We are pleased to submit the following Project Development Plan for the Public
Improvements Infrastructure for the PVHS Harmony Campus. This PDP will serve as a
framework for future project submittals within the Harmony Campus. Construction
phasing for road, utility and drainage improvements will be addressed with subsequent
development applications based on these overall infrastructure plans.
Conceptual Review comment response
In addition to the initial Conceptual Review meeting, we have held subsequent
meetings with CDOT, Engineering, Utilities, and Traffic staff to review specific design
issues. We also held a 'Pre -Submittal' meeting to review the items to be included with
this submittal. All issues that were discussed at the Conceptual Review Team meeting
have been addressed with this PDP (or will be addressed with subsequent Project
Development Plans as applicable) with the following exceptions:
Lighi and Power Comment 5: A utility coordination meeting will be held after the initial
round of review is completed by City staff.
Engineering Comment 7: The applicant/owner assumes that with this project that there
will not be any specific street oversizing fees applicable as with this project there is not
any specific vertical development. Applicant / Owner understands that each
development project will be held accountable for the then current City of Fort Collins
Oversizing Fees. Applicant / Owner also assumes that for all public street
improvements provided for each development project that the City will reimburse per
the':hen current City Oversizing Reimbursement Policy.
Engineering Comment 2: The applicant/owner assumes for this project that there will
not be any Larimer County Street Oversizing Fees as there is not any specific vertical
development related to this application. Applicant / Owner understands that each
development project will be held accountable for the then current Lorimer County
Street Oversizing Fees.
andsEape architecture I planning I urban design
voice- 970.22, 7577
fax: 970-'23. 1 827
Project Comments Sheet
M°'"'J Selected Departments
City of Norl ('ollins
Department: Engineering
Date: January 5, 2004
Project:
PVH HEALTH SYSTEM - HARMONY CAMPUTS INFRASTRUCTURE PDP
- TYPE 1
All comments must be received by Cameron Gloss in Current Planning, no later than
the staff review meeting:
January 07, 2004
Note - Please identify your redlines for future reference
Issue Contact: Dave Stringer
Topic: General
Number: 24 Created: 1 /5/2004
[1/5/04] No additional comments on this submital. Comments will be made with
Final Compliance submital. All comments on this submital are related to FC plans.
Additional comments will be provided at that time.
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site Drainage Report Other
Utility _ Redline Utility Landscape
Page 1
City of Fort Collins
Project Comments Sheet
Selected Departments
Department: Water Wastewater
Date: January 6, 2004
Project:
PVH HEALTH SYSTEM - HARMONY CAMPUTS INFRASTRUCTURE PDP
- TYPE 1
All comments must be received by Cameron Gloss in Current Planning, no later than
the staff review meeting:
January 07, 2004
Note - Please identify your redlines for future reference
Issue Contact: Jeff Hill
Topic: General
Number: 25 Created: 1 /5/2004
[1/5/04] Prior to final acceptance the following information will need to be provided.
-Profiles of all sewer mains and water mains larger than 12-inches.
-Lengths of pipe between all fittings, thrust blocks, valves, manholes, etc.
-All appropriate water and sewer details.
-All information necessary for the construction of the proposed water and sewer lines.
Number: 26 Created: 1/6/2004
[1/6/04] Provide a minimum of 5 feet of separation between the 12-imch water main in Snow
Mesa Drive and the proposed median/curb and gutter.
Number: 27 Created: 1/6/2004
[1/6/04] Label all area on the plat which are intended to be utility easements as utility
easements.
See plat, site, landscape and utility plans for other comments.
Signature
/ -G-Jzi-,
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
.� Utility Redline Utility ✓ Landscape
Page I
Project Comments Sheet
Selected Departments
Department: Stormwater Utility
Date: January 13, 2004
Project:
PVH HEALTH SYSTEM - HARMONY CAMPUTS INFRASTRUCTURE PDP
- TYPE 1
All comments must be received by Cameron Gloss in Current Planning, no later than
the staff review meeting:
January 07, 2004
Note - Please identify your redlines for future reference
Issue Contact: Basil Harridan
Topic: Drainage Plan
Number: 8
[1/13/041
Created: 12/2/2003
Still no phasing plans provided.
Easements need to be provided for proposed detention pond on north side of Timberwood Drive.
Easements need to be vacated for abandoned pond and drainage swalei
Need to discuss who maintains drainage facilities.
Effect on downstream properties, i.e. Stetson Creek detention pond should still be evaluated.
[12/2/03] The drainage plan needs to show what the assumed imperviousness of all basins are in order to be able to
check the proposed imperviousness in the future as the site develops.
Pond numbering is very confusing from existing ponds to proposed ponds. It is not clear which portion of the pond will
be built when and where as this site develops. It is suggested that a phasing plan be provided. Please
provide a phasing plan for the drainage infrastructure. Maybe this site should have 2 or 3 drainage phases
where the drainage infrastructure is constructed rather than doing a bit of pond enlargement with each
building, that could get very confusing and could cost more in the long run.
