Loading...
HomeMy WebLinkAboutCAMBRIDGE HOUSE LOFTS - Filed DCP-DEV. CONSTRUCTION PERMIT - 2005-04-07Citv of Fort Collins Transportation Services luiginecring Department DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 04-39 Issuance Date: �� i 4 Project Name: __ Cambrid<,e House Lofts Project A.K.A.: Project Location: __ 1113 W. Plum Street Permittee: Christian Ray Ci!r and developer contacts: See attached Exhibit "A "for names and phone numbers of all contact person s_for this project. Fees: Permit Application Fee (paid at the time of application) $ 150.00 Construction Inspection Fee (paid prior to issuance of this permit) $ 323.00 Total $ 473.00 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. S 4,060.00 Form of security deposited with the City: eaSIV _ I'll, RFORNIANCE REQUIREMENTS OF THIS PERMIT: 1. the Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and spcci fications the certification of all materials testing by an Engineer. The Permittee shall have an L11-incer prepare revised design drawings and secure City approval for all revisions to the l ltihty Plans and related documents. I he Permittee shall have an Engineer represent, as required by the ('ity in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Pernrttec shall proeidc "as -constructed" plans prepared by an Engineer prior to the City s acceptance of the constructed public improvements. (All references above to the terms "Project Engineer` and "Engineer " shall mean a Professional Engineer licensed in Colorado.) 2. All contractors who perform work on this project trustbe bonded and licensed in conformance with City rcquircmcnis. i It o Coil III a,�.i�sol; 2-0W • (970)221-660,; • FAX (970) 22 1 -(,,1 �tcw.icgov.cnm DEVELOPMENT CONSTRUCTION PERMIT APPLICATION (2/ 16/99) For City, use only: Application Number: i- Application Date: Permit application fee: S,.00 �C10•0d INSTRUCTIONS: 1. Complete this form (some questions may not apply to you) and attach all necessary documents and submit to the Development Engineering Section of the City. 2. If you have any questions contact the Development Engineer, , at 221-6605. 3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 N. College Avenue. PROJECT INFORMATION: Project Name (as approved by the City): Project A.K.A. (Marketing name if different from Project Name): Project Location: Property Owner(At the time of this permit issuanc : Individual Name: L���S4ta•+ a Company Name Address: '5l Phone number(s): Office: R 70- tA L et- 8 3$1t- Cellphone: 176- 2JJ.-P`ItS Fax number: -76 - 14L -Er 8 Email: t C O Applicant/Project Manager (Tile primary contact person for all matters regarding this project, and the person responsible for all matters referencing "the D{eveeloper" in the Development Agreement for this project): � i_ �-4. I l Individual Name: Company Name Address: Phone number(s): Office: Cellphone: _ Fax number: Email: Permittee (Person who is to Individual Name: _ Company Name : — Address: Phone number(s): Office: Cellphone: _ Fax number: Email: the Development Cowruction Permit): Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person, responsible for the design of this project, responsible for certification that improvements are constructed in accordance with approved plans, responsible for making revisions to plans with City approval and for providing as -constructed plans)/-� Individual Name: Ye_�rie i w t6- 0<_+C L% Company Name: R n ✓"'rk-% 2wT``v W Address: LkCA V• L-0 . t k 91 w Phone number(s): Office: el7co- Gy6 G� 39 Cellphone: Fax number: 9?0- G $G 11 4 Email: (M us Wcs•F . Nst Professional License Number: 3�0(0 Architect/Planner (The person responsible for the l site 1 �design of this project) Individual Name: pew QduaFS.Li ✓tQ• Company Name : Fad �-It Address: 2 iO"7 (<i-"c 0�.t Phone number(s): 11 Office: 4110 -A0-1 73 Cellphone: y 7d- AAA - \\3 2 Fax number: 0-41TV-0W Email: C.Py pot, -Om Jtv.