HomeMy WebLinkAboutWHITMAN STORAGE FACILITY - Filed CS-COMMENT SHEETS - 2010-04-16Department: Engineering
Date: June 23, 2008
Project: WHITMAN STORAGE FACILITY PDP - TYPE I
All comments must be received by Steve Olt in Current Planning, no later than the
staff review meeting:
May 21, 2008
Note - Please identify your redlines for future reference
Issue Contact: Randy Maizland
Topic: Engineering
Number: 14 Created: 5/16/2008
[5/16/08] The Utility Plans and Site Plan do not comply with LCUASS Appendix E
scanability requirements. There are many line over text conflicts throught the plans. Please
fix all lin over text conflicts and mask out text where it cannot be moved to resolve the
conflict. See redlines for clarification.
Number: 15 Created: 5/16/2008
[5/16/08] Please add the owner information to the cover sheet next to the consultants.
Number: 16 Created: 5/16/2008
[5/16/081 Please add any variances to Note 48 such as interim attached sidewalk on the
cover sheet.
Number: 17 Created: 5/16/2008
[5/16/08] LCUASS requires that two City benchmarks be provided on the plans. Only one
was provided.
Number: 18 Created: 5/16/2008
[5/16/08] Plat - Please revise the Vicinity Map to meet scanability requirements. A one -line
street map showing mojor streets with names and the site location would be ideal.
Number: 19 Created: 5/16/2008
[5/16/08] Plat - The Plat shows an additional 3 feet of new ROW being dedicated on
Skyway Drive. It is not clear how this dedication was determined. Please show the existing
centerline of Skyway on the utility Plan sheet and provide a dimension from the centerline to
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility Redline Utility Landscape
Page 1
the new ROW limits so that it is clear why 3 feet of additional ROW is needed to meet the
minor collector standard road section.
Number: 20 Created: 5/16/2008
[5/16/081 Grading Plan - Please clearly show and dimension the new ROW limits on the
Grading Plan. Dimension the proposed sidewalk.
Number: 21 Created: 5/16/2008
[5/16/08] Please clearly show and label the location of the existing chain link fence along
Skyway. If the fence is permitted by the Planning Department to remain in it's current
location, it will be encroaching into the City ROW. This encroachment will be permitted by
Engineering as an interim condition only and the fence will need to be relocated out of the
ROW at such time ultimate Skyway road improvements are constructed. Due to the existing
fence location, the ultimate sidewalk cannot be constructed in the final ultimate detached
configuration. Therfore, the City will allow an interim attached walk (at least 6 feet in width)
to be constructed as the interim condition however, a cash escrow must be provided to the
City for the future sidewalk construction. This cash escrow would be due at the time of
building permit. The interim walk may be asphalt or concrete and no Street oversizing
reimbursement is applicable. If you choose to leave the fence where it is and provide an
interim walk, please provide a cost estimate for a 4.5 foot wide concrete walk for review.
The interim condition and escrow payment will be clearly identified in the development
agreement.
Number: 22 Created: 5/16/2008
[5/16/08) Please provide an ADA ramp on the westerly corner and indicate if the sidewalk
will tie into existing walk to the east. If no walk exists to the east then a barricade will need
to be installed.
Number: 23 Created: 5/16/2008
[5/16/08] Please label the easements on the Utility Plan sheet to be consistent with the
dedications on the Plat (i.e. utility, drainage and emergency access etc... ). Show and label
the drainage easement for the pond on the Grading Plan sheet.
Number: 24 Created: 5/16/2008
[5/16/081 Please provide a comment letter from the Fort Collins - Loveland water Distric with
your next submittal. Comments must be received prior to scheduling a hearing. The Distict
will be signing the Utility Plans before the City signs.
Number: 25 Created: 5/16/2008
[5/16/08] All site and ROW LCUASS construction details will need to be provided at Final
Compliance after the hearing has ben completed.
Number: 26 Created: 5/16/2008
[5/16/081 Please see the redlines for any additional minor comments.
Number: 27 Created: 5/16/2008
[5/16/08] Please revise the Site & Landscape Plan to be consistent with the utility Plan
comments. See redlines for clarification. I will defer to Planning for comments related to
planting of trees along Skyway.
Number: 43
Created: 5/20/2008
Page 2
[5/20/08] The Transportation Development Review Fees were not paid with this submittal.
Supervising staff has met with the applicant and it was determined that commercial building
square footage would be calculated for all roofed building areas. The calculated TDRF fee
is for 23100 square feet of commecial building, 3.61 acres of gross property area and a
$2000 base fee for a total of $8,677.50. This fee must be paid to Engineering with the next
plan submittal.
Number: 44 Created: 5/20/2008
[5/20/081 The property owner will be obligated for the design and construction cost for Aran
Street along it's frontage. The City has agreed to delay payment for this obligation for
Phase I of this proposed development. At such time the City determines funding for Aran
Street will be needed for design and construction, the City will require the property
owner/developer to meet the cost obligation with future phased development. Funds for
design and construction of Aran Street may be collected by the City with the future phases
of development as shown on the Site and utility Plans or with any new redevelopment of this
property. This cost obligation and delayed payment for Phase I will be specified in the
development agreement.
