/04] Repeat comment. All off -site easements will require at minimum, a letter of intent from the effected property owner before going to hearing. The actual easement can be provided during final compliance, however, the mylars will not be approved until they have been submitted. Comment noted. [1/16/04] Will need off -site grading and construction easements. Number: 88 Created: 1 /16/2004 [3/16/041 Your response is acknowledged. This item may be addressed in Final Compliance and will remain open until then. Details shown. [1/16/04] Using detail 7-24 as a template, show a detail for each and every street widening on the plan and profile sheets calling out the various Lengths, Rs and Ws so that we can determine whether or not they are in compliance. Number: 112 Created: 3/16/2004 [3/16/04] The street names on the utility plans do not match the names on the plat. Street names now match plat PaL,e 7 Number: 131 Created: 3/18/2004 [3/18/04] Cover Sheet: Correct the Stormwater contact name on the bottom to read Glen Schlueter 224-6065. Stormwater contact name has been corrected. Number: 134 Created: 3/19/2004 [3/19/041 Sheet 14 - Lot 27 does not have the utility service to lot 6. Utility services provided. Number: 135 Created: 3/19/2004 [3/19/041 Sheet 15 - Rotate label for legibility, see redlines. Redlines addressed. Number: 136 Created: 3/19/2004 [3/19/041 Sheet 16, 17- Legibility and scanning issues, see redlines. Redlines addressed. Number: 137 Created: 3/19/2004 [3/19/04] Sheet 18 - Lot 2 does not show the driveway or the utilities. Driveway and utilities are now shown. Number: 138 Created: 3/19/2004 [3/19/041 Sheet 20 - Lot 6 does not show the driveway or the utilities. Driveway and utilities are now shown. Number: 139 Created: 3/19/2004 [3/19/041 Sheet 21- Lot 5 does not show the driveway or the utilities. Driveway and utilities are now shown. Number: 140 Created: 3/19/2004 [3/19/041 Sheet 28 - No inlets allowed in curb returns. This one looks close but may be out of the way. There are several areas like this and I've circled them throughout the plans just to call your attention to it. I really should have circled this on the storm water plan and profiles but you get the idea. Later when you do curb return profiles with the inlet info, I'll be able to verify these in final compliance. Sidehill is a great example if you want to see how they presented the information there. Just wanted to make you aware of this early to possibly save you some work later. Thanks! Inlets are not in the curb returns. Please refer to inlet/intersection transition detail. Number: 141 Created: 3/19/2004 [3/19/04] Sheet 30 - No services shown to lot 5. Utility services provided. Number: 142 Created: 3/19/2004 [3/19/04] Grading Sheets - Please label all slope ratios. Max slope allowed is 4:1, there are several areas graded at 3:1. Page 8 All slope ratios are labeled. Max slope of 4:1 is provided on all public property and in detention basins. Variance for 3:1 slope in swales has been requested of the Stormwater department. Number: 143 Created: 3/19/2004 [3/19/04] Grading sheets - these are unscannable in general and may spot elevations are illegible. Please rotate all labeling to the reader. Grading sheets have been cleaned up. Number: 144 Created: 3/19/2004 [3/19/041 Sheet 56 - Some kind of identification system is needed so that one can quickly identify which drawing is from where. Maybe numbering them like you have on other sheets and placing that number in the key map as well? Identification system is in place with a numbering system relating profile with the key map. Number: 145 Created: 3/19/2004 [3/19/041 Sheet 57, 58 - Put the numbers in the key map by the corresponding drawing. How will the storm design at Campfire and Vine work with the underpass? Identification system is in place with a numbering system relating profile with the key map. Storm has been redesigned to work with the underpass. Number: 146 Created: 3/19/2004 [3/19/041 Legend - Remove the word "tentative" from the driveway locations and remove Note number 3. The driveways need to be finalized on both the utility plans and plat now because of the narrow lots and are not flexible. The word "tentative" has been removed Number: 147 Created: 3/19/2004 [3/19/041 Sheet 64 - Please provide detail 1413 on the detail sheet and reference the sheet number where shown on this sheet. Detail 1413 has been provided. Number: 148 Created: 3/19/2004 [3/19/041 Sheet 68 - Please see detail 7-24 for the correct way to dimension the street widening details. See redlines. Detail has been referenced and dimensioning has been corrected. Number: 149 Created: 3/19/2004 [3/19/041 Sheet 70 - continuance of grade and ground lines for Glacier Creek Drive must be shown for 500' beyond the proposed construction. Continuance of grade and ground lines for Glacier Creek Drive is shown on the plan and profile sheets. Number: 150 [3/19/04] Sheet 71 - See comment 4148. Created: 3/19/2004 Detail has been referenced and dimensioning has been corrected. Number: 151 Created: 3/19/2004 PaL,e 9 [3/19/04] See redlines for other comments. Relines have been addressed. Number: 153 Created: 3/19/2004 [3/19/04] Please provide the interim condition as well as the ultimate on all street plan and profile sheets. Please see Sidehill for a great example of how this was done. Interim and ultimate conditions have been provided on all street plan and profile sheets. Number: 154 Created: 3/19/2004 [3/19/04] Need to show how the project's interior local streets will connect to Vine in the interim. Sidehill is a good example to look at - they have the same set of circumstances happening where all their locals connect to Timberline. Interim and ultimate conditions have been provided on all street plan and profile sheets. Number: 164 Created: 3/19/2004 [3/19/041 See the redlines on Appendix E4 for other comments. Most of them do not need to be done until Final Compliance but it is always your option to work on them anytime. Comment noted. Department: Natural Resources Issue Contact: Doug Moore Topic: Landscape Number: 107 Created: 3/16/2004 [3/16/041 Landscaping within Natural Habitats & Features buffer zone need to be Fort Collins Native Species. The list of Fort Collins Native Species can be found at http://www.fcgov.com/naturalareas/pdf/nativepi.pdf Trees in buffer along the ditch have been removed per regulations from Ditch company. Topic: Natural Habitat & Features Buffer Zones Number: 106 Created: 3/16/2004 [3/16/04] Block 11 lots 1, 2, 3, 10, 11,12, & 13 encroach into the 25' buffer surrounding the existing windbreak. Please contact Doug Moore at (970) 224-6143 to resolve this issue. Buffer zones have been adjusted to accommodate the lots that had encroached. Number: 108 Created: 3/16/2004 [3/16/04] Wildlife movement corridor buffer zone associated with the realigned Larimer & Weld Canal need to be shown on plans. Corridor has been addressed and is now shown on the site plan. Topic: Utility Number: 109 Created: 3/16/2004 [3/16/041 L.O.D. around trees will need to be shown on plans with details added to the detail sheets showing tree protection standards and L.O.D. fencing installation. Zone has been shown. Department: PFA Topic: General Number: 9 Pace 10 Issue Contact: Michael Chavez Created: 1 /5/2004 [3/16/04] [1/5/04] .Streets: Street names shall be verified and reviewed by the City Planning Department prior to being put in service. Note: Several street names are in question. Street names have been changed under City Planning Department recommendation. Number: 10 (3/16/041 Created: 1 /5/2004 [1/5/04] Addressing: Address numerals shall be visible from the street fronting the property, and posted with a minimum 6-inch numerals on a contrasting background. (Bronze numerals on brown brick are not acceptable.) Multi -family buildings more than one floor in height shall abide by the following addressing requirements: First - floor units shall be designated with 100's, second -floor units with 200's, third -floor units with 300's, and so on. Some multi -family layouts may require address postings from the back side as well as the front side of buildings. A clockwise addressing pattern shall be maintained whenever possible. Note: An addressing scheme shall be submitted to the fire department for approval prior to being posted on the buildings. UFC 901.4.5; 901.4.4 Comment has been noted. Number: 11 [3/16/04] Created: 1 /5/2004 [1/5/04] Water Supply/Commercial: No commercial buildings can be greater than 300 feet from a fire hydrant. Fire hydrants are required with a maximum spacing of 600 feet along an approved roadway. Each hydrant must be capable of delivering 1,500 gallons per minute at a residual pressure of 20 psi. If a fire hydrant cannot be provided, fire sprinklers shall be required. 