What will be done with the pond area that will be filled in ?? Please make sure area is seeded and mulched.
Please provide easements for all proposed detention areas and vacate the easement for the pond area that will be filled
in and no longer be used for detention.
CHECK ]HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site Drainage Report Other_
Utility _ Redline Utility Landscape
Page 1
Za)nProject Comments Sheet
Selected Departments
Cilyuf Norl toliins
Department: Engineering
Date: March 16, 2004
Project:
PVH HEALTH SYSTEM - HARMONY CAMPUS INFRASTRUCTURE PDP -
TYPE 1
All comments must be received by Cameron Gloss in Current Planning, no later than
the staff review meeting:
January 07, 2004
Mote - Please identify your redlines for future reference
Issue Contact: Dave Stringer
Topic: Civil Plans
Number: 34 Created: 3/16/2004
[3/16/04] CS300 - see redline plans Need to specify a typical Not approved street
pavement section indicating minimum pavement depth of 6 inches from existing
Timberwood Drive to Snow Mesa due to lack of cover at RCB's
Number: 35 Created: 3/16/2004
[3/16/04] Lack of cover see CS 300
Number: 36 Created: 3/16/2004
[3/16/04] CS 351
Need to use Concrete Pavement design for area over RCB's on Snow Mesa from
existing development to intersection with west Timberwood due to lack of cover ---
Number: 37 Created: 3/16/2004
[3/16/041 Cs 500 show RCB's at ditch crossing, show concrete pavement for
portion of street as discussed on sheet CS 351
Dave Stringer
March 16, 2004
Signature Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site Drainage Report Other_
Utility _ Redline Utility Landscape
Page 1
Number: 38 Created: 3/16/2004
(3/16/04] CS 505 see comment CS 300
Need revised soils report for all public streets. Report for PVH 3rd Filing shows
expansive soils
Number: 39 Created: 3/16/2004
[3/16/041 CS 557 some cross slopes either exceed or do not meet
minimum/maximum cross slopes, please correct
Number: 40 Created: 3/16/2004
[3/16/04] Once phasing has been agreed upon need to show phasing on all
applicable sheets
Topic: Plat
Number: 33 Created: 3/16/2004
[3/16/041 Name of Snow Mesa wrong Change
Page 2
Dave Stringer - PVH Infastructure plans
From: Dave Stringer
To: Cameron Gloss; jim alien-morley
Date: 3/ 1 G/04 11:07AM
Subject: PVH Infastructure plans
Jim,
attached are my comments for the PVH infastructure plans, I will give you redlines and hard copy of
comments on Thursday March 18th after meeting with Tess.
Dave
Page 1
Page 1
Dave Stringer - PVHInfiStrucFinal.doc
Project Comments Sheet
Selected Departments
C.ita of Fait C olluia
Department: Engineering
Date:
Project:
March 16, 2004
PVH HEALTH SYSTEM - HARMONY CAMPUS INFRASTRUCTURE PDP -
TYPE 'I
All comments must be received by Cameron Gloss in Current Planning, no later than
the staff review meeting:
January 07, 2004
Note - Please identify your redlines for future reference
Issue Contact: Dave Stringer
Topic: Civil Plans
Number: 34 Created: 3/16/2004
[3/16/041 CS300 - see redline plans Need to specify a typical Not approved street
pavement section indicating minimum pavement depth of 6 inches from existing
Timberwood Drive to Snow Mesa due to lack of cover at RCB's
Number: 35 Created: 3/16/2004
[3/16/04] Lack of cover see CS 300
Number: 36 Created: 3/16/2004
[3/16/04] CS 351
Need to use Concrete Pavement design for area over RCB's on Snow Mesa from
existing development to intersection with west Timberwood due to lack of cover ---
Number: 37 Created: 3/16/2004
[3/161041 Cs 500 show RCB's at ditch crossing, show concrete pavement for portion of
street as discussed on sheet CS 351
Dave Stringer March 16, 2004
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility Redline Utility Landscape
Page 1
Dave Stringer - PVHInfiStrucFinal.doc
Page 2
Number: 38 Created: 3/16/2004
[3/16/041 CS 505 see comment CS 300
Need revised soils report for all public streets. Report for PVH 3rd Filing shows
expansive soils
Number: 39 Created: 3/16/2004
[3/16/04] CS 1557 some cross slopes either exceed or do not meet minimum/maximum
cross slopes, please correct
Number: 40 Created: 3/16/2004
[3/16/04] Once phasing has been agreed upon need to show phasing on all applicable
sheets
Topic: Plat
Number: 33 Created: 3/16/2004
[3/16/041 Name of Snow Mesa wrong Change
Page 2
stantec-:.nm
Y'. EA RS)
April 14, 2004
Cameron Gloss
City of Fort Collins Planning
281 N. College
Fort Collins, CO 80521
RE: Poudre Valley Health System - Harmony Campus Infrastructure PDP
Dear Cameron
ISSUES:
Department: Current Planning Issue Contact: Cameron Gloss
Topic: Subdivison
Number: 29 Created: 1 /9/2004
[1/9/04] Snow Mesa Drive is incorrectly noted as "Timber Trail Road" on the subdivision plat.
