HomeMy WebLinkAboutINTERCHANGE BUSINESS PARK LOTS 4, 5, AND 6 - Filed GC-GENERAL CORRESPONDENCE - 2010-04-16NENORTHERN
ENGINEERING
SERVICES, INC.
Mr. Andrew Barnaby
Larimer County Engineering Department
218 W. Mountain Avenue
Fort Collins, Colorado 80521
February 4, 2003
RE: Interchange Business Park, Lot 4 and Lot 6
Dear Mr. Barnaby,
We have reviewed the as -built elevation survey by Alpha and Omega Consultants dated January
30, 2003 (please see attached 11x17 copies of this survey). Upon review of these documents, we
believe that the spot elevations shown are in substantial compliance with the proposed plan and
therefore drainage patterns are consistent with that of the proposed design.
As -built finished floor elevations appear to be within reasonable tolerance. The design finished
floor elevation for Lot 4 was 4932.20 and has been constructed at elevation 4932.17. The design
finished floor elevation for Lot 6 was 4930.60 and has been constructed at elevation 4930.61.
If you are in need of any further information or have any questions, please feel free to call me at
221-4158 ext. 114.
Sincerely,
NORTBE ENGINEERING SERVICES, INC.
aa-.
Aaron Cvar, P.E.
Project Engineer
420 SOUTH HOWES, SUITE 202 1 FORT COLLINS, COLORADO 80521 1 970.221.4158 / FAX 970.221.4159
- -
i Jo L to-nas wm/lo 31T0
•K8N 'N
eo°r°O'
sear-ur o
133Ns .0N T! 110
'S3
i.a j yo'nvr
OaV80703 •axre3oo asoA
stitvyznsxoo
tlDOKWO
f aoz
aaexns r,'unesr xotareM
vsazv
A11Yd
sssxisne
v
R A
`b!/
aoxmoasuu
q
4
Z�
�Zy1 � a
LZ6a
a
LjLD
q
D�Q
y1QZ
J
Li
J<k
€XIg
.
~N
' �
1M'2MW.
K11
W
O�'`Ob�
�W
mm-yyN
gj
X
U
in sr�
�sz
w �r��iO1l
133Ni- •pN �'e '�3
'S3
`+� "�"+ aev.'�
oQYao'io0 '81 MOO •LIo3
s.Lbd'V L Xn 011Zoo
vo�s¢o
—D8—
B d0'L
Jls 9 =tS' ag" KOLLVAM
vxa^Iv
gara
esa�usna aoxvxossam
0
LJWE
a
w
Waaw
Y
IL
W
7 oWrc
g
$
/