1997 UFC 901.2.2.2 Comment has been noted. Number: 12 [3/16/04] Created: 1 /5/2004 [1/5/04] Water Supply/Residential (Outside GMA): No residential buildings can be greater than 400 feet from a fire hydrant. Fire hydrants are required with a maximum spacing of 800 feet along an approved roadway. Each hydrant must be capable of delivering 500 gallons per minute at a residual pressure of 20 psi. If a fire hydrant cannot be provided, fire sprinklers shall be required. 1997 UFC 901.2.2.2 Comment has been noted. Number: 13 [3/16/041 Created: 1 /5/2004 [1/5/04] Fire Lane: A fire lane is required. The fire lane shall be visible by painting and signage, and be maintained unobstructed. The fire lane shall be platted as an "Emergency Access Easement" on the final plat. 1997 UFC 901.2.2.1; 901.3; 901.4.2; 902.2.1; FCLUC Comment is no longer applicable. Former multi -family layouts have been removed from this plan set. Areas are platted as tracts for future multi -family development. Number: 14 Created: 1 /5/2004 [3/16/04] [1/5/04] Aerial Access: Buildings three or more stories in height must have access to a 30-foot unobstructed access roadway on at least one side for aerial operations. Note: Please submit proposed elevations (number of stories) for multi -family dwellings. PFA Policy 85-5 (B) Comment is no longer applicable. Former multi -family layouts have been removed from this plan set. Areas are platted as tracts for future multi -family development. Pagc 11 Number: 15 Created: 1 /5/2004 [3/16/041 [1/5/04] Sprinkers: Fire sprinklers may be required. When any portion of the facility or any portion of an exterior wall off the first story of the building is located more than 150 feet from fire apparatus access as measured by an approved route around the exterior of the building or facility, it shall be fire sprinklered. Note: Buildings that are fire sprinklered shall have a minimum 6-inch fireline unless hydraulic calculations can support a smaller fireline. 1997 UFC 902.2.1 Comment has been noted. Number: 16 [3/16/041 Created: 1 /5/2004 [1/5/04] Fire Alarm: A fire alarm system may be required for the day care center. Comment has been noted. Number: 17 [3/16/041 Created: 1 /5/2004 [1/5/04] Knox Box: Poudre Fire Authority requires a Knox Box to be mounted on the front of every new building equipped with a required fire sprinkler system or fire alarm system. 1997 UFC 902.4; PFA Policy 88-20 Comment has been noted. Number: 18 [3/16/041 Created: 1 /5/2004 [1/5/04] Hazardous Materials: This comment pertains to the club house and swimming pool. Corrosive, flammable, reactive or toxic materials (as defined in the Uniform Fire Code), if used, stored or handled on site, must have a Hazardous Materials Impact Analysis (HMIA) completed and supplied to the fire department and Planning Department. FCLUC 3.4.5 (C) Comment has been noted. Department: Police Issue Contact: Joseph Gerdom Topic: General Number: 105 Created: 3/11 /2004 [3/11/04] Lighting and detailed Landscape plan are needed for day care and pool site. Detailed landscape plans were provided with the last submittal. Department: Stormwater Utility Topic: Erosion/Sediment Control Issue Contact: Wes Lamarque Number: 166 Created: 3/22/2004 1. This plan cannot be reviewed at this time - no calculations were submitted in Appendix G, and sheets of the plan set relating to stormwater runoff control were not attached. The sediment erosion control sheets (not the general notes at the front of the utility plan set), need to contain standard City erosion control notes, and the legend for BMP's. Also, it would be much better if one sheet could be utilized to show the entire project and the BMP's needed to control stormwater runoff. The other, more detailed sheets currently submitted could then be utilized for clarity on portions of the project. If the project is to be phased, each phase must have a "stand alone" stormwater runoff control plan. If you have any questions regarding erosion control, please call Bob Zakely at 224-6063. Calculations are included in the Drainage Report. Erosion control legend is included on each Drainage and Erosion Control Sheet. Pare 12 Topic: Stormwater Number: 165 Created: 3/22/2004 PDP is ready for hearing regarding drainage design. Quantity and quality detention volume provided meets standard and pond area shown on plans will work with the site layout. Comment noted. Thank you. Number: 167 Created: 3/22/2004 At next submittal, a review of all hydraulic design will take place, as well as a more detailed review of site grading. Comment noted. Thank you. Department: Transportation Planning Issue Contact: Tom Reiff Topic: Transportation Number: 72 Created: 1 /14/2004 [3/18/04] After conversations with the Transportation Service Area it was determined that the sidewalk along Greenfields should be constructed to City standards and within the ROW. Please correct for next submittal. The sidewalk along Greenfields is now within the ROW. [12/26/03] The sidewalks along Greenfields need to be pulled closer to the street and stay within public ROW. Or a little meandering is permitted but the walks would then have to be placed in a public access easement. Lighting levels for the sidewalk also need to be considered if they are outside the ROW. Number: 81 Created: 1 /14/2004 [3/17/041 Please see red lines for additional access ramp locations throughout the development. Also the details sheet needs to include the standard detail for directional access ramps for detached sidewalks. The center radial ramp detail included in the plans is not required since all the sidewalks are detached. It is also recommended that the crosswalks that lead to the Daycare Center and Club House be striped to highlight the pedestrian crossing to motorists. Additional access ramps have been added. Crosswalks have been striped. [1/14/041 Directional access ramps are required at the intersections with Vine Drive. If the street doesn't continue to the south or doesn't align to a street to the south, than the directional ramps should only go east to west. Number: 127 Created: 3/17/2004 [3/17/04] The standard width for bike lanes on a 2-1-ane Arterial is 8' in width, not 6' as shown. Please correct for the next submittal. Bike lanes are now to standard. Number: 128 Created: 3/17/2004 [3/17/04] The GreenfieldsNine Drive intersection needs to be designed as a standard arterial / arterial intersection if a roundabout design is determined to be unsatisfactory. This means dedicated turn lanes in all directions, or adequate space for future turn lanes, pedestrian enhanced crosswalks with minimum 6' median refuges, directional access ramps and continuous bike lanes through the intersection. The Greenfields/Vine drive ultimate design intersection has been designed to meet the full intersection design needed. Two thru lanes per direction, a left turn lane into Trailhead, a right turn lane into Trailhead, 2 thru bike lanes and thru pedestrian walks. Adequate room in the median has been provided for a left turn lane into the southern development when they develop. Pedestrian crossings across Vine Drive have not been provided since a pedestrian underpass is to be constructed just to the east of the intersection, a connection from the intersection to the proposed location has been provided. When the southern development is Page 13 designed they will only need to show the necessary left turn lane within the designed median, provide the additional ROW for a right turn lane into their development, and provide a southern pedestrian connection to the proposed underpass. We believe this design is best completed by the southern development property. A roundabout analysis has been completed and is described within the Trailhead Traffic Impact Study dated December 2003. The single lane roundabout analysis proved to be inadequate. Redline drawings and City comments dated 3/22/2004 have been included in this submittal. If you have any questions regarding this project, please contact me at (970) 491-9888. Yours Truly, Timothy Halopoff, P.E. Project Manager Pagc 14 FINAL PLAN REVISION REC.D COMMENT SHEET DATE: April 14, 2004 TO: Technical Services PROJECT: #43-02A Trailhead PDP — Type I (LUC) All comments must be received by Bob Barkeen no later than the staff review meeting: May 19, 2004 No Comment / Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** T _ CJ /SCE-" x'c.