As was discussed at the 12/16 meeting the applicant, the plat will need to be revised to reflect
this change. REPEAT COMMENT.
RESPONSE: Road name has been changed
Department: Engineering Issue Contact: Dave Stringer
Topic: Civil Plans
Number: 34 Created: 3/16/2004
[3/16/041 CS300 - see redline plans Need to specify a typical Not approved street pavement
section indicating minimum pavement depth of 6 inches from existing Timberwood Drive to
Snow Mesa one to lack of cover at RCB's
RESPONSE: We have shown concrete pavement here.
Number: 35 Created: 3/16/2004
[3/16/04] Lack of cover see CS 300
April 14, 2004
Pape 2 of 5
RESPONSE: We have shown a typical section for 6 inches minimum of pavement on
Timberwood W. and concrete pavement section on Snow Mesa Drive.
Number: 36 Created: 3/16/2004
[3/16/04] CS 351
Need to use Concrete Pavement design for area over RCB's on Snow Mesa from existing
development to intersection with west Timberwood due to lack of cover.
RESPONSE: We have shown the concrete Section
Number: 37 Created: 3/16/2004
[3/16/04] Cs 500 show RCB's at ditch crossing, show concrete pavement for portion of street
as discussed on sheet CS 351.
RESPONSE: We have shown the concrete Section
Number: 38 Created: 3/16/2004
[3/16/04] CS 505 see comment CS 300
Need revised soils report for all public streets. Report for PVH 3rd Filing shows expansive soils
RESPONSE: The Soils report is being completed and will be submitted in the next week
Number: 39 Created: 3/16/2004
[3/16/04] CS 557 some cross slopes either exceed or do not meet minimum/maximum cross
slopes, please correct.
RESPONSE: These have been corrected except for Snow Mesa Drive near Harmony Road
where it is in a grade transition. Here the longitudinal grade will be steep enough.
Number: 40 Created: 3/16/2004
[3/16/04] Once phasing has been agreed upon need to show phasing on all applicable sheets
RESPONSE: We have provided phasing sheets at the back of the set Sheets CS 700-702.
Topic: Plat
Number: 33 Created: 3/16/2004
[3/16/04] Name of Snow Mesa wrong. Please change.
RESPONSE: This has been changed
Engineering Comment 7: The applicant/owner will contact Matt Baker to discuss the
financial participation requirements for the proposed traffic signal. Applicant/Owner
4V- is assuming that standard City of Fort Collins Oversizing Reimbursements for qualified
projects apply to this project at the time the signalized intersection is constructed.
Engineering Comment 10: A phasing plan will not be provided with this submittal.
The purpose of this submittal is to provide a framework for future development
projects within the campus. Future project development applications will provide
phasing plans based on these infrastructure plans. At this time the sequence and
timefrome for future projects has not been determined.
We have included a copy of the Conceptual Review Letter with our submittal for your
reference.
Thank you for your assistance with this application. Please feel free to call if you have
any questions or need any additional information.
Sincerely,
For BHA Design, Inc.
Angela K. Milewski
Stantec
April 14, 2004
Page 3 of 5
Department: Stormwater Utility Issue Contact: Basil Hamdan
Topic: Drainage Plan
Number: 8 Created: 12/2/2003
[3/9/04]
Swale along east property line should be placed within a drainage easement.
RESPONSE: A drainage easement has been provided
Please address how the drainage will affect the downstream private property, of particular
concern is the effect of the additional runoff on the Stetson Creek HOA maintained detention
pond.
RESPONSE:
Storm pipe across Snow Mesa at inlet A-3 does not have the required cover. (2 feet from
road base)
RESPONSE: We have called out a concrete paving section for this.
Please show box culvert crossing of water line on water line profile. Call out clearances
after the lowering.
RESPONSE: This is now shown.
Topic: Erosion Control
Number: 6
[3/9/04]
Created: 12/2/2003
Sediment/Erosion Control Plan Comments
Poudre Valley Health Systems Harmony Campus Infrastructure Project
November 24, 2003
The sediment/erosion control submittal is incomplete - no plan, no calculations, no report.
Please submit a complete set of documents/calculations per City of Fort Collins requirements.
Second Review
February 23, 2004
April 14, 2004
Page 4 of 5
Same comment.
RESPONSE: We have revised the large note on the erosion control to say that no contruction
will occur with out an erosion control plan.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 25 Created: 1 /5/2004
[1/5/04] Prior to final acceptance the following information will need to be provided.