Number: 62 Created: 5/21/2008
[5/21/08] It was stated by the Planning Department that a modification for the chain link
fence location would likely not be supported by the City. This may resolve the issue of
sidewalk construction and sidewalk location.
Number: 63 Created: 5/21/2008
[5/21/08] Per the City Land Use Code, this development would be required to underground
existing overhead utilities with Phase I of this development. This was also a comment from
City Light and Power.
Number: 67 Created: 5/22/2008
[5/22/08] Based on a conversation with Mike Detulio of the Fort Collins -Loveland Water
District, the District will not consider the relocation of the 10 inch sewer main running
diagonaly across the east end of the site. It was suggested that the owner may be permitted
to place the proposed buildings over the existing sewer and easement if and only if specific
notes are provided on the Plat and on the construction drawings indicating that the District
will not be liable for any damage or extenuating costs that may be associated with any future
maintenance of the sewer on the property. A formal comment letter addressing this concern
must be provided from the District with your next round of review.
Topic: Technical services
Number: 64 Created: 5/21/2008
[5/21/08] There is an incorrect record distance along the west line. See redlines for
clarification.
Number: 65 Created: 5/21/2008
[5/21/08] Please fix all line over text conflicts.
Number: 66 Created: 5/21/2008
[5/21/08] The Lot numbering on the Site and Landscape Plans does not match the Plat.
Page 3
f�A"Q
STAFF PROJECT REVIEW
City of..Nort Collins
Randy Whitman Date: 6/26/2009
209 E. Skyway Dr.
Fort Collins, CO 80525
Staff has reviewed your submittal for WHITMAN STORAGE FACILITY PDP - TYPE II AND
FINAL PLANS, and we offer the following comments:
ISSUES:
Department: Advance Planning Issue Contact: Pete Wray
Topic: Landscape Plan
Number: 118 Created: 6/11/2009
[6/11/091 Landscape Plan - Turf Area. Planting legend needs to show turf planting
specifications. Parkway turf landscape area on plan is not labeled. Planting notes may need
additional information on turf planting procedures.
Department: Current Planning Issue Contact: Steve Olt
Topic: Exterior Elevations
Number: 120 Created: 6/23/2009
[6/23/091 The additional treatment on the west side of the proposed new building is
considered by staff to satisfy the condition of PDP approval.
Topic: Landscape Plan
Number: 119 Created: 6/23/2009
[6/23/09] On the Landscape Plan, please note the surface treatment (presumably turf
grass) in the parkway along Skyway Drive.
Topic: Plat
Number: 121 Created: 6/23/2009
[6/23/09] The east and south outside boundary (property) lines are lighter than the others.
Is there a reason for this? They should all be the same line weight.
Number: 122 Created: 6/23/2009
[6/23/09] The subdivision plat shows the street to the north, across Skyway Drive, to be
Boyne Street. The Site & Landscape Plans show this same street to be Boyne Court. Which
is correct and please make all the plans consistent.
Topic: Utility Plan
Number: 128 Created: 6/25/2009
[6/25/09] Red -lined plans from Jay East of the South Fort Collins Sanitation District are
being forwarded to the applicant with the staff comment letter.
Department: Current Planning Issue Contact: Dana Leavitt
Topic: Landscape Plan
Number: 127 Created: 6/24/2009
[6/24/09] Provide seed mixture specifications on landscape plan: seed mix, Ibs/acre
(minimum of 30 Ibs/ac) and method of application (drilled, plugs, broadcast).
Department: Engineering Issue Contact: Sheri Langenberger
Topic: Engineering
Number: 15 Created: 5/16/2008
Page 1
[6/9/09] Not yet completed.
[5/16/081 Please add the owner information to the cover sheet next to the consultants.
Number: 23 Created: 5/16/2008
[6/26/09] The easements being dedicated on the plat and the labels on the site and utility
plan do not match. Please make sure these match.
[5/16/081 Please label the easements on the Utility Plan sheet to be consistent with the
dedications on the Plat (i.e. utility, drainage and emergency access etc...). Show and label
the drainage easement for the pond on the Grading Plan sheet.
Number: 26 Created: 5/16/2008
[6/26/09] [5/16/08] Please see the redlines for any additional minor comments.
Number: 104 Created: 9/11/2008
[6/26/09]
[9/11/08] This development is obligated to pay for it's frontage design and construction
costs for future Aran Street. Previously this development was proposed to be done in 3
phases and the City was able to delay the obligation to be paid with phase 3. Now there is
no phasing and the City will need to determine when the funds or escrow should be
collected. Per City Code requirements, the escrow would be due at the time of the first
building permit for this development. I will be meeting with supervisory and planning staff to
further discuss this requirement and I will update you with any new information as I receive
it.
Number: 123 Created: 6/23/2009
What happens to the front fence at the NW corner of the property? Any fence along the
west property line needs to be placed outside of the row.
