6aProject Comments Sheet
CityofFort Collins Selected Departments
Department: Transportation Planning
Date: June 4, 2003
Project: BANK OF COLORADO PDP -TYPE I (LUC) #16-03
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
June 04, 2003
Note - Please identify your redlines for future reference
Issue Contact: Tom Reiff
Topic: Transportation
Number: 23 Created: 6/4/2003
The TIS identifies the Ped LOS for the street crossing of Lincoln to the Wal-Mart
Supercenter and the Buffalo Run apartments as LOS B. However, in order to
achieve this LOS of B the street crossing is required to have a 6' pedestrian refuge
within a raised median. The pedestrian refuge within the median is also required as
an element of the City's street standards as outlined in the LCUASS. The ped refuge
should also be incorporated within the Lemay median, according to the LCUASS.
Please include this features as part of the raised medians in subsequent submittals.
Number: 25 Created: 6/4/2003
Parking layout and site design should not preclude future cross access to
development that may occur to the east or north of this site. Please ensure that this
remains the case in subsequent submittals. Please also bear in mind that the
driveway providing access to E. Lincoln should be a right -in / right -out only.
Furthermore, as properties develop to the east a new shared access point to Lincoln
will be required. Cross access opportunities also apply to pedestrian facilities, such
as walkways and not be precluded by landscaping. Please work closely with the
adjacent developer / property owner on identifying the cross access locations with
this submittal.
Plat
Utility
Date
-HERS IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Site Drainage Report Other
Redline Utility Landscape
Page I
Project Comments Sheet
Selected Departments
—�-- 1�
Department: Water Wastewater
Date: June 7, 2003
Project: BANK OF COLORADO PDP -TYPE I (LUC) #16-03
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
June 04, 2003
Note - Please identify your redlines for future reference
Issue Contact: Jeff Hill
Topic: General
Number: 27 Created: 6/6/2003
A meeting is needed between the developer of this site and the owner of the
property to the east and north to discuss the future water and sewer requirements.
This property alone may not warrant a water main looping; however, from the
standpoint of the overall area, additional connections will likely be needed and will
be required with this project. The water main located in Lemay is a cathodically
protected water main. Include a Cathodic Isolation connection detail as well as
clearly define the connection on the overall utility plans.
Topic: Landscape
Number: 28 t;reatea: bibiLUU.S
Maintain the required landscape and utility separation distance on the landscape
plans.
Topic: Utility Plan
Number: 29 Created: 6/6/2003
A lowering of the existing 24-inch water mains is not advisable. A meeting is needed
to discuss alternative options to these lowerings. Have all the existing water mains
located in Lemay and Lincoln been potholed? Several crossings are in question as
to whether they Will conflict with one another.
See site, landscape and utility plans for other comments.
OU l L
r Signature _ � Dati
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
X Plat 4 Site Drainage Report Other
_ Utility _ Redline Utility T— Landscape
y
Page 1
PROJECT
COMMENrr S
City of Fort Collins
Current PlanninE
DATE: May 6, 2003 TO: Technical Services
PROJECT: #16-03 BANK of COLORADO PDP — TYPE I (LUC)
All comments must be received by Ted Shepard no later than the staff
review meeting:
June 4, 2003
Note - PLEASE identify. .our redlines for future reference
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Xplat _Site _Drainage Report _Other_
_Utility _Redline Utility _Landscape
a
City of Fort Collins
F
a
E
w 0
�U
c N
n aU
cm
Zw
M
W
9
R
° yN¢di•aM.s reed -� +-ra�m.�a�x�.� aces
• JAk E T f rov►� s opt ��
�,A te�LT
J m& Wyi- a(x255
U,0$14 dat Jam`
t"Vm{ S (-Lfv G c l CQ �j �P Go ►�Z W/ than (�)
�-- vn5;bw
Err c.
�cL�e
be 1315-vk )/ ea-v�-
V COX . t-e� IZictc. Qacli,•�Q.r .
at
w
n
�3aYt% Gf �Z 563n2_I����
Pin 4
tea,%-P
5- y� pis
l�� M
/ � 7r it ��s fc 1 1e51T Cf r7 /h ?ZT
/Xit Crl(1�'%.1G1�LYj ,'L� C��l�u��7 �Cl)vllC,Gl�L'.
irL-lerl 3-n
r�lrl
1�loi
{ V,,U�
�(� (�rF'I �'�.��,
oun(4 vutti rob&oo 00 2
C /Zj
a
E
`r' rY Ti�Y l ( �u1 Cl�" CS✓��C� yo 1AcdtCatt, odcl I/ a,� -f;r
co
li WC csn,,,�V FL ovy)
at
W
n
-Shcu" L��IC to ll CI nc� CAL SS Irt{� Gfio� Uhl
acy�I/ l/Strip/
NEE
/�z j
No Text
l
$air-n e^r IZu-ki6 � te�
V? - Y1of f v Stc� . -� � Coss -sly y
7w)
c�r�ve_o�eY
1�011e 's f c I�
Commercial, Inc
702 West Drake Road
Building E. Suite B-102
Fort Collins, CO 80526
(970)221-1965 Office
(970)221-1966 Fax
September 24, 2003
Mr. Ted Shepard
Chief Planner
281 North College Avenue
P.O. Box 580
Fort Collins, CO 80.522-0580
RE: Bank Of Colorado — Northeast Comer of East Lincoln Avenue and Lemay Avenue
Dear Ted:
The following is an explanation of issues arising from the Staff Project Review letter ( See
attached Staff Project Review letter dated 6/11/03 ) and how those issues have been
addressed.
Engineering — Katie Moore
7. Eight (8) copies of the plat map are included in this resubmittal package.
8. Acknowledged.
9. A revised layout has been provided as part of this resubmittal package. The revised
layout should not require a variance.
We are currently undergoing negotiations with the adjacent property owners regarding cross
access easements from both East Lincoln Avenue and Lemay Avenue.
10, Included as part of resubmittal.
11 The detailed design of Lemay Avenue along the property's frontage has been
incorporated as part of this resubmittal.
14_ Mylars will be submitted in accordance with quality requirements at the appropriate time
33. Acknowledged.
Landscape
31. Acknowledged.
9/24/200 VVDLCVDI, Nchaork\DLC TEXTVLETTERSTDP - BOC RESUBMIT LTR2.doc
Traffic
18. The access on Lemay Avenue will continue to be right in / right out. The direct access
from Lincoln Avenue from this property will be eliminated. The new access to Lincoln Avenue
will be approximately 500 feet from Lemay Avenue. See revised TIS ( memo form ) for further
details.
19. Per Eric Brac:ke, this development will not be responsible for constructing left turn lanes
on Vine Drive and Lemay Avenue.
Utility Plan
12. Note added per request.
13. Acknowledged.
15, Included as part of this resubmittal.
16. Revised as requested.
17. Please review resubmittal.
20. Included as part of this resubmittal.
30. We have adjusted pedestrian ramps in accordance with direction outlined in 6/25/03
meeting with staff representatives
Light and Power — Electric
2. Acknowledged.
3. Acknowledged.
Police
22. Revised as requested.
Stormwater Utility
42. Detail is added.
Drainage Report
41, The 2 year flows in the drainage report have been revised to reflect 02.
Text has been added to show what pipe scenario corresponds to which storm sewer.
Erosion Control
35. BMPs have been added.
Grading Plan
38. We are currently pursuing off -site grading easements from adjoining property owners.
The pavement thickness is on the grading plan for the convenience of the asphalt contractor —
we would prefer not to remove it.
The legend has been added.
Landscape Plan
34, The conflict between the proposed shade tree along Lemay Avenue and the proposed
storm sewer has been rectified.
Plat
34. The property will be platted as Bank of Colorado Subdivision.
Pond Operation
40_ Bank management will be responsible for operating the manual gate. Procedures will be
implemented to ensure that the gate is opened and closed so that flows are exiting the
9/24/2003/VADLCVDL Noeliyork1DLC TEXT\LETTERSVPDP - BOC RESUBMIT LTR2.doa
Date: e�-' Time: �'. '--✓
Loca+ion: r L t�IZG-�,
Description:
Applicant:
,,,447
� ��"' j:.{-. cti. I yJ-KiiY1 P:Z.e��[�-d1'��i��'T"� "j'Tj 1✓([-..i �,l....n-¢ �{�-.A-y"F`�t,"'!
C4e
i cS r
��pp,,��.,.Y. al:... 1. ' y.. ,A.t•.�... 1 }-.-If:.`_.¢+t"'+m,rF:�;".,'Yai 'f Y'1 u- .Twrq
.� 'ni��-��rL�(�"'S C�✓F`% l.i4 h.�G�L✓A..� 1 I�-6f%'i�� ��{;„lS,E.a...,.4
-- �� 11�-�/rs�^'C�l�'C"- (C�`?-f.�,',/ i►dl l.: r!:�l✓A..d ` ��j'�}1�%i�'-�.�--i�
``clz_�
A-f`4 ✓ 7l,
detention / retention pond in a prescribed manner. Also, keep in mind that the gate will only be
opened after a storm event as it is intended to not only detain, but also, to retain stormwater.
Spillway
39. The spillway and spillway detail are included as part of this resubmittal package.
Storm Sewer Profile
36. The inverts are existing — there is no plan to modify.
Utility Conflicts
37. We potholed to a depth of 8' and did not find the pipe for the City of Fort Collins or North
Weld. We don't see any conflicts, however, as we do not plan to do any work below 8'.
The electrical lines are overhead.
There will be no conflict between the proposed storm line on the North side of Lincoln Avenue
and the electrical lines.
Traffic Operations
1. Per Eric Brac:ke, this project will not be responsible for the EB and WB lanes at Vine
Drive and Lemay Avenue.
31, A revised TI S ( memo form ) is part of this resubmittal.
Transportation
23. This resubmittal is in accordance with 6/25/03 meeting directives.
25. Acknowledged.
26. Yes — in accordance with 6/25/03 meeting directives.
Water Wastewater
27. The water main loop has been removed — See revised plans
Landscape
28. Acknowledged.
Utility Plan
29. The water mains in Lincoln Avenue and Lemay Avenue have been potholed
Zoning
4. Building dimensions have been added as part of this resubmittal package
5. Building height has been placed on the revised elevations.
6. Acknowledged.
Should you have any questions regarding this matter, please call me.
Thank you for your cooperation.
Sincerely,
DO,SERSTEIN LEMBURG COMMERCIAL, INC.
Daniel R. Bernth, CCIM
President
9/24/200:/A\DLCADL NchaoWDLC TEXT\LETTERSVPDP - BOC RESUBMIT LTR2.doc
! (
Project Comments Sheet
��' Selected Departments
City of Fort Collins
Department: Engineering
Date: October 24, 2003
Project: BANK OF COLORADO PDP -TYPE I (LUC) #16-03
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
October 225 2003
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore
Topic: General
Number: 33 Created: 6/6/2003
[10/21/03] Repeatfyi.
Original comment:
Please see redlines for any additional comments.
Number: 63 Created: 10/21 /2003
[ 10/21/031 All plans should clearly show the locations and dimensions of new and existing ROW for Lincoln and Lemay.
Topic: Plat
Number: 52 Created: 10/20/2003
[ 10/20/031 Please use the standard language for plats (attached).
Number: 53 Created: 10/20/2003
[10/20/031 Please show all on -site easements on the plat (utility, drainage, emergency access, etc.)
Number: 54 Created: 10120/2003
[ 10/20/03] Please show how the ROW for Lemay and Lincoln was dedicated (book and page, reception number, etc).
Number: 55 Created: 10/20/2003
[ 10/20/031 Please clearly identify and dimension the existing ROW and the proposed ROW for both Lincoln and Lemay.
Number: 56 Created: 10/20/2003
110/20/031 According to a previous comment by PFA (#44), a fire lane will be required. Please dedicate the
corresponding emergency access easement on the plat. Please note that the radius requirements of 25' and 50'
for interior and exterior radii around curves should be measured from the same centerpoint. The width of the fire
lane around curves should be 25 feet.
w.Zyo�
Dare
Signature
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
✓ Plat ✓ Site Drainage Report ✓ Other
_V Utility V� Redline Utility 7 Landscape
Page 1hy
Number: 57 Created: 10/20/2003
[ 10/20/031 The following comments were received from Technical Services:
1. Boundary and legal close.
2. Subtitle does not match the legal (NW 1 /4)
3. Bearing in legal is Incomplete. See redlines.
4. 20' utility easement cannot be located on the easterly side of lot 1.
5. How was the south line nw 1 /4 determined?
Topic: Storm Sewer Profile
Number: 65 Created: 10/21 /2003
[10/21/03] It appears that there will not be enough cover over stormpipe 1 in the ROW. (min 2' to scarified
subgrade). Please call to set up a meeting with representatives from Stormwater, Engineering, and other utilities
(water/wastewater, ELCO, N. Weld) to discuss this issue.
Topic: Street design
Number: 9 Created: 5/30/2003
(10/23/03] No variance requests were received. Please submit variance requests for:
1. Driveway separation distances.
2. The design of the left turn lane on Lincoln.
3. Sub -standard ROW dedication on Lincoln (typically, another 12' of ROW would be required for the right turn lane at the
intersection). The sidewalk and parkway as shown are not acceptable. While we mentioned at an earlier meeting that the City
would entertain a variance to reduce the parkway width, it was not anticipated that there would be no parkway at all. A
minimum parkway width of Er needs to be provided, tapering to the standard parkway width at the property line to the east, and
this will still require a variance. The sidewalk and parkway should be within dedicated ROW.
Original comment:
The access points shown do not meet the minimum separation distance from an intersection as required by the Larimer
County Urban Area Street Standards. Please submit a variance request according to LCUASS 1.9.4. It is the City's
intention to support the variance, but not without conditions. Adding to comment Nl from Traffic Operations, the
medians required to restrict access to ri/ro for both the access on Lincoln and the one on Lemay should be standard
medians in the center of the street. "Pork chop" islands in the driveways would be insufficient. Also, please note that the
access location on Lincoln is approved on an interim basis only, and should be noted that it will be removed in the future.
When the property to the east develops, a shared access needs to be provided with a greater separation from Lemay than is
shown with the current access. It is suggested to work with the adjacent property owner(s) regarding cross access from this
parcel to both the north and the east.
Number: 10 Created: 6/2/2003
1101231031 This design shown needs to connect to the existing design for Lincoln. Please provide station equations and
ensure that the designs work together. Also, please provide additional information regarding the northeast portion of the
intersection of Lincoln and Lemay in the form of spot elevations and additional cross -sections. More information is needed to
determine whether the area will drain properly.
Original comment:
Please provide the full design (detailed, not preliminary) of Lincoln along the property's frontage, Including the full lengths
of the turn lanes that stretch east of the property. Beyond this, to the east, please show the horizontal alignment as a
possible future alignment of Lincoln, to be designed by others, and remove the vertical design as well.
Number: 11 Created: 6/2/2003
[ 10/23/031 Station equations weren't provided. The cross -sections should contain more information as required in
LCUASS. Enough vertical information regarding the design of Lemay needs to be provided to assess whether the
sidewalk being built along Lemay will be in the correct location with the ultimate buildout of Lemay.
Original comment:
There are approved designs of Lemay avenue stretching from south of this site north to Vine (in the Mulberry/Lemay
Crossings, 0-1814, and Buffalo Run plans, 0-1724). These plans may be used and referenced by this project, or, if this
project wishes to redesign Lemay, then both ends of the new portion need to tie into the approved design(s) (station
equations, vertical matches). Detailed design of Lemay along the property's frontage is needed.
Number: 59 Created: 10/21/2003
[10/21/03] Please provide station equations to tie the proposed designs to existing designs. The design on
Lincoln needs to show that, when Lincoln is widened and the ultimate median is constructed, the grade from the
median to the ultimate curb and gutter on the north will be a straight grade meeting standards. The ultimate curb
and gutter placement on both Lincoln and Lemay should ensure that grades between the sidewalk and curb and
Page 219
gutter do not exceed 4:1 and should also provide for a 2' shallow -graded area adjacent to the sidewalk on each
side.