-Profiles of all sewer mains and water mains larger than 12-inches.
-Lengths of pipe between all fittings, thrust blocks, valves, manholes, etc.
-All appropriate water and sewer details.
-All information necessary for the construction of the proposed water and sewer lines.
RESPONSE: These are shown
Number: 26
Created: 1 /6/2004
[1/6/04] Provide a minimum of 5 feet of separation between the 12-imch water main in Snow
Mesa Drive and the proposed median/curb and gutter.
RESPONSE: This has been done
Number: 27 Created: 1 /6/2004
[1/6/04] Label all area on the plat which are intended to be utility easements as utility
easements.
See plat, site, landscape and utility plans for other comments.
RESPONSE: This has been done
Number: 30
[3/11/04] Show and label ail valve
RESPONSE: This has been done
Created:3/11/2004
s
Number: 31 Created: 3/11/2004
[3/11/04] Show and label concrete encasement on sewer lines which cross above or with in 18-
inches vertically of water mains. The standard depth of bury for water lines with in the City of
Fort Collins service area is 4.5 feet to 5.5 feet. Avoid water line lowerings which require fittings
when possible.
Stantac
April 14, 2004
Page 5 of 5
RESPONSE: This has been done. Many of the lowerings are at the existing portion of the
water line and need to be mechanically lowered.
Number: 32 Created: 3/1 1/2004
[3/11/04] Provide a phasing plan for the water and sewer lines if these utilities are not to be
installed all in one time period.
See site, landscape and utility plans for other comments.
RESPONSE: This has been done.
Sincerely,
Sincerely,
Jim Allen -Morley
Senior Project Manager
Tel (970) 482-5922
Fax: (970) 482-6368
Jallen-morley@stantec.corn
'541:1.Project Comments Sheet
i� Selected Departments # •
City of Fort C011ins
®�
Department: (Engineering
Date: April 26, 2004
Project:
PVH HEALTH SYSTEM - HARMONY CAMPUS INFRASTRUCTURE PDP -
TYPE 1
All comments must be received by Cameron Gloss in Current Planning, no later than
the staff review meeting:
April 28, 2004
(Note - Please identify your redlines for future reference
Issue Contact: Dave Stringer
Topic: Civil Plans
Number: 38
[4/26/04]
Created: 3/16/2004
[3/16/04] CS 505 see comment CS 300
Need revised soils report for all public streets. Report for PVH 3rd Filing shows
expansive soils
Number: 40
[4/26/04]
Created: 3/16/2004
[3/16/04] Once phasing has been agreed upon need to show phasing on all
applicable sheets
Topic: Utility Plan
Number: 42 Created: 4/26/2004
[4/26/04] Cover Sheet - Please show elevations used as bench marks not just point
reference
Number: 43 Created: 4/26/2004
[4/26/04] Please label Bike lanes on Signing and Stripping plans (Typical)
Signature Date
CHECK: HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility Redline Utility Landscape
Page I
Number: 44 Created: 4/26/2004
[4/26/04] Please show typical cross section of all public streets indicating widths,
curb and gutter type and etc.
Number: 45 Created: 4/26/2004
[4/26/041 CS 513 Please increase size of drawing. Lines and text are not scannable
Number: 46 Created: 4/26/2004
[4/26/04] Bike lanes need to be shown correctly CS 532
Number: 47 Created: 4/26/2004
[4/26/04] Signal to be built with this project by Developer. If not typical CDOT
Standard please provide a design for signal bases. Show pole locations on
applicable sheets
Number: 48 Created: 4/26/2004
[4/26/04] Good set of plans
Page 2
Dave Stringer - PVH signal warrant
Page 1
From:
Ward Stanford
To:
Matt Delich
Date:
5/6/04 4:50PM
Subject:
PVH signal warrant
r
Hi Matt,
After reviewing the TIS's for the PVH site and the signal warrant, I've come across an item I need some
input on.
The following is my DIMS comment:
[4/30/04] As best I can tell from the TIS memo and the March 30, 2004 TIS, the site will generate approx.
180 PM trips (3/30 TIS). The Timberline and Timberwood intersection increased by 105 trips (diff. of Wb
ST Back and Wb ST Total), therefore 75 of the PM Snow Mesa Nb trips are from the development. The
remaining 130 (195 PM NbLt's + 10 NbRt's - 75 from site) must be PM peak trips from the neighborhood
connection of Timberwood. City counts for Nb Corbett are less in the PM than in the AM. Snow Mesa's Nb
PM peak hour volumes are higher in the PM than AM, but not due to PVH site traffic. There must be
something I'm missing or not following correctly. Please provide additional documentation and
conversation regarding the expectation of 120 PM Peak hour trips from the adjacent neighborhood via
Timberwood to Snow Mesa.