Number: 124 Created: 6/23/2009
[6/23/09] Please place the construction notes on the plans
Number: 125 Created: 6/23/2009
[6/23/09] The plans sets do not match in regards to what easements are being dedicated.
The plans need to be consistent.
Number: 126 Created: 6/23/2009
[6/23/09] The plans show the front fence line encroaching into the row at the west end of
the property. Please either move the fence back outside of the row being dedicated or
change the amount of row being dedicated so that the fence when placed 2 feet behind the
walk is not in the row.
Number: 133 Created: 6/26/2009
[6/26/09] The district will need to sign the utility plan mylars before they are submitted to the
City (when it is time for mylars0.
Number: 134 Created: 6/26/2009
[6/26/09] A couple of more details need to be provided on the plans. See plans for which
ones.
Department: Light & Power
Topic: Electric Utility
Number: 117
Issue Contact: Doug Martine
Created: 6/1/2009
Page 2
[6/1/09] The builder will be responsible for installation of the electric service from the
building to the electric transformer.
Topic: Utility Plan
Number: 116 Created: 6/1/2009
[6/1/09] The utility plan shows "Electrical Transformer" on the N.W. corner of the building. It
is assumed they really mean "Electric Meter."
Department: Light & Power Issue Contact: Rob Irish
Topic: General
Number: 47 Created: 5/20/2008
[6/1/09] (8/27/08] [5/20/08] Electric capacity fee and building site charges will apply for this
development. Any modification or relocation to existing electric facilities will be at the
owners expense.
Number: 48 Created: 5/20/2008
[6/1/09] [8/27/08] [5/20/08] Coordinate electrical load requirements and transformer
locations with Light & Power. Transformers will need to be within 10' of an all weather drive
over surface.
Number: 49 Created: 5/20/2008
[6/1/09] [8/27/08] [5/20/08] Will need to provide C-1 form and One -line diagram for
proposed development along with billing information.
Department: PFA Issue Contact: Carle Dann
Topic: Fire
Number: 129 Created: 6/25/2009
BUILDING AREA: I just want to ensure we address building size and fire separation for the
proposed 7,200 SF storage building. As I mentioned during Staff Review, our requirement is
that buildings that exceed 5,000 square feet for Type V construction shall be fire contained
(1-hour fire separation construction) or fire sprinklered. (2006 International Fire Code New
Table 903.1 and Section 702) During the building permit stage, we will look at your
submitted plans to ensure the building meets the separation requirement. Please contact me
if you need more information.
Number: 130 Created: 6/25/2009
FIRE LANE MARKINGS: I'd be happy to come by so we can nail down a plan to designate
the fire lane.
Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque
Topic: Stormwater
Number: 69 Created: 5/22/2008
[6/26/09] Repeat Comment. If you would like to reference the existing master plan for this
area, please let me know and we can set up a meeting.
[9/8/08] This off -site flow needs to be quantified and discussed in the text of the report on
how these flows will be routed. How was the 36-inch pipe sized. An exhibit of OS-1 sub -
basin is needed to determine if this basin was sized correctly.
[5/22/081 An analysis is required for the off -site flows that pass through the site. These
flows need to be identified and quantified. The design needs to show these flows passing
through the site safely while not inundating any structures. The Stormwater Dept. can help
in identifying these off -site flows.
Page 3
s.
Number: 70 Created: 5/22/2008
[6/26/09] Repeat Comment.
[9/8/08] A discussion in the report with calculations to back it up needs to be included to
verify that no negative impact will occur downstream and that Skyway can handle the extra
flows and still meet street criteria.
[5/22/08] As shown on the drainage plan, Sub -basin A is not being detained. An analysis
needs to show these additional flows will not negatively impact any downstream properties
or detention will be required for this sub -basin.
Number: 87 Created: 9/9/2008
[6/26/091 This could be done only if there is a drainage easement on the property to the
south. The plans have been labeled as if there was a drainage easement, but further
investigation showed that the property to the south has only a utility easement. An off -site
drainage easement would be required if the pipe were to stay on the property line. To avoid
getting an off -site drainage easement, the pipe could be located 10 feet north of the property
line. A 20 foot on -site drainage easement would be required with the pipe centered in the
easement.
[9/9/08] The east -west portion of the 36-inch storm sewer should be located in the center of
the easement which is the property line. This also shares the burden of the storm sewer
between the two properties. The storm sewer should also be extended past the sanitary
manhole. See redlines.
Number: 88 Created: 9/9/2008
[6/26/09] This is even more important due to the fact we know there is no 7.5 foot drainage
easement on the properties to the south.
[9/9/08] Consideration needs to take place on where the off -site flows exit the 36-inch storm
sewer and if there is an adequate flow path. There may need to be a swale constructed to
take these flows to the east property line.
Number: 131 Created: 6/26/2009
[6/26/09] All lots that drain to the pond should be responsible for maintenance. Please
include lot 3 on the plat as being responsible for the maintenance of the pond along with lots
1 &2.
Number: 132 Created: 6/26/2009
[6/26/091 Please include the City's standard water quality outlet structure detail. I can email
this to you.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Sincerely,
Steve Olt
City Planner