HomeMy WebLinkAboutSERVICE CENTER THIRD REPLAT - Filed GC-GENERAL CORRESPONDENCE - 2004-11-10(MMIML, — 1� Project Comments Sheet
Selected Departments
C itV al t'Ol"t C:UIF111"
ent: Engineering
Date: November 25, 2003
Project: CITY OF FTC VEHICLE STORAGE BUILDINGS PDP -TYPE II
All comments must be received by Bob Barkeen in Current Planning, no later than
the staff review meeting:
November 26, 2003
Note - Please identify your redlines for future reference
Issue Contact: Dave Stringer
Topic: General
Number: 5 Created: 11 /25/2003
[ 1 1 /25/03] Cover sheet, Ned to describe legal as being a replat lot 1--------- and
filing 4----------, whatever the correct legal is
Number: 6 Created: 11/25/2003
[ 1 1 /25/031 Use directional ramps at driveways, etc.
Number: 7 Created: 11 /25/2003
[ 1 1 /25/031 Need a soils report. I did not receive one with this submittal
Number: 8 Created: 11 /25/2003
[ 1 1 /25/031 Final Development Plan Documents will require more detail such as
storm sewer profiles, and etc.
Number: 9 Created: 11 /25/2003
[ 1 1 /25/031 If you are design curb, gutter and walk with this project provide
complete design with profile of Flow line. Elevations and street cross sections with Final
submittal
Number: 10 Created: 11 /25/2003
[ 1 1 /25/031 Who and when will rails to trail be vacated?
Number: 11 Created: 11 /25/2003
[ 1 1 /25/03] Engineering ready for hearing
Signature Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report �_ Other
' Utility Redline Utility Landscape -
)�' 0—
Page 1
Project Comments Sheet
Selected Departments
Department: Water Wastewater
Date: June 18, 2004
Pro.iect:
CITY OF FTC VEHICLE STORAGE BUILDINGS PDP - TYPE I AND FINAL
PLAN
All comments must be received by Bob Barkeen in Current Planning, no later than
the staff review meeting:
June 16, 2004
Note - Please identify your redlines for future reference
Issue Contact: Jeff Hill
Topic: General
Number: 65 Created: 6/18/2004
[6/18/04] Water meter pit must be placed in a meter pit out side of the building.
Provide the appropriate meter pit detail on the detail sheet.
Number: 66 Created: 6/18/2004
[6/18/04] Water services may not extend from fire lines. For a water line to be
considered a main a fire hydrant must be placed at the end.
Number: 67 Created: 6/18/2004
[6/18/04] Maintain 10 feet minimum separation between inlets and all water/sewer
lines.
Number: 68 Created: 6/18/2004
[6/18/04] Provide North Weld Water District signature block on these plans.
Number: 69 Created: 6/18/2004
[6/18/04] See site, landscape and utility plans for other comments.
Signature Date
ECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility --'Redline Utility c.--t-andscape
Page 1
Project Comments Sheet
Selected Departments
Department: Engineering
Date: June 18, 2004
Project:
CITY OF FTC VEHICLE STORAGE BUILDINGS PDP - TYPE I AND FINAL
PLAN
All comments must be received by Bob Barkeen in Current Planning, no later than
the staff review meeting:
June 16, 2004
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore
Topic: Civil plans
Number: 71 Created: 6/18/2004
16/18/04] Sheet C11- street plan and profile: Why does the curb angle east at the north property line? If curb and
gutter is needed for drainage purposes north of the property line, it should continue straight north as opposed to angling
or curving to narrow the street north of the development site.
Number: 72 Created: 6/18/2004
[6/18/04] Street design - C11 - The maximum grade break allowed is 0.4% and should be met even when tying to
existing grades.
Number: 73 Created: 6/18/2004
[6/18104] Please provide 500' offsite design of Wood Street to the north as required per LCUASS.
Number: 74 Created: 6/18/2004
(6/18/041 Please provide additional elevations so that cross -slopes can be verified. Do you have data for the east
edge/flowline of Wood Street?
Issue Contact: Dave Stringer
Topic: Civil plans
Number: 45 Created: 6/3/2004
[613/04] Review LCUASS appendix E-6 regarding scanning quality
Number: 46 Created: 6/3/2004
[613/04) Need off -site easements for storm sewer work and any work out side of property.
