HomeMy WebLinkAboutLEVONS WAREHOUSE AND OFFICE BUILDING PDP SECOND - Filed CS-COMMENT SHEETS - 2005-03-25REVISION
COMMENT SHEET
DATE: August 14, 2000 DEPT: ENGINEERING
PROJECT: ##19-96A Levon's Warehouse and Office, PDP — Type
1 (LUC)
PLANNER: Troy Jones
ENGINEER: Tim Blandford
All comments must be received by: September 6, 2000
❑ No Problems
0 Problems or Concerns (see below or attached)
Comments:
Please modify the General Notes per the attached sheets. They were updated since the last time these plans
were in for review.
/ According to the Plat, 4th Avenue was vacated some time ago. Typically when a street is vacated, the ROW is
split into equal amounts between adjacent properties. In this case, Lot I should have received a 40 foot piece of
land that is not accounted for on the Plat. Please show how this is accounted for with documentation and/or by
show it on the (Plat.
• Please show the full ROW for Hickory Street. What is the ROW dimension? There is a possibility that this
f" development will need to dedicate additional ROW to meet the City's requirements for a Collector Street
(Hickory is a Collector Street per the Master Street Plan).
• Please modify the Attorney's Certificate language per the attached sheet.
• The area, which is being proposed as an access, utility, and drainage easement, should be dedicated a public
y ROW..
A r Please show the name of the street adjacent to the southern boundary of this development.
9 S : Does curb, gutter, and sidewalk exist along Hickory Street? Please identify this on the plans. If not, this
a development is required to construct those improvements to City standards.
j - • The driveway should be constructed per the City's street standards. A "new driveway approach" should be
45 used.
j You will need to acquire an offsite construction easement for the sidewalk connection to the west of this
development.
i .— Please include detail D-20 in the plan set.
° • — Handicap access ramps need to be provided adjacent to the handicap parking stalls. Please show on the plans.
1 , Please provide curve information for the construction of the pedestrian walk connection to the west.
Please show the locations of the depressed sidewalk adjacent to the proposed building.
(: The developer is responsible for acquiring all necessary offsite construction, gracUng-and drainage easements for
the proposed swale south of the development.
Date: September 1, 2000 Signature:
PLEASE SEND COPIES OF MARKED REVISIONS
E Plat RfSite Ef Utility 1f Landscape ❑ Drainage Report ❑ NO COMMENTS -SUBMIT MYLARS
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: March 6, 2000 DEPT: ENGINEERING
PROJECT: #19-96A Levon's Warehouse and Office Building —
Type 1— PDP (LUC)
PLANNER: Troy Jones
ENGINEER: Tim Blandford
All comments must be received by: April 5, 2000
❑ No Problems
0 Problems or Concerns (see below or attached)
Comments:
• Per the Conceptual Review meeting notes on February 1, 2000, a TIS will need to be
submitted. The TIS needs to address bike, transit, and pedestrian levels of service.
• Pedestrian connections will need to e provided from the parking area to the buildings.
• Please update the General Notes as indicated on the attached sheet.
• Please update the Plat language as described on the attached sheet.
• he Develoer will need to provide the City a cost estimate for curb, gutter, sidewalk and
paving of 4 Street along the frontage of his/her property. This would most likely be a
contribution in aid. At this time we are not requiring the Developer to construct 46' Street, but
"escrow" the amount needed for future construction of this street.
• Please refer to the utility plans for additional comments and concerns.
Date: April 10, 2000 Signature:
PLEASE SEND COPIES OF MARKED REVISIONS
10 Plat [0 Site 0 Utility 21 Landscape ❑ Drainage Report ❑ NO COMMENTS -SUBMIT MYLARS
\l, fy�_.• Please include the following language on the Plat rather than note number 4:
ALL EXISTING EASEMENTS WITHIN THE BOUNDARIES OF THIS REPLAT SHALL BE VACATED
UPON THE RECORDING OF THIS PLAT. ALL EASEMENTS SHOWN ON THIS REPLAT SHALL BE
OF RECORD AND SHALL EXIST WITH THE FILING OF THIS PLAT.