Number: 60 Created: 10/21/2003
[10121/03] The grading shown for Lemay needs to provide an area for water to drain off of the pavement into
perhaps a swale or small ditch. The edge of pavement (and the bike lane) should not be at the low point. Also,
as discussed in a previous meeting, these flows from the streets need to be diverted into the pond.
Number: 62 Created: 10/21/2003
[ 10/21 /03] When adding pavement to an existing street, the slope of the new pavement should be at least as steep as
that of the existing pavement (per LCUASS). It Isn't as critical where the pavement is being added to the center of the
street, starting with a shallower slope and dropping off to a steeper slope toward the edge of the road. It is more important
where the center of the roadway is steeper than the newly added edge and puddling and maintenance problems may be
created.
Number'
66 Created: 10/21 /2003
[10/21/03] The cross-section shown for Lemay on Sheet 10 doesn't make sense; it is neither the interim nor the
ultimate cross-section.
Number: 67 Created: 10/2112003
[10/21/03] Please show the location of ROW along Lincoln to the east.
Number. 76 Created: 10/23/2003
[ 10/231031 Please show that the turning movements at the Lincoln-Lemay intersection will work. (As discussed in a
previous meeting.)
Number: 82 Created: 10/24/2003
[ 10/24/03] The median on Lemay should be centered on the existing line separating the northbound through lane and
the southbound turn lane to minimize the lane offsets for vehicles traveling north and south on Lemay. Additional
pavement may be needed on both sides of Lemay to accommodate this. Travel lane widths should be maintained at IT;
there is a location on southbound Lemay where the lane was narrowed to 10', and this is too narrow.
Number: 83 Created: 10/24/2003
[ 10/24/031 FYI - The driveway access on Lincoln is not guaranteed to remain full movement Indefinitely. Increased
traffic in the future may result in the access point becoming right-in/right-out only.
Topic: Striping
Number: 68 Created: 10/21/2003
[ 10/21/031 The striping shown on Lincoln east of the site doesn't seem to work. With a double -yellow line in the middle
of the street, the center left turn lane will be removed, but the way the double yellow ties into the existing striping on
Lincoln doesn't end up re -starting the center left turn lane. What happens to it?
Topic: Traffic
Number: 58 Created: 10/21 /2003
[ 10/21/031 The TIS identifies the need for a left turn lane into the proposed access road on Lincoln, but this lane is not
shown on any of the plans. Please design this lane and provide for any needed construction/re-striping for it.
Topic: Utility Plan
Number: 12 Created: 6/2/2003
[10/23/03] Any cuts/edges of mill/inlays need to be made at the edge of a lane line or the middle of a vehicle travel lane. They
are not allowed in the middle of bicycle lanes.
Original comment:
Please show the approximate limits of street cuts and add the note: Limits of street cut are approximate. Final limits are to
be determined in the field by the City Engineering Inspector. All repairs are to be in accordance with City street repair
standards.
Page 314
Number: 13 Created: 6/2/2003
110/23/03) Repeated for your information.
Original Comment:
It appears that offsite grading and utility easements will be needed. Letters of intent for these easements from the affected
property owner(s) will be required prior to hearing. For easements to be dedicated to the City (utility easements), the
completed legal descriptions and dedication paperwork must be submitted to the City prior to mylar approval. For private
easements (grading easement with neighbor) a copy of the completed easement will need to be submitted to the city prior
to mylar approval
Number: 15 Created: 6/2/2003
[10123/031 No checklist was received. Please see the attached and newly reformatted checklist. Please contact me if you
would like it emailed to you.
Original comment:
Please submit a completed Utility Plan Checklist (LCUASS) with the next submittal.
Number: 20 Created: 6/2/2003
[10/21/03] Repeat.
Original comment (6/2/03):
Please provide all information on street cross -sections as required under LCUASS.
Page 411
Project Comments Sheet
Selected Departments
City of Fort Collins
���
Department: Water Wastewater
Date: October 22, 2003
Project: BANK OF COLORADO PDP -TYPE I (LUC) #16-03
All comments must: be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
October 22, 2003
Note - Please identify your redlines for future reference
Issue Contact: Jeff Hill
Topic: Plat
Number: 73 Created: 10/22/2003
[10/22/031 Provide utility easements for the proposed water main, water service up
to the curb stop, fire hydrant and the sanitary sewer service across the adjacent
property.
Number: 74 Created: 10/22/2003
[10/22/03] Provide all appropriate details on the detail sheet (i.e. meter pit, water
line lowering, CP isolation, etc.).
Topic: Utility Plan
Number: 27 Created: 6/6/2003
[10/22/031
A meeting is needed between the developer of this site and the owner of the
property to the east and north to discuss the future water and sewer requirements.
This property alone may not warrant a water main looping; however, from the
standpoint of the overall area, additional connections will likely be needed and will
be required with this project. The water main located in Lemay is a cathodically
protected water main. Include a Cathodic Isolation connection detail on the detail
sheet.
Number: 71 Created: 10/22/2003
_/c �Z
Date
/`fLsHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
X Utility _ >G Redline Utility x1 Landscape
Page I
[10/22/03] Will lowerings of the proposed 8-inch water main be required at the
crossings of the proposed 24-inch RCP, existing 12-inch Elco and the 24-inch
NWCWD mains? If so provide complete details for the lowerings.
Number: 72 Created: 10/22/2003
(10/22/03] Show and label proposed water main in storm sewer profile view and
include concrete encasement of storm sewer 10 feet each way at water main
crossing.
See site, landscape and utility plans for other comments.
Page 2
Project Comments Sheet
Selected Departments
Department: Transportation Planning
Date: October 24, 2003
Project: BANK OF COLORADO PDP -TYPE I (LUC) #16-03
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
October 22, 2003
Note - Please identify your redlines for future reference
Issue Contact: Tom Reiff
Topic: General
Number: 69 Created: 10/22/2003
[10/22/03] Please show the bike rack near the building's entrance on all plan sheets.
Number: 70 Created: 10/22/2003
[10/22/03] Recommendation: For the drive through exit, please extend the curb and
shorten the turn radius on the west edge of the driveway. This will force people to
make a deliberate left turn and prevent people from trying to cut the corner as they
enter Lemay or block the driveway entrance.
Topic: Transportation
Number: 25 Created: 6/4/2003
[10/22/03] Follow-up comment: After discussions with other departments and the applicant
at the Wed. 10-22-03 meeting a possible future cross access drive to the north was
recommended. This connection will be an extension of the north /south drive aisle on
the east side of the property and terminate at the north edge of the property.
Parking layout and site design should not preclude future cross access to development that
may occur to the east or north of this site. Please ensure that this remains the case in
subsequent submittals. Please also bear in mind that the driveway providing access to E.
Lincoln should be a right -in / right -out only. Furthermore, as properties develop to the east a
new shared access point to Lincoln will be required. Cross access opportunities also apply to
pedestrian facilities, such as walkways and not be precluded by landscaping. Please work
closely with the adjacent developer / property owner on identifying the cross access locations
with this submittal.
Signature
/,, Z—'7
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site Drainage Report Other
1/ Utility _ Redline Utility Landscape
�� Page 1
Number: 77 Created: 10/24/2003
[10/24/03) It is unclear from the plan sets what the interim and ultimate
improvements for the Lemay / Lincoln intersection will include. Please keep in mind
that the ultimate intersection improvements need to account for all necessary turn
lanes, a ped. refuge and a 6' bike lane. The interim improvements do not need to
include the ped refuge.
Number: 78 Created: 10/24/2003
[10/24/031 The latest submittal includes an attached sidewalk along the property's
Lincoln frontage. The pedestrian Level of Service and the street standards require
that a landscaped parkway be located between the sidewalk and right turn lane.
After discussions with transportation staff it was determined that the parkway width
can be reduced from 10 feet to 6 feet if necessary.
Number: 79 Created: 10/24/2003
[10/24/03] The bike; lane striping for Lincoln needs to be reconfigured. Instead of
transitioning the bike lane at the development's new driveway location, the bike lane
should continue next to the curb and transition closer to the intersection. The
transition should begin approximately 200 feet from the intersection and transition
back to the curb within a 75 foot distance. Please see engineering's red lines.
Page 2
A"A PROJECT
COMMENT SHEET
City of Fort Collins
Current Planninii
DATE: June 13, 2003 TO: Technical Services
PROJECT: #16-03A BANK OF COLORADO PLAT —TYPE I
(LUC) Q��
All comments must be received by Ted Shepard no later than the staff
review meeting:
July 16, 2003
Note - PLEASE identify your redlines for future reference
r
inlZ'01"PtI
`��
G �c.� ✓7, s
�
LgSc i✓Ir��
Gq� Y1C� UC'
�C Gs�"'� G �l I�`�'=
i
Name (please print)
CIjECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
Da+e:'2`1�02 Time: c� n
Loca+ion:
Descrip+ion:
Applican+: - y ?fir _ ZZ-� — �5—.
N
Project Comments Sheet
Selected Departments
(itl of Pori Collin'
Department: Stormwater Utility
Date: October 24, 2003
Project: BANK OF COLORADO PDP -TYPE I (LUC) #16-03
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
October 22, 2003
Note - Please identify your redlines for future reference
Issue Contact: Basil Hamdan
Topic: Erosion Control
Number: 35
[10/211031
Second Review
Created: 6/10/2003
The plan indicates silt fencing on the west, north, and east sides of the project. Why
not the south? What is to protect the surrounding area from sediments from the
southerly storm pipe installation?
Are the detention areas to be landscaped? Please indicate on the plan what is the final
stabilization of these areas. Where does the straw mulching indicated in your
calculations go?
Topic: Floodplain Comments
Number: 61
J10/21/031
Created: 10/21 /2003
1. The site is in the FEMA 100-year and 500-year floodplain. The off -site access is in
the City 100-year Dry Creek floodplain.
A floodplain use permit will be required for both the offsite work and the on -site
work that is in the 100-year floodplain. A $25 permit fee is required for each permit.
Signature
!0/Zy103
Date
/ HECK ]HERE IF YOU WISH TO RECEIV COPIES OF REVISIONS
v Plat — -Site iainage Report Other
:Utility _ ��IZedline Utility =�,_1 ndscape
Page 1
3. Please see attached floodplain review checklist for items to be included on the plans
and in the drainage report. If the floodplain information causes the drainage/ and or
grading plan to become too cluttered, a separate floodplain plan can be included.
4. Please see additional minor comments in the drainage report.
5. Sizing of the storm sewer along Lincoln should look at the FEMA 100-year
discharges in addition to local runoff if a swale is not going to be provided.
Topic: Grading Plan
Number: 38
[10/24/031
Created: 6/10/2003
There seems to be grading to the north and east of the property line. Any such grading would require an off -site
grading easement from the property owner.
Why is the pavement thickness on the grading plan ?? Please remove.
Please provide a legend.
Topic: Landscape Plan
Number: 43
[10124/031
Created: 6/10/2003
There seems to be a conflict between one of the proposed shade trees along Lemay Avenue and the proposed storm
sewer. Please rectify.
Topic: Lemay Avenue Street runoff
Number: 84 Created: 10/24/2003
[10/24/031 It seems that flows coming off of Lemay Avenue will be trapped in the ROW during the interim period. There
needs to be a roadway swale design that drains into the storm sewer system to evacuate water off of the ROW in the
interim condition.
Topic: Pipe alignment
Number: 81 Created: 10/24/2003
[10124/031 Please make sure that the storm sewer along Lemay is not affected by proposed trees in the parkway strip.
In the future when this alignment of Lemay is vacated, this pipe will need to be in a designated drainage easement.
Topic: Plat
Number: 80 Created: 10/24/2003
[10/24/031
Please show drainage easements on the plat for the detention ponds and storm sewers.
Also call out FEMA floodplain on the plat.
Topic: Storm Sewer Profile
Number: 36 Created: 6/10/2003
[10/24/031
This comment was not addressed
Page 2
The storm sewer along Lincoln Avenue has an invert out at the manhole that is higher than invert in. Please redesign
the proposed storm line, projecting the storm sewer elevations back through the Lemma Avenue intersection such that
there would be a positive slope at the manhole and throughout the pipe profile. If raising this storm sewer causes a
cover problem at Lemay Avenue then this should be discussed at a utility coordination meeting.
Topic: Utility Conflicts
Number: 37 Created: 6/10/2003
[10124/031
Due to the strong potential for utility conflicts for the pipe crossing of Lemay Avenue, a utility coordination meeting with
ALL affected utility providers is strongly recommended. Such a meeting should take place before any
potential re -submittal is considered.
Previous comments regarding utility conflicts :
The proposed storm sewer crossing of Lemay Avenue may have some major utility conflicts. Please show and call out
on the pipe profiles the existing City of Fort Collins, ELCO and North Weld Irrigation District lines. Please provide a
minimum of 18 " of clearance from these lines.
Show the electric duct bank crossing of the proposed storm line at Lemay Avenue.
Will there be a conflict between the proposed storm line on the north side of Lincoln and any proposed duct banks as
the storm sewer alignment seems to coincide with the area that Electric utilities are usually located.
There seems to be a utility conflict at the crossing of the 8" water line and the existing storm sewer. Please pothole to
check existing elevations.
Page 3
Z3 /63 I %—i cS . Coo W
a
W0
rU
00 i
n aD
cry m
rn c
c;
zw
w
C�1
7YllyI lP' fib � � GId'e-u9a�,dz
o✓l LJ 7col`'.
5ch") abQ - "P�td.
d r" Vt wa-t-i 0.CCv'5 br L'kAc o l n
� � I �{�- (C�/✓1�- T((.� � w� -i � bY�. G�-{fir k GF CC�.SS �rr (J�.
F"' C'U fio &I C
�+Wcr _ No , � t Is not- 6k.
140U-04-2003 09:01
City o Fott Collins
URUGHTFRYE/UF RIPLEYTS
970 224 1662 P.0324
STAFF PROJECT REVIEW
DOBERSTEIN & LEMBURG Date: 10/29/2003
DAN BERNTH
702 W. DRAKE RD. #B102
FT. COLLINS, CO 80526
Staff has reviewed your submittal for BANK OF COLORADO PDP - TYPE I (LUC)
#16-03, and we offer the following comments:
ISSUES:
Department: Engineering
Topic: General
Issue Contact: Katie Moored
Number: 63 Created: 10/21 /2003
[10/21/031 All plans should clearly show the locations and dimensions of new and
existing ROW for Lincoln and Lemay.
oplc: Plat
Number: 52 Created: 10/20/2003
[10/20/03] Please use the standard language for plats (attached).
Number:53 Created: 10/20/2003 �
[10/20/031 Please show all on -site easements on the plat (utility, drainage,
emergency access, etc.)
Number: 54 Created: 10/20/2003
[10/20/03] Please show how the ROW for Lemay and Lincoln was dedicated (book
and page, reception number, etc).
Number: 55 Created: 10/20/2003
[10/20/03] Please clearly identify and dimension the existing ROW and the
proposed ROW for both Lincoln and Lemay.
Number: 56 Created: 10/20/2003
(10/20/031 According to a previous comment by PFA (#44), a fire lane will be
required. Please dedicate the corresponding emergency access easement on the
plat. Please note that the radius requirements of 25' and 50' for interior and exterior
radii around curves should be measured from the same centerpoint. The width of
the fire lane around curves should be 25 feet.
Number: 57 Created: 10/20/2003
[10/20/03] The following comments were received from Technical Services:
1. Boundary and legal close.
2. Subtitle does not match the legal (NW 1/4)
3. Bearing in legal is incomplete. See redlines.
Page 1
KTL
NOV-04-2003 0901 URUGHTFRYE,UF RIPLEYTS 970 224 1662 P.04/24
4. 20' utility easement cannot be located on the easterly side of lot 1.
5. How was the south line nw 1/4 determined?
Topic: Storm Sewer Profile
Number: 65 Created: 10/21 /2003
[10/21/03] It appears that there will not be enough cover over stormpipe 1 in the
ROW. (min 2' to scarified subgrade). Please call to set up a meeting with
representatives from Stormwater, Engineering, and other utilities (water/wastewater,
ELCO, N, Weld) to discuss this issue.