- _;.a� jJ C157 �, i�i2c�ric i I �a%31n�ev� W41 iuOT ADD23SSeO JVc, AIvNcx 76 Crrc, Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS ,('Plat Site _Drainage Report _Other Utility Redline Utility _Landscape Egse-menT 6cc, _-4;.WuS_ 1. N q Date � � N c r, � z � — 1 q D p v W City of Fort Collins Number: 75 Created: 1 /14/2004 [1 /14/04] Please contact Craig Foreman in the Parks Dept. to determine the easement width required for a regional trail. Number: 76 Created: 1 /14/2004 [1/14/041 Additional connections to the proposed regional trail is required off of North Vista Drive and Wagon Trail Road (see redlines for suggested locations) These suggestions only apply if the proposed trail alignments are approved by the Parks Department. Number: 78 Created: 1 /14/2004 [1 /14/041 In order to achieve pedestrian level of service as identified in the TIS, the sidewalk along Vine Drive will need to connect to the sidewalk along Waterglen's frontage. This may require discussions with the Waterglen HOA to determine who bears the cost. Number: 79 Created: 1/14/2004 [1/14/041 Sidewalks are required to be a minimum 6 feet in width where parked cars overhang. Number: 80 Created: 1 /14/2004 [1/14/041 Does the proposed location of the trail underpass of Vine Drive align with the proposed development to the south? Number: 81 Created: 1 /14/2004 [1/14/041 Directional access ramps are required at the intersections with Vine Drive. If the street doesn't continue to the south or doesn't align to a street to the south„ than the directional ramps should only go east to west. Number: 82 Created: 1 /14/2004 [1/14/041 Provide walkway connections from the end of the Green Lake Crt and Flagstaff Crt. Cul-de-sacs out to Vine Drive. See red lines for suggested alignments. Page 2 6 offma An City of Fort Collins Project Comments Sheet Selected Departments Department: Transportation Planning Date: May 21, 2004 Project: TRAILHEAD PDP -TYPE I (LUC) All comments must be received by Bob Barkeen in Current Planning, no later than the staff review meeting: May 19, 2004 Note - Please identify your redlines for future reference Issue Contact: Tom Reiff Topic: Transportation Number. 78 Created: 111412004 [5/21/041 Please label the sidewalk connection along Vine Drive to the Waterglen subdivision as part of this project and that it will be built with the Trailhead project. [1/14/04] In order to achieve pedestrian level of service as identified in the TIS, the sidewalk along Vine Drive will need to connect to the sidewalk along Waterglen's frontage. This may require discussions with the Waterglen HOA to determine who bears the cost. Number: 81 Created: 1 /14/2004 [5/21/041 The ramps added to the previous submittal need to be shown on the site and landscape plans in addition to the utility plans. [3/17/041 Please see red lines for additional access ramp locations throughout the development. Also the details sheet needs to include the standard detail for directional access ramps for detached sidewalks. The center radial ramp detail included in the plans is not required since all the sidewalks are detached. It is also recommended that the crosswalks that lead to the Daycare Center and Club House be striped to highlight the pedestrian crossing to motorists. Plat Utility Dare HFIE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Site Drainage Report Other_ Redline Utility Landscape REC.D Y89NRV24PN Page 1 [1/14/041 Directional access ramps are required at the intersections with Vine Drive. If the street doesn't continue to the south or doesn't align to a street to the south, than the directional ramps should only go east to west. Number: 128 Created: 3/17/2004 [5/21/041 Regardless of the trail underpass the pedestrian street crossing facilities for Vine Drive are still needed and are required as part of the standard intersection design. Please include these facilities within the next submittal. [3/17/04) The Greenfields/Vine Drive intersection needs to be designed as a standard arterial / arterial intersection if a roundabout design is determined to be unsatisfactory. This means dedicated turn lanes in all directions, or adequate space for future turn lanes, pedestrian enhanced crosswalks with minimum 6' median refuges, directional access ramps and continuous bike lanes through the intersection. Page 2 Cultural, Library, and Recreational Services Park Flannin;� and Development P,iviSinn City of I ort Collin" yL FINAL PLAN REVISION COMMENT SHEET TO: Bob Barkeen, Planner FR: Craig L. Foreman, Manager Park Planning and Development GLd DATE: May 25, 2004 PROJECT: #43-02A TraiIhead PDP—Type I (LUC) City trail issue: Review of the drawings of the trail system east of the irrigation ditch. It appears the proposed trail underpass of Grecnfields Drive may not be efficient for trail users. I've marked up a Site Plan with a trail route that may work better. Basically the trail would go under Greenfields Drive with connections to sidewalks north of the underpass. Then the trail would go east to near Campfire Drive. Near Campfire Drive there would be a connection from the trail to the street. The trail would then be a widened sidewalk (10' wide south along the west side of Campfire Drive to the underpass at Vine Drive. The proposed trail connection west along Vine Drive from the street to the underpass would not be needed. r Prolu-i Comments Beset Tr2A.ii_I-IBATE PDr= - TYFE i (LUC) Ail comments must be received by Bob Barkeep in Current Planning, no later than the staff review meeting: May 19, 2004 Note - Please identify your redlines for future reference Issue Contact: Susan Joy Topic: East Vine Drive Interim Number: 208 Created: 5/20/2004 [5/20/041 This set needs to be coordinated with the Trailhead Development so that the info shown matches. Number: 209 Created: 5/20/2004 [5/201041 Please provide cross sections every 50' as required by LCUASS. Number: 210 Created: 5/20/2004 [5/20/04] Please see comments under the Trailhead plans where applicable. Number: 213 Created: 5/20/2004 [5/20/041 See redlines for other comments. Number: 216 Created: 5/25/2004 [5/25/04] Please submit a separate appendix E4 with the next round of review for these plan sets. Topic: East Vine Drive Ultimate Number: 152 Created: 3/19/2004 [5/20/04] [3/19/041 This must be a stand alone set, so they will also need all the same notes and details as the main set. Please provide construction notes, erosion control, etc. Please provide all appropriate details. Corrections are required to the General Notes, Owner Name, and Stormwater contact. Number: 156 Created: 3/19/2004 [5/20/04] Need 1000' of preliminary vertical design west of the project's frontage as required by code. Because Vine Drive's alignment has not been approved and the alignment may change in the future, a variance to this requirement will be approved. The variance will need to be submitted and approved prior to scheduling the public hearing for this project. [3/19/04] Plan and Profile sheet 3 - Remove note 2. Need to show existing grade and proposed grades. These can be adjusted in the future but we need to have the assurance that what you're proposing will basically work. Signature f Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site Drainage Report Other Utility Redline Utility Landscape - Page I u, C i2, ),1111 bI, t o .I,!.t In P71(11 1 cnI', V ,-ICI Tl i „ c ne. Number. 160 Created: 3/19/2004 [5/18/04] If Note 2 does not apply, then take it off so there Isn't any confusion. If it does apply, then submit a variance stating where it doesn't apply, why the insufficient lengths exist and why you can not make the minimums. This variance would need to be submitted and approved prior to scheduling the public hearing. [3/19/04] Sheet 9 - Note number 2 states that insufficient lengths were available for the taper lengths and that modifications were made. Variance requests will be necessary, please see 1.9.4. Number: 161 Created: 3/19/2004 [5/20/041 The underpass design needs to be included here as well. [3/19/041 Sheet 10 - Please provide all the details shown and/or asked for on sheets 83-85. In addition, please provide detail 1608. Number: 211 Created: 5/20/2004 [5/20/04] Please see comments under the Trailhead plans where applicable. Number: 212 [5/20/04] See redlines for other comments. Created: 5/20/2004 Number: 217 Created: 5/25/2004 [5/25/041 Please submit a separate appendix E4 with the next round of review for these plan sets. Topic: General Number: 29 Created: 1 /13/2004 [5/18/041 [3/16/04] The ditch easements can be filed by separate document but the reception number of the separately recorded document will need to be noted on the plat and utility plans. However, the ditch company may need to sign off on the utility plans if any grading is being done