Loading...
HomeMy WebLinkAboutBLOCK 82 LOTS 2 AND 3 209 SOUTH MELDRUM STREET OTTERBOX - Filed DCP-DEV. CONSTRUCTION PERMIT - 2010-06-03City Ol Planning, Development & Transportation T Engineering Department Fort Collins 281 North College Avenue PO Box 580 Fort Collins, CO 80522-0580 970.221.6605 970.221.6378 - fax DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 03 Issuance Date: Project Name: Otterbox Corporate Headquarters Project A.K.A.: None Project Location: 209 South Meldrum Street Permittee: Stu MacMillan City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $ 400.00 Construction Inspection Fee (paid prior to issuance of this permit) $ 978,60 Total $ 1,378.60 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 18,545.93 Form of security deposited with the City: PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. OF NORTHERN COLORADO 1013 EAST HARMONY ROAD P.O. BOX 270770 FORT COLLINS, COLORAD 0527 970-223-4000 May 4, 2010 City of Fort Collins Engineering Department 281 N. College Ave. Fort Collins, Colorado 80524 Dear Sirs: We hereby establish, at the request and for the account of Otter Properties, LLLP, (209 S. Meldrum, Fort Collins, Co., 80524, in your favor as beneficiary, our Irrevocable Letter of Credit No. 7962023, in the amount of Eighteen Thousand Five Hundred Forty Five Dollars and Ninety-three Cents ($18,545.93) (as more fully described below), effective immediately and expiring at the close of banking business on May 4, 2011, at our office at 1013 E. Harmony Road, Fort Collins, Co., 80525. This Letter of Credit is intended for the funding required for the Otter Box Corporate Headquarters Development Project ("Development Project") for the assurance of the completion of the construction and the maintenance and repair of the public infrastructure in connection with the aforesaid development project and its associated development agreement and development construction permit. Funds under this Letter of Credit are available to you for one or more drawings prior to the close of business on May 4, 2011, against sight drafts in an aggregate cumulative amount not to exceed $18,545.93, dated the date of presentment, drawn on our office referred to above, referring thereon to the number of this Letter of Credit and accompanied by your written certificate signed by you and acknowledged as therein provided in the form of Exhibit 1 hereto. Presentation of such draft and certificate shall be made at our office referred to above. Upon the earlier of (i) our honoring your draft(s) totaling $18,545.93 in the aggregate presented on or before this Letter of Credit expires pursuant to the terms herein or (ii) the surrender to us by you of this Letter of Credit for cancellation, this Letter of Credit shall automatically terminate. It is understood that the amount of this Letter of Credit may be reduced as public improvements are constructed and accepted by the City. As components of the infrastructure are satisfactorily completed in accordance with approved utility plans, the value of the completed components may be established from the Development Construction Permit worksheet for determining costs of infrastructure construction and inspection fees, whereupon the amount of this letter of credit may be reduced by the value of the completed component(s), upon execution of a "Request for Amendment to Letter of Credit" in the form attached hereto as Exhibit 2 . This letter of credit shall be subject to the Uniform Commercial Code as in effect in the State of Colorado, and, to the extent not inconsistent with the terms of this Letter of Credit and the Uniform Commercial Code, the Uniform Customs and Practice for Documentary Credits, 2007 revision, ICC publication number 600. This Letter of Credit will be automatically extended without amendments for one year from the present, and each future, expiration date thereof, unless Issuer delivers written notice at least sixty (60) days prior to any such expiration date to the City of Fort Collins of its intent not to renew this Letter of Credit. Any such notice shall be in writing and shall be delivered with an acknowledged receipt, either in hand or by certified mail. Any requests for amendments to this Letter of Credit shall be made in the form of Exhibit 2 attached hereto. The City may at any time