Per our Syncro volumes for Corbett and Harmony we show about 170 vph Nb in the PM, and 480 vph Nb
in the AM. And I seem to recall having seen numbers you provided possibly in the bound TIS for the site
indicating about 200 vph in the PM, and roughly 400 in the AM.
So I'm having some trouble with the PM exiting numbers in the "Warrant" TIS.
Any assistance you could provide would be appreciated.
Sincerely,
Ward Stanford
Traffic Systems Engineer
City of Fort Collins
wstanford@fcgov.com
970.221.6820
CC: Cam McNair; Dave Stringer; Eric Bracke; Mark Jackson
6a
Selected Issues Report
City of Fort C ollins � "rnkf..
Date:
05/24/2004
PVH HEALTH SYSTEM - HARMONY CAMPUS INFRASTRUCTURE
PDP - TYPE 1
COMMENTS DUE 5/26/04
ISSUES:
Department: Engineering Issue Contact: Dave Stringer
Topic: Civil Plans
Number:38 Created:3/16/2004 Unresolved
[4/26/041
[3/16/04] CS 505 see comment CS 300
Need revised soils report for all public streets. Report for PVH 3rd Filing shows
expansive soils
Number:40 Created:3/16/2004 Unresolved
[4/26/041
[3/16/04] Once phasing has been agreed upon need to show phasing on all
applicable sheets
Topic: Covers,heet
Number:65 Created:5124/2004 Pending
[5/24/041 Name of cover sheet needs to match name of plat ( See redline plans)
Number:66 Created:5/24/2004 Pending
[5/24/04] Still need CDOT approval for Harmony Road portion of plans. Have
meeting schedulked for May 26th at 1:30 PM to discuss
Topic: Phasing, Plans
Number:62 Created:5/24/2004 Pending
[5/24/04] See comment 62 (if still applicable) as it relates to latest phasing plans for
imfastructure
Topic: Utility Plan
Number: 47
[5/24/04]
Page 1
Created:4/26/2004 Pending
[4/26/041 Signal to be built with this project by Developer. If not typical CDOT
Standard please provide a design for signal bases. Show pole locations on
applicable sheets
Topic: Utility Plans
Number:63 Created:5/24/2004 Pending
[5/24/04] If TIS doesn't meet signal warrants then will need some alternate design
for intersection of Snow Mesa and Harmony
Number: 64
Created:5/24/2004 Pending
[5/24/04] 1 didn not find any detail on how landscaped median drainage (per
LCUASS 7.5.1 - median drainage) was being addressed
Page 2
STAFF PROJECT REVIEW
(ih'nF 14 n9 Collln>
BHA DESIGN Date: 05/26/2004
LUKEOLDENBURG
4803 INNOVATON DR.
FT. COLLINS, CO 80525
Staff has reviewed your submittal for PVH HEALTH SYSTEM - HARMONY CAMPUS
INFRASTRUCTURE PDP - TYPE 1, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Dave Stringer
Topic: Coversheet
Number: 65 Created: 5/24/2004
[5/24/04] Name of cover sheet needs to match name of plat ( See redline plans)
Number: 66 Created: 5/24/2004
[5/24/04] Still need CDOT approval for Harmony Road portion of plans. Have meeting schedulked for May 26th at 1 30
PM to discuss
Topic: Phasing Plans
Number: 62 Created: 5/24/2004
[5/24/04] See comment 62 (if still applicable) as it relates to latest phasing plans for imfastructure
Topic: Utility Plan
Number: 47
[5/24/041
Created: 4/26/2004
[4/26/04] Signal to be built with this project by Developer. If not typical CDOT Standard please provide a design for
signal bases. Show pole locations on applicable sheets
Topic: Utility Plans
Number: 63 Created: 5/24/2004
[5/24/04) If TIS doesn't meet signal warrants then will need some alternate design for intersection of Snow Mesa and
Harmony
Number: 64 Created: 5/24/2004
[5/24/041 1 didn not find any detail on how landscaped median drainage (per LCUASS 7. 5.1 - median drainage) was
being addressed
Department: Stormwater Utility
Topic: Erosion Control
Number: 6
[5/25/041
Fourth Review
May 24, 2004
Issue Contact: Basil Harridan
Created: 12/2/2003
1. Erosion Control calculations are contained in Appendix H, not Appendix G as stated
in the body ofyour report.
Page I
2. The notes on your sheet CS 221 need to be updated to the most current notes
(available from stormwater development review).
If the project is to be constructed in phases, each phase should have its own
stormwater management plan which includes individual phase report, calculations,
and surety. This "Master Infrastructure Plan" should not contain any stormwater
management/erosion control information, except the note that each phase will have
stonnwatcr management as shown in the plans for that phase.
[4/27/041
Since there will be construction done off of these plans an erosion control plan and report is still expected for this
project development plan.
t3/9/04]
Sediment/Erosion Control Plan Comments
Poudre Valley Health Systems Harmony Campus Infrastructure Project
November 24, 2003
The sediment/erosion control submittal is incomplete - no plan, no calculations, no report. Please
submit a complete set of documents/calculations per City of Fort Collins requirements.