Topic. Street design
Number: 9 Created: 5/30/2003
[10/23/031 No variance requests were received. Please submit variance requests
for:
1. Driveway separation distances.
2. The design of the left turn lane on Lincoln,
3. Sub -standard ROW dedication on Lincoln (typically, another 12' of ROW would be
required for the right turn lane at the intersection). The sidewalk and parkway as
shown are not acceptable. While we mentioned at an earlier meeting that the City
would entertain a variance to reduce the parkway width, it was not anticipated that
there, would be no.parkway_at all. A minimum parkway width of 6' needs to be
provided, tapering to the standard parkway width at the property line to the east, and
this will still require a variance. The sidewalk and parkway should be within
dedicated ROW.
Original comment:
The access points shown do not meet the minimum separation distance from an
intersection as required by the Larimer County Urban Area Street Standards.
Please submit a variance request according to LCUASS 1.9.4. It is the City's
intention to support the variance, but not without conditions. Adding to comment #1
from Traffic Operations, the medians required to restrict access to rl/ro for both the
access on Lincoln and the one on Lemay should be standard medians in the center
of the street. "Pork chop" islands in the driveways would be insufficient. Also,
please note that the access location on Lincoln is approved on an Interim basis only,
and should be noted that It will be removed in the future. When the property to the
east develops, a shared access needs to be provided with a greater separation from
Lemay than is shown with the current access. It is suggested to work with the
adjacent property owner(s) regarding cross access from this parcel to both the north
and the east.
Number: 10 Created: 6/2/2003
[10/23/031 This design shown needs to connect to the existing design for Lincoln,
Please provide station equations and ensure that the designs work together. Also,
please provide additional information regarding the northeast portion of the
intersection of Lincoln and Lemay in the form of spot elevations and additional cross -
Page 2
HDQ-04-2003 09:01 VRUGHTFPYE/QF PIPLEYTS 970 224 1662 P.05i24
i
sections. More information is needed to determine whether the area will drain
properly.
Original comment:
Please provide the full design (detailed, not preliminary) of Lincoln along the
property's frontage, including the full lengths of the turn lanes that stretch east of the
property. Beyond this, to the east, please show the horizontal alignment as a
possible future alignment of Lincoln, to be designed by others, and remove the
vertical design as well.
Number: 11 Created; 6/2/2003
[10/23/03] Station equations weren't provided. The cross -sections should contain
more information as required in LCUASS. Enough vertical information
regarding the design of Lemay needs to be provided to assess whether the
sidewalk being built along Lemay will be in the correct location with the
ultimate buildout of Lemay.
There are approved designs of Lemay avenue stretching from south of this site north
to Vine (in the Mulberry/Lemay Crossings, C3-1814, and Buffalo Run plans, C3-
1724). These plans may be used and referenced by this project, or, if this project
wishes to redesign Lemay, then both ends of the new portion need to tie into the
approved design(s) (station equations, vertical matches). Detailed design of Lemay
along the property's frontage is needed.
Number: 59 Created: 10/21/2003
[10/21/03) Please provide station equations to tie the proposed designs to existing
designs. The design on Lincoln needs to show that, when Lincoln is widened and
the ultimate median is constructed, the grade from the median to the ultimate curb
and gutter on the north will be a straight grade meeting standards. The ultimate curb
and gutter placement on both Lincoln and Lemay should ensure that grades
between the sidewalk and curb and gutter do not exceed 4:1 and should also
provide for a 2' shallow -graded area adjacent to the sidewalk on each side.
Number 60 Created; 10/21/2003
[10/21/03] The grading shown for Lemay needs to provide an area for water to drain
off of the pavement: into perhaps a swale or small ditch. The edge of pavement (and
the bike lane) should not be at the low point. Also, as discussed in a previous
meeting, these flows from the streets need to be diverted into the pond.
Number: 62 Created: 10/21/2003
[10/21/03) When adding pavement to an existing street, the slope of the new
pavement should be at least as steep as that of the existing pavement (per
LCUASS), It isn't as critical where the pavement is being added to the center of the
street, starting with a shallower slope and dropping off to a steeper slope toward the
edge of the road. It is more important where the center of the roadway is steeper
Page 3
NCO-04-2003 09:01 VRUGHTFRYEiUF RIPLEYTS 970 224 1662 P.06i24
than the newly added edge and puddling and maintenance problems may be
created.
Number: 66 Created: 10/21/2003
[10/21/03) The cross-section shown for Lemay on Sheet 10 doesn't make sense;
is neither the interim nor the ultimate cross-section.
Number: 67 Created: 10/21/2003
[10/21/03] Please show the location of ROW along Lincoln to the east.
Number: 76 Created: 10/23/2003
[10/23/03) Please show that the turning movements at the Lincoln-Lemay
intersection will work. (As discussed In a previous meeting.)
Number: 82 Created:'10/24/2003
(10/24/03] The median on Lemay should be centered on the existing line separating
the northbound through lane and the southbound turn lane to minimize the lake
offsets for vehicles traveling north and south on Lemay. Additional pavement may
be needed on both sides of Lemay to accommodate this. Travel lane widths should
be maintained at 12'; there is a location on southbound Lemay where the lane was
narrowed to 10', and this is too narrow.
Number: 83 Created: 10/24/2003
[10/24/031 FYI - The driveway access on Lincoln is not guaranteed to remain full
movement indefinitely. Increased traffic in the future may result in the access point
becoming right-in/right-out only.
Topic: Striping
Number: 68 Created: 10/21/2003
[10/21/03] The striping shown on Lincoln east of the site doesn't seem to work.
With a double -yellow line in the middle of the street, the center left turn lane will be
removed, but the way the double yellow ties into the existing striping on Lincoln
doesn't end up re -starting the center left turn lane. What happens to it?
Topic: Traffic
Number: 58 Created: 10/21/2003
(10/21/03] The TIS identifies the need for a left turn lane into the proposed access
road on Lincoln, but this lane is not shown on any of the plans. Please design this
lane and provide for any needed construction/re-striping for it.
Topic: Utility Plan
Number: 12 Created: 6/2/2003
[10/23/031 Any cuts/edges of mill/inlays need to be made at the edge of a lane, line
or the middle of a vehicle travel lane, They are not allowed in the middle of bicycle
lanes.
Page 4
NOU-04-2003 09:02 URUGHTFPYENF RIPLEYTS 970 224 16S2 P.07i24
Original comment:
Please show the approximate limits of street cuts and add the note: Limits of street
cut are approximate. Final limits are to be determined in the field by the City
Engineering Inspector, All repairs are to be in accordance with City street repair
standards,
Number 13 Created: 6/2/2003
[10/23/03] Repeated for your information,
Original Comment:
It appears that offsite grading and utility easements will be needed. Letters otintent
for these easements from the affected property owner(s) will be required prior;to
hearing, For easements to be dedicated to the City (utility easements), the
completed legal descriptions and dedication paperwork must be submitted to the
City prior to mylar approval. For private easements (grading easement with
neighbor) a copy of the completed easement will need to be submitted to the city
prior to mylar approval.
Number: 15 Created: 6/2/2003
(10/23/031 No checklist was received. Please see the attached and newly
reformatted checklist. Please contact me if you would like it emailed to you.
original comment:
Please submit a completed Utility Plan Checklist (LCUASS) with the next submittal.
Number: 20
[10/21/03) Repeat.
Created: 6/2/2003
Original comment (6/2/03):
Please provide all information on street cross -sections as required under LCUASS.
Department: Natural Resources Issue Contact: Doug Moore
Topic: Landscape Plan
Number: 75 Created: 10/23/2003
[10/23/031 Trees that are being preserved need to shown and labeled on plan.
Contact City Forestry for a copy of the tree preservation notes that need to added to
the plans (Landscape, Grading, etc.). Add a detail to the Utility Plan showing how
the orange construction fencing needs to be placed around the trees (Tree
Protection Standards LUC 3.2.1(G)(3)). Label the trees that are required for
mitigation as "mitigation trees". Mitigation trees are added above and beyond
normally required development required standards.
Page 5
N r�
11011-04-2003 09:02 URUGHTFRYE/UF RIPLEYTS 970 224 1662 P.08i24
Department: Stormwater Utility Issue Contact: Basil Hamdon
Topic: Erosion Control
Number: 35 Created: 6/10/2003
[ 10/21 /03]
Second Review
1. The plan indicates silt fencing on the west, north, and east sides of the
project. Why not the south? What is to protect the surrounding area from
sediments from the southerly storm pipe installation?
2. Are the detention areas to be landscaped? Please indicate on the plant what
is the final stabilization of these areas, Where does the straw mulching
indicated in your calculations go?
Topic: F/oodplaln Comments
Number: 61 Created: 10/21/2003
[10/21 /03]
1. The site is in the FEMA 100-year and 500-year floodplain. The off -site
access is in the City 100-year Dry Creek floodplain.
2. A floodplain use permit will be required for both the offsite work and the on -
site work that is in the 100-year floodplain. A $25 permit fee is required for
each permit.
3. Please see attached floodplain review checklist for items to be included on
the plans and in the drainage report. If the floodplain information causes tht
drainage/ and or grading plan to become too cluttered, a separate floodplain,
plan can be included.
4. Please see additional minor comments in the drainage report.
S. Sizing of the storm sewer along Lincoln should look at the FEMA 100-year
discharges in addition to local runoff if a swale is not going to be provided.
Topic: Grading Plan
Number: 38 Created: 6/10/2003
[10/24/03]
There seems to be grading to the north and east of the property line. Any such
grading would require an off -site grading easement from the property owner.
Why is the pavement thickness on the grading plan ?? Please remove,
Please provide a legend.
Page 6
/L
�PROJECT
i�••a COMMENT SHEET
Ciry of Fort Collins p�\
14AV
Current Plannim!
DATE: May 6, 2003 TO: Engineering Pavement
PROJECT: #16-03 BANK OF COLORADO PDP - TYPE I (LUC)
A11 comments must be received by Ted Shepard no later than the staff
review meeting:
June 4, 2003
Note - PI F,ASE identify your redlines for future reference
Name (please print) G
CHECK HERE IF YOU WISI-I TO RECEIVE COPIES OF REVISIONS
Plat _Site _Drainage Report _Other
_Utility _Redline Utility Landscape etrv�iFortcott;ns
hIDQ-04-20M 09:02
VRUGHTFRYENF PIPLEYTS 970 224 1662 P.09/24
Topic: Landscape Plan
Number 43
[10/24/03]
Created: 6/10/2003
There seems to be a conflict between one of the proposed shade tree along Lemay
Avenue and the proposed storm sewer. Please rectify.
Topic: Lemay Avenue Street runoff
Number: 84 Created: 10/24/2003
[10/24/03) It seems that flows coming off of Lemay Avenue will be trapped in the
ROW during the interim period. There needs to be a roadway swale design that
drains into the storm sewer system to evacuate water off of the the ROW in the
interim condition,
Topic: Pipe alignment
Number 81 Created: 10/24/2003
[10/24/03] Please make sure that the storm sewer along Lemay will not be affected
by proposed trees in the parkway strip. In the future when this alignment of Lemay
is vacated, this pipe will need to be in a designated drainage easement.
VFX-
Topic: Plat
Number: 80 Created: 10/24/2003
[10/24/03)
Please show drainage easements on the plat for the detention ponds and storm
sewers.
Also call out FEMA floodplain on the plat.
Topic: Storm Sewer Profile
Number: 36 Created: 6/10/2003
[10/24/03)
This comment was not addressed
The storm sewer along Lincoln Avenue has an invert out at the manhole that Is
higher than invert in. Please redesign the proposed storm line, projecting the storm
sewer elevations back through the Lemay Avenue intersection such that there would
be a positive slope at the manhole and throughout the pipe profile. If raising this
storm sewer causes a cover problem at Lemay Avenue then this should be
discussed at a utility coordination meeting.
Page 7
HM-04-2003 09:02
VRUGHTFP.YE/UF RIPLEYTS 970 224 1662 P.10%24
Topic: Utility Conflicts
Number: 37
[10/24/031
Created: 6/10/2003
Due to the strong potential for utility conflicts for the pipe crossing of Lemay Avenue
a utility coordination meeting with ALL affected utility
providers is strongly recommended. Such a meeting should take place before any
potential re -submittal is considered.
Previous comments regarding utility conflicts :
The proposed storm sewer crossing of Lemay Avenue may have some major utility
conflicts. Please show and call out on the pipe profiles the existing City of Fort
Collins, ELCO and North Weld Irrigation District lines. Please provide a minimum of
18 " of clearance from these lines.
Show the electric duct bank crossing of the proposed storm line at Lemay Avenue.
Will there be a conflict between the proposed storm line on the north side of Lincoln
and any proposed duct banks as the storm sewer alignment seems to coincide with
the area that Electric utilities are usually located.
There seems to be a utility conflict at the crossing of the 8" water line and the
existing storm sewer, Please pothole to check existing elevations.
Department: Traffic Operations Issue Contact: Eric Bracke
Topic: Traffic
Number: 51 Created: 10/8/2003
Generally no problems. The access on Lemay will be a ri/ro
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: General
Number: 69 Created: 10/22/2003
[10/22/03] Please show the bike rack near the building's entrance on all plan sheets
Number: 70 Created: 10/22/2003
[10/22-/031 Recommendation: For the drive through exit, please extend the curb and
shorten the turn radius on the west edge of the driveway. This will force people to
Page B
s
Fk-
,ry
i;
N0U-04-203 09:02 UAUGHTFRYENF RIPLEYTS 970 224 1662 P.1124
make a deliberate left turn and prevent people from trying to cut the corner as they
enter Lemay or block the driveway entrance.
Topic: Transportation Number: 25 Created:6/4/2003
(10/22/03) Follow-up comment: After discussions with other departments and the
applicant at the Wed. 10-22-03 meeting a possible future cross access drive
to the north was recommended. This connection will be an extension of the
north /south drive aisle on the east side of the property and terminate at the
north edge of the property.
Parking layout and site design should not preclude future cross access to
development that may occur to the east or north of this site. Please ensure that this
remains the case in subsequent submittals. Please also bear in mind that the
driveway providing access to E. Lincoln should be a right -in / right -out only.
Furthermore, as properties develop to the east a new shared access point to Lincoln
will be required. Cross access opportunities also apply to pedestrian facilities, such
as walkways and riot be precluded by landscaping. Please work closely with the
adjacent developer / property owner on identifying the cross access locations with
this submittal,
Number: 77 Created: 10/24/2003
IJ10124/031 It is unclear from the plan sets what the interim and ultimate
improvements for the Lemay / Lincoln intersection will include. Please keep in mind
that the ultimate intersection improvements need to account for all necessary turn
lanes, a ped. rofugo and a 6' bike lane. The interim improvments do not need to
include the ped refuge.
Number: 76 Created: 10/24/2003
[10/24/03] The latest submittal includes an attached sidewalk along the property's
Lincoln frontage. The pedestrian Level of Service and the street standards require
that a landscaped parkway be located between the sidewalk and right turn lane.
After discussions with transportation staff it was determined that the parkway width
can be reduced from 10 feet to 6 feet if necessary.
Number: 79 Created: 10/24/2003
[10/24/03] The bike lane striping for Lincoln needs to be reconfigured. Instead of
transitioning the bike lane at the development's new driveway location, the bike lane
should continue next to the curb and transition closer to the intersection. The
transition should began approximately 200 feet from the intersection and transition
back to the curb within a 75 foot distance. Please see engineering's red lines.
Page 9
H011-04-2003 09:02 VRUGHTFRYE/UF PIPLEYTS
970 224 1662 P.12i24
Department: Water Wastewater issue Contact: Jeff Hill
Topic; Plat
Number: 73 Created: 10/22/2003
[10/22/03) Provide utility easements for the proposed water main, water serve¢e
upto the curb stop, fire hydrant and the sanitary sewer service across the adjacent
property.