• As per the letter sent to Mr. Meserlian dated May 4, 2000, 4th Street (Hemlock Street) is classified as an
Industrial Local Street. The cost estimate, which was submitted with this last set of revised utility plans, did not
account for this street classification. Please revise the quantities to match the standards of an Industrial Local
Street. The estimate needs to include the cost of sidewalk, pavement, curb and gutter, sub -grade, etc. Once
these quantities have been revised, please resubmit it to the Engineering Department so it can be evaluated. If
you have any questions on this matter, please contact this office at 221-6605.
G ;
A-_ ), ' 4
t-
X
y>
Development Review Comments — Page 1
REVISION
COMMENT SHEET
DATE: August 14, 2000 TO: Technical Services
PROJECT: #19-96A Levons Warehouse and Office, PDP —
Type I (LUC)
All comments must be received by Troy Jones no later than the
staff review meeting:
Wednesday, September 6, 2000
No Comment
Problems or Concerns (see below or attached)
"PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE"
�. I.JC`C12i TIc.J L-'�D)1
J� 7-71(i C.U2I�'ti/�'T�/
Date:
7KYOUWI5H7
Plat _ site _ Drainage Report
_ udhty _ Redline Utility _ Landscape
-1
�%
I L /4 T %CTp %C /-17 BUT -
Other
REVISION
COMMENT SHEET
DATE: August 14, 2000 DEPT: ENGINEERING
PROJECT: #19-96A Levon's Warehouse and Office, PDP — Type
1 (LUC)
PLANNER: Troy Jones
ENGINEER: Tim Blandford
All comments must be received by: September 6, 2000
❑ No Problems
0 Problems or Concerns (see below or attached)
Comments:
• Please modify die General Notes per the attached sheets. They were updated since the last time these plans
were in for review.
• According to the Plat, 4th Avenue was vacated some time ago. Typically when a street is vacated, the ROW is
split into equal amounts between adjacent properties. In this case, Lot 1 should have received a 40 foot piece of
land that is not accounted for on the Plat. Please show how this is accounted for with documentation and/or by
show it on the Plat.
• Please show the full ROW for Hickory Street. What is the ROW dimension? There is a possibility that this
development will need to dedicate additional ROW to meet the City's requirements for a Collector Street
(Hickory is a Collector Street per the Master Street Plan).
• Please modify the Attorney's Certificate language per the attached sheet.
• The area, which is being proposed as an access, utility, and drainage easement, should be dedicated a public
ROW..
• Please show the name of the street adjacent to the southern boundary of this development.
• Does curb, gutter, and sidewalk exist along Hickory Street? Please identify this on the plans. If not, this
development is required to construct those improvements to City standards.
• The driveway should be constructed per the City's street standards. A "new driveway approach" should be
used.
• You will need to acquire an offsite construction easement for the sidewalk connection to the west of this
development.
• Please include detail D-20 in the plan set.
• Handicap access ramps need to be provided adjacent to the handicap parking stalls. Please show on the plans.
• Please provide carve information for the construction of the pedestrian walk connection to the west.
• Please show the locations of the depressed sidewalk adjacent to the proposed building.
• The developer is responsible for acquiring all necessary offsite construction, grad' nd drainage easements for
the proposed swale south of the development. \
Date: September 1, 2.000 Signature:
PLEASE SEND COPIES OF MARKED REVISIONS —
E6Plat ff Site ZUtility ff Landscape ❑ Drainage Report ❑ NO COMMENTS -SUBMIT MYLARS
Please include the following language on the Plat rather than note number 4:
ALL EXISTING EASEMENTS WITHIN THE BOUNDARIES OF THIS REPLAT SHALL BE VACATED
UPON THE RECORDING OF THIS PLAT. ALL EASEMENTS SHOWN ON THIS REPLAT SHALL BE
OF RECORD AND SHALL EXIST WITH THE FILING OF THIS PLAT.