around their ditch. Please see comments from Stormwater. [1/13/041 The ditch company will need to sign off on the plat, site and utility plans. Please provide the appropriate signature blocks. Number: 31 Created: 1 /13/2004 [5/18/04] [3/16/04] The plans (site/plaVutility/landscape) are not scannable. Please see Appendix E6 for minimum font sizes, etc. Please correct all overlapped labeling. [1/13/041 See Appendix E6 for scannability requirements. Please correct all overlapped labeling. Number: 35 Created: 1 /13/2004 [5/18/04] (3/19/04] Please provide the ultimate design for the underpass in accordance with LCUASS. Include all necessary notes, details, structural talcs, etc. See examples given for Young's Creek and Lind Property. [1/13/041 A grade separated crossing is required where the future bike trail crosses Greenfields. This project is responsible for the design and possibly the construction of this underpass. Please coordinate with Craig Foreman in Parks Planning. Page 2 '+ambel, 3S Created: 1/13/200-1 uor,7 D l F,F ,higi� •+ 1, _ ' '� i `.is r,l on! CC-,IrUat r 1 ...,i_eoi fr alx n thuir r r r. J—er 1 t1;e r ip i�J. ;: C� r r �i r Ce _ Le_, :c; :I�e r_..t of thr it local slr.net nrtron_ Ar estimates c l rr f, !ra ,lP �qin ii, i -ill be, I r rc a^:cj 1 C� e�,.c r — _ _„ t`,.ar L i,_ f i_urL r L . -.dcu 1, ne D4. Number: 91 Created. 1 /16/2004 [5/18/04] [3/18/041 Just keeping this comment alive until we do the DA. [1/16/041 Glacier Creek will not need to be constructed to the property line per the discussion at Staff Review, January 14th_ Cash in lieu of will be accepted so that the street can be built at some point In the future- An estimate will be required from JR Engineering for the City's review and approval so that the dollar amount can be included in the DA. Number: 92 Created: 1 /16/2004 [5/20/04] [1/16/04] From Rick Richter/Pavement Management: Will need a mitigation plan for swelling soils in the pavement design. Swell consolidation testing should run at 500 PSF not 1,000. Number: 130 Created: 3/18/2004 (5/18/04] To answer your question, the TIS does not determine whether or not an intersection has full movement or not. The Land Use Code states in 3.6.3.0 and D that full movement Collector and Local Street Intersections with Arterial streets shall be provided every 1320' and that additional, limited movement Collector and Local Street Intersections with Arterial Streets shall be spaced at intervals not to exceed 660'. The only full movement intersection allowed for this development is at Greenfields and Vine. All other interestions are limited movement only as stated below [3/18/041 Wagontrail and Vine is limited to a right -in, right -out only. 3/4 access at Lower Loop Drive. Number: 132 Created: 3/18/2004 [5/18/041 Note placed on Plat. Still need note on Site Plan. (3/18/04] Please place a note on the Plat and Site plan limiting the "alley" loaded lots to rear access only and that no driveways allowed off the front. Number: 163 Created: 3/19/2004 [5/18/041 [3119/041 Site/Landscape/Utility/Plat - please coordinate the comments given under the various topics so that all plan sets present the same information. Number: 186 Created: 5/20/2004 [5/20/041 Minimum parkway widths are not being met at the underpass on Greenfields. Number: 187 Created: 5/20/2004 (5/20/04] Sight distance requirements do not appear to be met as you exit the underpass. Number: 215 Created: 5/25/2004 [5125/04] The interim and ultimate designs for Vine drive are confusing and do not provide enough information. Also, the local streets that connect to Vine are shown as not being constructed for quite a distance leading up to Vine while it appears from the grading that it is possible to construct the locals to the PCs. Suggest setting up a meeting prior to the next submittal so that we can coordinate what needs to be built now versus what needs to be built later. More comments to follow as plans are changed and more information is given. Page 3 Number : 219 Created. 5!2-5/2C04 TI„, .�,.,n, ,,,,,_,*r_ .. _ ,,,I ci ' ,rci I I , Topic; Greensfield.s Arterial Number: 162 Created: 3/19/2004 [5/18/041 [3/19/04] Conimen! number 132 applies here as well. Number. 223 Created: 5/26/2004 [5/26/041 Please submit a separate Appendix E4 with the next round of review. Number: 224 Created: 5/26/2004 [5/26/041 See comments under General and applicable comments under Utility. Topic: Hearing Number. 226 Created: 5/26/2004 [5/261041 To summarize, in order to go to hearing, we'll need letters of intent for the offsite construction, grading, and drainage easements and ditch crossings. A letter from the RR will be required for the drainage pipe going underneath them to the east. Finally, any variances to the project will have to be submitted and approved before we'll allow the project to schedule the hearing. Topic: Landscape Number: 125 Created: 3/16/2004 [5/18/041 [3/16104] Please see comments under General. Number: 170 Created: 5/18/2004 [5/18/04] See Appendix E6 for scanning requirements. Correct all overlapped labeling, minimum font size requirements, etc. Number. 171 Created: 5/18/2004 (5/18/041 Show and label all retaining walls. Number: 180 Created: 5/20/2004 [5/20/041 Please provide street trees along all local streets. Number: 181 Created: 5/20/2004 [5/201041 Place a note that all trees along Vine Drive will be installed with the Ultimate Vine Drive Road Improvements, Number: 182 Created: 5/20/2004 [5/20/04] Sheet 3 - ROW needs to be dedicated to the back of walk. Number: 183 [5/20/04] Show all driveways. Created: 5/20/2004 Number: 184 Created: 5/20/2004 [5/20/04] Sheet 7 - Do not construct the sidewalk in Tract K at this time. Label as Future Sidewalk. Number: 185 Created: 5/20/2004 [5/20/04] Remove contours for legibility. The plans are difficult to read. Page 4 (lumbar G5 Created: 1/13,260-1 (5112/i)i [3 16041 f ycu are r-viding a &i_ l easeme _ b, ,eparai3 co-.urnert,'hen �, no; , the pl„Uc ility plars vdiG hvrv^ i I - I faJ �h� [ n..h,des h - ecepFcn .r bar o• ! „ sa�arat. I; re�ordec . �c�ment. T� �=se�n� � nll need ro bu I .': )riled wi11 th,e County before we can approve Me rnylers. [1/13/04) Provide a signature block for the ditch company. Number. 90 Created: 1/16/2004 [5/18/041 [3/16/041 Your response notes that the vacation is being done by separate document and that is ok, but the vacation will need to be filed and recorded with the County and the reception number placed on the plat/utility plans before we can approve the mylars. [1/16/04] Vacate the old ditch easement with the plat. Number: 95 Created: 1/16/2004 [5/18/04] Has the naming of this street been approved by PFA? [3/16/04] Lower Loop Drive can not be a Circle. Check with PFA for direction. [1116104] From Technical Services: East/west portion of Lower Loop Dr needs to be renamed. Number: 111 Created: 3/16/2004 [5/20/04] Some of the tracts shown do not have an access easement - will you need this? (3/16/04] Please provide a tract table that includes what each tract is for, who owns it, and who maintains it. Number: 116 Created: 3/16/2004 [5/18/041 Repeat comment. We have seen your response, however, this still needs to be located on the plat in order for the plat to be approved. (3/16/04] From Technical Services: Industrial and Gas easement not locatable on plat. Number: 133 Created: 3/19/2004 [5118/041 [3/19/04] See redlines for other comments. Number: 189 Created: 5/20/2004 [5/20/04] Show all driveways. Do not shade them, just an outline is fine. Topic: Site Number: 121 Created: 3/16/2004 [5/18/04] [3/16/04] See comments under General. Number: 172 Created: 5/18/2004 [5/18104] See Appendix E6 for scanning requirements. The cover sheet is illegible and will not scan. Please remove grading for clarity. Remove the utilities from all sheets. Number: 173 Created: 5/18/2004 [5/18/041 Show and label all retaining walls. Number: 188 Created: 5/20/2004 [5/20/041 Remove the contours for legibility. Page 5 Jumb-�r: 152N .l 29 Topic: Utility Number. 38 Created: 1 /13/2004 [5/18104] [3/16/041 Please sou redlines. 