Topic: Utility Plan
Number: 27
[10/22/031
Created; 6/6/2003
A meeting is needed between the developer of this site and the owner of the
property to the east and north to discuss the future water and sewer requirements.
This property alone may not warrant a water main looping; however, from the
standpoint of the overall area, additional connections will likely be needed and will
be required with this project. The water main located in Lemay is a cathodically
protected water main. Include a Cathodic Isolation connection detail on the detail
sheet.
Number: 71 Created: 10/22/2003
[10/22/03] Will lowerings of the proposed 8-inch water main be required at the
crossings of the proposed 24-inch RCP, existing 12-inch Elco and the 24-inch
NWCWD mains? If so provide complete details for the lowerings.
Number: 72 Created: 10/22/2003
[10/22103] Show and label proposed water main in storm sewer profile view and in
clude concrete encasement of storm sewer 10 feet each way at water main crossing.
Number: 74 Created: 10/22/2003
[10/22/03) Provide all appropriate details on the detail sheet (ie meter pit, water line
lowering, CP isolation, etc.).
See site, landscape and utility plans for othe comments.
Current Planning:
Be sure to show the location of the electrical transformer. The source of power
is on the north side of Lincoln east of the site. The transformer must be
screened from view from both public streets. This may best be accomplished
by a three -sided enclosure made of materials to match the building. Please add
a General Note Number 13 indicating that the transformer will be screened.
(See redlines.)
The Lighting Plan did not provide information on the building -mounted light
fixtures. We have had some problems on recent projects with a several '
Page 10
VFF
VFF
NDV-04-2003 09:02 JAUGHTFRYE/VF RIPLEYTS 970 224 IGG2 P.13i24
Project Comments Sheet
Selected Departments
City of Fort Collins
Department: Transportation Planning
Date: October 24, 2003
Project: BANK OF COLORADO PDP -TYPE I (LUC) *16-03
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
October 22, 2003
Note - Please identify your redlines for future reference
Issue Contact: Tom Reiff
Topic: General
Number: 69 Created: 10/22/2003
(10/22/03] Please show the bike rack near the building's entrance on all plan sheets.
Number: 70 Created: 10/22/2003
[10/22/031 Recommendation: For the drive through exit, please extend the curb and
shorten the turn radius on the west edge of the driveway. This will force people to
make a deliberate lelft turn and prevent people from trying to cut the corner as they
enter Lemay or block the driveway entrance.
Topic: Transportation
Number: 25 Created: 6/4/2003
[10/22/03] Follow-up comment: After discussions with other departments and the applicant
at the Wed. 10.22-03 meeting a possible future cross access drive to the north was
recommended. This connection will be an extension of the north /south drive aisle on
the east side of the property and terminate at the north edge of the property.
Parking layout and site design should not preclude future cross access to development that
may occur to the east or north of this site. Please ensure that this remains the case in
subsequent submittals. Please also bear in mind that the driveway providing access to E,
Lincoln should be a right -in / right -out only. Furthermore, as properties develop to the east a
new shared access point to Lincoln will be required. Cross access opportunities also apply to
pedestrian facilities, such as walkways and not be precluded by landscaping. Please work
closely with the adjacent developer / property owner on identifying the cross access locations
with this submittal.
Signature
/a-zyb�
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility Redline Utility _/Landscape
Page I
HOU-04-2003 09:03 URUGHTFRYE/UF RIPLEYTS
970 224 1562 P.14/24
REVISION
COMMENT SHEET
DATE: October 6, 2003 TO: Forestry
PROJECT: #16-03 BANK OF COLORADO PDP - TYPE I'
(LUC)
All comments must be received by Ted Shepard no later than the
staff review meeting:
October 22, 2003
ElNo Comment
zProblems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
l "rtnq Lgi.,C.�Scs P� PICw Ne.Gds '+o SNow 4-4c �`hi3t-ys
IBA . putt c �-4 +e. �' 4—o -4 on ur v _ o..4- S 4� �eJ
] Ttoe_ -7 AA1�;54--,'oM 4-vte5 SLP✓Ij (Qt 3.0
, C.c.(.
6tUV, pall Ln0+- 0-tc.. TLvis '�-,
bL ct"C",5tA n, +L �154-d+t /.-taLt.
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _Site _—Drainage Report _Other
_Utility Redline Utility —,Landscape
Date
[JM-04-2003 09:03
VRUGHTFRYENF RIPLEYTS 970 224 1662 P.15=24
PROJECT
COMMENT SHEET
Current Planning
DATE: June 13, 2003 TO: Technical Services
PROJECT: #16-03A BANK OF COLORADO PLAT — TYPE.1
pLuc>
All comments must be received by Ted Shepard no later than the staff
review meeting:
July 16, 2003
/, btu NVq-CY -�j LE6A(, ((( 0 %6 .
Z, 5U3T�Ti-E- `DO!`Ri N✓9 /�';ATG� `THL LEG/1L
3 DEPRr L LN LEGAL 15 iJGomP[ErF.
,If. —)O, tJ}i �� CAI &%57s . D+lrrN7 cc,H Yioi' t1�
L°.QS �r'l-t 9i de OP LO+ i,
SEE Qf/IDGri✓�S
JO GOK� O
1 14" u,As TI't5 N'1'J/V
Name (pleaseprint)
CFfECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
N00-04-2003 09:03 URUGHTFRYE,UF RIPLEYTS 970 224 1662 P.16 24
Project Comments Sheet
City of Fort Collins Selected Departments
0
Department: Water Wastewater
Date: October 22, 2003
Project: BANK OF COLORADO PDP -TYPE 1 (LUC) #16-03
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
October 22, 2003
Note - Please /dentlfy your redlines for future reference
Issue Contact: Jeff Hill
Topic: Plat
Number: 73 Created; 10/22/2003
[10/22/03] Provide utility easements for the proposed water main, water service up
to the curb stop, fire hydrant and the sanitary sewer service across the adjacent
property.
Number: 74 Created: 10/22/2003
[10/22/03] Provide all appropriate details on the'detail sheet (i.e. meter pit, water
line lowering, CP isclation, etc.).
Topic: Utility Plan
Number: 27
[10/22/031
Created: 6/6/2003
A meeting is needed between the developer of this site and the owner of the
property to the east and north to discuss the future water and sewer requirements.
This property alone may not warrant a water main looping; however, from the
standpoint of the overall area, additional connections will likely be needed and will
be required with this project. The water main located in Lemay is a cathodically
protected water main. Include a Cathodic Isolation connection detail on the detail
sheet.
Number: 71 Created: 10/22/2003
Date
/HECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Y Plat Site Drainage Report Other
Utility Redline Utility _-4- Landscape
Page 1
NOV-04-2003 09:03 VRUGHTFRYE/VF RIPLEYTS 970 224 1662 P.17i24
[10/22/03] Will lowerings of the proposed 8-inch water main be required at the
crossings of the proposed 24-inch RCP, existing 12-inch Elco and the 24-inch
NWCWD mains? If so provide complete details for the lowerings.
Number: 72 Created: 10/2212003
[10/22/03) Show and label proposed water main in storm sewer profile view and
include concrete encasement of storm sewer 10 feet each way at water main
crossing.
See site, landscape and utility plans for other comments.
Page 2
1400-04-2003 09:03 UAUGHTFRYENF RIPLEYTS 970 224 1662 P.18/24
.i
Date: October 24, 2003
Project: BAINK OF COLORADO PDP -TYPE 1 (LUC) #16-03
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
October 22, 2003
Note - Please identify your redlines for future reference
Issue Contact: Katle Moore
Topic: General Created:6/6/2003
Number. 33
1`1=1/03) Repeattyi.
odglnal comment:
for any additional comments.
Please see redllnes
Created: 10121 /2003
Number: 63
110/21/03) All plans should clearly show the locations and dimensions of new and existing ROW for Lincoln and Lemay.
Topic: Plat Created: 10/20/2003
J
Number: 52
110/20/03) Please use the standard language for plats (attached).
Created: 10/20/2003
Number: 53
all on -site easements on the Plat (utility, drainage, emergency xcess, etc.)
110/20/031 Please show
Created: 10/20/2003
Number: 54
110/20/031 Please show how she ROW for Lemay and Lincoln was dedicated (book and page, reception number, etc).
Created: 10/20/2003
Number: please clearly Identify and dimension the iodsdn` ROW and the proposed ROW for both Lincoln and Lem*
Number: 55
Created: 10/20/2003
Number: 56
11020/031 According to a previous comment by PFA (s144), a fire lane will be required. Please dedicate the
Please note that the radius requirements of 26' and 50'
corresponding emergency access easement on the plat.
radii around curves should be measured from the same centerpoint. The width of the fire
JI
for respond and emerge
lane around curves should be 25 feet.
Date
SignafWe
CHECK. HERE IF YOU WISH TO RECEIVE COPIES OF RF,.VISIONS
✓ Plat V Site
Drainage Report Otber_�-�'
UtWty _�_ Redline Utility —� Landscape
Page 1/1
Katie Moore - Re: trans coord 5/29 Page 1
From: Eric Bracke
To: Cam McNair; Dave Stringer, David Averill; Garold Smith; Kathleen Reavis; Katie
Moore, Marc Virata; Mark Jackson; Matt Baker; Mike Herzig; Randy Hensley; Sheri Wamhoff, Susan
Joy, Tom Reiff; Troy Jones; Ward Stanford
Date: 5/28103 3:11 PM
Subject: Re: trans coord 5/29
Hi Sheri,
I will not be able to attend TC on Thursday but I believe Ward will be there to represent Traffic Ops.
However, here are my comments to add to the mix:
>>> Sheri Wamhoff 05/28/03 02:45PM >>>
Here's the agenda for tomorrow. Let me know if there are any additional items.
AGENDA
Transportation Coordination Meeting - May 29, 2003
10:00 A.M. to 12:00 P.M.
LOCATION 281 Conf A
1. Bank of Colorado project, Lincoln and Lemay design, specifically the transition of Lincoln from 4-lane to
2-lane and where that should happen, medians in Lincoln in the interim condition, APF issues at Vine and
Lemay, access point locations, and probably more. - Katie•Medians should be installed on both Lincoln
and Lemay to control the access to ri/ro only due to the proximity of the access locations to the
intersection. There are APF issues that apply to this development and there's not much they can do about
it. However, I am seriously considering eliminating the peak hour NB and SB left turns during the AM and
PM peak hours at Vine/Lemay. This will add capacity and soften the APF issue and allow the
development to proceed. A decision on this will be made by the end of the week.
2. Centre Ave - 6 ft bike lane okay?, Directional ramps or a corner ramp - Sheri I assume you are talking
about Centre Avenue from Lake to Prospect and the project CSU is proposing. I have worked with CSU
on this project and believe the design is head and shoulders above the existing condition - especially the
removal of the parking on the west side of Centre. Given the constraints of the roadway width, I believe
the 6' bike lanes works adequately. If this is not the section you're talking about, then I'll catch up with
Ward for comments.
3 Potential future alignment of Pennsylvania/Kentucky south of Cherokee Flying Heights, in particular, as
it intersects with West Mulberry - Troy J No comment
4. Timberline Village (Harmony School Shops), traffic study adequacy, the future of the 3/4 access off of
Harmony when the Harmony goes to 6 lanes, if there is no 3/4 access in the future distribution of traffic. -
Marc V The 3/4 movement is an approved access under the Harmony Road Access Plan. If it becomes a
problem either under the four or six lane Harmony Road, the Traffic Operations and CDOT have the
Police power to close it (assuming we can muster the courage to withstand the political ramifications). In
other words, I wouldn't be concerned with it at this point. I am more concerned with the Milestone access
on Timberline. The last set of plans I saw did not show the channelized "T" median that was previously
discussed. If they have changed there minds about the control feature, then the access will be rilro
-ONLY with a full median for control. I do not want to see another College/Kensington scenario.
Also with the project, I am not overly thrilled with the access provisions to the east. I expected a
"roadway" look and feel. the design appears to me as too circuitous to be overly effective. However, it's
nothing I'll fall on the sword over - it's a Transportation Planning call in my opinion.
6
6.
HOU-04-2003 09:03 VRUGHTFRYE/VF RIPLEYTS 970 224 1662 P.19/24
Number: 57 Created: 10/20/2003
110/20/03] The following comments were received from Technical Services!
1. Boundary and legal close.
2. Subtitle does not match the legal (NW 1 /4)
3. Bearing In legal Is See redlines
4. 20' u[Illty easementnt cannot be located on the easterly side of lot I.
5. How was the south Ilene nw 1 /4 determined?
Topic; Storm Sewer Profile
Number: 65 Created: 10/2112003
(10121/03) It appears that there wlII not be enough cover over stormpipa 1 In the ROW. (min 2' 10 srarifled
subgrade). Please cell 110 set up a meeting with representatives from Stormwater, Engineering, and other utilities
(water/wastewater, ELCO, N, Weld) to discuss this issue.
Topic. Street design
Number: 9 Created: 5/30/2003
[10/23/031 No variance requests were re=Ived. Please submit variance requests for.
1, onveway separation dlltanoes.
2. The design of the left turn lone on Lincoln.
3, Substanderd ROW dedication on Lincoln (typically, another 12' of ROW would be required for the right turn lane at the
intersection). The sidewalk and parkway as shown pro not acceptable. While we mentioned at an earlier meeting that the City
would entertain a variance sro redo= the parkway Moth. It was not anticipated that them would be no parkway at all. A
minimum parkway width of S' needs to be provided, tapering to the standard parkway width at the property line to the east, and
this will still require a variance. The sidewalk and parkway should be within dedicated ROW.
Original comment:
The access points shown do not meet the minimum separation distance from an Intersection as required by the Larlmer
County Urban Area Street Standards. Please submit a variance request according to LCUASS 1.9.4. It Is the Clty's
Intention to support the variance, but not without conditions. Adding to comment q1 from Traffic Operations, the
medians required to restrict access to rl/ro for both the access on Lincoln and the one on Lemay should be standard
medians In the center of the sweet_ "Pork chop" Islands In the driveways would be Insufficient. Also, please note that the
access location on Lincoln Is approved on an Interim basis only, and should be noted that It will be removed In the future.
When the property to the east develops, a shared access needs To be provided with a greater separation from Lemay than Is
shown with the current access, It Is suggested to work with the adjacent property owner(s) regarding cross access from this
parcel w bosh the north and the east.
Number: 10 Created: 5/2/2003
110/23103] This design shown needs to conned to the existing design for Lincoln. Please provide station equations and
ensure that the designs work together. Also, please provide additional Information regarding the northeast portion of the
integecilon of Lincoln end Lemay In the form of spot elevations and additional cross -sections. More Information Is needed to
determine whether the area will dreln properly.
Original comment!
Please provide the full design (detailed, not preliminary) of Lincoln along the property's frontage, Including the full lengths
of the turn lanes that stretch east of the property. Beyond this, to the east, please show the horizontal alignment as a
possible future alignment of Lincoln; to be designed by others, and remove the vertical design as well.
Number: 11 Created: 5/2/2003
(10/23/031 Sadon equations weren't provided. The crow -sections should contain more Information as required In
LCUASS. Enouglh vertical Information regarding the design of Lemay needs to be provided to assess whether the
sidewalk being bull[ along Lemay will be In the correct location with the ultimate buildout of Lemay.
Original comment:
There are approved designs of Lemay avenue stretching from south of this site north to Vine (In the Mulberry/Lemay
Crossings, 0.1814, and Buffalo Run plans, 0.1724). These plans may be used and referenced by this project, or, If this
project wishes to redesign Lemay, then both ends of the new portion need to tie Into the approved deslgri (station
equations, vertical matches). Detalled design of Lemay along the property's frontage Is needed.
Number: 59 Created: 10/21/2003
110/21/031 Please provide station equations to tie the proposed designs to existing designs. The design on
Lincoln needs to show that, when Lincoln Is widened and the ultlmale median Is constructed, the grade from the
median to the ultimate curb and gutter on the north will be a straight grade meeting standards. The ultimate curb
and gutter placement on both Lincoln and Lemey should ensure that grade& between the sidewalk and curb and
Page 2/4
NOl!-04-2003 09:04 VRUGHTFPYENF RIPLEYTS 970 224 1662 P.2024
gutter do not exceed 4:1 and should also provide for a 2' shallow -graded area adjacent to the sidewalk on each
slde.