As per the letter sent to Mr. Meserlian dated May 4, 2000, 411 Street (Hemlock Street) is classified as an
Industrial Local Street. The cost estimate, which was submitted with this last set of revised utility plans, did not
account for this street classification. Please revise the quantities to match the standards of an Industrial Local
Street. The estimate needs to include the cost of sidewalk, pavement, curb and gutter, sub -grade, etc. Once
these quantities have been revised, please resubmit it to the Engineering Deparunent so it can be evaluated. If
you have any questions on this matter, please contact this office at 221-6605.
Development Review Comments — Page 2
REVISION C,'' > ,�
COMMENT SHEET
DATE: May 7, 2001 TO: Engineering
PROJECT: #19-96C LeVons Warehouse - Type I (LUC)
All comments must be received by Troy Jones in Current Planning
no later than the staff review meeting:
May0r, 2001j
Do Comment
ElProblems or Concerns (see below or attached)
**.PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
Q&K HERE IF Yoi) Wises To-nctw-r— wms-0CRmISION§ignaturee --
Plat site Drainage Report other
_ Utility Redline Utility LaDdscape
City of Foet Collins
REVISION
COMMENT SHEET
DATE: MARCH 26, 2001 DEPT: Engineering
PRO] ECT:#19-96C- Levons Warehouse @315 W. Hickory,
Type 1
PLANNER: Troy ]ones
ENGINEER: Dave Stringer
All comments must be received by: type date due
❑ No Problems
❑ Problems or Concerns (see below or attached)
Comments:
I. On plat, What is meant by old line to be vacated with this Plat? If this is RR right-of-way it
needs to be vacated by separate document. If vacation has occurred show reception number
2. Page 2/3 , what are the widths of sidewalks?
3. What is being proposed at ends of pipe? Flared end sections, headwalls?
4. Page 3/3, Show profile of pipes
5. 4. Is there enough cover over pipes, show pipe sizes and class
Date: March 26, 2001 Signature:
PLEASE SEND COPIES OF MARKED REVISIONS
0 Plat ❑ Site 0 Utility 0 Landscape ❑ Drainage Report 0 NO COMMENTS -SUBMIT MYLARS
PROJECT
COMMENT SHEET
City of Fort Calling
Current Planniniz
DATE: March 612000 TO: Engineering Pavement
PROJECT: #19-96A Levon's Warehouse and Office
Building — PDP - Type I (LUC)
A11 comments must be received by Troy Jones no later than the staff
review meeting:
April5, 2000
Note- Please identify your redlines for future reference
jlidvG� �e �}v5�1C' be
o<
Signature
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site _Drainage Report Other
Utility _Redhnc Utility _Landscape
0000 lArou
PROJECT
i■.� COMMENT SHEET
City of Fort Collins
Current Planning
DATE: March 6, 2000 TO: Mapping/Drafting
PROJECT: #19-96A Levon's Warehouse and Office
Building — PDP - Type I (LUC)
All comments must be received by Troy Jones no later than the staff
review meeting:
April5, 2000
L,e—v ^rUM,vz
Note- Please identify your redlines for future reference
I ou DF24' l-E/ML _'�Do /JOT
i�otiler
Snz �
�j t C c ,t 7_ T--I-+ Zj ou 7-cr� c �, r),a �2y a r
7-0 S4 f U -I L, j T N I jc J v�.q.�7 c/
G�1 bi)Hc, � �T C
sl,oud a
Gj 1 t d Ylq C. ra Y �`!O✓� O �� -- -----
Signature
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site _Drainage Report _Other
_ Utility _Redline Utility _Landscape
City of Fort Collins