HomeMy WebLinkAboutPARKWOOD EAST SECOND - Filed DA-DEVELOPMENT AGREEMENT - 2004-01-23SUBDIVISION AGREEMENT
THIS AGREEMENT, made and entered into this day of ill ,
A.D. 1979, by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal
corporation, hereinafter referred to as "the City," and LAKE SHERWOOD
VENTURE, a joint venture, hereinafter referred to as "the Developer,"
WITNESSETH:
WHEREAS, the Developer is the owner of certain property situate in the
County of Larimer, State of Colorado, and legally described as follows,
to -wit:
Parkwood East Second Filing, situate in the East 112 of
Section 19, Township 7 North, Range 66 West of the 6th
Principal Meridian, City of Fort Collins, County of
Larimer, State of Colorado.
WHEREAS, the Developer desires to develop said property as a residen-
tial subdivision and has submitted to the City a subdivision plat (and
a site plan if said property is to be developed as a Planned Unit Develop-
ment), a copy of which is on file in the Office of the City Engineer and
made a part hereof by reference; and
WHEREAS, the Developer has further submitted to the City a utility
plan for sand lands, a copy of which is on file in the office of the City
Engineer and made a part hereof by reference; and
WHEREAS, the parties hereto have agreed that the development of said
lands will require increased municipal services from the City in order to
serve such area and will further require the installation of certain
improvements primarily of benefit to the lands to be developed and not to
the City of Fort Collins as a whole; and
WHEREAS, the City has approved the subdivision plat (and site plan
where applicable) submitted by the Developer subject to certain require-
ments and conditions which involve the installation of and construction of
utilities and other municipal improvements in connection with said lands.
NOW, THEREFORE, in consideration of the premises and the terms and
conditions acknowledged by the parties hereto, it is agreed as follows:
1. Except as otherwise herein specifically agreed, the Developer
agrees to install and pay for all utility lines, storm drainage facilities,
streets, and other municipal facilities necessary to serve the lands within
the subdivision, provided the City agrees to reimburse Developer for "over -
sizing" of water, sewer and street improvements, and further to install
and pay for the northly half of Stuart Street or to reimburse Developer for
the same.
2. Water Lines.
a. The Developer agrees to install all water lines as shown on
the utility plans in accordance with the requirements and as shown on said
plans, whether such lines are actually on the property, bordering the
property, or on other lands connecting the subject property to the existing
City water distribution system.
b. Such water lines shall be installed in full compliance with
the standard specifications of the City on file in the office of the City
Engineer and applicable provisions of the City Code relating to the instal-
lation of such lines.
c. The Developer understands and agrees that no building permit for
any structure in the subdivision shall be issued by the City until the water
line and the fire hydrant serving such structure is installed and accepted
by the City.
d. Any water lines described on Exhibit "A," attached hereto,
shall be installed within the time required on Exhibit "A." If the City
Engineer determines that any lines shown on the utility plans are required
-2-
to provide service to other areas of the city, those lines shall be in-
stalled within the time determined by the City Engineer.
e. All of said lines shall be installed at the sole expense of
the Developer.
f. The installation of said line shall be inspected by the Public
Works Department of the City and shall be subject to such department's
approval. The Developer agrees to correct any deficiencies in such instal-
lation in order to meet the requirements of the plans and the specifica-
tions applicable to such installation.
3. Sanitary Sewer Collection Lines.
a. The Developer agrees to install all sanitary sewer collection
lines shown on the utility plans, whether the same be on or off the subject
property.
b. Such sanitary sewer lines shall be installed in full com-
pliance with the standard specifications of the City on file in the office
of the City Engineer relating to the installation of such lines.
c. The Developer understands and agrees that no building permit
shall be issued by the City for any structure in the subdivision until the
sanitary sewer line serving such structure is installed and accepted by the
City.
d. Any sanitary sewer line described on Exhibit "A," attached
hereto, shall be installed within the time required on Exhibit "A." If the
City Engineer determines that any lines shown in the utility plans are
required to provide service to other areas of the city, those lines shall
be installed within the time determined by the City Engineer.
e. All of said lines shall be installed at the sole expense of
the Developer.
—3—
f. The installation of said lines shall be inspected by the
Public Works Department of the City and subject to such department's
approval. The Developer agrees to correct any deficiencies in such instal-
lation in order to meet the requirements of the plans and the specifica-
tions applicable to. such installation.