11/13/04] Corrections required to the General Notes. See redlines. Number: 62 Created: 1/13/2004 [5/20/04] Arterials (Vine and Greensfield, interim and ultimate) require cross sections every 50' at final compliance. [1/13/041 Please provide preliminary cross sections (typical) for each street proposed. Number: 85 Created: 1 /16/2004 [5/18/041 [3/16/04] Repeat comment. All off site easements will require at minimum, a letter of intent from the effected property owner before going to hearing. The actual easement can be provided during final compliance, however, the mylars will not be approvec until they have been submitted. [1/16/04] Will need off -site grading and construction easements. Number: 88 Created: 1/16/2004 [5/18/04] The details provided are illegible (could not review) and will not scan. [3/16/041 Your response is acknowledged. This item may be addressed in Final Compliance and will remain open until then. [1/16/041 Using detail 7-24 as a template, show a detail for each and every street widening on the plan and profile sheets calling out the various Lengths, Rs and Ws so that we can determine whether or not they are in compliance. Number: 136 Created: 3/19/2004 (5/18/04] Repeat. Also, there are labels with arrows pointing to nothing. [3/19/04] Sheet 16, 17- Legibility and scanning issues, see redlines. Number: 137 Created: 3/19/2004 [5/18/041 Scannability issues, lot 23 doesn't show utilities now. Label size and type of stormpipe. Refer to detail and sheet on headwalls and flared end sections. [3/19/041 Sheet 18 - Lot 2 does not show the driveway or the utilities. Number: 143 Created: 3/19/2004 [5118/041 Repeat comment. In addition, spots must be provided at all lot corners (many are missing). [3/19/04] Grading sheets - these are unscannable in general and many spot elevations are illegible. Please rotate all labeling to the reader. Number: 145 Created: 3/19/2004 [5/20/04] Need to show the underpass in all profiles so that we can see how the utilities will work with it and that you are meeting the minimum cover requirements for both the utilities and the street. [3/19/04] Sheet 57, 58 - Put the numbers in the key map by the corresponding drawing. How will the storm design at Campfire and Vine work with the underpass? Page 6 `tumbac i4L` Gre8ted: 31 19,/200,t t6t20; 1 r .'n C,)I 1K, is sh:. pl _s , - �0(" [3/19N; St;;ct 7� ,i,t n1 n cf Ora.de and grwrid rues for Gla .i:.r C t,k 0 e must be sti, .vn for 5U' e /, nd the prop,) d consti moat. Number. 154 Created: 3/19/2004 [5/18/041 Repeat comment. See sheet 48 of 64, for example, of the Sidehill plans. This is how your plan and profiles need to show the information. Right now they're not showing much information at all. [3/19/041 Need to show how the project's interior local streets will connect to Vine in the interim. Sidehill is a good example to look at - they have the same set of circumstances happening where all their locals connect to Timberline. Number: 164 Created: 3/19/2004 [5/18/04j Repeat comment. Plans are missing some of the required info but it is not required until Final Compliance. Please make your client aware that he is proceeding with the design at his option and at his own risk ($$) until the Board's decision on the rezoning for the property. [3/19/041 See the redlines on Appendix E4 for other comments. Most of them do not need to be done until Final Compliance but it is always your option to work on them anytime. Number: 176 Created: 5/18/2004 (5/18/041 Will need to show the street cuts into Vine for the utility connections. Please add the street cut note: Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. Number: 177 Created: 5/18/2004 [5/181041 As discussed at conceptual and the first round of review, this project is responsible for the full design of the ditch crossing on the north side of the property as well as contributing 1/2 their share of the costs of constructing it. All applicable notes, details, and structural talcs must be provided in the plans. Please see Young's Creek and The Lind Property for good example. An estimate will need to be prepared for the city's review and approval once the design has been completed and that amount will go in the DA. This project must also provide a complete design for the underpass at Vine with enough information so that it can be built in the field. Please see Lind and Young's Creek bluelines for good examples of the information that will need to be provided on the plans for the bridge or culvert and the underpass. Number: 178 Created: 5/18/2004 [5/18/041 No retaining walls are allowed within the utility easement. Please provide a design and all necessary details, talcs for any and all walls over 30". Handrails (or fences) are required for any wall over 30". Number: 190 Created: 5/20/2004 (5120/04] None of the match lines/sheet numbers match up on the street plan and profile sheets. Number: 191 Created: 5/20/2004 (5/20/04] Sheet 10 -see redlines. Number: 192 Created: 5/20/2004 [5/20/04] Sheet 11 - the ditch culvert and head wall shown in Vine is labeled to be removed, however, its removal is not shown in the interim or ultimate plan sheets. Please clarify. Number: 193 Created: 5/20/2004 j5/20/04] Sheet 12- is the storm inlet shown at the end of Greenfields street going in? If so, the street will need to be constructed far enough to accommodate that. If not, how will the drainage work in the interim? Please provide a type 3 barricade. Page 7 Project Comments Sheet City of Fort Collins Selected Departments Department: Engineering Date: January 16, 2004 Project: TRAILHEAD PDP - TYPE I (LUC) All comments must be received by Bob Barkeen in Current Planning, no later than the staff review meeting: January 14, 2004 Note - Please identify your redlines for future reference Issue Contact: Susan Joy Topic: General Number: 29 Created: 1 /13/2004 [1/13/041 The ditch company will need to sign off on the plat, site and utility plans. Please provide the appropriate signature blocks. Number: 30 Created: 1 /13/2004 [1/13/041 Need to dedicate all sight distance triangles on the plat. Must show all sight distance triangles on all plan sheets (Utility, Site, and Landscape). Number: 31 Created: 1 /13/2004 [1113104] See Appendix E6 for scanability requirements. Please correct all overlapped labeling. Number: 32 Created: 1 /13/2004 [1/13/041 Alleys may only be used in conjuction with a narrow street. Those proposed must be Private Drives if the applicant wishes to keep the local street width. Private Drives must be placed in a tract and be dedicated on the plat as a utility, public access and drainage easement. Number: 33 Created: 1/13/2004 [1/13/04] Additional easements are required of this project. PFA requires a fire lane in the MF areas. A public access easement, both on and off site, is required for the future city bike trail shown on the site plan. Need to show all Natural Resource buffers and easements (emergency access, trail, etc) on all plan sets (Utility, Site, Landscape). Number: 35 Created: 1 /13/2004 [11131041 An grade separated crossing is required where the future bike trail crosses Greensfield. This project is responsible for the design and possibly the construction of this underpass. Please coordinate with Craig Foreman in Parks Planning. Number: 36 Created: 1 /13/2004 11/13/041 Engineering will require an interim and ultimate road design for Vine Drive. The TIS shows the need for a right turn lane from Vine to Greensfields in the long range. This project is responsible for dedicating the additional ROW and designing it in the ultimate design. This project is also responsible for construction of Vine Drive along their Signature-' Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS, Plat Site Drainage Report Other Utility Y Redline Utility Landscape Page 1 Number 1Created 5/20/200d 15 _20,0 , _. 7 in _r ons _ -I C .r h i p _-,r trr ci fI Jv _ a. ;ahe _ r;r A; S,r , =5t ., r n fr. �. i �h sh^:vn =.. Number: 196 Created: 5/20/2004 15/20/041 Sheet 15 - Refer to dotaii and sheet Y for all FES_ See redlines_ Number. 