/R-'0
Date
CHECK HE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat =Site �rainage Report Other_
/ Utility Redline Utility Landscape
Page 1
Number: 47 Created: 6/3/2004
[6/3/04] Is some form of permit required for work in Poudre River?
Number: 48 Created: 6/3/2004
[613/041 Need signature block for North Weld County Water District and Nauta (neighbor with irrigation lateral crossing
this property).
Number: 49 Created: 6/3/2004
[6/3/04] Need to dedicate emerengcy access easement by separate document and to standard, with curves as
opposed to 90-degree turns.
Number: 50 Created: 6/3/2004
[6/3/04] Note reception number or book and page for all existing easements.
Number: 51 Created: 6/3/2004
[6/3/04] Page C4 Note 2. Where is this note refering to?
Number: 52 Created: 6/3/2004
[6/3/04] Page C6 main building corner is very close to existing easement. Need to make sure future building does not
encroach into easement
Number: 54 Created: 6/3/2004
[6/3/04] Sheet C12 cross slopes ahev reverse fall or little slope to gutter. Existing street will require an overlay to
correct problems. Appoximately station 2+00 to 3+00
Number: 55 Created: 5/3/2004
[6/3/04] Sheet C15 and C17 - How will under drain pipe tie into slope of pond, show detail, Provide better detail of
subdrain bedding and fabric system, fabric type, size of aggregate and etc.
Number: 56 Created: 6/3/2004
[613/041 See additional comments on relined plan sheets. Please return redlines plans with next submittal
Issue Contact: Katie Moore
Topic: General
Number: 70 Created: 6/18/2004
[6/18104] Please see redlined utility plan checklist for additional comments.
Issue Contact: Dave Stringer
Topic: General
Number: 10 Created: 11/25/2003
[6/3/04] The Rails to Trails easement will need to be vacated prior to Building C being approved.
(11/25/03] How and when will rails to trail be vacated?
Number: 25
[6/3/04]
Created: 12/3/2003
(1213/03] refer to Larimer County Urban Area Street Standards for scaring requirements for all plan sheets
Page 2
Project Comments Sheet
- Selected Departments
Department: Stormwater Utility
Date: .tune 17, 2004
Project:
CITY OF FTC VEHICLE STORAGE BUILDINGS PDP - TYPE I AND FINAL
PLAN
All comments must be received by Bob Barkeen in Current Planning, no later than
the staff review meeting:
June 16, 2004
Note - Please identify your redlines for future reference
Issue Contact: Wes Lamarque
Topic: Drainage
Number: 27 Created: 12/4/2003
6/16/04 - Since outfall pipe may be relocated farther west, these issues will be detailed
with next submittal and will be reviewed at that time.
[1/8/04]
Please provide more detail for the outfall into the Poudre River and include all proposed
construction details like flared -end sections, riprap, etc.
A 20-foot wide off -site drainage easement is also required for the outlet storm sewer. If
there is already an easement for the existing storm sewer, it would have to provide 10-
feet on either side of the proposed storm sewer to be used. This scenario is unlikely
and a new easement is probably required.
On -site drainage easements are also required for all drainage structures including storm
sewers and detention ponds up to the 100-year WSEL.
Number: 59 Created: 6/15/2004
Please provide, as much as possible, horizontal separation between the tailings deposit
area and the storm sewer. See grading plan.
Cow)
Signature
6-►-?-d'f
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site ✓ Drainage Report Other_
✓ Utility _ ✓ Redline Utility Landscape
Page t
C.C. i�eb �rkee�
k,.%ie Moore
TFc
Number: 62 Created: 6/16/2004
Please show the underdrain outfall for the tailings deposit area and design all
underdrains to outfall at the toe of the slope of the detention pond.
Number: 63 Created: 6/16/2004
Please see additional comments on the redlined plans.
Number: 64 Created: 6/17/2004
The Extran model will be reviewed with comments, if any, provided the week of June
21 st.
Topic: Erosion/Sediment Control
Number: 61 Created: 6/16/2004
1. It seems (although it is not really possible to tell) that your calculations reflect completed
conditions, not "during construction" conditions with your BMP's. Please clarify.
2. The main site is protected, I did not see any protection to the north of the main detention
area to protect the pipeline constructions there????
3. Your report calls for seeding and mulching, please put a note on the plan to that effect
and indicate the area(s) that are to be so treated.
