Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CSU PARKING STRUCTURE - Filed DCP-DEV. CONSTRUCTION PERMIT - 2009-07-09
+ 1 Lip, N �'�� �tT Planning, Development & Transportation Engineering Department Fort Collins 281 North College Avenue PO Box 580 Fort Collins, CO 80522-0580 970.221.6605 970.221.6378 - fax DEVELOPMENT CONSTRUCTION PERMIT Permit Number: 09-03 Issuance Date: Project Name: Lake Street Parking Garage Project A.K.A.: CSU Building # 0250 Project Location: 1508 Centre Ave. Permittee: Brian Chase — Director of Facilities City and developer contacts: See attached Exhibit "A" for names and phone numbers of all contact persons for this project. Fees: Permit Application Fee (paid at the time of application) $ 400 Construction Inspection Fee (paid prior to issuance of this permit) $ 4,335.60 Street Cut Fee (To be paid by the contractor as needed) $ Total $ 4,735.60 Development Bond or other approved security: Amount of security deposited with the City to guarantee the completion of all public improvements to be constructed as shown on the approved plans for the development. $ 0.00 — See attached letter from CSU indication that CSU stands behind the maintenance/repair warrantee and will provide for the repair and maintenance of the improvements for 2 years from date of acceptance of the improvements and will repair or replace any damaged improvements prior to transfer of the maintenance responsibilities to the City (2 years after acceptance) PERFORMANCE REQUIREMENTS OF THIS PERMIT: 1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design drawings and specifications the certification of all materials testing by an Engineer. The Permittee shall have an Engineer prepare revised design drawings and secure City approval for all revisions to the Utility Plans and related documents. The Permittee shall have an Engineer represent, as required by the City in the Development Agreement, that the improvements are constructed in conformance with the approved Utility Plans and the standards and specifications of the City. The Permittee shall provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the constructed public improvements. (All references above to the terms "Project Engineer" and "Engineer" shall mean a Professional Engineer licensed in Colorado.) CA Development Construction Permit, Page 2/5 2. All contractors who perform work on this project must be bonded and licensed in conformance with City requirements. 3. Construction time restrictions: 4. The applicant understands that additional permits maybe required for this development project and the applicant shall secure those permits directly from the issuing departments. 5. This permit, along with a complete set of all approved plans and documents for this project (utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic study, drainage report, plat easements and any other official documents), shall be kept on the development site available for use by City staff doing inspections. 6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or Section 2.6.3(K) of the Land Use Code, whichever is applicable): a. If construction has not begun within sixty (60) days from the date of issuance of this permit, this permit shall expire and the applicant will forfeit the permit fee paid for this permit, whereupon the applicant must re -apply for a new permit. b. In addition, this permit shall expire one year from the date of issuance. The applicant may apply for an extension by reapplication at least two weeks prior to the expiration date. Such application shall contain information sufficient to justify the granting of the extension. An extension may be granted for up to six months. 7. Building permits and certificates of occupancy will only be issued when all conditions contained in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29- 678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the Development Agreement does not specify times for completion of public improvements, or if there is no Development Agreement, then the improvement requirements specified in Section 24-95 of the City Code shall apply, which provides that construction of all improvements shall be required prior to the time of issuance of the first building permit. 