197 Created: 5/20/2004 [5/20/04] None of the storm crossings shown across the local streets at Vine (utility sheets 15 and 17) are shown in the interim Vine design. How will this work? Number: 198 Created: 5/20/2004 [5/20/04] The information shown in the water/sewer/storm needs to match in both the plan and profiles. Number: 199 Created: 5/20/2004 [5/20/041 Sheet 16 - Ramp at widening needs a matching ramp on the other side. Number: 200 Created: 5/20/2004 (5/20/04] Sheet 25 - show how the proposed water line ties into the existing. Number: 201 Created: 5/20/2004 [5/20/041 Grading sheets - missing spot elevations on some lot corners. Number: 202 Created: 5/20/2004 [5/20/04] Remove the contour lines in the plan view from all plan and profile sheets for clarity. Number: 203 Created: 5/20/2004 [5/20/041 Please provide curb return, inlet, and station equations on the street profiles. Also show the underpass, gas lines, etc where applicable. Number: 204 Created: 5/20/2004 [5120/04] Sheet 87 - Curb Chart needs to be updated. Number: 205 Created: 5/20/2004 [5/20/041 Sheet 88 through 90 - see redlines. Number: 206 Created: 5/20/2004 [5120/041 See each sheet of the redlines for other comments. Number: 218 Created: 5/25/2004 [5/25/041 Provide type 3 barricades at all deadend streets and sidewalks. Streets must be constructed far enough to include the stormwater improvements shown on the plans. Number: 220 Created: 5/25/2004 [5/25/04] A portion of the waterline in Vine Drive may need to be lowered so that the connections coming in from the local streets are at the ultimate location. Number: 221 Created: 5/25/2004 [5/25/04] See Craig Foreman's comments regarding the newly proposed location of the underpass in Greensfields. Page 8 Number: 222 Created 5/25/2004 Page 9 REVISION COMMENT SHEET DATE: July 28, 2004 TO: Technical Services PROJECT: #43-02A Trail Head PDP - TYPE I (LUC) *Please review plans with the same level of detail as for a Final Compliance review* All comments must be received by Bob Barkeen no later than the staff review meeting: August 25, 2004 ❑ No Comment Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** I. a�u JDA 0 Y '- LEC.A L. G1-0s6 . Z. l re IV 5 3 �¢ f 2vr+l 511910¢ eE ✓iEw Npi COMPLETEL J CD/�Q�C7E�. Name (please print) Date CHECK HERE IF YOU WISH TO RECEIvE COPIES OF REVISIONS a Plat _Site _Drainage Report _Other Utility _Redline Utility _Landscape c;ty of Fort cou;�s x Project Comments Sheet Selected Departments of Fort Collins Department: Engineering Date: August 31, 2004 Project: TRAILHEAD PDP - TYPE I (LUC) All comments must be received by Bob Barkeen in Current Planning, no later than the staff review meeting: August 25, 2004 Note - Please identify your redlines for future reference Issue Contact: Susan Joy Topic: East Vine Drive Interim Number: 213 Created: 5/20/2004 [8/27/04] [5/20/04] See redlines for other comments. Number: 269 Created: 8/27/2004 (8/27/04] Add the street cut note: Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. Topic: East Vine Drive Ultimate Number: 211 Created: 5/20/2004 [8/27/04] [5/20/04] Please see comments under the Trailhead plans where applicable. Number: 265 Created: 8/27/2004 [8/27/041 Corrections to lines 11 and 23 of the General Notes req'd. Topic: General Number: 29 Created: 1 /13/2004 [8/24/04] [5/18/04] [3/16/04] The ditch easements can be filed by separate document but the reception number of the separately recorded document will need to be noted on the plat and utility plans. However, the ditch company may need to sign off on the utility plans if any grading is being done around their ditch. Please see comments from Stormwater. [1/13/041 The ditch company will need to sign off on the plat, site and utility plans. Please provide the appropriate signature blocks. Number: 31 Created: 1/13/2004 Signature l Datc CHECK HERE IF%V4U WISH TO RECEIVE COPIES OF REVISIONS Plat / Site Drainage Report Other_ —� Utility Redline Utility / Landscape Page 1 [8/24/04] The plans have been cleaned up nicely, however, there are a few scanning issues that remain (overlapped labeling, etc). [5/18/04] [3/16/04] The plans (site/plat/utility/landscape) are not scannable. Please see Appendix E6 for minimum font sizes, etc. Please correct all overlapped labeling. [1/13/04] See Appendix E6 for scannability requirements. Please correct all overlapped labeling. Number: 35 Created: 1 /13/2004 [8/24/04] Please provide more information at the possible future underpass at Vine. Need to show how the drainage works and that that location will work with the utilities. Need to show the underpass in all plan and profiles. [5/18/04] [3/19/041 Please provide the ultimate design for the underpass in accordance with LCUASS. Include all necessary notes, details, structural calcs, etc. See examples given for Young's Creek and Lind Property. [1/13/04] A grade separated crossing is required where the future bike trail crosses Greenfields. This project is responsible for the design and possibly the construction of this underpass. Please coordinate with Craig Foreman in Parks Planning. Number: 36 Created: 1 /13/2004 (8/24/041 [5/18/041 A change has been made to the requirements below. The trees will not be installed at this time along Vine and their costs will be included in the contribution in aid for the developer's local street portion. Please continue to show the trees on the plans but label the landscaping and utility plans that the trees will be installed with the Vine Drive Road Improvements. [3/19/04] [1/13/041 Engineering will require an interim and ultimate road design for Vine Drive. The TIS shows the need for a right turn lane from Vine to Greensfields in the long range. This project is responsible for dedicating the additional ROW and designing it in the ultimate design. This project is also responsible for construction of Vine Drive along their frontage, however, the City's Streetoversizing Dept prefers to construct the entire length of Vine when it's realigned at some point in the future. This project will only construct the sidewalk along their frontage and install the landscaping. A Contribution in Aid will be accepted for the rest of their local street portion. An estimate prepared by JR Engineering will be required prior to drafting the Development Agreement so that this amount can be added to the DA. Number: 91 Created: 1/16/2004 [8/24/04] [5/18/04] [3/18/04] Just keeping this comment alive until we do the DA. [1/16/041 Glacier Creek will not need to be constructed to the property line per the discussion at Staff Review, January 14th. Cash in lieu of will be accepted so that the street can be built at some point in the future. An estimate will be required from JR Engineering for the City's review and approval so that the dollar amount can be included in the DA, Number: 92 Created: 1/16/2004 [8/24/041 [5/20/04] [1/16/04] From Rick Richter/Pavement Management: Page 2 Will need a mitigation plan for swelling soils in the pavement design. Swell consolidation testing should run at 500 PSF not 1,000. Number: 163 Created: 3/19/2004 [8/27/041 [5/18/04] 13/19/04] Site/Landscape/Utility/Plat - please coordinate the comments given under the various topics so that all plan sets present the same information. Number: 235 Created: 8/24/2004 [8/24/04] Access ramp shown in front of lot 3 at Campfire and Vine leads to nowhere. Please remove. Number: 236 Created: 8/24/2004 [8/24/04] A number of driveways are shown over storm inlets. This is not allowed. Number: 258 Created: 8/27/2004 [8/27/041 Please dimension the Day Care parking lot stalls and drive aisles on the Site and Utility Plans. Topic: Greensfields Arterial Number: 271 Created: 8/27/2004 [8/27/04] Looks good, just need the rest of the bridge design. See redlines for other minor comments. Topic: Landscape Number: 125 Created: 3/16/2004 [8/24/041 [5/18/04] [3/16/04] Please see comments under General. Number: 171 Created: 5/18/2004 [8/24/04] [5/18/041 Show and label all retaining walls. Number: 181 Created: 5/20/2004 [8/27/04] Repeat comment (this is just for the trees that would go inside the parkway. The rest of the plantings on site may go in with your project). [5/20/04] Place a note that all trees along Vine Drive will be installed with the Ultimate Vine Drive Road Improvements. Topic: Plat Number: 65 Created: 1/13/2004 [8/24/041 [5/18/04) [3/16/041 If you are providing a ditch easement by separate document, then a note to the plat/utility plans will have to be added that includes the reception number of the separately recorded document. The easement will need to be recorded with the County before we can approve the mylars. [1/13/041 Provide a signature block for the ditch company. Number: 90 Created: 1/16/2004 [8/24/04] [5/18/04] [3/16/04] Your response notes that the vacation is being done by separate document and that is ok, but the vacation will need to be filed and recorded with the County and the reception number placed on the plat/utility plans before we can approve the mylars. Page 3 [1/16/04] Vacate the old ditch easement with the plat. Number: 111 Created: 3/16/2004 [8/24/04] [5/20/04] Some of the tracts shown do not have an access easement - will you need this? [3/16/04] Please provide a tract table that includes what each tract is for, who owns it, and who maintains it. Number: 133 Created: 3/19/2004 [8/24/04] [5/18/04] [3/19/04] See redlines for other comments. Number: 189 Created: 5/20/2004 [8/24/04] All driveways must be shown for lots with 50' or less street frontage. [5/20/04] Show all driveways. Do not shade them, just an outline is fine. Number: 259 Created: 8/27/2004 [8/27/041 From Technical Services: Boundary and legal close. Number: 260 Created: 8/27/2004 [8/27/04] From Technical Services: Block boundaries must be delinated - show by separate line type and w/metes & bounds to describe. Number: 261 Created: 