[vw r Developer (The party or parties referenced in the Development Agreement who ate responsible for the Developer's obligations contained in the Agreemen — dd additional names below): Individual Name: C L.v,ulic.-. K✓ Company Name: Address: a' Phone number(s): Office: Cellphone: _ Fax number: Email: General Contractor (The contractor in overall charge of the public infrastructure construction): Individual Name: GHrib+�°'^ wo,e Company Name: V -C I-'t-e Address: l l l 3 FAJ W S{ Nil Phone number(s): Office: et jo- Lkl°i' V?6p8�1+ Cellphone: et')p• %,k& "$�tS Fax number: CA70 - tkll • 951r7 Email: C_4h%j-7o k 6L If you have no General Contractor, list all other contractors below. Grading contractor: Individual Name: Company Name A A A,,., Phone number(s): Office: Cellphone: Fax number: Email: Utility contractor: Individual Name: Company Name: — Address: Phone number(s): Office: Cellphone: Fax number: Email: Concrete contractor for flat work: Individual Name: Company Name: Address: Phone number(s): Office: Cellphone: Fax number: Email: Concrete contractor for structures: Individual Name: Company Name: Address: Phone number(s): Office: Cellphone: Fax number: Email: Paving contractor: Individual Name: Company Name Address: Phone number(s): Office: Cellphone: _ Fax number: Email: Landscape contractor: Individual Name: Company Name : — Address: Phone number(s): Office: Cellphone: _ Fax number: Email: Other contractors and parties involved in the project: SUBMIT THE FOLLOWING ITEMS (Required for all projects): • 81/2"xl1" copy of the Site Plan • Proposed Project Schedule • Project quantities and cost estimate for all of the public improvements to be constructed. In addition, include all private improvements that are required to be inspected by the City Construction Inspectors. This information must be submitted in the format shown on the attached form titled "Project Quantities and Cost Estimate Sheet." ADDITIONAL SUBMITTALS (Required if checked): ❑ Traffic control plan(s) for the project ❑ Proposed haul routes shown on a City map ❑ Shop drawings CI Other CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss plans and special requirements for your project, is required for all development projects. The people required to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land Planner and General Contractor (if no General Contractor, representatives for each of the contractors expected to work on this project) People to Attend: List the peoples names and titles for those who will attend the pre - construction meeting: Name Title ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of all public infrastructure improvements that will be constructed and accepted by the City to own and maintain. In addition provide the value of all private infrastructure improvements that the City will inspect and require certification for. The estimate shall be in the same format as the attached sheet titled "Project Quantities and Cost Estimate Sheet." Public infrastructure, estimated cost: $ 40 & & c Private infrastructure, estimated cost: I certify that the information on this permit application along with the required additional submittals are true and correct to the best of my knowledge, and that in filing this application 1 am acting with the knowledge, consent, and authority ofthe owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, 1 hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. Applicant Signature:_ ���- i. Date: /3 - J, ^ O t+ _ Ru�Gmn'aT nv.u�nn• ____-_- IpavAN.+e-19-HPHVw.'y.�w � lF ' 1 09 �Biii�l gi ]E Eg�x V� C qAs P iea AR 3 ypa a � r { d 6ASd4 3 Be .'