8. Acceptance by the City of the public improvements shall be after (1) dedication documents for Prospect Road Right-of-way and utility and drainage easements in acceptable format have been fully signed and received by the City; (2) final inspection has been conducted by the City; (3) punch list items from the final inspection are completed and accepted by the City; (4) required certifications from the licensed professional engineer that improvements are completed to City standards, specifications and approved Utility Plans; and (5) the `as -constructed' plans have been received and accepted by the City. 1 Development Construction Permit, Page 3/5 9. The warranty on street improvements is for five (5) years from the date of acceptance by the City of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use Code, as applicable. 10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any planned construction on this project. All required perimeter silt fencing and other erosion/sediment control best management practices (BMP's) that can be installed prior to construction must be in place and inspected by the City Erosion Control Inspector before any land disturbing activity begins. 11. No work (including grading) shall be started in State Highway right-of-way until a permit is issued by the Colorado Department of Transportation to allow such work to begin. 12. Other conditions: Permittee's acknowledgment signature: By signing this permit I acknowledge that I am acting with the knowledge, consent, and authority of the owners of the property (including all owners having legal or equitable interest in the real property, as defined in Section 1-2 of the City Code; and including common areas legally connected to or associated with the property which is the subject of this application) without whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such property to perform work required of the applicant if the applicant were to fail to perform the required work. I also acknowledge that I have read this permit document with all its requirements and conditions, and I agree to all of the terms and conditionso so stated in this permit. Applicant/Project Manager' s Signature: Approval for issuance: City Engineer Date: .c-2C J Date: &lj— (Permit Issuance Date) 1 Development Construction Permit, Page 4/5 EXHIBIT "A" DEVELOPMENT PROJECT CONTACT PERSONS Project Name: Lake Street Parking Garage Project A.K.A.: CSUBuilding # 0250 City Staff Contact Persons: Development Engineer: Andrew Carney, 281 North College Ave, Fort Collins, CO 80522 Office: 970-221-6501 Email: acarneykfcgov.com Construction Inspector: Marc Virata, 281 North College Ave, Fort Collins, CO 80522 Office: 970- 221-6567 Cell: 970-217-0552 Email: mviratakfcgov.com Water Utilities Engineer: Roger Buffington, 700 Wood Street, Fort Collins, CO 80521 Office: 970-221-6681 Email: rbuffin ton e,fcgov.com Erosion Control Inspector: D.A. Black, 700 Wood Street, Fort Collins, CO 80521 Cell 970-218-3011 Fax 970-221-6619 Email: dblack e,fc og v.com Natural Resources: Dana Leavitt, 281 N. College Ave., Fort Collins, CO 80521 Office 970-224-6143 Fax 970-416-2020 Email: dleavitt fc og v.com Traffic Operations: Street Closures: Syl Mireles, 626 Linden Street, Fort Collins, CO 80521 Office 970-221-6815 Fax 970-6282 Email: smireles@fc og v.com Transportation Planning: Denise Weston, 215 N. Mason, Fort Collins, CO 80521 Office 970-416-2643 Fax 221-6239 Email: dweston&fcaov.com Development Construction Permit, Page 515 Forestry: Ralph Zentz, 215 N. Mason, Fort Collins, CO 80521 Office 970-224-6302 Fax 970-221-6586 Email: rzentzAfcgov.com Light and Power: Doug Martine, 700 Wood Street, Fort Collins, CO 80521 Office 970-224-6152 Fax 970-221-6619 Email: dmartinekfc og v.com Developer' Contact Persons: Developer/Owner/PM: Brian Chase, Colorado State University Facilities Services Center, North Building Office: (970) 491-0006 Fax (970) 491-7572 Brian. chaseAcolostate.edu Planner: Marty Clausen, H&L Architecture 1755 Blake St., Denver, CO 80202 Office: (303) 298-5080 Fax: (303) 292-6437 Project Engineer: Cameron Fowlkes, Tetra -Tech 1900 South Sunset St., Longmont, CO 80501 Office: (303) 772-5282 Fax: (303) 772-7039 General Contractor: Don Wassenat, Shaw Construction 300 Kalamath St., Denver, CO 80223 Office: (303) 825-4740 Cell: (720) 951-0685 Fax: (303) 825-6403 donwkshawconstruction.net H W W 2 N w a H N w N V 0 Z Q U) w H H Q D Q1 V w 0 w a 000000 N00000 0000000000 O d' u,)0000000 OOOOOo Ln00000 p to 00 LO O LO Cl) LO 0N69k1 0 - O O M O O O O O O 6 I CW— I- 169-69—M h.4q O Cl) M 00000000 �. M 0 W LA LO 69 � Ln 69 69 69 69 69 � N 69 69 N N 69 69 69 69 E9 N 69 � � 69 69 69 69 J x O Z H Q W m IL LU Oy Z IW1. Z 000000 r_ r*_ 0 l)00 OOOOOOOOOO I_ I_ f_ 0000000 