Number: 60 Created: 10/21/2003
[10/21/03) The grading shown for Lemay needs to provide an area for water to draln off of the pavement Into
perhaps a swele or small ditch. The edge of pavement (and the bike lane) should not be at the low point. Also,
as discussed In a previous meeting, these flows from the streets need to be diverted into the pond.
Number: 62 Created: 10/21/2003
[ 10/21/031 When adding pavement to an existing street, the slope of the new pavement should beat lean as steep as
that of the existing pavement (per LCUASS). It Isn't as crltical where the pavement Is being added to the center of the
street, starting with a shallower slope and dropping off to a steeper slope toward the edge of the road. It Is more Important
where the center or the roadway Is steeper than the newly added edge and puddling and maintenance problems maybe
created.
Number: 66 Created: 10121/2003
[l Ml/03] The croae-section shown for Lemay on Sheet 10 doesn't make sense; 11 Is neither the Interim nor the
ultimate cross -section -
Number: 67 Created: 10/21/2003
[ 10/21/031 Please show the loadon of ROW along Lincoln to the east.
Number: 76 Created: 10/23/2003
[ 10/23/031 Please show that the turning movements at the Lincoln-Lemay Intersection will wort. (As discussed In a
previous meeting.)
Number: 82 Created: 10/24/2003
110/24/031 The median on Lemey should be centered on the existing line separating the northbound through lane and
the southbound turn lane to minimise the lane offsets for vehicles traveling north and south on Lemay. Additional
pavement may be needed on both sides of Lemay to accommodate this. Travel lane widths should be malnulned ar12;
there Is a location on southbound Lemay where the lane was narrowed to )0', and this is too narrow.
Number: 83 Created: 10/24/2003
[ 10/24/031 FYI - The driveway access an Lincoln Is not guaranteed to remain full movement Indefinitely, Increased
traEk In the future may result In the access point becoming right-In/right-out only.
Topic: Striping
Number: 68 Created: 10/21/2003
[ 10/21 /031 The striping shown on Lincoln east of the site doesn't seem to work. With a double -yellow line in the middle
of the street, the center left turn lane will be removed, but the way the double yellow des Into the existing striping on
Lincoln doesn't end up re -starting the center left aim lane. What happens to It?
Topic: Traffic
Number: 58 Created: 10/21/2003
110/21103j The TIS Identifies the need for a left turn lane Into the proposed access road on Lincoln, but this lane Is not
shown on any of the plans. Please design this lane and provide for any needed constructlon/re-Mping for It.
Topic: Utility plan
Number: 12 Created: 6/2/2003
(I =31031 Any cuts/edges of mlIVinloye need to be made at the edge of a lane line or the middle of a vehicle travel lane. llThey
are not allowed In the middle Hof bicycle lanes.
Original comment
Please show the approximate limits of street cuts and add the note: Limps of street cut are approximate. Final limits are to
be determined In the field by the City Engineering Inspector. All repairs are to be In accordance with City street rep4lr
"neardt.
Page 3/4
HOU-04-2003 09:04 VRUGHTFRYENF RIPLEYTS
970 224 1662 P.21/24
Number: 13
(10/23103) Repeated for your Information.
Created: 6/2/2003
Original Comment•
It appears that offslte pading and udllty easements will be needed. Letters of Intent for these easements from the affected
property owner(s) will be required prior to hearing. For easements to be dedicated m the City (utlllty easements), the
completed legal descrlp00115 and dedicatlon paperwork must be submitted to the City prior to mylar approval. For private
easements (grading easement with nelghbor) a copy of the completed easement will need w be submitted to the city prior
to mylar approval.
Number: 15 Created: 6/2/2003
(1023103] No checkllet wee recelved. Please see the attached and newly reformatted checkltat Please contact me If you
would like it amalled to you.
Original comment
Please submit a completed Utility Plan Checklist (LCUASS) with the next submittal.
Number: 20 Created: 6/2/2003
(1021/03] Repeat.
Original comment (MA13):
Please provide all information on street cross sections as required under LCUASS.
Page 41,
HOO-04-2003 09:04 URUGHTFRYE/UF RIPLEYTS
970 224 1662 P.22/24
Project Comments Sheet
Selected Departments
Department: Stormwater Utility
Date: October 24, 2003
Project: BANK OF COLORADO PDP -TYPE I (LUC) #16-03
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
October 22, 2003
Note - Please identify your redlines for future reference
Issue Contact: Basil Namdan
Topic: Erosion Control
Number: 35
[10/21/031
Second Review
Created: 6/10/2003
The plan indicates silt fencing on the west, north, and east sides of the project. Why
not the south? What is to protect the surrounding area from sediments from the
southerly storm pipe installation?
Are the detention areas to be landscaped? Please indicate on the plan what is the final
stabilization of these areas. Where does the straw mulching indicated in your
calculations go?
Topic: Floodplaln Comments
Number: 61
[10/21/03i
Created: 10/21/2003
1. The site is in the FEMA 100-year and 500-year floodplain. The off -site access is in
the City 100-year Dry Creek floodplain.
2. A floodplain use permit will be required for both the offsite work and the on -site
work that is in the 100-year floodplain. A $25 permit fee is required for each permit.
Signature
1012 ti103
Date
HECK HERE IF YOU WISH TO RFC, EIyrE COPIES OF REVISIONS
Plat _ to _T a(8i age Report Other_
tility edline Utility andscape
page I
HOV-04-2003 09:04 VRUGHTFPYENF PIPLEYTS 970 224 1662 P.23i24
3. Please see attached floodplain review checklist for items to be included on the plans
and in the drainage report. If the floodplain information causes the drainage/ and or
grading plan to become too cluttered, a separate floodplain plan can be included.
4. Please see additional minor comments in the drainage report.
5.
Topic: Grading Plan
Number: 38
(10/24/03)
Created: 6/10/2003
There seems to be grading to the north and east of the property line. Any such grading would require an off -site
grading easement from the property owner.
Why is the pavement thickness on the grsding plan 77 Please remove.
Please provide a legend.
Topic: Landscape Plan
Number: 43 Created: 6/10/2003
[10/24/031
There seems to be a conflict between one of the proposed shade trees along Lemay Avenue and the proposed storm
sewer. Please rectify.
Topic: Lemay Avenue Street runoff
Number: 84 Created: 10/24/2003
(10124/031 It seems that flows coming off of Lemay Avenue will be Irapped in the ROW during the interim period. Thera
needs to be a roadway &wale design that drains into the storm sewer system to evacuate water off of the ROW in the
interim condition.
Topic: Pipe alignment
Number: 81 Created: 10/24/2003
[10/24103) Please make sure that the storm sewer along Lemay Is not affected by proposed trees in the parkway strip.
In the future when this alignment of Lemay is vacated, this pipe will need to be In a designated drainage easement:
Topic: Plat
Number: 80 Created: 10/24/2003
[10/24/031
Please show drainage easements on the plat for the detention ponds and storm sewers.
Also call out FEMA floodplain on the plat.
Topic: Storm Sewer Profile
Number: 36 Created: 6/1012003
110124/031
This comment was not addressed
Page 2
10V-04-203 09:04 OAUGHTFRYE/UF PIPLEYTS 970 224 1662 P.2424
The storm sewer along Lincoln Avenue has an invert out at the manhole that Is higher than Invert in. Please redesign
the proposed storm line, projecting the storm sewer elevations back through the Lemma Avenue intersectlon such that
there would be a positive slope at the manhole and throughout the pipe profile. If raising this storm sewer causes a
cover problem at Lem8y Avenue then this should be discussed at a utility coordination meeting.
Topic: Utility Conflicts Created: 6/10/2003
Number: 37
[10124103j
ty coordination
Due to the strong ALL affected utielty for
Islslrongly recofor the mmended. Such a meeting should crossing of Lemay Avenue, a stake piece before any meeting with
potential re -submittal is considered.
Previous comments regarding utility conflicts
The proposed storm sewer crossing of Lemay Avenue may have some major utility conflict$ Please show and call out
on the pipe profiles the existing City of port Collins, ELCO and North Weld Irrigation District lines. Please provide a
minimum of 18"of clearance from these lines.
Show the electric duct bank crossing of the proposed storm line at Lemay Avenue.
Will there be a conflict between the proposed storm line on the north side of Lincoln and any proposed duct banks as
the storm sewer alignment seems to coincide with the area that Electric utilities are usually located.
There seems to be a utility conflict at the crossing of the 8" water line and the existing storm sewer. Please pothole to
check existing elevations.
Page 3
TOTAL P.24
0-
a
0
co
a
E
w °
0 N
a
zW
it
w
9
R
LI'4 $ o� U'Icolvl d _te
Dale:
(OAcr +o rv-\U- D' Mass.
dcrn k�o�a @�6u's ins VOL
A aclnss� �detzC�,t2c W,oDi K- m LJ nc o l n����
ve iS 9u "001 -i-, EA-) C {'L cqM
01a, f rvji v e mcr L" -ICWIfgMKq t.l cx CIS
ed S.
,ion ftwdy
Uavd
i IreLax-
Project Comments Sheet
Selected Departments
City of Fort Collins
Department: Engineering
Date: February 2, 2004
Project: BANK OF COLORADO PDP -TYPE I (LUC) #16-03
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
January 28, 2004
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore
Topic: General
Number: 33 Created: 6/6/2003
[1/27/04] [10/21/03] Repeatfyi.
Original comment:
Please see redlines for any additional comments.
Topic: Grading Plan
Number: 92 Created: 1/27/2004
[ 1 /27/041 Existing grade lines offsite to the north and east of the project need to be shown and the propsed grade lines
need to tie to them.
Number: 93 Created: 1/27/2004
[ 1 /27/0411 /27/04] The section of unpaved area along Lincoln between the EOA and the sidewalk contains a low point,
and it appears that a Type R inlet is proposed to drain this low point. In the interim, this inlet should be changed to an
area inlet with interim grading shown to drain to it.
Topic: Landscape
Number: 87 Created: 1/27/2004
[ 1 /27/04] Where attached, sidewalk along an arterial must be min. 7' wide. (currently shown as b' on Landscape plan,
7' on utility plans).
Number: 88 Created: 1/27/2004
[1 /27/04] It appears that the property line/ROW line along the south side of the property was deleted or the layer
turned off. Please show it again.
Topic: Lemay Avenue Street runoff
Number: 94 Created: 1/27/2004
[ 1 /27/04] The interim median on Lemay is placed blocking the pedestrian path from the ramp on the east side of Lemay
to the west. Please either, relocate the ramp, pull back the nose, or a combination of the two to rectify this.
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
"I
Plat L Site Drainage Report t/ Other ''i l:
Utility _� Redline Utility ✓ Landscape
Page 1
Topic: Plat
Number: 53 Created: 10/20/2003
(1/27/04] It appears that an easement for a pond and the emergency access easement are still missing.
[ 10/20/031 Please show all on -site easements on the plat (utility, drainage, emergency access, etc.)
Number: 54 Created: 10/20/2003
11/27/04] This applies to all portions of Lemay and Lincoln ROW dedicated along the property's frontage, notjust the triangle at
the corner. How were the rest of Lemay and Lincoln dedicated?
[ 10/20/03] Please show how the ROW for Lemay and Lincoln was dedicated (book and page, reception
number, etc).
Number: 55 Created: 10/20/2003
[ 1 /27/04] The ROW dedication shown on the plat does not match the other plans. As shown on the utility plans, the
new ROW dedication should be measured from the section line as opposed to the center line of Lincoln, since
Lincoln Avenue is slated on the City's master street plan to veer north instead of south as it heads east of this
property.
[10/20/03] Please clearly Identify and dimension the existing ROW and the proposed ROW for both Lincoln and Lemay.
Number: 56 Created: 10/20/2003
[1127/04] The emergency access easement still hasn't been shown.
[10/201031 According to a previous comment by PFA (#44), a fire lane will be required. Please dedicate
the corresponding emergency access easement on the plat. Please note that the radius requirements of 25' and
50' for interior and exterior radii around curves should be measured from the same centerpoint. The width of the
fire lane around curves should be 25 feet.
Topic: Storm Sewer Profile
Number: 65 Created: 10/21/2003
(1/27/04] There is still less than 2' of cover over this stormpipe. Can an elliptical pipe be used here? Ductile Iron? Two pipes?
If the standard cover cannot be met, a variance request will need to be submitted. Engineering and the Utilities realize that
there are conflicting standards and comments regarding the stormpipe extension, cover, and water line lowering, and we still
highly recommend a meeting with the representatives listed below in order to resolve the issues to all parties' satisfaction and
hopefully in a more efficient manner than by contacting everyone individually. I will be happy to coordinate this meeting, so
please contact me when you are ready to attend.
[10/21103] It appears that there will not be enough cover over stormpipe 1 in the ROW. (min 2' to
scarified subgrade). Please call to set up a meeting with representatives from Stormwater, Engineering, and
other utilities (water/wastewater, ELCO, N. Weld) to discuss this issue.
Topic: Street design
Number: 9 Created: 5/30/2003
[1/27104] The variance requests for the left turn lane on Lincoln and for attaching the sidewalk on Lincoln were received, but
the driveway separation distance variance was not. The variance for the left turn lane design was approved, as was
the variance for attaching the sidewalk. Please list these variances under the general notes.
110/23/03] No variance requests were received. Please submit variance requests for
1. Driveway separation distances.
2. The design of the left turn lane on Lincoln.
3. Sub -standard ROW dedication on Lincoln (typically, another 12' of ROW would be required for the right turn lane at the
intersection). The sidewalk and parkway as shown are not acceptable. While we mentioned at an earlier meeting that the City
would entertain a variance to reduce the parkway width, it was not anticipated that there would be no parkway at all. A
minimum parkway width of 6' needs to be provided, tapering to the standard parkway width at the property line to the east, and
this will still require a variance. The sidewalk and parkway should be within dedicated ROW.
Original comment:
The access points shown do not meet the minimum separation distance from an intersection as required by the Larimer
County Urban Area Street Standards. Please submit a variance request according to LCUASS 1.9.4. It is the City's
intention to support the variance, but not without conditions. Adding to comment #1 from Traffic Operations, the
medians required to restrict access to ri/ro for both the access on Lincoln and the one on Lemay should be standard
medians in the center of the street. "Pork chop" islands in the driveways would be insufficient. Also, please note that the
access location on Lincoln is approved on an interim basis only, and should be noted that it will be removed in the future.
Page 2
When the property to the east develops, a shared access needs to be provided with a greater separation from Lemay than is
shown with the current access. It is suggested to work with the adjacent property owner(s) regarding cross access from this
parcel to both the north and the east.
Number: 10 Created: 6/2/2003
[1/27/041 Again, please provide additional information regarding the northeast portion of the intersection of Lincoln and Lemay
in the form of spot elevations and additional cross -sections. More information is needed to determine whether the area will
drain properly, especially now that it is shown that the flowline along Lemay is to be raised in elevation.
(10/23/03] This design shown needs to connect to the existing design for Lincoln. Please provide station equations
and ensure that the designs work together. Also, please provide additional information regarding the northeast portion of the
intersection of Lincoln and Lemay in the form of spot elevations and additional cross -sections. More information is needed to
determine whether the area will drain properly.
Original comment:
Please provide the full design (detailed, not preliminary) of Lincoln along the property's frontage, including the full lengths
of the turn lanes that stretch east of the property. Beyond this, to the east, please show the horizontal alignment as a
possible future alignment of Lincoln, to be designed by others, and remove the vertical design as well.
Number: 60 Created: 10/21 /2003
[1/27/04] A number of the gross -sections for Lemay still show the low point at the edge of asphalt. Please revise the grading
to provide the ditch/swale mentioned below.