_ PH$a�r�gs3ai1 £ &qei �P9.'sa1�g gii e4�F xl, ¢,a da g don 5 da 8$�P�3A a3Pae Ats e° 1 - i°4a�F55 g9-v� RaF SOUTH SHIELDS STREET i s iC I t I 9 1j� y SF r 11 x 9si O fsd p O y A O I' �J II I I I� I �I I app.'' ipgprt _ I igts� {6 I I I �11l�p1� �I �, xrvos "= CAMBRIDGE LOFTS �a r aS , 1113 West Plum Street a FM Collins, Colorado ` 0 Development Construction Permit. Page 2'S 3. Construction time restrictions: 4. The applicant understands that additional permits may be required for this development project and the applicant shall sccurc those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat casements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 0. permit Fxpiration (in accordance xvith Section 29-12 ofthe Transitional Land U!se RegLdatiorls or Section 2.0.3(K) of the Land Use Code, whichever is applicable): a. It -construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new pennit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting ofthe extension. An extension may be granted for up to six months. 7. Building permits and ccrti ficates ofoccupancy will only be issued when all conditions contained in the Developmcnl Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, arc met. If the Development Agreement does not specify times for completion ofpublic improvements, or ifthcre is no Development Agreement, then the improvement requirements specified in Section 24-95 ofthc Citv Code shall apply, which provides that construction of all improvements shall he required prior to the time of issuance of the first building permit. S. Acceptance by the City of the public improvements shall be after (1) final inspection has been conducicd by the City; (2) punch list items from the final inspection arc completed and accepted by the City; and (3) required certifications from the licensed professional engineer that improvements arc completed to City standards, specifications and approved Utility Plans; and the "as -constructed" plans have been received and accepted by the City. 9. 1 he wan <mty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Ilse Regulations and/or Sections 2.2.3(C)(3)(g), 33.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least hvenly-four (24) hours prior to any Development Construction Permit, Page 3%� planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. I I. No work (including grading) shall be started in State Highway right-of-vaay until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: No Certificate ofOccupancywill be issued for Phase I until all ublic impgovcments for Phase I are complete and accepted by the City. Permittee's acknowledgment signature: By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Codc: and including common areas legally connected to or associated �a ith the property which is the subject of this application) without whose consent and authority the rcqucslud action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City olllcials to enter upon file property for pwposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms Applicant/Project Managcr' s Signature: Approval /br issuance: St.- I this permit. and conditions so s Date: 1), - /6 'c' City Engineer Approval � Date: (Z �(I (Peru it Issuance Dale) Development Construction Permit_ Page 4'S EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Name, address and numbers Project Name: Cambridge House Lofts Project A.K.A.: NA City Staff Contact Persons: Development Engineer: Susan Joy, 281 N. College Ave., Fort Collins, CO 80521 Office970-221-6605 Fax970-221-6378 Email sioy(t0cg0\.coll Construction Inspector: Joe Crabill, 281 N. College Ave., Fort Collins, CO 80521 Office 970-221-6005 Cell 970-222-1134 Fax 970-221-6378 Fnwil..1cid>iIl tt lc, o�_com Current Planner: Steve Olt, 281 N. College Ave., Fort Collins, CO 80521 Office 970-221-6750 Fax 970-416-2020 limail: soltal is ,o� coin Water Utilities Engineer: Erosion Control Inspector: Bob Zakely, 700 Wood Street, Fort Collins, CO 80521 Office 970-224-6063 Fax 970-221-6619 Email. heal cl�4: let l}'.c ml Natural Resources: Doug Moore, 281 N. College Ave., Fort Collins, CO 80521 Office 970-221-0750 Fax 970-416-2020 Finail: dmootcra Icgo%_com Traffic Operations: Street closures: Syl Mireles, 626 Linden Street, Fort Collins, CO Office 970-221-6815 Fax 970-6282 Email: smirclesia