4. The outlet of the detention pond shows "inlet protection". There should be some
clarification to this, what is to be utilized there (straw bales will not work).
If you have any questions regarding erosion control, please contact Bob Zakely at 221-6700
Page 2
Project Comments Sheet
City olFort Collins Selected Departments
Department: Engineering
Date: July 16, 2004
Project:
CITY OF FTC VEHICLE STORAGE BUILDINGS PDP - TYPE I AND FINAL
PLAN
All comments must be received by Bob Barkeen in Current Planning, no later than
the staff review meeting:
July 28, 2004
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore
Topic: Civil plans
Number: 72
Created: 6/18/2004
(7/14/04] The offsite design needs a vertical curve - the grade break is over 1 % and the
maximum is 0.4%.
[6/18/04] Street design - C11 - The maximum grade break allowed is 0.4% and should be
met even when tying to existing grades.
Number: 75 Created: 7/14/2004
[7/14/04] Please work with Real Estate services to dedicate the easement for the water line
for the water district.. Dedication of this easement will require Council approval.
Number: 77 Created: 7/16/2004
17/16/04] The drainage alignment legals were checked for closure and are fine. The utility
and drainage easement on -site legal was checked and was fine. This item should be re-
named as an alignment or area (remove the word easement).
Issue Contact: Dave Stringer
Topic: Civil plans
Number: 46 Created: 6/3/2004
(7/14/04] Please provide copies of these completed easements ASAP. The legals were
checked for closure and are fine.
(6/3/04] Need off -site easements for storm sewer work and any work out side of property.
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility _ Redline Utility Landscape
Page I
Number: 49 Created: 6/3/2004
[7/14/041 The 10' radius curves provided are inadequate. Minimum 25' interior and 50'
exterior radii are required on emergency access easements. Please revise and resubmit
legals and re -name as an alignment (vs. easement).
[6/3/04] Need to dedicate emerengcy access easement by separate document and to
standard, with curves as opposed to 90-degree turns.
Number: 55 Created: 6/3/2004
[7/14/04] Repeat: How will under drain pipe tie into slope of pond, show detail.
[6/3/04] Sheet C15 and C17 -How will under drainpipe tie into slope of pond, show detail,
Provide better detail of subdrain bedding and fabric system, fabric type, size of aggregate
and etc.
Number: 56
[7/14/04]
[6/3/04] See additional comments on relined
next submittal
Created: 6/3/2004
plan sheets. Please return redlines plans with
Page 2
Project Comments Sheet
Selected Departments
City of Fort Collins
Department: Engineering
Date: December 3, 2003
Project: CITY OF FTC VEHICLE STORAGE BUILDINGS PDP - TYPE II
All comments must be received by Bob Barkeen in Current Planning, no later than
the staff review meeting:
November 26, 2003
Note - Please identify your redlines for future reference
Issue Contact: Dave Stringer
Topic: General
Number: 5 Created: 11/25/2003
[11/25/031 Cover sheet, Ned to discribe legal as being a replat lot 1--------- and filing
4----------, whatever the correct legal is
Number: 6 Created: 11/25/2003
[11/25/031 Use directional rampps at driveways, etc.
Number: 7 Created: 11/25/2003
[11/25/031 Need a soils report. I did not receive one with this submital
Number: 8 Created: 11/25/2003
[11/25/03] Final Development Plan Documents will require more detail such as
storm sewer profiles, and etc.
Number: 9 Created: 11/25/2003
[11/25/031 If you are design curb,gutter and walk with this project provide complete
design with profile of flow line. Elevations and street cross sections with Final
submital
Number: 10 Created: 11/25/2003
[11/25/03] Who and when will rails to trail be vacated?
