Loading...
HomeMy WebLinkAboutCOLLINDALE BUSINESS PARK THIRD REPLAT LOTS 6 AND 7 - Filed GC-GENERAL CORRESPONDENCE - 2004-11-10STATEMENT OF PLANNING OBJECTIVES COLLINDALE OFFICES AT THE FAIRWAYS NWC CARIBOU DRIVE AND AUTOMATION WAY FORT COLLINS, CO Project Description: The Collindale Offices at the Fairways is a proposed office campus located at the northwest corner of Automation Way and Caribou Drive. The development includes six, two-story office buildings of approximately 6,064 square feet each (4,440 of leasable square feet per building). Convenient parking is located adjacent to each office structure with a forty -foot wide landscaped strip in the center of the site creating a park -like median. Vehicular access to the site is via two curb cuts off Automation Way along the east property line. Pedestrian access to the site is by a public sidewalk along Automation Way and an internal pedestrian system of walkways between the structures and parking areas. The subject site is currently owned by Bill Tiley and the Estate of Mae M. Tiley, in care of University Realty, P.O. Box 471, Fort Collins, Colorado 80522. Developer and Contract Purchaser is Chapter 7 Ownership Group, 1605 Remington Street, Fort Collins, Colorado 80525. Galloway, Romero & Associates will represent the owner and developer for all correspondence and matters related to the development review process for PDP and Replat approvals. Compliance with Intent of Zone District The proposed Collindale Offices at the Fairways is located within the Employment District (E). The Employment District is intended to provide locations for a variety of workplaces including light industrial uses, research and development activities, offices and institutions. Additionally, the Employment District is intended to encourage the development of planned office and business parks; to promote excellence in the design and construction of buildings, outdoor spaces, transportation facilities and streetscapes; to direct the development of workplaces consistent with the availability of public facilities and services. The proposed two-story office buildings will fulfill the goal of the district by providing office employment for general offices as well as medical and dental offices. The office buildings will promote excellence through architectural design compatible with existing developments within the Collindale Office Park. Compliance with Land Use Standards The proposed office complex meets the Land Use Standards of the Employment Zone District as follows: Dimensional Standards: The proposed offices are two-story strictures. These are within the four-story height limitation allowed within the district. Surrounding properties within the Collindale Business Park includes both single and two-story strictures for general office and light industrial uses. Development Standards: Site Design: The proposal is included in the subdivided Collindale Business Park. Several, of the lots within the business park are currently developed with mixed uses, which meet the intent of the zone district. Public streets and infrastructure have been approved and constructed to provide adequate circulation and services within the business park. In addition to compliance with City codes governing the Employment Zone District, developments with the Collindale Business Park are subject to Declarations of Covenants, Conditions and Restrictions for Collindale Business Park and amendments thereto. The business park CCR's require approvals through an architectural control committee to insure a standard of quality development contextually complimentary to other developments within the park. The context diagram demonstrates compatibility between the proposed project and developed sites within the office park. Existing development within the park consists of a variety of unrelated mixed uses, which offer vehicular access through the existing public street system and pedestrian links through a combination of public and private walkways and pedestrian paths. Construction of this site completes pedestrian connections between developments along the west side of Automation Way. Similar planting materials have been used to provide a thematic presentation with the adjacent development to the north. The scale and height of the proposed offices are complimentary to surrounding developments within the park in both mass and height. The height restriction of the zone district will further insure consistency in future developments within the park. Building Design: The building design complies with City Code Division 4.22(E) (2) (a). Although the buildings are oriented away from the street, the proposed office plaza provides a campus -like development block. A connecting walkway links the public sidewalk located along Automation Way with each of the six separate office buildings within the development. A common open space area is located in the center of the development, which interrupts the parking area and provides for landscaped relief. Pedestrians do not have to cross parking in order to access any of the offices from the public way. The sidewalk along Automation Way provides a pedestrian link between existing and future business and industrial uses within the park. Transit stops are also provided within the park for alternative modes of transportation to and from other developments and the community. y -o p>f.S'l'.� 1'l:\1IA 1' 01= f'I.: NNL G OF01:{""TfVFS.doc Compliance with General Development Standards Open Space/Landscaping The proposed landscaping supports functional purposes by creating spatial definition through the campus setting. The central landscaped area provides a mini -park setting outlined with tree canopies to maximize shade areas and break up the pavement of the parking areas. The landscaping is also designed to provide management of drainage within the site. Combinations of evergreen and deciduous trees provide buffering along the perimeter of the site. The selection of planting materials and landscape design enhances the pedestrian environment as well as compliments and frames the architectural features of the structures. 