[10/21/03] The! grading shown for Lemay needs to provide an area for water to drain off of the
pavement into perhaps a swale or small ditch. The edge of pavement (and the bike lane) should not be at the
low point. AjsG,—a&-d+&o4ssed R a prev At 'A FTIAPt Rig, these flows fFern the strai;itg naPd to he diverted RIO the
Number: 76 Created: 10/23/2003
[1 /27/041 Have the turning movements been analyzed and do they work?
[ 10/23/031 Please show that the turning movements at the Lincoln-Lemay intersection will work. (As discussed
in a previous meeting.)
Topic: Striping
Number: 95 Created: 1 /27/2004
[ 1 /27/04] On the sheets showing the ultimate striping for Lincoln, please remove the left turn lane for the access point
to the north and show the taper and bike lane transition for the right turn lane. The RTL should not be continuous. If this
can be shown on just sheet 15A, then please remove ISB.
Topic: Utility Plan
Number: 12 Created: 5/2/2003
[1/27/04] While the cut shown west of the proposed median on Lemay is made on a lane line, the end of the cut needs to be
squared off and not pointy, which means that the cut should be made at the center of a through lane as opposed to the lane
line for the right turn lane.
[10/23/03] Any cuts/edges of mill/inlays need to be made at the edge of a lane line or the middle of a vehicle travel
lane. They are not allowed in the middle of bicycle lanes.
Original comment:
Please show the approximate limits of street cuts and add the note: Limits of street cut are approximate. Final limits are to
be determined in the field by the City Engineering Inspector. All repairs are to be in accordance with City street repair
standards.
Number: 13 Created: 6/2/2003
[1127/041 (10123/03] Repeated for your information.
Original Comment:
It appears that offsite grading and utility easements will be needed. Letters of intent for these easements from the affected
property owner(s) will be required prior to hearing. For easements to be dedicated to the City (utility easements), the
completed legal descriptions and dedication paperwork must be submitted to the City prior to mylar approval. For private
easements (grading easement with neighbor) a copy of the completed easement will need to be submitted to the city prior
to mylar approval.
Number: 15 Created: 6/2/2003
[1/27/041 REPEAT REPEAT
[10/23/03] No checklist was received. Please see the attached and newly reformatted checklist. Please contact me
if you would like it emailed to you.
Page 3
Project Comments Sheet
Selected Departments
City of Fort Collins
�..�.M
Department: Engineering
Date: June 6, 2003
Project: BANK OF COLORADO PDP -TYPE I (LUC) 016-03
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
June 04, 2003
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore
Topic: General
Number: 7 Created: 5/30/2003
Please provide a plat of the property with ROW and easements dedicated as necessary, since the property is not currently
platted. Both Lincoln and Lemay are 4-lane arterials on the Master Street Plan, with a total of 1 1 S' of ROW. Utility
easements I S' wide are required behind the ROW on both streets as well. ROW dedicated for Lemay should be located to
provide for the ultimate alignment of Lemay as it swings east for the future overpass at Vine.
Number: 8 Created: 5/30/2003
Regarding the ultimate design of Lincoln, the transition of Lincoln from 4-lane to 2-1ane needs to occur at the next
intersection east of Lemay. Studies have shown that the Lincoln/Lemay intersection needs to be 4 lanes on all sides to
provide for the needed capacity.
Number: 9 Created: 5/30/2003
The access points shown do not meet the minimum separation distance from an intersection as required by the Larimer
County Urban Area Street Standards. Please submit a variance request according to LCUASS 1.9.4. It is the City's
intention to support the variance, but not without conditions. Adding to comment #1 from Traffic Operations, the
medians required to restrict, access to ri/ro for both the access on Lincoln and the one on Lemay should be standard
medians in the center of the street. "Pork chop" islands in the driveways would be insufficient. Also, please note that the
access location on Lincoln is approved on an interim basis only, and should be noted that it will be removed in the future.
When the property to the east develops, a shared access needs to be provided with a greater separation from Lemay than is
shown with the current access. It is suggested to work with the adjacent property owner(s) regarding cross access from this
parcel to both the north and the east.
Number: 10 Created: 6/2/2003
Please provide the full design (detailed, not preliminary) of Lincoln along the property's frontage, Including the full lengths
of the turn lanes that stretch east of the property. Beyond this, to the east, please show the horizontal alignment as a
possible future alignment of Lincoln, to be designed by others, and remove the vertical design as well.
Number: 11 Created: 6/2/2003
There are approved designs of Lemay avenue stretching from south of this site north to Vine (in the Mulberry/Lemay
Crossings, 0-1814, and Buffalo Run plans, 0-1724). These plans may be used and referenced by this project, or, if this
Dare
✓. CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat __� Site Drainage Report _� Other I 1 5
—� Utility _�G Redline Utility Landscape
Page I
Original comment:
Please submit a completed Utiility Plan Checklist (LCUASS) with the next submittal.
Number: 89 Created: 1 /27/2004
[1/27/04]
The cover sheet shows recommended pavement thicknesses. Since pavement designs for use within the ROW are not
approved until later in the project, please remove these or clearly note that they are not for use within the public Right of
Way.
Number: 90 Created: 1/27/2004
[1 /27/04] The storm sewer in Lincoln was relocated since the last round of review, and it appears that the new manholes
will be located in the future bike lane. Standards prohibit the location of manholes in bike lanes, so these manholes need to
be relocated.
Number: 91 Created: 1/27/2004
[1 /27/04] The radii used for driveway connections to arterials need to be 20', not 15' as currently shown.
Page 4
r
Project Comments Sheet
Selected Departments
City of Fort Colhns
®e
Department: Transportation Planning
Date: January 28, 2004
Project: BANK OF COLORADO PDP -TYPE 1 (LUC) #16-03
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
January 28, 2004
Note - Please identify your redlines for future reference
Issue Contact: Tom Reiff
Topic: Transportation
Number: 96 Created: 1 /28/2004
[1/28/041 The interim median shown on Lemay Ave. is currently shown as blocking
the crosswalk. Please correct this by shortening the nose of the median.
Signature -
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
V Utility Redline Utility Landscape
Page 1
Project Comments Sheet
Selected Departments
Citvof Fort otho
Department: Water Wastewater
Date: January 28, 2004
Project: BANK OF COLORADO PDP -TYPE I (LUC) #16-03
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
January 28, 2004
Note - Please identify your redlines for future reference
Issue Contact: Jeff Hill
Topic: Plat
Number: 73
Created: 10/22/2003
[ 1 /28/04]
[10/22/031 Provide a copy of the utility easement for the proposed sanitary sewer
service across the adjacent property.
Topic: Utility Plan
Number: 71
Created: 10/22/2003
[1 /28/04]
[10/22/031 Provide complete details for the lowerings of the CFC 8" water main at
the ELCO water main.
Number: 74 Created: 10/22/2003
[1 /28/041
[10/22/031 Provide all appropriate details on the detail sheet (ie meter pit, water line
lowering, CP isolation, etc.).
See site, landscape and utility plans for other comments.
Date
,CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
,,-'-Plat :"Site Drainage Report Other_
✓tility ✓Redline Utility �/, andscape
Page t
REVISION
COMMENT SHEET REC.0
DATE: January 12, 2004 TO: Technical Services
PROJECT: 916-03 Bank One PDP —Type I (LUC)
All comments must be received by Ted Shepard no later than the
staff review meeting:
January 28, 2004�
❑ No Comment
0 Problems or Concerns (see below or attached)
"PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE"
Z•Lor SQtAnLr FooT�c-a� SNoJ�� eT 1/�[cLv/�cT TN�>
2.D • W .
3 7—r/e Z� 6).6
JI. 4coNG, TNT l�oarir Wiry 7'HK /v Zo
Jd C� S — I`I6iLj 4 13a�r �4 i_16rL STr¢7tn/L, Tl-�C A Zd
tlme-) ,4t Sae 4X gt LxJ e(L ?
Name (please print) Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Ik/Plat Site _Drainage Report _Other
_Utility _Redline Utility _Landscape city of Fort Collins
h Project Comments Sheet
Selected Departments
Citvof Fort Collins
���
Department: S'tormwater Utility
Date: January 30, 2004
Project: BANK OF COLORADO PDP -TYPE I (LUC) #16-03
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
January 28, 2004
Note - Please identify your redlines for future reference
Issue Contact: Basil Harridan
Topic: Erosion Control
Number: 35
[1/30/041
Third Review
January 30, 2004
Created: 6/10/2003
1. One or more of the previous comments has not been addressed. Please do so.
Second Review
October 21, 2003
The plan indicates silt fencing on the west, north, and east sides of the project. Why
not the south? What is to protect the surrounding area from sediments from the
southerly storm pipe installation?
Are the detention areas to be landscaped? Please indicate on the plan what is the final
stabilization of these areas. Where does the straw mulching indicated in your
calculations go?
Bank of Colorado at Lincoln and Lemay
June 3, 2003
1. The plan doesn't show t1 BMP;s, it would probably help if they were there!?!?!
Signature
re
Da V 7
Da�
HECK HERE IF YOU WISH O RECF VE COPIES OF REVISIONS
PI S' rainage Report Other
tility Redline Utility Landscape
Page 1
Topic: Grading Plan
Number: 38 Created: 6/10/2003
[1/30/041
Grading to the north not shown. Depending on the grading an off -site construction easement may be required on the
property to the north.
[10/24/03]
There seems to be grading to the north and east of the property line. Any such grading would require an off -site
grading easement from the property owner.
Why is the pavement thickness on the grading plan ?? Please remove
Please provide a legend.
Topic: Landscape Plan
Number: 85
[ 1 /20/041
The north detention pond looks rather bare.
Created: 1/20/2004
Please provide some landscaping within that pond.
Topic: Lemay Avenue storm line
Number: 98 Created: 1 /30/2004
[1/30/041
The existing storm sewer lines under Lemay are in a very poor condition. The City recommends that these lines be
replaced with this project. If possible please follow existing pipe elevations, if cover requirements cannot be met, then
alternative cover materials may need to be investigated. If a 48" pipe is not possible then maybe smaller sized pipes to
match at least existing pipe sizes could be installed.
Please show on the storm line profile how this line will tie into the existing ditch on the west side of Lemay.
Topic: Lincoln Avenue water lowering
Number: 97 Created: 1 /30/2004
[1/30/041
It is currently proposed to lower the existing North Weld Irrigation line for the line from the north to be tied with the
outfall system, can this lowering be eliminated if the storm line is extended east to tie in with the pipe outlet from the
detention pond ?? If not explain why.
Topic: Lincoln Inlet
Number: 86 Created: 1/27/2004
[1/27/041
Please explain how will the 5' Type R inlet on Lincoln function. It is shown to be under the sidewalk currently. Will this
inlet be relocated once the ultimate improvemenst on Lemay are completed ? Maybe an area inlet similar to the one on
Lemay may work better in the interim. If a special curb inlet is proposed then special details for that inlet should be
provided.
Topic: Plat
Number: 34 Created: 6/10/2003
[1 /20/041
North pond still needs to be in a drainage easement. Additionally it might be beneficial to place the storm sewer
connecting the north and south detention ponds within a drainage easement. Please also provide a minimum 20-foot
utility and drainage easement for all storm lines.
Page 2
Number: 80
[1/27/041
Created: 10/24/2003
North pond and storm sewer still not shown to be within drainage easements.
[10/24/031
Please show drainage easements on the plat for the detention ponds and storm sewers.
Also call out FEMA floodplain on the plat.
Topic: Utility Conflicts
Number: 37
[1/30/041
Created: 6/10/2003
A meeting to address the potential storm lines crossings at Lemay as well as the lowering of the North Weld County
water line is still suggested.
[10/24/03)
Due to the strong potential for utility conflicts for the pipe crossing of Lemay Avenue, a utility coordination meeting with
ALL affected utility
providers is strongly recommended. Such a meeting should take place before any potential re -submittal is considered.
Previous comments regarding utility conflicts :
The proposed storm sewer crossing of Lemay Avenue may have some major utility conflicts. Please show and call out
on the pipe profiles the existing City of Fort Collins, ELCO and North Weld Irrigation District lines. Please provide a
minimum of 18 " of clearance from these lines.
Show the electric duct bank crossing of the proposed storm line at Lemay Avenue.
Will there be a conflict between the proposed storm line on the north side of Lincoln and any proposed duct banks as
the storm sewer alignment seems to coincide with the area that Electric utilities are usually located.
There seems to be a utility conflict at the crossing of the 8" water line and the existing storm sewer. Please pothole to
check existing elevations.
Page 3
2. 11. D'I
jovit a j(ce.�s FbIw-k
cc
a
W
U
0 N
n N
M N
O� C
01
O LI
Z LL
w
9
A
O
Se slyaAt ll. (Z CL C,
Li ln.c b (K to va l -
acN i +�{ c�setc� S f e(Q v s -Gy (, t
Pa, e Vvv-t"-t � �— � C'm4 Ir (a.y
2 i CIoe- /LLC i( OA C ,,*,�,tcb
� T to 3y� `' rev,
y��•�. U�
vile o� '�J v-v• dleop IhY, lD�
C lea- u� c� #r 5 re, t� (n (av� U 10
IZ
Project Comments Sheet
Selected Departments
Department Transportation Planning
Date :Alpril 20, 2004
Project:
BANK OF COLORADO PDP - TYPE I (LUC) AND FINAL COMPLIANCE
(LINCOLN EAST #40-94)
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
April 21, 2004
Note - Please identify your redlines for future reference
Issue Contact: Tom Reiff
Topic: Transportation
Number: 105
[4/20/04] No further comments.
Signature
Created: 4/20/2004
Date
CHE(ICHERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site Drainage Report Other
Utility _ Redline Utility Landscape
Page 1
project wishes to redesign Lemay, then both ends of the new portion need to tie Into the approved design(s) (station
equations, vertical matches). Detailed design of Lemay along the property's frontage Is needed.
Number: 14 Created: 6/2/2003
Please see the Larimer County Urban Area Street Standards Appendix E-6 Criteria for Scanable Quality Mylars, for quality
requirements for all plan sheets (site, landscape, utility, plat, etc.).
Number: 33 Created: 6/6/2003
Please see redlines for any additional comments.
Topic: Landscape
Number: 31 Created: 6/6/2003
Special consideration should be given to the landscaping just south of the Lemay access point because of the conflicting
vehicle movements (The vehicles exiting the drive -through vs. vehicles entering from Lemay).
Topic: Traffic
Number: 18 Created: 6/2/2003
Please revise the TIS to reflect the access points as ri/ro, and the access on Lincoln going away in the future.
Pmber: 19' ; T 11, � -,- 1-r, Created: 6/2/2003
Plea v note chat, while there are plans currently being approved for the addition of left turn lanes on Vine at Lemay, if
those les are not constructed by the time this development wishes to move forward, then this development will need to
construe Ose lanes.
Topic: Utility Plan
Number: 12 Created: 6/2/2003
Please show the approximate limits of street cuts and add the note: Limits of street cut are approximate. Final limits are to
be determined in the field by the City Engineering Inspector. All repairs are to be in accordance with City street repair
standards.
Number: 13 Created: 6/2/2003
It appears that offsite grading and utility easements will be needed. Letters of intent for these easements from the affected
property owner(s) will be required prior to hearing. For easements to be dedicated to the City (utility easements), the
completed legal descriptions and dedication paperwork must be submitted to the City prior to mylar approval. For private
easements (grading easement with neighbor) a copy of the completed easement will need to be submitted to the city prior
to mylar approval.
Number: 15 Created: 6/2/2003
Please submit a completed Utility Plan Checklist (LCUASS) with the next submittal.
Number: 16 Created: 6/2/2003
Both driveway cuts should be the radius -style, not flared, cuts with the standard radius because both Lincoln and Lemay are
arterials.
Number: 17 Created: 6/2/2003
Because so much of the street design shown needs to be substantially changed for the next submittal, these designs were not
given a detailed review; please expect new comments with the next submittal.
Number: 20 Created: 6/2/2003
Please provide all information on street cross -sections as required under LCUASS.