Second Review
February 23, 20041
Same comment.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: General
Number: 50 Created: 4/27/2004
[5/25/041 Please provide an up to date phasing plan. Currently, the temporary sidewalk is shown on the Primary Care
PDP, but not on the PVH infrastructure plan. Please include on both plans for clarification and label it as being
constructed during the appropriate phase.
[4/27/041 Where is the temporary pathway for pedestrians that is called for in the TIS from Timberwood Dr. to Snow
Mesa? Will there be a sidewalk constructed with Timberwood and Snow Mesa? Is the fire access easement suppose
to provide this connection? If so it needs to be ADA accessible. Please clarify with a phone call 416-2040.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 32 Created: 3/11 /2004
[5/26/041
[4/29/041
[3/11/04] Provide a phasing plan for the water and sewer lines if these utilities are not to be installed all in one time
period. Provide all information necessary for the termination of phased water mains (temp fire hydrant for flushing).
Sanitary sewer mains may only be stubbed a maximum of 2 feet or must be extended to the next manhole. Provide
profiles of all proposed sanitary sewer mains.
Number: 53
Page 2
Created: 4/29/2004
L7Project Comments Sheet
Selected Departments
Cirpot fort Collins
Department: Engineering
Date: December 3, 2003
Project:
PVH HEALTH SYSTEM - HARMONY CAMPUTS INFRASTRUCTURE PDP
- TYPE 1
All comments must be received by Cameron Gloss in Current Planning, no later than
the staff review meeting:
December 07, 2003
Note -Please identify your redlines for future reference
Issue Contact: Dave Stringer
Topic: Civil Plans
Number: 9 Created: 12/3/2003
[12/3/03] Existing irrigation ditch to stay within right-of-way until future road
improvements to Harmony Road are made
Number: 10 Created: 12/3/2003
[12/3/03] No comments for this submittal. Project ready for hearing
Number: 11 Created: 12/3/2003
[12/3/03] General Comments as it relates to Final Development Plans: Plat needs
to show easements as shown on redline plans. Suggest that each tract be related at
time of PDP submittal for these lots. This will allow for more defined easements
when building pads sites are more defined.
Southern drive off Timberwood servicing existing structure needs to be removed to
accommodate the traffic that will be generated with future build out.
Number: 15 Created: 12/3/2003
[12/3/03] Need irrigation owner's signature block on plat
Signature Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility _ Redline Utility Landscape
Page I
[5/26/041
[4/29/04] List all sanitary sewer manholes which are to be adjusted. Include the existing and proposed rim elevations.
Include the manhole adjustment detail on the detail sheet.
Number: 54 Created: 4/29/2004
[5/26/041
[4/29/041 Coordinate the other plan sets for this site with this plan set. Show and label all proposed stubs for MOB and
Primary Care Fac. On these plans. Coordinate all sheets of this plan set with one another.
Number: 56
Created: 4/29/2004
[5/26/041
[4/29/04] Clearly define all aspects of ALL the water and sewer main constructions (i.e. fittings, valves, thrust restraint,
etc.).
See site, landscape and utility plans for other comments.
Be sure and return all of your reclined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
Cameron Gloss
City Planner
Page 3
Project Comments Shee'v
Selected Departments
� 1 it f N ..t C IIICI '
y O OI O S
i
Department: Engineering
Date: June 13, 2004
Project:
PVH HEALTH SYSTEM - HARMONY CAMPUS INFRASTRUCTURE PDP -
TYPE 1
All comments must be received by Cameron Gloss in Current Planning, no later than
the staff review meeting:
Review Date
(Vote - Please identify your redlines for future reference
Issue Contact: Dave Stringer
Topic: Coversheet
Number: 66
[6/13/04]
ATMU i�: E.' if &ZAP0I1L I
[5/24/04] Still need CDOT approval for Harmony Road portion of plans. Have
meeting scheduled for May 26th at 1:30 PM to discuss. Additional meeting set for
June 24th at 1:30 for further discussion
Topic: Utility Plan
Number: 47
[6/13/04]
[5/24/04]
Created: 4/26/2004
[4/26/041 Signal to be built with this project by Developer. If not typical CDOT
Standard please provide a design for signal bases. Show pole locations on
applicable sheets
Signature Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility Redline Utility Landscape
Paae I
Topic: Utility Plans
Number: 69 Created: 6/13/2004
[6/13/04] CS001 add check to box as shown regarding CDOT access ramp details
Number: 70 Created: 6/13/2004
[6/13/041 Cs512 add note referencing Landscape plan for type of sprinkler system
to be used in medians without inlets
Number: 71 Created: 6/13/2004
[6/13/041 Cs 200 move road detail to right edge of page
Number: 72 Created: 6/13/2004
[6/13/04] Cs000 note variance for radii at Snow Mesa and Harmony Road, Cs 003
Cdot access ramp standards add note
Number: 73 Created: 6/13/2004
[6/13/04] Cs 513 add detail regarding existing concrete test section and how asphalt
will abut to it
Number: 74 Created: 6/13/2004
[6/13/041 Cs 532 Revise note regarding signal to meet current status
Number: 75 Created: 6/13/2004
[6/13/04] Cs 602 CDOT access ramps provide M&S standard details
Number: 76 Created: 6/13/2004
[6/13/04] If no other CDOT concerns after June 24 meeting , Engineering is ready
for mylar
Page 2
F
City of Fort Collins
Current Planning
FINAL PLAN REVISIONS
COMMENT SHEET
DATE: June 9, 2004 TO: Engineering
PROJECT: #32-98D PVHS, Harmony Campus, Infrastructure
PDP - Final Plan Revisions
All comments must be received by Cameron Gloss no later than the
staff review meeting:
June 23, 2004
Note - Please identify your redlines for future reference
(c:GH(-- GLOSS.