Ln000LAL) V OOO V v J J O O Cl) CM Cl) Cl) 69 69 69 69 0 001 O O O O O M O U) Ln LO 69 69 69 cM� 0 - •- � 0 0 69 W. 69 69 69 69 O W c.i 69 � 64 - 64 64 60V c� H W 9 W W wap� W 2 U. ZLLam 0 w m 000000 OoO000 O O O O O O O O O O 0000000000 O o 0 0 0 0 0 000000o i=CD CD 000000 N Ln69000 Lrierc0000000 0NLC�N06906900 000OD0LOLO 00a)00NLOLn W ti n' w �f� LA00 (Ocl)0-0 I,- 00LO �L6C'Mi� M oMLOCO0 LC)- M �.. Q G 0000 O N N E9 E9 E9 N' (6 60). E9 EH E9 NE9 LL W Ix 69 69 H4 6H V4 Z V. d Q J 44 qN Q N H W H ¢ oLL WZv lo— r W w = 0 0 0 0 0 0 O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O y 0 _ Z f. 0—W W F Qm O LA 0 0 0 0 NN69000 N C G C O C O 0 0 �N�N06906900 O O Ln N f_ Ln Ln OMM�COMM U U 69 LO O 0 b'i E9 E9 - O 0) CV)649, LOLn o 69 69 69 69 69 69 W W LU � m J F-�Lu w�p w V v �cnt-2ym.. z W000WOa w CO 0 0 LO N LO N LO 0 ce) 0 CD LO It O It IT 0 M M I O ^ W titi t���fOMM U. W W Z Z W W �Z V_ J o m W J Im J W C W W a N Q z> 0 J 0 Ma O vZ Lua H w IL 00 U. W v) V)y l Lil>->UU tilili000Ui)UU i }} fn>_Iililm ZW Q '�JUUW W JJJW W W W W Ww -1CgJJJ(nCn UO LL Z y w W 0 m LU CY Ci W aN :3 my rn a~ -- �JV zwZ �N uj Z C. 2 m o c LU Q W w Uo 15 LL a JO �:3 30 Z aoi� a) c a E �Z aJ aW mm O�� IL c mU af0i'Q = 3 �.. ^�U m ~ J W 3 = C0 � cc3 N .�i N H �. c W O NIn ayGoa C Nv�), �_JH ca m —2NW r0 Q� W V CV(C 0.0w>0CoC 4D Y N C a� o N Ntu >N v w Q m v)EmN m i C9aUcaaQUy « N M V N f0 tm - O N M Q b f0 �: v 0 O N M aT N f0 h N N N N N N N N aD N W p N M p - N O M M M V M 2�pp fA t+I M M M S Cl) § 2 $° R � � < � 0 --' A --------- o � � A $� �c �..� ..��..... Q ~ « A � $� , ..... .�...-- c .... � I $ �............ m = e oc y ) / j ■ § ) :� .n :v !C)G) : . e ;o ;o ;o m ■ © R G ;CD o k z � i 'i0 a , : E m � �� . .� � 0 :m ;( �o ;a ;C :C @ / a. L �k e ;e ;e ;o .o_ § miR'�'®'®I- ._ [ i o F- . I� .q ® ;� :® � :� �� ;� ■ _ r m 2 4) j ;� 'c .� : &fie: :L'o:o,=,LL § co a \ .� .. . : w - .,.:.. ) - # MCct 2 ''0I'a m m �'( . / � :n ,L :0 n - � 1 � i 0� . o , ;Ad �e ; k .: �m w :�_ 2 ;e : m o;Q�f co' i iE�2 $ ; a,��E:B,« . §§ .§§r .© / § Ef § § be.k kv \ \ n a �m i \k &_ ;# i2 o .—- 00) co � Cl) ��� � % § E :�'�'� ' a k < c C14 n V LO (D r, /# ® ao wl W. AOISW MIN OII/.WN) P+fy 0])f� M!1 CW M1.MO w0»G10p Mwa9lyrMi fMO YI1101lI. CD M► IM�IM1.':YYt•'MM( �4 No s / j�� COL�MDO�STAB TET TY F .A ,t ... MASTER C UTILITY PLAN — 444.ge— 4r11- &4A Ilk, OTETRA TECI PnarE �1l{3.9 AI tImm June 1, 2009 Engineering Department City of Fort Collins 281 North College Avenue PO Box 580 Fort Collins, CO 80522-0580 Colo'alp University Knowledge to Go Places Facilities Management Fort Collins, Colorado 50523-6030 RE: Lake St Parking Garage - Utilities extensions, connections, and other improvements To Who it may concern, The City of Fort Collins Engineering Department and Colorado State University have agreed that this letter establishes security for utilities extensions and connections and other improvements made by Colorado State University made necessary on account of the development of the Lake St Parking Garage, to the extent said utilities extensions, connections, and other improvements are dedicated to the City of Fort Collins. The City of Fort Collins Development Construction Permit (DCP) process requires this security. The improvements within the ROW will be designed and constructed per the drawings and specifications dated 5/4/2009 as approved by the City of Fort Collins Engineering Department 5/20/09. For this security Colorado State University will provide the following for two years from the "Notice of Acceptance" issued by the City of Fort Collins Engineering Department: - Maintenance — Basic maintenance of the improvements. Repair warranty - Includes repair or replace any damage to the improvements. Individual maintenance and repair instances will be negotiated and agreed upon by the City of Fort Collins and Colorado State University prior to completion of the work. At the end of the two-year warranty period, all maintenance and repair responsibilities will be transferred to the City of Fort Collins. Construction of the improvements is anticipated to be complete by the end of May 2010. The end of the two-year warranty period is anticipated to occur in May 2012. Sincerely, Df Idn Chase, D Facilities Mana Cc: Jason L. Johnson, Associate Legal Counsel and Special Associate Attorney General Steve Hultin, Assistant Director of Maintenance Engineering and Utilities Project File — Lake St Parking Garage �' EPA I�iGreen Division of Administrative Services ; 1.191ILN - P A R T N E R