Current Planning
DATE: December 28, 1998 TO: Engineering
PROJECT: #37-9813 Larimer County Courthouse - Final
Compliance (LUC)
All comments must be received by Ted Shepard noi ttr-Lh�n the staff
review meeting:
January 13, 1999
Date:
it
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_ Plat _ site _ Drainage Rgod _ Ofber
Utility _ Redline Utility _ Landscape
REVISION
Rr
COMMENT SHEET
DATE: October 12, 1998 DEPT: Engineering
PROJECT: 937-98A Larimer County Courthouse-PDP-
(LUC) Type I1
PLANNER: Ted Shepard
ENGINEER: Mark McCallum
All comments must be received no later than the staff review meeting:
General Comments:
❑O See redline comments throughout the utility, site, and landscape plans. More
specific comments will be mentioned below.
❑O Improvements or variations to the signing and stripping plan should be shown in the
utility plan set (i.e. The left turn lane on Mason Street).
Utility Plan Comment:
Plat; Street I of 1:
X Why arc the easements being dedicated as utility easements? Where the easements
arc dedicated it appears they could be classified as pedestrian and/or drainage
easements.
Horizontal Control and Street Modification Plan; Sheet C3 of 8:
• Show the centerline on Mountain Avenue.
❑O The street overlay limits for the sanitary sewer extension will be determined in the
field by the City Inspector. Include a note similar to the general note #5 on the
Cover Sheet. All street cuts and replacement should not be within the vehicle flow
line.
❑ Revise the access ramps at the corner of Laporte Avenue and Mason Street per our
discussions and faxes. The sidewalk or pedestrian pathway should align with the
access ramps.
• Note: In regard to the ADA access ramp requirements. I will respond to your
question after I review more information.
• Include a note about how the curb and gutter will be modified to remain consistent
when Laporte Avenue is lowered.
• An access ramp should be included at the corner of Laporte Avenue and Howes
Street.
Utility Plan; Sheet C4 of 8:
• Show the slope, length of pipe, size of pipe, and top -of -pipe elevations for the
sanitary sewer extension.
❑p If details are going to be included for the stormwater system include all pertinent
details (i.e. landscape piping).
Grading and Erosion Control Plan; Sheet C7 oft
N Show top -of -wall elevations where redlined comments indicate sight distance
conflicts.
Detail Sheet; Sheet C8 of 8:
❑O Include a modified, one-way version of the access ramp detail.
❑O Include the signature block.
9 Include the metal sidewalk chase detail.
❑ Include sidewalk repair detail.
• Include enhanced crosswalk detail.
Site and Landscape Plan:
O See redline comments.
N Show enhanced crosswalks.
Date: / S Signature:1 �
Please send copies of marked revisions ✓I''lat ✓Site
po tility ndscape
City of Fart Collins
City of Fort Collins
Park Planning
ber 15,
PROJECT
COMMENT SHEET
Building Permit Review
PROJECT: Justice Center Park
L vk�
This project involves developing the adjacent area south and west of the County Justice Center
into a new urban neighborhood park. Please refer to the attached description for further details
on the park. Although the description notes an amphitheater concept, it is not intended to be
programmed or maintained as an amphitheater by the City. Further, if the site is ever used for
this purpose it will be by permit only. The park is intended to provide for informal rallies and
free speeches as the current courthouse steps allow for. Please refer to the Courthouse
ODP/PDP submittal for Stormwater Analysis and tree mitigation plan.
PLANNER: Janet Meisel Burns
All comments must be received by: Thursday, November 5, 1998
UEconvnoors aU sI/U
Date:� Signature:
CIIECK HERE IF YOU Ull TO RECEIVE COPIES OF REVISIONS
_ Plat ✓Site e Report _ Mer —
Ut k _ Redline Utility dsa*
City of Fort Collins
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: 26, August 1998 DEPT: Engineering
PROJECT: 437-98A Larimer County Courthouse (LUC) Type II PDP
PLANNER: Ted Shepard
ENGINEER: Mark McCallum
All comments must be received by: 09/09/98
No Problems
Problems or Concerns (see below or attached)
General Comments:
1. See redlined comments on all sheets of the utility plans. More specific comments and
concerns will be mentioned below.
Utility Plan Comments:
Cover Sheet; Sheet 1 of 7:
2. See redlined General Notes.
3. There is a new vertical control listing for the City of Fort Collins which does not include
fire hydrant benchmark descriptors as being accurate. Therefore, the benchmark
descriptors for this project should come from the new vertical control listing. The
following are locations from the new listing that might be helpful:
(a.) (E-136) The southwest corner of College Avenue and Oak Street.
(b.) (28-97) The northeast corner of Mulberry Street and Whedbee Street on a traffic
signal base.
It has been discussed to allow a fire hydrant benchmark descriptor if it is referenced for
the new vertical control list.
Plat; Sheet 1 of 1:
4. A pedestrian easement should be dedicated for the pedestrian access throughout the site.
See redlined comments.
Horizontal Control and Street Modification Plan; Sheet 3 of 7:
5. The traffic impact study did not define the daily volumes of traffic for the site in respect to
the secured access, the Sally Port, and the service access. Therefore, it is hard to determine
the viability of the access points. Here are the concerns:
(a.) The alignment of the secured access on Laporte Avenue is a question. The skewed
alignment does not lend itself to a be a pedestrian friendly access and provides poor
turning movements if it is to be a full turning movement intersection. Also if it is a
full turning movement intersection with a significant daily traffic volumes than the
access should align with access to the north on Laporte Avenue.
(b.) What volumes of traffic will the service access and Sally Port access produce? If
they are significant volumes of traffic than the distant between accesses is a
question.
(c.) What type of vehicles and how will these vehicles maneuver the service access?
6. It is difficult to deceiver how the construction is being phased. All construction proposed
outside Parcel "C" should be clearly labeled as being built with this project.
7. See redlined comments. The redlined comments reference the following, but comments are
not limited to:
(a.) The pedestrian access ramps along Laporte Avenue should be designed consistent
with the downtown area. Detail 12.7 of the City Design Manual would be more
consistent.
(b.) What is happening at and near the back entrance? What are the pedestrian
connections? Where and how does the site transition for a hardscape plaza to open
space? What are the vehicular movements?
Utility Plan; Sheet 4 of 7:
8. Show all existing and proposed sanitary sewer lines including but not limited to the
following: type of pipes, slopes, and lengths of segments. Also, show the points where the
encasement will be used.
9. The four inch service for the parking level ejector pump should not discharge to the sanitary
sewer unless it is worked out with the Water Utility.
P.D.P. Plan Site and Landscape Plan Comments:
10. See redlined comments and comment 9(b).
11. Is the future pedestrian walk going to be built with this project?
U/L 2 x
�o tZfi��.SP/if �f.Sl ///i�0/OGY�l7�/ifS. J
Date: VPy Signature:�5��� PLEASE SEND COPIES OF MARKED REVISIONS: PLAT
[� SITE
UTILITY
[� LANDSCAPE
REVISION
COMMENT SHEET
DATE: August 12, 1998 TO: Mapping & Drafting
PROJECT: #37-98A Larimer County Courthouse - PDP -
Type II
All comments must be received by Ted Shepard no later than the staff
review meeting:
Wednesday, September 9,1998
Date: Signature:,
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site _ Drainage Repod _ Other
Utility _ Redline Utility _ Unds*