request that the Bank amend this Letter of Credit by submitting to the Bank a fully executed certificate in the form of Exhibit 2. The Bank may thereafter promptly issue an amendment to the Letter of Credit corresponding to the change or changes requested in such certificate. This Letter of Credit is not transferable. This Letter of Credit sets forth in full our undertaking, and such undertaking shall not in any way be modified, amended, amplified or limited by reference to any document, instrument or agreement referred to herein, except only the certificate and draft(s) referred to herein; and any such reference shall not be deemed to incorporate herein by reference any document, instrument or agreement except for such certificate and draft(s). incerelv, r, 1 Dawn M. Davis, Senior Vice President FirstBank of Northern Colorado, Issuer Issuing company name: FirstBank of Northern Colorado Address: 1013 E. Harmony Road Fort Collins, Co. 80525 Phone Number: (970) 223-4000 EXHIBIT 1 CERTIFICATE The City of Fort Collins hereby certifies as follows with respect to the certain Irrevocable Letter of Credit No. dated 9 , established in favor of the City of Fort Collins, Colorado (the "Letter of Credit"): (a) He (She) is authorized to execute this Certificate of behalf of the City of Fort Collins; (b) The applicant/developer is in default under the terms of the development agreement and/or the development construction permit. (c) The sum of $ , which is the amount of the draft presented with this Certificate, is the amount currently due to the City of Fort Collins from (d) The amount of the accompanying draft together with all previous draws under the Letter of Credit do not exceed in the aggregate $ :and (e) The Letter of Credit has not expired. IN WITNESS WHEREOF, the undersigned has executed this Certificate of behalf of the City of Fort Collins this day of THE CITY OF FORT COLLINS, COLORADO A Municipal Corporation [Title] EXHIBIT 2 Request for Amendment or Release of Letter of Credit # The City of Fort Collins certifies that the person signing below is authorized to execute this Request for Amendment or Release of Letter of Credit on behalf of the City of Fort Collins, and further certifies with respect to the provisions contained in the Development Construction Permit dated , and/or the Development Agreement dated between the City of Fort Collins (Beneficiary) and (Developer), the following: [Check applicable boxes.] ❑ The Letter of Credit is to be reduced to $ ❑ The expiration date of the Letter of Credit is revised to be ❑ The 60-day automatic one year renewal provision contained in the Letter of Credit is no longer in effect. ❑ Release Original Letter of Credit upon receipt of separate replacement Maintenance Letter of Credit in the amount of (current value). ❑ Release Letter of Credit. In witness whereof, the undersigned has executed this certificate on behalf of the City of Fort Collins this day of , I0 CITY OF FORT COLLINS, COLORADO a Colorado municipal corporation (Name and Title) Development Construction Permit, Page 2/6 3. Construction time restrictions: 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducted by the City; (2) punch list items from the final inspection are completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any Development Construction Permit, Page 3/6 planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if toe applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditions so stated in this permit. Applicant/Project Manager' s Signature. Approval for issuance: City Engineer Apprpv ' �/ Date: /0 Date: (Permit Issuance Date) Development Construction Permit, Page 4/6 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Otterbox Corporate Headquarters Project A.K.A.: None City Staff Contact Persons: Development Engineer: Andrew Carney, 281 N. College Ave., Fort Collins, CO 80521 Office 970-221-6501 Fax 970-221-6378 Email: acarneykfc ov.com Construction Inspector: Tracy Dyer, 281 N. College Ave., Fort Collins, CO 80521 Office 970-416-2011 Cell: 970-222-0855 Email: tdyer@,fcgov.com Current Planner: Emma McArdle, 281 N. College Ave., Fort Collins, CO 80521 Office 970-221-6206 Fax 970-224-6134 Email: emcardle2fc ov.com Water Utilities Engineer: Roger Buffington, 700 Wood Street, Fort Collins, CO 80521 Office: 970-221-6681 Email: rbuffin ton(iDfcgov.com Erosion Control Inspector: D.A. Black, 700 Wood Street, Fort Collins, CO 80521 Cell 970-218-3011 Fax 970-221-6619 Email: dblackna,fc ov.com Natural Resources: Erica Saunders, 215 North Mason, P.O. Box 580, Fort Collins, CO 80522 Office: 970-416-2032 Email: esaunderskfc ov.com Traffic Operations: Development Construction Permit, Page 516 Syl Mireles, 626 Linden Street, Fort Collins, CO 80521 Office 970-221-6815 Fax 970-6282 Email: smireles@fcgov.com Transportation Planning: Denise Weston, 215 N. Mason, Fort Collins, CO 80521 Office 970-416-2643 Fax 221-6239 Email: dweston(a fc ov.com Forestry: Ralph Zentz, 215 N. Mason, Fort Collins, CO 80521 Office 970-224-6302 Fax 970-221-6586 Email: rzentzfc ov.com Light and Power: Doug Martine, 700 Wood Street, Fort Collins, CO 80521 Office 970-224-6152 Fax 970-221-6619 Email: dmartinekfc ov.com Developer' Contact Persons: Project Manager: Stu MacMillan Everitt MacMillan, 3003 E. Harmony Rd., Suite 300, Fort Collins, CO 80528 Office:970-226-1500 Cell:970-2105-7000 Fax: 970-213-4156 Email: stugeverittcomnanies.com Developer/Owner: Curt Richardson Otterbox Properties, LLLP, One Old Town Square, Suite 303, Fort Collins, CO 80524 Email: curt.richardsongotterbox.com Architect/Planner: Don Bundy, The Architect's Studio, 151 W. Mountain Ave., Fort Collins, CO 80524 Office:970-482-8125 Fax:970-482-8450 Email: dbgthe-architects-studio.com Project Engineer: Bud Curtiss, Northern Engineering, 200 S. College Ave., Fort Collins, CO 80524 Office:970-221-4158 Fax:970-388-1033 Email: cbudgnorthemen ineerin com Development Construction Permit, Page 6/6 General Contractor: Jim Ciesla, Brinkman Construction, Inc., 3003 E. Harmony Rd. Suite 200, Fort Collins, CO 80528 Office:970-267-0954 Fax:970-206-1011 Email: iim.cieslakbrinkmanpartners com llVM9d l-13HS GNd 3WO { rx a 3x gg 0(]V'6OlOo 'SNillOo lao3 x 3 133HIS Wflaol3W HinOS 60Z o 0 SH31iMDOV9H M3NIL uj aQ NORTH AWWeucl\cBuryeS pue gwwnxQ�:� Wb CC�lL�44044ZRL/E H W ul U) Lll Q F- Cl) W t- cn O L) 0 Z uj F- F- Z Q a I- U w O a 0 0 0 0 0 o 000000 0000000000 O (D O O O O O O O O 0 0 0 0 0 0 O O O O M O 69(A 696`i0(A Om0000-7 n 69��69 h969 r�69 M O O O O O O M000(MO C N p W _ _O Or-Or-O(A h. %1 Q Z 4o O Z J W ` Q W LU ONw ~ Z LL 5 O~ LL Z ~ } 0 0 o a o 0 � Lo(n00 0 00 0 0 0 0 0 0 0 L-f-N 0000000 (n000tt) U) J J Z Z Q H p O o M (M (�7 (M 69 d9 69 69 O 0 0 0 0 0 0 M 0 0 L j Uj 69 (fl 69. N N O fl- M M (M 69 6 69 9 _O W U w p w �� 6969�69696969 69 (+9 (ri fq F U wow,0� Z w zwam y;, LL > _ w o00000 0 0 0 0 0 0 0000000000 0 0 0 0 0 0 0 0 0 0 or�000r�o O N O Z',' O O a 609609 b04609�� OONOOOOOOo 69.6s 69 69 O O O O O O O �000(00 W U Q Q C - (0 M M 6'i 6% 609 69 (o LO o c} 0 69 M ti LLL to Q H _� dN9��69� y' co J Q N Z. IL LL Q aiLL OO w HWZU Q' W w w Z w L=- 0 0 0 0 0 0 o 0 0 0 0 Cl o O o o O o 0 0 o O 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 o ~ to 3 Q f" L- 0 } (V Ln 0 0 0 0 CN 69 69 0 69 69 w C) m 0 0 0 0 0 0 0 69 O LO 0 0 0 0 0 0 0 0 0 Ln ui (n o 0 69 W m (!� 6 k 6N9 N p LO 6M9 M N V' V 69 69 69 69 EA 69 L11` W 69 61, 69 ai aaw> O CO Z N 2U, V U LL z Oa_ z 0 0 0 V w Q U m W �� Mom- MC)C (N y O w W F=- ( Z. mw V z U co J uj W L1: z �Z>O �QOw O w�aa vz U.� O= w- a 2 2 2 2 2 2 2 2 2 Cl? Ll' LL }} U)Z Z Im Z WQ J J U U Q Q W W J J J Q Q Q Q Q Q Q O l.L } www W W ww U) U) 1 0 C7 F- J aZ-, O a � U J w W = Z yU Z a m N 3 Z Q w V0 a U) y a� -j o o 0 U � y I _ U �� t%i•m u 2 Z 6 Y vl w� OLL z�a Oaf c �O dU m a) c c a E _z aJ J w �.� aa) 3 p 2 a 3 �vU m y c a) c a) CD a) Q IL aJF.. d U U �� N(n•� 3 �m.� m� y :3 c 0 Lu OH U> o �� m o cu�t�' o �o W 0)0)(D f' N N ova c c 0 0 c r e��o0—m al a) u a) = t a) m y ie�m�mcm a c E °� c N c w �m>�m°)�o > w # V 3Q� �f/��I-�LL�>�Il� int az N � O N CL8) <2A OtterBox - New Corporate Headquarters 4/21/2010 DCP PRECONSTRUCTION MEETING ATTENDANCE SHEET Contact name �OGS /rJ3/Nip Company Name G14K7" Address �o woof S7'- Phone Number/email address 970 - ,slaI- rd%blt . tow►G��. pw� Q 6F 4r6el c.c9 3,-cz- At-1. TV /41 A `C t el� c c �� 5t 1 C''G � � �v �e v Zi. f,a,,,Oest , vl ��- `�' OAr S/VOWbO.%j ✓ lE 2.00 -%. ftc"e Avg 38$ - �os3 cony � ✓1%,KtN.e.,,r�'..,�,.�4r.?. v D 3 } (, me,µ • �'� 5'I�c - '3 Do 'DAvty L>=NvRr "I-5R11qkMj6,H �KSTR-t(oN 5ao3 r. #ARMan(y st�•3ob fT. CO"-( l5, Co eGS�5 -r(%6-G31-7G3� VE. t••&NORRE B (Nk r t- . Co .