Loading...
HomeMy WebLinkAboutPULSE PUD - Filed CS-COMMENT SHEETS - 2009-03-12Messaoe S Daat 1444^ ted 0/ )1/8 ubject: S. SHIELDS L�=-�`CAPING S^I D : / Sender: Doug MARTINE / CFC/01 ^ ^ Contents: 2. Part 1. TO: Mike HERZIG / CFC/01 CC: Al BOUSHEE / CFC/01 Bob KOST / CFC/01 Part 2. Ihave some potentially serious concerns about the proposed Shield St Laarea where noscapzng S.I.D. The portion along Shields is in an s ^ have an existing major~duct bank (substation tie circuit)we must be taken in this area to avoid damage to our facilities could be quite expensive, �es, as repairs Now for the bad news. The installation of landscaping along otherwise undeveloped roads (Stuart & Hobbit Sts.) creates a significant d iari from established installation sequence procedures In the past e« on S.I.D.s, Light and Power has installed street crossings, at Utility expense, in an attempt to avoid future cutting of asphalt when actual ^'^ development takes place (we have not charged the S I D ^ l+ the cr ing(s) installed later turn out to be inadequate,^ ^ oss- loca- tion, the developer would be responsible for or at the wrong the necessary facilities. Since a "landscaping costs to provide plant- ings that are exactly where Light and Power facilities installs it will be necessary for us to install �ztzes are to be placed, a ing^ This creates several problemsFoursystempriortothelandscap- S^I^D^ for a portion of our "development-� -t` we^ ~i^^ have tu charge the cur- rently $15 ^ 00 per lineal foot charges". This charge is o+ property line adjacent to each side f the road e o �=r. �u��rzona� normal "development charges" and "building site charges" will be charged to the developer(s)when development takes place. Secondly, we will need to install streetlights concur- rently rently with our above mentioned system These lights not r- until development takes place sincethere y o operate Volt) source available There ere will be no secondary (240 . ere will be additional charges (approxima e t l $4000.00) to make secondary power available for the two Sprinkler control shown. Also, the trees to be installed should be a type that wills /`u� grow large enough to block the streetlights (mounted at a height of51 ft > The third problem is there is an increased possibility that the systemwe^ ^ installaugmented (vaults and streetlights} may need to be relocated or meet the needs of the development. This would be at the developers to and can be quite costly, opers expense, Fort Collins Light and Power's system has been designed to provide an aesthetically pleasing, reliable electric system at a reasonable costThis type of S.I.D. has the potential of forcing future system modz+i^ ca- tions, significantly increasing the final cost to the developer. For this reason, I believe that landscaping S I D s should be di ^ ^ or not allowed. I am sure that PSCo and t^ ^ discouraged, o problems with this, and at the very least'there other utilities have similar coordination meeting, including the party initiating be a utility the S.I.D. ' Please keep me informed of the status of this project Thanks for th opportunity to comment. ^ e End of Item 1. IN TRAY > DATE. 6 May ';e DEPARTM�NT: ITEM. 2-87B THE PULSE PUD, Phase 1 - FINAL b No Problems Problems or Concerns (see below) r Date .r111/e7 Signature /r