r o /,VpY
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat Site Drainage Report _Other
_Utility Redline Utility _Landscape
o Ito Q
VaN
WO
Project Comments Sheet
Selected Departments
'itv of For[ Collins
Department: Transportation Planning Is -A' ,
Date: December 3, 2003
Project:
PVH HEALTH SYSTEM - HARMONY CAMPUTS INFRASTRUCTURE PDP
-TYPE 1
All comments must be received by Cameron Gloss in Current Planning, no later than
the staff review meeting:
December 07, 2003
Note - Please identify your redlines for future reference
Issue Contact: Tom Reiff
Topic: Civil Plans
Number: 16 Created: 12/3/2003
[12/3/03] The intersection design at Snow Mesa and Harmony Rd. will need to
include directional ramps for the future ped crossing of Harmony (see red lines).
Number: 17 Created: 12/3/2003
[12/3/03] The bike lane width when it is located between the right turn lane and the
through lane only needs to be 6' in width, not 8' as shown.
Number: 18 Created: 12/3/2003
[12/3/03] Add additional crosswalks at the Snow Mesa intersections with
Timberwood and the driveway just south of the Harmony intersection (see red lines).
Also please straighten some of the crosswalks to cross the street more directly.
Number: 19 Created: 12/3/2003
[12/3/03] Reconfigure the right turn lane as it approaches the Harmony intersection
and the first driveway. Please see red lines for the new design.
Signature
ate
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Y Utility _ Redline Utility Landscape
Page I
RESPONSE TO CITY OF FORT COLLINS COMMENTS: 12 22 2003
BY: Sear Brown and bha design
ISSUES:
Department: Current Planning Issue Contact: Cameron Gloss
Topic: Landscape Plan
Number: 7 Created: 12/2/2003
A maximum of 15% of any one -tree species is permitted within the development. It
appears that one species- Washington Hawthorn- exceeds this limitation. Staff
acknowledges that two varieties are provided, but they appear to be the same species
and therefore don't comply with the minimum species diversity. Please add an additional
tree species.
Response: The quantities shown on the plan are incorrect. The plant schedule is
representational at this time and quantities for individual species have not been
calculated. The actual plant species for each plant will be indicated on the plans in final
design. The re -submittal of this PDP will not indicate any quantities in the plant
schedule.
Topic: Subdivison
Number: 5 Created: 12/2/2003
Please remove "Preliminary" from the Subdivision Plat title. Administrative action on the
subdivision request will be for a final version of the plat.
Response: This will be addressed with the final plat as well as all of the other specific
commentns.
Department: Engineering
Topic: Civil Plans
Issue Contact: Dave Stringer
Number: 9 Created: 12/3/zuu,3
[12/3/03] Existing irrigation ditch to stay within right-of-way until future road
improvements to Harmony Road are made
Response: Comment noted.
Number: 10 Created: 12/3/2003
[12/3/03] No comments for this submittal. Project ready for hearing
Response: Comment noted.
Number: 11 Created: 12/3/2003
[12/3/03] General Comments as it relates to Final Development Plans: Plat
needs to show easements as shown on redline plans. Suggest that each tract be
replatted at time of PDP submittal for these lots. This will allow for more defined
easements when building pads sites are more defined.
Response: The plat shows easements necessary for utilities that will be
extended from under the road to outside of the right of way.
Southern drive off Timberwood servicing existing structure needs to be removed
to accommodate the traffic that will be generated with future build out.
Response: The roadway will be designed without this opening. It has also been
noted on the plat.
Number: 15 Created: 12/3/2003
[12/3/031 Need irrigation owner's signature block on plat
Response: The signature block has been included.
Department: Light & Power Issue Contact: Alan Rutz
Topic: General
Number: 1 Created: 11/25/2003
Underground electric lines (UGE) are drawn incorrectly on the Overall Utility
Plan, Contact Light and Power for maps of the existing underground electric
system.