Number: 30 Created: 6/6/2003
Pedestrian ramps should be the same width as the sidewalks leading into them, in this case 6 feet wide on Lincoln and
Lemay.
Page 2
City of Fo,i Call! Es
DATE: A p I lil 20()4 TjD: i efhl:ical Sej-vjif -s
PROJECT: #16-03A Bank of Colorado PBP — Final Plan
All comments must be received by Ted Shepard no later than the staff
review meeting:
April 21, 2004
Note - Please identifr Your redlines for future reference
/, aoV,4jlD/h Y � 6C&,4L CL6.s€ _
Name (please print)
CHECK HERE IF YOL WISH TO RECEWE COPIES OF REVISIONS
Plat Site _Drainage Report _Other
_Utility _Redline utility _Landscape
Development Review Engineering
April 21, 2004
Ms. Patricia Kroetch, PE
North Star Design Inc.
700 Automation Drive Unit 1
Windsor, CO 80550
Re: The variance request for separation distance between a driveway and a street intersection
Dear Mr. Oberlander,
This letter is in response to your request for a variance to the Larimer County Urban Area Street
Standards. The variance requested was a reduction of separation distance between the driveway on
Lemay and the Lemay and Lincoln intersection from the standard 460 feet to 325 feet. This variance has
been approved by the City Engineer only for this project.
As with all variances to the street standards, the variance granted forthis project is based on the particular
situation under design and the judgment that we (the designer and the City) apply to determine whether
there is a public safety concern. The variance for this project in no way sets any precedence for relaxing
these standards on other projects without complete analysis and justification.
Should you have any further questions or concerns, please do not hesitate to contact this office.
Sincerely,
Katie Moore
Project Engineer
City of Fort Collins
cc: file
Ted Shepard
LO Box -H"C • Fort llin;, CO 0522-C°xG • i970; 2'1 Go11S • x rIX (C) j 221 6378
ovww.i.go.°.ccm
Project Comments Sheet
of Fort Collies of Departments
Department: Engineering
Date: April 21, 2004
Project:
BANK OF COLORADO PDP - TYPE I (LUC) AND FINAL COMPLIANCE
(LINCOLN EAST #40-94)
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
April 21, 2004
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore
Topic: General
Number: 33 Created: 6/6/2003
[4/161041 [1/27/04] 110121/03] Repeat fyi.
t Original comment:
" Please see redlines for any additional comments.
Number: 99 Created: 4/16/2004
14/16/04] Please clearly show on all plans (except the landscape plan) that the same ROW is being dedicated.
Measurements from section line should be provide, Currently, the ROW dedications do not match on all the plan sets.
Number: 100 Created: 4/16/2004
14/16/04] This comment was previously included on redlines, but not in written comments, and was not addressed.
The sidewalk along Lincoln should be transitioned to be detached at the property's eastern property line. See redlines
for clarification.
Number: 101 Created:4/16/2004 . ,.,__.
[4/16/04] Please show the emergency access easement on the overall utility plan and the site plan..,The easement _
should exclude landscaped areas and curb.
Topic: Grading Plan
Number: 93 Created: 1/27/2004
14/16/041 Please provide additional detail forthis inlet to address erosion control concerns. The gutter should be
constructed In front of the inlet, plus five foot transitions on both sides of the inlet (east and west), aad4ae
areas between LOA and the sidewalks on Lincoln and Lemay should be seeded.
[1127/04] The section of unpaved area along Lincoln between the EOA and the sidewalk contains a low point, and it
appears that a Type P inlet is proposed to drain this low pointIn the Intennn. this inlet should bechanged-to-arrarea+nlet
,V0 nteom grading shown to drain to t
Sly /l OIIIPL' Date
CHECK HERE IF ) OC LAVISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site Drainage Report Other
UtiH0 _ Redline I7tilit.N Landscape
Pac I
Topic: Plat
Number: 54 Created: 10/2012003
14/16/041 You are correct in that the existing ROW is not within your legaIdes cription boundary, but you still need to label how
the existing ROW for Lincoln and Lemay (outside of your boundary) was originally dedicated.
1/27/04] This applies to all portions of Lemay and Lincoln ROW dedicated along the property's frontage, notjust the triangle at
the corner. How were the rest of Lemay and Lincoln dedicated?
[10/20/031 Please show how the ROW for Lemay and Lincoln was dedicated (book and page, reception number, etc).
Number: 55 Created: 10/20/2003
(4/16/04] The-ROW-tlezdrtatlorron the plat still does..notappear to match the other -plans. Please read the comments
below and address them.
/[1/27/04] The ROW dedication shown on the plat does not match the other plans. As shown on the utility plans, the
new ROW dedication should be measured from the section line as opposed to the center line of Lincoln, since
Lincoln Avenue is slated on tfie City _master sTFeeT_p-Ta�67o ve_e'rrno`rtFi ihstead'ofsov ea s east of this
[10120/031 Please clearly identify and dimension the existing ROW and the proposed ROW for both Lincoln and Lemay.
Topic: Street design
Number: 10 Created: 6/2/2003
(4116104] Several, but not all, of the spot elevations required as depicted on Drawing 7-32B were provided for the northeast
quadrant of the Lincoln-Lemay intersection. Please add the missing elevations so that it can be seen whether the design for
the intersection in its ultimate condition will work.
11/27/04] Again, please provide additional information regarding the northeast portion of the intersection of Lincoln and Lemay
in the form of spot elevations and additional cross -sections. More information is needed to determine whether the area will
drain properly, especially now that it is shown that the towline along Lemay is to be raised in elevation.
(10123/031 This design shown needs to connect to the existing design for Lincoln. Please provide station equations and
ensure that the designs work together. Also, please provide additional information regarding the northeast portion of the
intersection of Lincoln and Lemay in the form of spot elevations and additional cross -sections. More information is needed to
determine whether the area will drain properly.
Original comment:
Please provide the full design (detailed, not preliminary) of Lincoln along the property's frontage, including the full
lengths of the turn lanes that stretch east of the property. Beyond this, to the east, please show the horizontal
alignment as a possible future alignment of Lincoln, to be designed by others, and remove the vertical design as well.
Number: 102 Created: 4/16/2004
[4/16/04] Please provide additional data on Lincoln as discussed in this morning's meeting (4.16.04). See redlines.
`Number: 103 Created: 4/16/2004
4/16/04 As discussed in this morning's meeting, revisions need to be made to the previously approved CLC plans for
[ ] 9' 9. P Y PP
�.�Lemay to correct problems with the Lemay centerline profile. (Sheet CS 11.12, last revised 6.6.01)
Topic: Utility Plan
Number: 12 Created. 6/2/2003
[4116/041 Please revise the area of mill and inlay as discussed in the meeting this morning (4.16.04) with Rick Richter. The
edge of the mill and inlay should occur at the middle of the through lane rather than the edge of the turn lane.
[1/27/041 While the cut shown west of the proposed median on Lemay is made on a lane line, the end of the cut needs to be
- squared off and not pointy, which means that the cut should be made at the center of a through lane as opposed to the lane
line for the right turn lane. /
ci - [10/23/03] Any cuts/edges of milliinlays need to be made at the edge of a lane line or the middle of a vehicle travel lane. They
—n are not allowed in the middle of bicycle lanes-
r`. Original comment:
Please show the approximate limits of sreet: cuts and add the note: Limits of street cut are approximate. Final limits
are to be determined in the field by the City (Engineering Inspector. All repairs are to be in accordance with City street
repair standards. V
Number: 13 Created: 6/2/2003
[4116/04] Legal descriptlogs were received and were checked- Please provide deeds of dedication using standard City
language for the utility easement on the east property line and the gradingand access easement to the east. The
grading and access easement should also be a drainage and emergeitcy access easement because of the flows off
of Lincoln and because emergency vehicles will need way out to Lincoln. Forthis easement, please show where
existing P,OW `er Lincoln is located, and stop the easement at the ROW. Please provide a copy of the completed
grading easement to the City for our files. This easement does net need to be dedicated to the City.
Pase 2
[1/27/04] [10/23/03] Repeated for your information.
Original Comment:
It appears that offsite grading and utility easements will be needed. Letters of intent for these easements from the
affected property owner(s) will be required prior to hearing. For easements to be dedicated to the City (utility
easements), the completed legal descriptions and dedication: paperwork must be submitted to the City prior to mylar
approval. For private easements (grading easement with neighbor) a copy of the completed easement will need to be
submitted to the city prior to mylar approval.
Page
Project Comments Sheet
City of Fort CollinsSelected Departments
��i"
Department: Water Wastewater
Date: April 21, 2004
Project:
BANK OF COLORADO PDP - TYPE I (LUC) AND FINAL COMPLIANCE
(LINCOLNI EAST #40-94)
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
April 21, 2004
Note - Please identify your redlines for future reference
Issue Contact: ,Jeff Hill
Topic: Plat
Number: 73 Created: 10/22/2003
[4/20/041
[ 1 /28/041
[10/22/03] As previously indicated, provide a copy of the utility easement for the
proposed sanitary sewer service across the adjacent property.
Issue Contact: Roger Buffington
Topic: Utility Plan
Number: 106 Created: 4/21 /2004
[4/21/04] Include a note to pothole existing 12-inch ELCO water main at the 8-inch
water main crossing and to provide pothole info to city Utilities and design
engineer for evaluation prior to construction.
Issue Contact: ,Jeff Hill
Si;aal ure Date
CHECK IIERE IF YOU SNFSII TO RECEIVE COPIES OF REVISION'S
Plat Site Drainage Report Other
Utility Redline Utility landscape
Page 1
Topic: Utility Plan
Number: 74 Created: 10/22/2003
[4/20/04]
[1 /28/04]
[10/22/03] Provide all appropriate details on the detail sheet (ie meter pit, water line
lowering, CP isolation, etc.). Remove any and all reference to Rodding on the city
water line lowering detail
See site, landscape and utility plans for other comments.
Page 2
ZI I Project Comments Sheet
in) Selected Departments
C ilv of Fort Col lin'
Department: Slormwater Utility
Date: April 23, 2004
Project:
BANK OF COLORADO PDP - TYPE I (LUC) AND FINAL COMPLIANCE
(LINCOLN EAST #40-94)
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
April 21, 2004
Note - Please identify your redlines for future reference
Issue Contact: Basil Harridan
Topic: Easements
Number: 109 Created: 4/23/2004
(4/23/041 Please provide any offsite grading and drainage easements, in particular, for the area of the temporary drive
and the areas to the north and east of the site where the grading extends beyond the property limits.
Topic: Erosion Control
Number: 35 Created: 6/10/2003
[4123/041
Nearest existing power is at the N. side of Lincoln Ave., approximately 120 ft. east of this site. Developer will be
required to provide an off -site easement from this point to the corner of the bank site along the north side of Lincoln.
Contact Light & Power Engineering (224-6152) for assistance.
Topic: Floodplain Comments
Number: 61 Created: 10/21/2003
[4/231041
Floodplain comments were partially addressed. Items still needed:
1. document in the written part of the report that the site is entirely in the FEMA 500-year floodplain.
2. Show limits of the floodplain on the plat.
3. please submit separately the final signed floodplain use permit with the $ 25 fee to the floodplain administrator.
[1/30/041
Bank of Colorado
Floodplain Comments
1-28-04
Please show the FEIv]A4oQdplain boundary on the plat. — REPEAT comment
Signature
2,3 o46
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site _11,::!��rainage Report Other_
_J,-*fJtility _�dline Utility �andscape
Page 1
2. See notes on Floodplain Use Permits in drainage report for needed info. Submit final, signed floodplain use
permit along with the $25 permit fee for each permit.
3. Drainage Report — Please document that the entire property is in the FEMA 500-year floodplain.
4. Drainage Report — please list the Larimer County FIRM on which the property is located (080101 0179 E)
5. Drainage Report — Please list Chapter 10 of City Code in the compliance section.
Topic: Landscape Plan
Number: 85 Created: 1 /20/2004
[4/23/041
Please note that I did not receive a landscaping plan with this round of submittal to see whether this comment has been
addressed.
[1 /20/041
The north detention pond looks rather bare. Please provide some landscaping within that pond.
Topic: Pond Retaining Wall
Number: 110 Created: 4/23/2004
[4/23/041 Please provide a detail for the proposed retaining wall on the south pond.
Topic: Seeding
Number: 108 Created: 4/23/2004
[4/23/04] Please provide some seeding for the areas between the edge of the asphalt to the edge of the sidewalk on
the Lincoln and Lemay frontage.
Topic: Utility Plan
Number: 104 Created: 4/20/2004
[4/20/041 Although the extension of the pipe across Lemay is no longer required at this time, please extend the profile
for the existing 18" twin RCP's to show how they tie into the ditch on the West side of Lemay.
Please specify what type of PVC will be used for the outlet pipe from the pond into the storm sewer on Lincoln
Number: 107 Created: 4/23/2004
[4/23/041 Please provide a temporary gutter in front of the proposed Type R inlet at Lincoln. The gutter length should
be a minimum of 5 feet on either side of the inlet.
Page 2
Development Review Engineering
April 21, 2004
Ms. Patricia Kroetch, PE
North Star Design Inc.
700 Automation Drive, Unit 1
Windsor, CO 80550
Re: The variance request for separation distance between a driveway and a street intersection
Dear Ms. Kroetch,
This letter is in response to your request for a variance to the Larimer County Urban Area Street
Standards. The variance requested was a reduction of separation distance between the driveway on
Lemay and the Lemay and Lincoln intersection from the standard 460 feet to 325 feet. This variance has
been approved by the City Engineer only for this project.
As with all variances to the street standards, the variance granted forthis project is based on the particular
situation under design and the judgment that we (the designer and the City) apply to determine whether
there is a public safety concern. The variance for this project in no way sets any precedence for relaxing
these standards on other projects without complete analysis and justification.
Should you have any further questions or concerns, please do not hesitate to contact this office.
Sincerely,
Katie Moore
Project Engineer
City of Fort Collins
cc: file
Ted Shepard
'�� �'c-r�.Co _ i:J.Bcx F0 • Fo t" s ,CG ;_5a2 Q 80 • i3701 -21 6-0, r FAV(97)1-i78
'rA'WW.ICb0`L!Sa
e! CProject Comments Sheet
� Selected Departments
City of Fort Collins
Department: Stormwater Utility
Date: June 10, 2003
Project: BANK OF COLORADO PDP -TYPE I (LUC) #16-03
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
June 04, 2003
Note - Please identify your redlines for future reference
Issue Contact: Basil Harridan
Topic: Details
Number: 42 Created: 6/10/2003
Please provide a detail for the manually operated headgate at the retention pond outlet into the ditch.
Topic: Drainage Report
Number: 41 Created: 6/10/2003
Please call out the 2 year flows in the drainage report rational method calculations as Q2, not Q10 as currently shown.
Explain in the text of the report and provide a schematic of what pipe scenario corresponds to which to which storm
sewer.
Please specify how the pipe crossing of Lemay Avenue was designed. Provide 100 year master plan flows in the
Lincoln channel upstream of Lemay. If the proposed improvements are the ultimate improvements for Lemay Avenue
then pipe should be designed to carry 100 year master plan flows with no overtopping allowed since Lemay Avenue is
an arterial street.
Topic: Erosion Control
Number: 35 Created: 6/10/2003
June 3, 2003
The plan doesn't show the BMPs, it would probably help if they were there I?I?
Topic: Grading Plan
Number: 38 Created: 6/10/2003
There seems to be grading to the north and east of the property line. Any such grading would require an off -site
grading easement from the property owner.
Why is the pavement thickness on thing plan ?? Please remove
Please
Signature
6fjo 3
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ / 4Site (/brainage Report Other_
F-l'Utility _ L-1kedline Utility __L,,��andscape
Page 1
Project Comments Sheet
Selected Departments
C itt ul Furl Cailinr
Department: Stormwater Utility
Date: duly 30, 2004
Project:
BANK OF COLORADO PDP - TYPE I (LUC) AND FINAL COMPLIANCE
(LINCOLN EAST #40-94)
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
July 28, 2004
(Vote - Please identify your redlines for future reference
Issue Contact: Basil Harridan
Topic: Details
Number: 116 Created: 7/30/2004
[7/30/041
Please provide a detail for the Type 13 inlet proposed at inlet 6-1.
