HomeMy WebLinkAboutJFK SENIOR APARTMENTS - Filed GC-GENERAL CORRESPONDENCE - 2005-03-24Interoffice Memorandum
Date: 6/21 /1999
To: Cam
�MccNs6r, City Engineer
From: Marklvlcc allum, Development Review Engineer
t.
I 1, Lt l ti/ty.iif
G
RE: JFK Senior Apartments — Variance Request
The applicant for JFK Senior Apartments is requesting a variance to section 1.02.03.D in the
"Design and Construction Criteria, Standards and Specifications for Streets, Sidewalks,
Alleys, and Other Public Ways" in order to allow an off -set driveway alignments across JFK
Parkway. See the attached copies of the variance from J.R. Engineering.
If the standard is applied strictly, it only pertains to street intersections and not driveway
intersections. As Engineering Staff, we strive to use the standard liberally to align all
driveways and streets. With that in mind, it is my opinion that it is important to try to align
intersecting streets and driveway s to promote safe traffic conditions, but it is also important to
consider traffic volumes associated with a development. The proposed JFK Senior
Apartments development is expected to generate 17 morning peak hour trips, 25 afternoon
peak hour trips, and 263 trips per day for both of the development's driveways. I could not
find the traffic impact study for Parkway Townhomes, but in my opinion, it would generate
similar or less traffic than this development. In addition, the movements are not conflicting left
turn movements. The relatively low traffic volumes at the driveways and free left turning
movements between the two driveways, in my mind demonstrates that by allowing this
variance the City is by no means compromising public safety. Finally, per Detail D-9 in
"Design and Construction Criteria. Standards and Specifications for Streets, Sidewalks,
Alleys, and Other Public Ways", all curb cuts on arterial streets need to be evaluated by the
City Engineer and City Traffic Engineer. For the record. I have heard no objection to the
access point from the latter during the review process.
If there are any questions, please let me know. Thank you.
Sincerely,
Mark McCallum
Cc: Steve Olt
JREngineering, Mo.
2620 Fast Prospcct Rd. Suit" 190
Frvt Collins, Colorad, S LS2
(970) 491-9888 • FAX (970) 491-9984
www.jreny;.a0111
June 8. 1999
Mr. Murk McCallum
City of Fort Collins Engineering Department
281 North College .Avenue
P.O. Box 580
Fort Collins, Colorado 80522
Re: JFK Senior Apartments — Entrance from JFK Parkway - Request for Variance for
Alignment with Entrance with Parkwav Townhomes Entrance
Dear Mark:
Please consider this as the Variance Request for the entrance location from JFK Parkway in the JFK
Senior Apartments Site. The proposed driveway is slightly off set from the existing Parkway
Townhomcs driveway on the west side of JFK Parkway. Per detail D-9 of the "Design and
Construction Criteria. Standards and Specifications for Streets. Sidewalks, Alleys and Other Public
Ways". City of Fort Collins. Colorado, City Engineering Office, July 199o, (City's Street Design
Criteria). all curb Cuts on arterial streets need to be evaluated by the City Engineer and City Traffic
Fngineer.
This site is proposed as Senior Housing. Therefore, it is anticipated that there will be trips to the site
by vans. Dial -a -Ride vehicles, and emergency vehicles. It is also anticipated that many of these trips
will take place during off-peak times. This variance is being requested to allow the location of the
entrance to be situated to allow for the smooth entrance and exist of the aforementioned vehicles. In
addition, the driveway to the Parkway Townhomcs serves only a limited number of dwelling units.
Therefore, it is anticipated that the potential conflicts of vehicles wanting to turn left into both sites
concurrently Lit this location will be minimal. Therefore, it is not anticipated that any public health,
safety, and/or wolf are problems will be created by the varied design.
If you have any questions or comments, or need additional information, please do not hesitate to
contact me at (970) 491-9888. Thank you. maa�etsn�.
Sincerely,
JR Engineering
Davl Klockeman,
Project Manager
40}5 lnrlh "t001 Strr•� I 6020 C,rernwnnJ Phz l 61cd. 7114 Fortino 131ad. West
(b "I Id" "pangs, ( duradu WWI Cnl "l, d , od , $0l I I Fulhlo, Colnndo 81008
7'1'01U27, . FAX(19)�N
TransI, tiOT7 Services
I nttini•rrin DcharUncnk
Cite of fort Collin
June 14, 1999
Matt Deal
P.O. Box 272349
Fort Collins, CO 80527
Dear Matt:
Dave Stringer and I reviewed your request to create special language for Oakridge Village, I I(h
Filing, which states that you would like to pull F&F permits during the road construction phase of
the project. It is our opinion that this special language will not be granted. The reason for our
denial is that we do not feel that there is an overwriting need for the F&F permits with respect to
the actual construction of the street. Furthermore, yourjustification lot deterioration to the street
Mid continuos street clean-up really does not apply for building permits can be issued when the
hase course has been completed. Thus, construction will be completed per typical development
agreement language and criteria.
Please call me at:121-6605 if there are any questions.
Sincerely,
�1� 4 --
Mark McCallum
Civil Engineer
Cc: Dave Stringer
Post -it" Fax Note 7671
co. G'110yOr +.G.
Phone # L-�l
Fax N , ,_._ — <
,V,_I'� v I'Cl Ti tiff fret ���llio�_ C)AO��^_�i ti0' iu—,O) '221-6i60