Response: We will come to the electric offices prior to final design to get the
correct locations.
Number: 2 Created: 11/25/2003
Please provide potential future building and parking lot layouts along
Timberwood and Snow Mesa to help facilitate electric system design.
Response: We have provided a concept of this to you at the Utility Coordination
Meeting ( I think) If not we can get a concept plan to you.
Number: 3 Created: 11/25/2003
Streetlights will be placed along public streets. A 40 feet separation on both
sides of the light is required between canopy trees and streetlights. A 15'
separation on both sides of the light is required between ornamental trees and
streetlights. See note 14 on Landscape Plan.
Response: The plan will comply with the required landscape spacing from the
streetlights. Lighting design will be completed by the city of Fort Collins Light and
Power Department during final design. The landscape plan will be adjust when
the lighting design is completed.
Department: Stormwater Utility Issue Contact: Basil Hamdan
Topic: Drainage Plan
Number: 8 Created: 12/2/2003
[12/2/03] The drainage plan needs to show what the assumed imperviousness of
all basins are in order to be able to check the proposed imperviousness in the
future as the site develops.
Response: All of the new development is considered to be 80% impervious.
Please refer to the erosion control plans for Coefficient values.
Pond numbering is very confusing from existing ponds to proposed ponds. It is
not clear which, portion of the pond will be built when and where as this site
develops. It is suggested that a phasing plan be provided.
Response: You are right it is confusing. The SWMM model from Anderson
Engineering has 500 type numbering and the original SWMM modeling has 300
type numbering. Before Final design Sear Brown will discuss with you the
preferred numbering system.
What will be done with the pond area that will be filled in ?? Please make sure
area is seeded and mulched.
Civil Response: This set of plans does not address the filling in of the pond
because there will be no construction until another development is proposed.
When a development is proposed that will cause the pond to be filled in then we
will call for seeding and mulching.
Planners Response: The site will be vegetated or reconfigured with subsequent
development. Please see note 21. On sheet 1 of the landscape plan.
Please provide easements for all proposed detention areas and vacate the
easement for the pond area that will be filled in and no longer be used for
detention.
Response: This will be done in response to the needs of each development
proposal. As discussed we have noted that the pond will be built in no more than
three phases.
Topic: Erosion Control
Number: 6 Created: 12/2/2003
[12/2/031
Sediment/Erosion Control Plan Comments
Poudre Valley Health Systems Harmony Campus Infrastructure Project
November 24, 2003
The sediment/erosion control submittal is incomplete - no plan, no calculations,
no report. Please submit a complete set of documents/calculations per City of
Fort Collins requirements.
Response: This will be addressed with final construction Plans.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Civil Plans
Number: 16 Created: 12/3/2003
[12/3/03] The intersection design at Snow Mesa and Harmony Rd. will need to include
directional ramps for the future ped crossing of Harmony (see red lines).
Response: This; has been included.
Number: 17 Created: 12/3/2003
[12/3/031 The bike lane width when it is located between the right turn lane and the
through lane only needs to be 6' in width, not 8' as shown.
Response: Comment noted
Number: 18 Created: 12/3/2003
[12/3/03] Add additional crosswalks at the Snow Mesa intersections with Timberwood
and the driveway just south of the Harmony intersection (see red lines). Also please
straighten some of the crosswalks to cross the street more directly.
Response: This has been done:
Number: 19 Created: 12/3/2003
[12/3/03] Reconfigure the right turn lane as it approaches the Harmony intersection and
the first driveway. Please see red lines for the new design.
Response: As discussed previously there is a lot of storage required. This configuration
maximizes the storage. We are keeping the same configuration.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Civil Plans
Number: 12 Created: 12/3/2003
[12/3/03] The intersection of Snow Mesa and the private drive on the north side of this
development needs to be realigned with the existing 12-inch water main.
Response: We are moving the 12" water line per our utility coordination meeting.
Number: 13 Created: 12/3/2003
[12/3/03] Several water and sewer services are proposed throughout this site. Provide
an overall development plan which justifies the locations of these proposed services or
perhaps it would be better to extend services from the mains when the exact location of
the future buildings is better known. If services are extended now and they are located
in the wrong location for future buildings they will need to be removed from the mains
and new services extended which could double the cost of the future services.
Response: We have adjusted the services per out utility coordination meeting
Number: 14 Created: 12/3/2003
[12/3/03] A meeting is needed between the developer, developers consultants
and the City utility staff to facilitate this project.
See the master infrastructure plan for other comments.
Response: The meeting has been held and issues resolved.
When resubmitting plans, please return all of your redlined plan sets.
If you have any questions regarding these issues or any other issues related to
this project, please feel free to call me at (970) 221-6750.
Sincerely,
Cameron Gloss
CuTent Planning Director