Will the construction of this inlet fit within this property without needing any easement from
the property to the east ?
Topic: Erosion Control
Number: 115
[7/30/04]
Fifth Review
July 26, 2004
Created: 7/30/2004
1. Please delete all of the notes on your plan sheet #2 under "Grading and Erosion
Control Notes'.
2. What BMP's are to be used to protect against sediment transport during construction
of the 36" storm line in Lincoln Ave?
3. The plan sheet 6 has a note indicating that "40.0 foot install sod from asphalt to
sidewalk for erosion protection." What does this mean? How is the area to be protected
from erosion prior to the sidewalk and asphalt installation? Is it just in the small area inside
the lines where the_nnoot_e is? Etc.
213���a
Signa0 a Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat L�'Site L--15rainage Report Other_
✓Utility L�Redline Utility �dscape
Page 1
4. Please put a project schedule on plan sheet 6 or 7 indicating when various BMP's
are to be installed in relation to various construction events (e.g. grading, concrete
installation, etc.). 'Use Month 1, 2, 3, not specific months (April, May, etc.) for the timeline.
5. Where does the straw mulch indicated in your calculations go?
6. The surety calculation is incorrect, reseeding cost is now $775 per acre for less than
5 acres, $725 per acre for over 5 acres. Also, your plan shows bale outlet protection on the
ponds which aren't included in the calc's.
Topic: Floodplain Comments
Number: 61 Created: 10/21 /2003
[7/30/04]
2. Show limits of the floodplain on the plat.
3. please submit separately the final signed floodplain use permit with the $ 25 fee to the
floodplain administrator.
Topic: Landscape Plan
Number: 85
[7/30/04]
Created: 1 /20/2004
The north detention pond looks rather bare. Please provide some landscaping within that
pond.
Additionally, the pond bottom slope is very flat, it is recommended that the pond seed mix
be chosen appropriately to accommodate wet conditions.
Topic: Pond Retaining Wall
Number: 110 Created: 4/23/2004
[7/30/04]
[4/23/04] Please provide a detail for the proposed retaining wall on the south pond.
Topic: Seeding
Number: 108 Created: 4/23/2004
[7/30/04] Please provide native seeding rather than sod for the area in front of the inlet on
Lincoln. May need to be temporarily irrigated until establishment.
[4/23/041 Please provide some seeding for the areas between the edge of the asphalt to the
edge of the sidewalk on the Lincoln and Lemay frontage.
Page 2
City of Fort Collins
Project Comments Sheet
Selected Departments
Department: Water Wastewater
Date: July 27, 2004
Project:
BANK OF COLORADO PDP - TYPE I (LUC) AND FINAL COMPLIANCE
(LINCOLN EAST #40-94)
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
July 28, 2004
Mote - Please identify your redlines for future reference
Issue Contact: Roger Buffington
Topic: Utility Plan
Number: 106 Created: 4/21/2004
[7/27/04] Repeat comment.
[4/21/04] Include a note to pothole existing 12-inch ELCO water main at the 8-inch water
main crossing and to provide pothole info to city Utilities and design engineer for evaluation
prior to construction.
Number: 114 Created: 7/27/2004
[7/27/04] Modify grading to provide flat area for fire hydrant and meter pit at west end of
detention pond.
Issue Contact: Jeff Hill
Topic: Utility Plan
Number: 74 Created: 10/22/2003
[7/27/04] Still need! details for traffic rated sewer service clean -out and cathodic protection
isolation.
[4/20/04]
[1 /28/04]
[10/22/03] Provide all appropriate details on the detail sheet (ie meter pit, water line
lowering, CP isolation, etc.). Remove any and all reference to Rodding on the city water line
lowering detail
See site, landscape and utility plans for other comments.
Signature
�
Daie I
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site Drainage Report Other
Utility _ Redline Utility Landscape
Page 1
(M"631
City of Fort Collins
Current Planning
FINAL PLAN REVISIONS
DATE: July 9, 2004
COMMENT SHEET
TO: Technical Services
PROJECT: ##16-03 Bank of Colorado PDP —Final Plan
Revisions
RED .D
All comments must be received by Ted Shepard no later than the staff
review meeting:
July 28, 2004
Note - Please identify your redlines for future reference
z�
-&C /-171)IC, 7C-[0
R'C>yrC"
I
l� � T
FiL
(L441)ZIFIC=4IIC'j)
o_�<
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
uPlat Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
4:�
Project Comments Sheet
CAN, ofFort Collins Selected Departments
0000�_
Department: Engineering
Date: July 28, 2004
Project:
BANK OF COLORADO PDP - TYPE I (LUC) AND FINAL COMPLIANCE
(LINCOLN EAST #40-94)
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
July 28, 2004
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore
Topic: General
Number: 33 Created: 6/6/2003
[7/27/04] [4/16/04] [1/27/04] [10/21/03] Repeat fyi.
Original comment:
Please see redlines for any additional comments.
Number: 99 Created: 4/16/2004
[7/27/04] Repeat: the site plan and utility plans should clearly label the new ROW and
should provide a dirnension for the ROW being dedicated, including a measurement from
the Section line.
[4/16/041 Please clearly show on all plans (except the landscape plan) that the same ROW
is being dedicated. Measurements from section line should be provided. Currently, the
ROW dedications do not match on all the plan sets.
Number: 100 Created: 4/16/2004
[7/27/04] Repeat:
[4/16/04) This comment was previously included on redlines, but not in written comments,
and was not addressed: The sidewalk along Lincoln should be transitioned to be detached
at the property's eastern property line. See redlines for clarification.
Number: 101 Created: 4/16/2004
[7/27/04] The emergency access easement is now being shown, but it still includes curb,
gutter, and landscaped areas. Please revise the emergency access easement to include
only the applicable drive aisles.
[4/16/04] Please show the emergency access easement on the overall utility plan and the
site Ian. The easement should exclude landscaped areas and curb.
% u.. b
Stgnatare Date
VI -CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site Drainage Report Other
Utility _ Redline Utility / Landscape
Page 1
Topic: Grading Plan
Number: 93 Created: 1/27/2004
[7/27/04] A detail for the inlet is still needed for its interim condition. Please show how the
5' curb and gutter transitions will work.
[4/16/041 Please provide additional detail for this inlet to address erosion control concerns.
The gutter should be constructed in front of the inlet, plus five foot transitions on both sides
of the inlet (east and west), and the areas between EOA and the sidewalks on Lincoln and
Lemay should be Needed.
[1/27/04] The section of unpaved area along Lincoln between the EOA and the sidewalk
contains a low point, and it appears that a Type R inlet is proposed to drain this low point. In
the interim, this inlet should be changed to an area inlet with interim grading shown to drain
to it.
Topic: Plat
Number: 54 Created: 10/20/2003
(7/27/04] Repeat:
[4/16/04] You are correct in that the existing ROW is not within your legal description
boundary, but you :still need to label how the existing ROW for Lincoln and Lemay (outside
of your boundary) was originally dedicated.
[1/27/04] This applies to all portions of Lemay and Lincoln ROW dedicated along the
property's frontage, not just the triangle at the corner. How were the rest of Lemay and
Lincoln dedicated?
(10/20/03] Please :show how the ROW for Lemay and Lincoln was dedicated (book and
page, reception number, etc).
Number: 55 Created: 10/20/2003
[7/27/041 Too little ROW is proposed to be dedicated on Lincoln. This round shows a
significantly smaller amount than all previous rounds of review. The Land Use Code
(3.6.1.13) requires compliance with the City's Master Street Plan, which shows Lincoln as a 4
lane arterial (minimum 115' ROW, excluding right turn lanes or special conditions) for Bank
of Colorado's frontage and further east. The MSP also shows that Lincoln will shift from a
south -curving road to a north curving road in this vicinity. To accommodate this, as required
by the LUC, the Bank of Colorado needs to dedicate ROW for the future alignment of
Lincoln. Assuming that the Section Line to the south of the development will be the future
centerline of Lincoln (since it is pretty much the centerline of Lincoln as it crosses Lemay),
and taking into account the variance for the street cross-section previously approved (a 7'
attached walk, which is one foot wider than the standard walk, and a 12' right turn lane
attached to that walk, which is 2' wider than the standard parkway), this project needs to
dedicate the standard ROW (575, or half of 116), plus 3' for the abovementioned items,
making a total of 60.5' of ROW dedicated from the section line. It appears that previous
rounds of review showed the correct ROW to be dedicated along Lincoln (see previous
utility, site and landscape plans). Please revise and resubmit.
Variances were granted for this project based on the ROW shown on previous utility and site
and landscape plan sets. These variances may need to be revisited if less ROW is now
proposed.
[4/16/041 The ROWdedication on the plat still does not appear to match the other plans.
Please read the comments below and address them.
[1/27/04] The ROWdedication shown on the plat does not match the other plans. As
shown on the utility plans, the new ROW dedication should be measured from the section
Page 2
line as opposed to the center line of Lincoln, since Lincoln Avenue is slated on the City's
master street plan to veer north instead of south as it heads east of this property.
[10/20/031 Please clearly identify and dimension the existing ROW and the proposed ROW
for both Lincoln and Lemay.
Topic: Street design
Number: 10 Created: 6/2/2003
[7/27/04] Repeat.
[4/16/04] Several, but not all, of the spot elevations required as depicted on Drawing 7-32B
were provided for the northeast quadrant of the Lincoln-Lemay intersection. Please add the
missing elevations so that it can be seen whether the design for the intersection in its
ultimate condition will work.
11/27/04] Again, please provide additional information regarding the northeast portion of the
intersection of Lincoln and Lemay in the form of spot elevations and additional cross -
sections. More information is needed to determine whether the area will drain properly,
especially now that it is shown that the flowline along Lemay is to be raised in elevation.
[10/23/03] This design shown needs to connect to the existing design for Lincoln. Please
provide station equations and ensure that the designs work together. Also, please provide
additional information regarding the northeast portion of the intersection of Lincoln and
Lemay in the form of spot elevations and additional cross -sections. More information is
needed to determine whether the area will drain properly.
Original comment:
Please provide the full design (detailed, not preliminary) of Lincoln along the property's
frontage, including the full lengths of the turn lanes that stretch east of the property. Beyond
this, to the east, please show the horizontal alignment as a possible future alignment of
Lincoln, to be designed by others, and remove the vertical design as well.
Number: 102
Created: 4/16/2004
[7/27/04] This data was not provided.
[4/16/04] Please provide additional data on Lincoln as discussed in this morning's meeting
(4.16.04). See redlines.
Number: 103 Created: 4/16/2004
[7/27/04] The revision sheet provided doesn't quite match the flowline data shown on sheet
11. Please revise,.
[4/16/04] As discussed in this morning's meeting, revisions need to be made to the
previously approved CLC plans for Lemay to correct problems with the Lemay centerline
profile. (Sheet CS 11.12, last revised 6.6.01)
Number: 111 Created: 7/27/2004
[7/27/04] Please show proposed limits of street cut/mill/overlay for addition of median on
Lincoln. Please submit a variance request for the separation of the driveway on Lincoln to
the Lincoln/Lemay intersection. The previously approved variance only addressed the
driveway on Lemay.
Number: 112 Created: 7/27/2004
[7/27/04] Please re -include the ultimate cross -sections for Lincoln.
Number: 113 Created: 7/27/2004
[7/27/04] Sheet 11 a- the new centerline design should tie into the existing centerline design
- the elevation at sta 47+50.92 should match the previously approved plans (4942.22).
Page 3
CJD 41oq I Irl-Ck-
F
m
a
E
w O
r U
aD i
n N
ce) (1)
a�
zw
K
wc�, ubrn�tt d LI(ACOln dvwy
(005 ROW lzova L (VrCvin
° D �r Ira6C^r' *ram-s� vk-@inLQ*
�uf ir-fcn cc,$rn <� tebvs on 11,12-
a
a
w�
W
9
a
.HCcess rt5 re . Vari4Y1c, .SJ .
not 5how,Aq �i�e access Xlr_9 oLway 1p, �iur-c,
(0" 41nco1.l ) ) bt.t- -fwiu 2 Y1ro
�p ✓LiSt
�xhbt� �r ROW/txhl esrx�la ml 61), -
Z _J41 @ Lema. y — IIISP shows
ja fr ro-b yo vid" iYl?d Q,y5 in h iri wCam.
LirlUCoIf/ rrti+� ec�l�n &q1l a / IF-q"Zxkkzs,o-;r?
• Shw Id ® Llncv/n a(c4ss
nlvAa n ` ?V-14 s'
,fie rlro rr� Yaeu)?
UM1�r
Moat cur-(� lncft
� lcrco(n
rt��SS-'� C�oe.S ccwcc� �r.'F�.re.—�ol�� access -}a eGCS�
%S$, /lpf �i So fzr� fo E prl LJnCO/n
Ripley .ss��I,,,F.s l��
L A-h,1 cl ira Urban Daslgn Planning
8/13/04
Ted Shepard
Fort Collins Planning Department
281 North College Avenue,
Fort Collins, CO , 80524
CC: Katie Moore — Engineering
Basil Hamden — Stormwater Utility
Bank of Colorado PDP — Type 1 and Final Compliance
Response to staff comments (dated 08/02/04)
VF Ripley Associates
ISSUES:
Department: Engineering
Topic: General
Number 99: New ROW dimensions are shown on the Site Plan.
Number 93: A native seed mix is shown and specified.
Department: Stormwater Utility
Topic : Details
Number 85: Landscape Plan.
Two canopy trees have been added to the north detention area to
provide additional landscape.
Pond seed mix. Kentucky Blue Grass would be a reliable grass type for this
location. We also sent Bob Zakley a plan and he also confirmed that this
grass type would be suitable.
Number 108: Seeding.
A note has been added to the drawings and a native seed mix specified.
PI inn- 1)70 2?d1,8BH Rix 970.221 166?
-101 W.:>1 Mou.. -r, A- our c 201
1 , t Cronin; CO 811521
vh mlcy cum
Topic: Landscape Plan
Number: 43 Created: 6/1012003
There seems to be a conflict between one of the proposed shade tree along Lemay Avenue and the proposed storm
sewer. Please rectify.
Topic: Plat
Number: 34 Created: 6/10/2003
Is this property being replatted ?? If yes please provide a copy of the plat as none was received, if not then all
detention areas need to be placed within drainage easements by separate document(s). Please also provide 20 foot
utility easement for all storm lines.
Topic: Pond Operation
Number: 40 Created: 6/10/2003
Please clarify how the manual gate will be operated after a storm. Who will be in charge of opening and closing the
gate, when would that happen in relation to a storm event and what happens if the gate is left closed after a storm or
opened during normal operations, who is responsible for making sure that the system functions adequately.
Topic: Spillway
Number: 39 Created: 6/10/2003
Please provide a spillway and a spillway detail for the detention pond.
Topic: Storm Sewer Profile
Number: 36 Created: 6/10/2003
The storm sewer along Lincoln Avenue has an invert at the manhole that is higher than invert in. Please redesign the
proposed storm line, projecting the storm sewer elevations back through the Lemay Avenue intersection such that there
would be a positive slope at the manhole and throughout the pipe profile.
Please call out the 100 year HGL on the pipe profiles
Topic: Utility Conflicts
Number: 37 Created: 6/10/2003
The proposed storm sewer crossing of Lemay Avenue may have some major utility conflicts. Please show and call out
on the pipe profiles the existing City of Fort Collins, ELCO and North Weld Irrigation District lines. Please provide a
minimum of 18 " of clearance from these lines.
Show the electric duct bank crossing of the proposed storm line at Lemay Avenue.
Will there be a conflict between the proposed storm line on the north side of Lincoln and any proposed duct banks as
the storm sewer alignment seems to coincide with the area that Electric utilities are usually located.
There seems to be a utility conflict at the crossing of the 8" water line and the existing storm sewer. Please pothole to
check existing elevations.