48.8% of the site is provided in landscaping, which meets and exceeds the standards of Division 3.2.1 of the Fort Collins Land Use Code. Minimum planting requirements are met. One tree is provided per 40 lineal feet of frontage along .Automation Way. Additional shrub beds and sod with a meandering sidewalk provide a pleasing entrance into the development. The perimeters of the site are buffered from adjacent properties by a minimum of one tree per 40 lineal feet of side lot frontages. Planting materials used in adjacent developments have been repeated to add continuity and provide a sense of connectivity between developments in the area. Restricting plantings to 24" or less within fifteen feet of curb cuts has honored sight visibility distances. The interior parking lot landscaping far exceeds the minimum 6% requirement by Land Use Code. The placement and interrelationship of required landscape elements enhances visual continuity within and between adjacent developments, provides a generous tree canopy and creates visual interest year round. Foundation plantings complement the architecture of the office buildings and direct pedestrians to the building entries. Placement of the shrub beds along the street frontage provides additional screening to the parking area and frames the joint tenant monument sign. Access, Circulation and Parking: The proposed development is designed with safety, efficiency and convenience in mind for vehicles, bicycles, and pedestrians, both within the development and to and from surrounding areas. The campus arrangement of the buildings around the perimeter of the site separates pedestrians from vehicles and bicycles through a walkway network that also provides entry from the public way Site amenities are offered to promote alternative means of transportation. Bike racks are provided conveniently located near the entries of each office structure. Walkways are located and aligned to directly and continuously connect areas or points of pedestrian origin and destination. ys70.psf.S ATF",MEN`F OF PLANNING OBJECI f ES.doc The parking lot layout provides well-defined circulation routes for vehicles, pedestrians and bicycles. The parking orientation furnishes convenient parking to the tenants without dominating the site with expanses of uninterrupted pavement. The center median and landscaped yards in front of each building provide an aesthetically pleasing presentation 1.7 for the tenants. The parking areas are setback from 14.5' to 21.5' from the street right-of-way. The rear parking setback is over 20' from property line. Parking requirements utilized for this development are three spaces per 1,000 square feet of general office space plus four and one-half spaces per 1,000 square feet of medical/dental office space. The developer assumes leasable space proportioned at 25% for general office use and 75% for medical/dental use. A total of six handicap accessible spaces are provided for the overall development, two of which are van accessible. Site Lighting 3.2.4 Sight lighting is designed with safety for the tenant users and sensitivity to surrounding uses. Light sources are shielded. Proposed light standards are on 25' poles with a 2' concrete base. Lights will be 400 watt metal halide luminaires. A photometric light analysis is provided to demonstrate compliance with Land Use Code requirements. Maximum on -site lighting levels shall not exceed 10 foot-candles. Engineering Standards Utilities: A water line will be looped through the drive aisle to provide service to each building. Sanitary Sewer lines are extended along the building frontages from the main in Automation Way. Gas and electric service lines are extended from Automation Way to each building. Drainage: On site detention is provided pursuant to the requirements of city engineering. Public Improvements: There are no street improvements associated with development of this site. A public sidewalk is provided along Automation Way with private sidewalk links serving the buildings. Building Standards Measures were; taken to provide architectural compatibility with the established architectural character of the area. No specific architectural theme emerged in the developed areas within the business park although all fit within the parameters of the CCR's for the park. We feel that the proposed architecture will elevate the standard that has been established for the business park. The two-story stucco/brick and glass buildings will compliment adjacent developments. Each building is well defined with an attractive glass and brick entry feature. Window and door patterns are repeated for each structure with the same building materials, color, brick and stucco. The predominant OF PLANNING OBiFC1'I.VESAOC building color is light earth -toned stucco with bronze glazed windows. Brick accents above the entries and building bases consist of a dark, earth red hue to anchor the structures. Trash enclosures are located unobtrusively in the rear of the site. The enclosures consist of brick veneer walls that match the brick on the buildings. The intent of the developer is to complete shell construction, which defines the architectural elements reflected in the elevations. Although the tenant finish plans will determine the final location of the mechanical equipment, provision has been made to accommodate adequate rooftop screening. Any future mechanical equipment can be incorporated into the overall design theme of the buildings and screened from adjacent properties and public ways through effective use of landscaping. Conduit, meters, vents and other equipment attached to the building will be painted to match surrounding building surfaces. Section 3.5.3, Mixed -Use, Institutional and Commercial Buildings: Consideration was given to the relationship of the building to the streets, walkways and parking areas. The main entrances of each office building faces directly onto a connecting walkway that leads to the public pedestrian system along Automation Way. The two buildings on the street frontage comply with the 15 foot build to line. The building facade treatment includes wall articulation by patterns of stucco and windows planes. The entrances are clearly defined by projecting into the landscaped yards and framed by sheltering elements. The buildings include bases of brick of a complimentary color to the building palette. Signs: The Collindale Offices at the Fairways will be identified by a 7'-0" high internally illuminated sign on a 4'-0" brick monument base to match the brick base of the buildings. The individual office buildings will be further identified by letters. Additional directional and identification signage may be used as tenants are identified. In all circumstances, all signage will comply with City Code requirements. Summary Statement: The Collindale Offices at the Fairways will provide a quality project to further enhance the existing development within Collindale Business Park. We respectfully request approval of the Project Development Plan (PDP) and Replat based upon design and plans meeting and exceeding the codified development standards and design guidelines for the park. OF PLA.""'1\G OBjl-.,( It'l >.doc Commu ' , Planning and Environmental 'vices Current Planning City of Fort Collins Mr. Craig Olson and Tom Richards Summit Constructors 1605 South Remington Street Fort Collins, CO 80525 July 8, 1999 Dear Tom: For your information, attached is a copy of the Staff's comments concerning the New Offices on Lots 6 and 7 Collindale Business Park, which was presented before the Conceptual Review Team on June 28, 1999. The comments are offered by staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sincerely, T� Ted Shepard Chief Planner cc: Eric Bricke, Streets Dept. Stormwater Dept. Project Planner File 181 North Collece Avenue • PO. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020