fc-o\.coltl Transportation Planning: David Averill, 215 N. Mason, Fort Collins, CO 80521 Office 970-416-2643 Fax 221-6239 Finail: d.ncnlVa lc-ov corn Development Construction Pcrmit, Page S 5 Forestry: Ralph 'Lentz, 215 N. Mason, Fort Collins, CO 80521 Office 970-224-6302 Fax 970-221-6586 Email: ricnti<rr fcgo� com Light and Power: Doug Martine, 700 Wood Street, Fort Collins, CO 80521 Office 970-224-0150 Fax 970-224-6152 Email: c narlinc a fcaoc.wm Developer's Contact Persons: Project Manager: Christian Ray, Cambridge Flouse 1,1C, 1 1 13 W. Plum Street, Fort Collins, CO Off ice 970-419-8384 Cell 970-222-8915 Fax 970-419-8387 Gnail: cpray7((vaol.com Developer: Christian Ray, Cambridge Flouse LLC, 1 113 W. Plum Street, Fort Collins Office 970-419-8384 Cell 970-222-8915 Fax 970-419-8387 Email: cpray7(a'a0lcom Owner(s): Christian Ray, Cambridge House LLC, 1113 W. Plum Street, Fort Collins 01'f icc 970-419-8384 Cell 970-222-8915 Fax 970-419-8387 Email: cpray7(P aol.com Architect/Planner: Don Brookshire, Eastpoint Studio, 3207 Kittery Court, Fort Collins Officc 970-970-207-1973 Cell 970-218-1132 Fax 970-498-0843 Linail: castpoint(u'frii.com Project Engineer: Patricia Kroetch, Northstar Design, 1194 W. Ash Street, Ste B, Windsor, CO 80550 Office 970-686-0939 Fax 970-686-1188 Email northstar(U)uswest.net General Contractor: Christian Ray, Cambridge House LLC, 1 l 13 W. Plum Street, Fort Collins, CO Office 970-419-8384 Cell 970-222-8915 Fax 970-419-8387 Email: cpray7(a aolcom i 0 o o 0 0 0 0 0 0 O O O O O O O O O O O O O O O O 0 0 0 0 0 0 EA d) to fA fA N3 0 0 0 0 0 0 0 0 0 0 kA fA fA fA fA to EA fA Ni fA M 0 0 0 0 0 O fJ1 to M, W � M O k J z U O Z r- w J U m W a � w O m Lu z OzLL ��u��noo rr��000000o v000vv J ': � F- Y F- oovi ri ri of to fA fA fA O O 00000ri o �n vi u� EA fA fA I� r O r M M M o moo fA fA fA fA IH to N Z Z p 0 Lu EA fA r' fA di Vi fA � H 0 W w Lu W \ a>Om W J w Z W d m Z 0 Wit U D o 0 0 0 0 0 EA to (f) fH (» fA 0 0 0 0 0 0 0 0 0 0 to kA EA fA fA fA fA to fA fA 0 0 0 0 0 0 o o 0 0 (D o fA to W W r U �Cl O N M It (L U) C F- ww J a U Q r F- F- cL N 00wz00 Q ~ ,'.. > w r W w 2 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0,_ Of Ham~ F- F-y O O O O O O �F»c»svc»v> 0 0 0 0 0 0 0 0 0 0 e»e�v>e»u>e»eae»c»c» O O O N O O O oo�i»oe»c» U� D D L) w p x N N W FJ NU)F-w uj UZ ¢ �m N _ LL O O O aro ? U U 0 a W Z lLL ? W W F� V Z z J Y w J wwL) o v) Mz>O O a0 F F- (� F-a�a OUz Lu F- a 8 lL W O M S S 2 2 S 2 2 2 2 m m (n = lL U- % Y U U L IL LL U U U U U U U (n IL IL U- t< JJUUw W JJJ J(nJ J J(n (n HQ Z W W W W W W W U W 7 U N z0 �v m a aw W 0� E d U z IX m p a 2 d a `y c a m >2 W F- 4Q7 d N y > R r c m UE I^ U N C m (0 n. w? 4T Z c U :° co ~ o a3i E a J �Q ¢ j N O N Y .-. -oU f d� co = LU Oa a E (n O — > O 06 NON wo�n > U E C C CN m> ° Q' F_ W o m— ao m m z U pa in SF L) cn2o>2 LLB rn C7 aUpd¢U — m v m m S n i m t A big 3.k I id[ z d i k7 NEI NEI r— 1 CAMBRIDGE LOFTS 8 s3 V '� 0 0, £ q (IR 1113 West Plum Street g!. U Fort Collins, Colomdu ° " a Plum 302006 05, 2005 15, 2005 20, 2005 25, 2005 28, 2005 01.2005 site Transportation Services Engineering Department MEMORANDUM Christian Ray, Cambridge House Lofts, LLC _. I: Susan Joy, Development Review Engineer, Reagan Yeomans December 16, 2004 Initiate Development Escrow Account for Cambridge House Lofts This memo is to acknowledge the receipt of escrow funds in the amount of $4,060.00 for the following: Cambridge House Lofts, Fort Collins, CO for development security to guarantee the completion of public improvements to be constructed as shown on the plans for development. Escrow funds have been received from: Christian Ray, Cambridge House Lofts, LLC 1113 W. Plum Street Fort Collins, CO 80521 (970) 225-0067 cc: Initiate Escrow file Subdivision File Accounts Payable Clerk Permit # 04-39 Initiated by: Susan Joy 1 ��r,rlL C ; �� ,-1�.'�nt:N • P.G. &x �c�� . F.- �oilm�, �O b!�.��= is°(i ° f9�0; :.,SC., .. ,� , � -.. w w. w..icgoo.com