8/27/2004 [8/27/041 From Technical Services: Reception numbers missing. Number: 262 Created: 8/27/2004 [8/27/041 From Technical Services: This is a nice looking plat. Good line and text. Number: 263 Created: 8/27/2004 [8/27/04] From Technical Services: Plat is missing curve info. All curves must have 5 values shown. Number: 264 Created: 8/27/2004 [8/27/04] New policy effective immediately: All local local intersections must be dedicated with either a 15' inside radius or a 15' chamfered corner to accommodate the new directional ramp design. All projects (even those currently in review) are effected. If the additional row dedication makes your lot too small to meet the land use code, then you may dedicate the additional area as a Public Access Easement. Topic: Site Number: 121 Created: 3/16/2004 [8/24/041 [5/18/041 [3/16/041 See comments under General. Number: 132 Created: 3/18/2004 (8/24/04] [5/18/041 Note placed on Plat. Still need note on Site Plan. [3/18/04] Please place a note on the Plat and Site plan limiting the "alley" loaded lots to rear access only and that no driveways allowed off the front. Pa-e 4 Number: 172 Created: 5/18/2004 [8/24/04] Much better but the cover sheet will not scan very well. Is there another option for the shaded areas? Those usually don't scan at all or they come out as a blob. Sorry about that' [5/18/041 See Appendix E6 for scanning requirements. The cover sheet is illegible and will not scan. Please remove grading for clarity. Remove the utilities from all sheets. Number: 173 Created: 5/18/2004 [8/24/04] Please label the retaining walls. [5/18/04] Show and label all retaining walls. Topic: Utility Number: 143 Created: 3/19/2004 [8/27/04] Great job cleaning these up. Still missing a few lot corner spots, see redlines. [5/18/04] Repeat comment. In addition, spots must be provided at all lot corners (many are missing). [3/19/04] Grading sheets - these are unscannable in general and many spot elevations are illegible. Please rotate all labeling to the reader. Number: 145 Created: 3/19/2004 [8/24/04] Please show the underpass in all applicable profiles and label as "future" [5/20/04] Need to show the underpass in all profiles so that we can see how the utilities will work with it and that you are meeting the minimum cover requirements for both the utilities and the street. [3/19/041 Sheet 57, 58 - Put the numbers in the key map by the corresponding drawing. How will the storm design at Campfire and Vine work with the underpass? Number: 176 Created: 5/18/2004 [8/24/04] [5/18/04] Will need to show the street cuts into Vine for the utility connections. Please add the street cut note: Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. Number: 177 Created: 5/18/2004 [8/24/041 Full design has not been completed. Will need this before approving the development's mylars. [5/18/04] As discussed at conceptual and the first round of review, this project is responsible for the full design of the ditch crossing on the north side of the property as well as contributing 1/2 their share of the costs of constructing it. All applicable notes, details, and structural calcs must be provided in the plans. Please see Young's Creek and The Lind Property for good example. An estimate will need to be prepared for the city's review and approval once the design has been completed and that amount will go in the DA. This project must also provide a complete design for the underpass at Vine with enough information so that it can be built in the field. Please see Lind and Young's Creek bluelines for good examples of the information that will need to be provided on the plans for the bridge or culvert and the underpass. Number: 178 Page 5 Created: 5/18/2004 [8/24/04] Some of the retaining walls have been removed, but still need details for the ones now shown. 15/18/041 No retaining walls are allowed within the utility easement. Please provide a design and all necessary details, calcs for any and all walls over 30". Handrails (or fences) are required for any wall over 30". Number: 190 Created: 5/20/2004 [8/24/041 There are still numerous problems with the reference labels and matchlines not matching up. [5/20/04] None of the match lines/sheet numbers match up on the street plan and profile sheets. Number: 196 Created: 5/20/2004 [8/24/04] [5/20/04] Sheet 15 - Refer to detail and sheet # for all FES. See redlines. Number: 198 Created: 5/20/2004 [8/24/04] A number of plan and profiles show conflicting or missing information. (5/20/041 The information shown in the water/sewer/storm needs to match in both the plan and profiles. Number: 200 Created: 5/20/2004 [8/24/04] Show the existing waterline in Vine and show how your line is tieing into it. [5/20/04] Sheet 25 - show how the proposed water line ties into the existing. Number: 201 Created: 5/20/2004 [8/24/04] [5/20/04] Grading sheets - missing spot elevations on some lot corners Number: 203 Created: 5/20/2004 [8/24/041 Information still missing. [5/20/04] Please provide curb return, inlet, and station equations on the street profiles. Also show the underpass, gas lines, etc where applicable. Number: 220 Created: 5/25/2004 [8/24/041 Information on the existing line is not shown on the plans. [5/25/041 A portion of the waterline in Vine Drive may need to be lowered so that the connections coming in from the local streets are at the ultimate location. Number: 267 Created: 8/27/2004 [8/27/041 Lets get together the week of 8/30-9/3 to talk about the redlines and make sure we're all on the same page. I think we could go through the comments a lot fasterjust going through the plans real quick than to try type them all out. The plans overall are fantastic - we're just down to the last minute details. I also wanted to talk about coordinating the various sets (interim, ultimate, etc) and how to best do that. I have a suggestion but would like to talk it over with you first. Number: 268 Created: 8/27/2004 [8/27/04] Please see the redlines and checklist E4 for additional comments. Please return the reclined checklist for Trailhead Utility Plans only, I do not need the others back. Page 6 FINAL PLAN COMMENT SHEET City of Fort Collins Current Planning DATE: September 14, 2004 TO: Technical Services PROJECT: #43-02B Trallhead PDP - FINAL PLAN REM All comments must be received by Bob Barkeen no later than the staff review meeting: September 29, 2004 �� Note - Please identify your redlines for future reference /, 5"Al P0 f/ ji 4 eto Z, t cOeVE /%651bn/Hr'anl071s5�N,�.OAI toT// 91-,e4 30VEEr4�S. 3, Sod Mi6Hr GNRN(st 7//E 4E6RG A.3 3U66E57E, .1 d SNCET Z . �CoTT� 2�j L Name (pleas print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS d� Plat _Site _Drainage Report _Other f _Utility _Redline Utility _Landscape cof Port couins 3.= frontage, however, the City's Streetoversizing Dept prefers to construct the entire length of Vine when it's realigned at some point in the future. This project will only construct the sidewalk along their frontage and install the landscaping. A Contribution in Aid will be accepted for the rest of their local street portion. An estimate prepared by JR Engineering will be required prior to drafting the Development Agreement so that this amount can be added to the DA. Number: 37 Created: 1 /13/2004 [1/13/041 The variance request for Lower Loop Drive was approved. Please list the variance under line 48 of the General Notes in the Utility Plans. Number: 52 Created: 1 /13/2004 [1/13/041 High volume driveways must be a minimum of 150' from an intersection. Several do not meet the standard. Number: 53 Created: 1 /13/2004 [1/13/041 The sidewalk shown along Greenfields is not in the proper location. The back of walk must line up with the ROW. Number: 55 Created: 1/13/2004 [1/13/041 The private drive off Glacier Creek must line up with Lower Loop Circle. Number: 56 Created: 1 /13/2004 11/13/041 The future bike trail is shown in a tract dedicated as a private access easement only. The bike trail must be located in a Public Access Easement. Is the Ditch cc allowing improvements of any kind in their easement? Number: 57 Created: 1 /13/2004 [1/13/04] Will need to discuss the private drive/bike trail combination with transportation planning and parks department. This configuration may not be acceptable. Number: 58 Created: 1 /13/2004 [1/13/041 Drivecuts off an arterial require radial returns. The curb cut shown on the north end is not allowed. Number: 67 Created: 1 /13/2004 [1/13104] Please provide additional ped/bike connections from North Vista Drive to the future bike trail in lieu of street connectivity requirements. Number: 86 Created: 1 /16/2004 [1/16/041 Will need to dedicate