4. Electric Lines and Facilities. The City Light and Power Depart-
ment shall install all electric distribution lines and facilities required
for the subject property, and the Developer shall pay for such work in
accordance with the established charges of the Light and Power Department.
Such installation shall include all street lights required for the develop-
ment.
5. Storm Sewer Lines and Facilities.
a. The Developer agrees to install all storm sewer lines and
facilities as shown on the utility plans.
b. Such storm sewer lines and' facilities shall be installed in
full compliance with the standard specifications of the City on file in the
office of the City Engineer relating to the installation of such lines.
c. The Developer agrees to complete the installation of drainage
outfall facilities prior to the issuance of more than 25 single family and
50 multi -family unit building permits or the issuance of more than 13
single family and 25 multi -family unit certificates of occupancy.
d. All of said lines and facilities shall be constructed in an
orderly fashion, as determined by the City Engineer, so as to prevent
damage to other util.ities, streets, curb, gutter, sidewalks, and all
adjacent properties.
e. All of said facilities shall be installed at the sole expense
of the Developer.
-4-
f. The installation of all such lines and facilities shall be
inspected by the Public Works Department of the City and shall be subject
to such department's approval. The Developer agrees to correct any defi-
ciencies in such installation in order to meet the requirements of the
plans and the specifications applicable to such installation.
6. Streets.
a. The Developer agrees to install all streets shown on the
utility plans, complete with paving, curb, gutter, and sidewalks, Hotwith-
standinq arythi�n� to th� contrary herein the City agrees to ins all the
/ir / �1,. <.cn / flit '1 `• ¢s rr-f 77c
-Developer installs its
streets o��� tbn4�trnarb Deele�ew ma nstall the nothly half of
of the cost thereof '
�.
f-om the City. -
b. Such streets shall be installed in full compliance with the
standard specifications of the City on file in the office of the City
Engineer relating to the installation of such streets.
c. No building permit for the construction of any structure in
the subdivision shall be issued by the City until the street providing
access to the structures is improved with at least the gravel base required.
Furthermore, no building permit shall be issued by the City for any structure
located in excess of six hundred sixty (660) feet from a single point of
access.
d. ,Any streets described on Exhibit "A," attached hereto, shall
be installed within the time required on Exhibit "A." If the City Engineer
determines that any streets shown in the utility plans are required to
provide access to other areas of the city, those streets shall be installed
within the time determined by the City Engineer.
e. All of said streets shall be installed at the sole expense of
the Developer.
except as provided in (a) above.
f. The Developer agrees to correct any deficiencies in such
installation in order to meet the requirements of the plans and the speci-
fications applicable to such installation.
-5-
g. Str-et improvements shall not be -stalled until all utility
lines to be placed in the streets have been completely installed and all
services to individual lots have been installed from main utility lines to
the property line.
h. The Developer agrees to provide and install at his expense
adequate barricades, warning signs, or other devices on the dead ends of
streets to be continued, unfinished crossings, and other sites designated
by the City Engineer as areas requiring such measures to insure the public
safety.
7. Other Requirements.
a. It shall be the responsibility of the Developer and/or the
homeowners to maintain the sidewalk in Tract "A"
8. Miscellaneous.
a. The Developer shall provide the City Engineer with certified
record utility drawing transparencies upon satisfactory completion of
utility construction for his use in making record prints for the City's
files.
b. This Agreement shall be binding upon the parties hereto, their
heirs, personal representatives, and assigns.
c. Nothing herein contained shall be construed as a waiver of any
requirements in the City Subdivision Ordinance or any other provision of
the City Code, and the Developer agrees to comply with all requirements of
the same.
T ITY OF.FORT COLLINS, COLORADO
A icppal Cyporat,ion
!M.
ager
APPROVED: -�
Di'Pr�Public Works
ASst City -Attorney
ATTEST:
.{}tj�A. Secretary
LAKE SHERWOOD VENTURE,
a Joint Venture -
By
-7-
EXHIBIT "A"
1. Schedule of water lines to be installed out of sequence.
Not Applicable
2. Schedule of sanitary sewer lines to be installed out of sequence.
Not Applicable
3. Schedule of street improvements to be installed out of sequence.
a. Sheet of 12 or 13 of the utility drawings shows a "possible
future street extension" for Riverside Drive through Edora
Park. This was shown for information only and is not .to be
construed as a commitment to final design nor.a construction
commitment by either the developer or the City of Fort
Collins.
b. Lots 214 through and including 232 may not be built upon