HomeMy WebLinkAboutBLOCK 128 814-816 SOUTH COLLEGE AVENUE HOWELL BUILDING - Filed CS-COMMENT SHEETS - 2005-03-18®� Qualified Affordable
® r ®1 Housing Project
J
Comment Sheet
Current Planning
DATE: September 16, 1998 TO: Mapping & Drafting
PROJECT: #46-98 The Howell Building - PDP - Type I
All comments must be received by Leanne Harter no later than the staff
review meeting:
September 30,1998
k_ S V-0-
Date:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS�IITn ..
_ Pit _ Site _ Drainage Repoli _ Others
_ Utility _ Redline Utility _ lendsrape City of Foxt Collins
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: 16 September, 1998 DEPT: Engineering
PROJECT: 946-98 The Howell Building - PDP - Type I
PLANNER: Leanne Harter
ENGINEER: Mark McCallum
All comments must be received by: 09/30/98
El o Problems
Problems or Concerns (see below or attached)
Utility Plan Comments:
❑► A State Highway Permit is required for the street cut on College Avenue.
❑► The Site Plan and the Utility Plan should coincide. The Utility Plan does not depict:
• The proposed balconies, 12 feet above the ground, overlooking College
Avenue.
• The small addition to the back of the building.
• The parking configuration.
❑► There is a new vertical control listing for the City which negates the use of the black
bolt as a benchmark. Call Wally Muscott at 221-6605 for more information.
❑► There are a few more details required.
• Curb and gutter details.
• Sidewalk detail.
❑► As a result of the proposed balconies, encroachment permits will be needed for the
balconies encroach into the ROW.
Site Plan Comments:
❑► The site plan does not depict:
• The proposed balconies, 12 feet above the ground, overlooking College
Avenue.
• The retaining wall in the parking area along the southern property line.
0 As a result of the proposed balconies, encroachment permits will be needed for the
balconies encroach into the ROW.
0 There is some general concern with the parking layout:
• How do vehicles maneuver within the parking lot configuration?
Specifically, the vehicles will have to back out into the alley. The parking
stalls meet the dimensions set forth in the standards, but they do not allow a
vehicle to turn around safely.
• The rear entrance for the building adjacent to the northern property line is Yz
a foot into the parking stall.
Date: �%� Signature -
PLEASE' SEND COPIES OF MARKED REVISIONS: O—PLAT
SITE
0-�76TILITY
Ff LANDSCAPE
®� Qualified Affordable
®l� Housing Project
J
Comment Sheet
Current Planning
DATE: September 16, 1998 TO: Engineering Pavement
PROJECT: #46-98 The Howell Building - PDP - Type I
All comments must be received by Leanne Harter no later than the staff
review meeting:
September 30,1998
N
�,
Date:
signanure:
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_ Plat _ SRe _ Drainage RTOIt _ Oler
-Utility — Redline Utility — Undsape City of Fort Collins
DATE: October 22, 1998 TO: Engineering
PROJECT: #46-98 Howell Building - Type I (LUC) - PDP
vw Priority Processing `&�a
All comments must be received by Steve Olt no later than the staff
review meeting:
Wednesday, November 4, 1998
❑ No Comment
IdProblems or Concerns (see below or attached)
GfI�GkSiiF l/S. Gfi/L/�J!`�A�fJ
Date:
City of Port Collins
REVISION
COMMENT SHEET
DATE: December 24, 1998 DEPT: Engineering
PROJECT: #46-98 Howell Building -Type I (LUC)-PDP
PLANNER: Steve Olt
ENGINEER: Mark McCallum
All comments must be received no later than the staff review meeting:
Wednesday, January 13, 1998
No Problems
Problems or Concerns (see below or attached)
All Plans and Supplements Included:
O Utility Plan
© Site Plan
© Landscape Plan
© "Street Repair and Reconstruction Standards and Guidelines"
General Comments:
O See redline comments on all sheets of the utility plan, site plan, and landscape plan.
More specific comments will be mentioned below.
G The utility plans do not match the sit and landscape plans in that the utility plan
balcony extends further than what is shown on the site plan.
13 The main issue to resolve is the parking lot layout. Currently, the parking
configuration does not meet the parking stall dimension criteria set forth in the LUC.
The pervious submittal was headed in the right direction and had only one fcwer
parking space.
Date: /� Signature: _��
Please send copies of marked revisions Mat ate
Affility �,Eandscape
City of Fort Collins
11 N N 11 11 N N 11 11 11 N 11 N 11 N .1 11 11 11 11 N 11 11 11 11 11 N N
0 , Qualified Affordable
L 1
Housing Project
L .1
Comment Sheet ffi
ffi
0 Current Planning ffi
11
;V 11
DATE: February 22, 1999 TO: Engineering
V
Ift PROJECT: #46-98 The Howell Building — PDP — Final 1p
Am Type I (LUC)
.1
ift All comments must be received by Steve Olt no later than the staff >
0 review meeting:ID
„
11
ID
March 10, 1999 .1
11
iorJ %N&69iCor s� 7 40 aE %aES4%"s r012�-
.1
THE LeT/Li77F5 hLat�(� Ti+E J?o12) tfH-rl43ull�r7�
,' �.ruza. id6�orrZ�SAo �d�c %Z ' �s�flu+nJG
N
'?.
11
11
.1
M
11
N
u
u
n
u
n
u
n
n
n
n
Dater/9f Signature: i
0 CIM HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
0 YW _/ Sitel - I _ Iha * Repod _ Ok
1( Ut R�WWG Udq hadsM Citv of Fort
u
J n m it