an access easement for all shared driveways and this easement will need to be shown on all plan sets (landscape/site/utility/plat). Number: 87 Created: 1 /16/2004 [1/161041 Parking setbacks in MF and culdesacs must be in accordance with current street standards. Number: 89 Created: 1 /16/2004 [1/16/041 Need to line up the ramps with the trails and sidewalks. Ramps must be the same width as the sidewalk or trail it lines up with. Number: 91 Created: 1 /16/2004 [1/16/041 Glacier Creek will not need to be constructed to the property line per the discussion at Staff Review, January 14th. Cash in lieu of will be accepted so that the street can be built at some point in the future. An estimate will be required from JR Engineering for the City's review and approval so that the dollar amount can be included in the DA. Number: 92 Created: 1 /16/2004 [1/16/04] From Rick Richter/Pavement Management: Will need a mitigation plan for swelling soils in the pavement design. Swell consolidation testing should run at 500 PSF not 1,000. Page 2 Sri 6a City of Fort Collins Project Comments Sheet Selected Departments Department: Transportation Planning Date: September 28, 2004 Project: TRAILHEAD PDP - TYPE I (LUC) AND FINAL PLAN All comments must be received by Bob Barkeen in Current Planning, no later than the staff review meeting: September 29, 2004 Note - Please identify your redlines for future reference Issue Contact: David Averill Topic: Site Number: 317 Created: 9/27/2004 [9/27/04] Comment pertaining to E. Vine proposed arterial design improvements - Please show locations for bicycle lane symbols/signs to be applied/installed. Topic: Transportation Number: 239 Created: 8/24/2004 [9/27/04] [8/24/041 Sheet 81 of Utility Plans: Ultimate Vine/Greenfields - please add a ramp on NE corner that directs pedestrians south across Vine to the refuge provided in the median. Signature Date CHECK HF,RE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Qom' Site Drainage Report Other_ _— Utility _ Redline Utility Landscape Page I Project Comments Sheet 000 (0:090V �" City of Fort Collins Selected Departments Department: Engineering Date: October 1, 2004 Project: TRAILHEAD PDP - TYPE I (LUC) AND FINAL PLAN All comments must be received by Bob Barkeen in Current Planning, no later than the staff review meeting: September 29, 2004 Note - Please identify your redlines for future reference Issue Contact: Susan Joy Topic: East Vine Drive Interim Number: 269 Created: 8/27/2004 [9/23/041 Since the utility connections are all now shown in the Trailhead PDP plans, please provide another note that states: Please refer to Trailhead Utility Plans for all utility connections in Vine Drive. Or something like that. [8/27/041 Add the street cut note: Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. Topic: East Vine Drive Ultimate Number: 309 Created: 9/23/2004 [9/23/041 Cross Section Sheets - show the slope ratio on each section, both sides (cannot exceed 4:1) Number: 318 Created: 9/28/2004 [9/28/04] Sheet 15-22, note 2 - Correct the spelling of Whitman to Whitham. Topic: General Number: 36 Created: 1 /13/2004 [9/23/04] [8/24/041 [5/18/04] A change has been made to the requirements below. The trees will not be installed at this time along Vine and their costs will be included in the contribution in aid for the developer's local street portion. Please continue to show the trees on the plans but label the landscaping and utility plans that the trees will be installed with the Vine Drive Road Improvements. [3/19/041 [1/13/04] Engineering will require an interim and ultimate road design for Vine Drive. The TIS shows the need for a right turn lane from Vine to Greensfields in the long Sid nature Da e CHECK H"E IF\,) Plat Site WISH TO RECEIVE COPIES OF REVISIONS Utility --K— Redline Utility Page 1 Drainage Report Other. Landscape range. This project is responsible for dedicating the additional ROW and designing it in the ultimate design. This project is also responsible for construction of Vine Drive along their frontage, however, the City's Streetoversizing Dept prefers to construct the entire length of Vine when it's realigned at some point in the future. This project will only construct the sidewalk along their frontage and install the landscaping. A Contribution in Aid will be accepted for the rest: of their local street portion. An estimate prepared by JR Engineering will be required prior to drafting the Development Agreement so that this amount can be added to the DA. Number: 91 Created: 1 /16/2004 [9/23/041 [8/24/041 [5/18/041 [3/18/041 Just keeping this comment alive until we do the DA. [1 /16/04] Glacier Creek will not need to be constructed to the property line per the discussion at Staff Review, January 14th. Cash in lieu of will be accepted so that the street can be built at some point in the future. An estimate will be required from JR Engineering for the City's review and approval so that the dollar amount can be included in the DA. Number: 333 Created: 10/1/2004 [10/l/04] Engineering is ready for mylars provided that the remaining issues are addressed. Topic: Greensfields Arterial Number: 324 Created: 10/1/2004 [10/1/04] Sheet B2 - See redlines. Question/suggestion on the placement of the wingwalls. There is a concern that there will be scouring - is there another way to place these or will we need to do something with the embankment to account for that? Also, the typical section for the bridge girds show that you will be laying the girds at an angle. This is OK, just that it is harder to lay this out in the field and could cost more. Another option would be to pour a stepped deck instead (but this is not required). Number: 325 Created: 10/1/2004 [10/1/04] Sheet B4 - Please provide an elevation for the other side of the the Abutment, Also, the bearing seats calc out at 1.33% slope one way and 2.66% the other. Our minimum is 2%. Detail A - See redlines for questions and some dimensioning requirements. Please call if you have questions or if you need to meet with me. I also went over these redlines with Tim Halopoff and you could call him as well. Number: 326 Created: 10/1/2004 [10/1/04] Sheet B5 - Please show the L bar in detail A so that it doesn't get missed when they're forming this up. Please provide an elevation for the other side of Abutment 2. Number: 327 Created: 10/1/2004 [10/1/04] Sheet B6 - Typical Wingwall Section - Where is this in plan view? And does the galv sheet metal piece go all the way over the top or just around it? Number: 328 Created: 10/1/2004 110/l/041 Shet B8 - Plan View- Detail A on B4 and B5 add up to 9" while this detail adds up to 10 and 3/8". See redlines. Page 2 Number: 329 Created: 10/1/2004 [10/1/04] Sheet B10 -Detail 2 -Is there another way to run the deck drain? The way it is now leaves 3" of concrete for the sidewalk and by the time you subtract out the rebar, you don't have a lot of concrete left. It won't stand up to traffic very long. Number: 330 Created: 10/1 /2004 [10/1/041 Sheet B11 - Bridge Rail Anchorage detail - we drew in the rebar from the other detail and just wanted to make sure that there won't be any conflict. Could you take a look at this? Number: 331 Created: 10/1 /2004 [10/1/04] Please provide the shop drawings for the reinforcing steel. Number: 332 Created: 10/1 /2004 [10/1/041 See attached sheets to comment letter. Topic: Landscape Number: 319 Created: 9/28/2004 [9/28/041 Sheet 4 - Tree located over shared driveway, lots 1 and 24, block 4. Number: 334 Created: 10/1 /2004 [10/1/04] There are 4 trees shown in an area that will be regraded in the future to accommodate the ultimate Vine Drive improvements. As a policy, the city does not allow trees to be planted in areas that will require their removal in the future. The developer does have a choice in this case... if he chooses to have the trees there, then they must be ornamentals and the developer would have to escrow for the future trees as well. That would mean that he has to pay for 8 trees rather than 4. The other choice, of course, is to not install the trees at this time and include their cost in the Vine Drive estimate. Topic: Plat Number: 259 Created: 8/27/2004 [10/1/04] [8/27/04] From Technical Services: Boundary and legal close. Number: 322 Created: 10/1 /2004 [10/1/041 From Technical Services: Curve designation missing on lot 1, blk 4, sheet 4 and 5. Number: 323 Created: 10/1 /2004 [10/1/04] From Technical Services: You might want to change the legal as suggested on Sheet 1. Topic: Site Number: 316 Created: 9/23/2004 [9/23/04] Please add a note: Please refer to the Trailhead Utility Plans for the interim improvements along Vine Drive. Page 3