Number: 11 Created: 11/25/2003
[11/25/031 Engineering ready for hearing
Signature Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility Redline Utility Landscape
Page 1
Nurr ;er: 24 Created: 12/3/2003
[12!! ,03] Nedd to verify that there are existing easements for off -site storm sewer as
shown. Will need construction easements for this work
Number: 25 Created: 12/3/2003
[1'L,I)'/03] refer to Larimer County Urban Area Street Standards for scaning
requirements for all plan sheers
Page 2
REVISION
COMMENT SHEET
DATE: December 19, 2003 TO: Engineering
PROJECT: #23-03A CITY OF FT. COLLINS VEHICLE
STORAGE BUILDINS PDP — TYPEA9(LUC)
All comments must be received by Bob Barkeenlater than the
staff review meeting:
January 7, 2004
a} omment
ElProblems or Concerns (see below or attached)
print)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
1
7
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape
City of Fort Collins
City of Fort Collins Current Planning Date: 12/19/2003
Bob Barkeen
281 N. College
FT. COLLINS, CO 80524
Bob, Here are the responses to the First round PDP Comments
ISSUES:
Department: Current Planning Issue Contact: Bob Barkeen
Topic: General
Number: 35 Created: 12/10/2003
[12/10/03] The fence along Vine Drive is a solid wooden fence. This fence design should incorporate design features to
enhance its appearance, such as masonry columns, trim details. etc. Is it possible to have the fence be designed as an
"Art in Public Places" amenity? An elevation of the site plan will need to be included on the site plan.
Response. The fence s giver 50 fro—:��R 5 jewa''U a g V oe are ,,,id oe sc,eened 'rom iev, w to a row eve green
trees Fven though it w, l ^,ot �e rs,e ire resderces V he whet, the andscape buffer matureswe are
planning on using the Dwaine-tafence de'aled or. the sae p ar.
Number: 36 Created: 12/10/2003
[12/10/03] Additional landscaping (trees and evergreens) will need to be located behind the two rear garages to meet
tree -stocking requirements.
Response. The proper+y mmed welt' to t-e Nest 7 'he s'e s o,v^.ed by tt-e City and s sated for future facilities
development Isee attached mas'e plan;. ':^!e are c'ccos no v:'aKe ' e quantty of trees reowred for tree stocking and
using them along me Right o' wa7 nermet 'o enharc - e , __^ g of the orgect from pubic v ew The trees will be
above and hey-nd ^re 1-ant !, req:, 'e&tt fc s7ee' ee _ a,e,g dupe, piarD.ng. See attached Altemabve
Compliance Request
Number: 37 Created: 12/11 /2003
[12/11/03] Additional landscaping (trees and evergreens) should be located adjacent to the storage bins to help provide
additional screening for this utility.
Response We ha✓- aide^ a e.ergreer. `ee hedge a ny _ __ scree -'he storage o ns from re pjb'ic view
Number: 38 Created: 12/11/2003
[12/11/03] The paved area (southeast corner of the site) will need to maintain a 10-foot separation from the adjacent
right-of-way.
Respo^.se. The paved a*ea has red adlus'ed to pre:- e a '.0 1=1 soca�alicn from th,e adlace^.I r,g,t of way
Number: 39 Created: 12/ 1 1 /2003
[12/11/03] The interior area of the site is a vehicle use area. which requires a minimum of 6% of the paved area to be
landscaped. An island on the south side of Building A and perhaps an island within the gravel area would meet this
requirement.
Response. Due to the type or ve-cces used at the `acil.ty are're nature of the use. trees plated within the paved or
gravel area would probabry be 5neckep over and oesiroyed n adc tion.:he waterline to the south of bw:ding A
prevents a large porocn of the area west of c:r,ldirg 4'Fora berg carted wrh trees. S rnilarlythe same waterline goes
in between bjild ng B and C p�evenorg tees (Firm bung p,a-tec '-ere as we'.' We propose taking the trees and
landscape regwreo o, the ;and Use Code r Venice cse a ee5 d d piacing '^err, gong the pe, meter of the sire to
increase the landscape butter and re', 'c further screen ire as 'e ''om publ.c view See the aternallve compliance
request.
Based on issues raised at the neighborhood meeting and from follow up calls, the notification area should be increased
to include the Martinez Park Neighborhood and residences further south, especially along Wood Street. A map can be
made representing the expanded notification area.
Response Boh, if you can get us a man of the expanded eoP' Ca' cn area then we wi"l get reused marling labels to you.
Department: Engineering Issue Contact: Dave Stringer
Topic: General
Number Created: 11/25/2003
[11/25/031 Cover sheet, Ned to describe legal as being a replat lot 1 -- ------ and filing 4----------, whatever the correct
legal is
Response: Legal has beer adjusted
Number:6 Created: 11/25/2003
[11/25/03] Use directional ramps at driveways, etc.
Response The plan has changed and we are utilizing the ex sting o.✓b cut and ramps instead of cwlding a new one
Page I
Number:7 Created: 11/25/2003
[11/25103] Need a soils report. I did not receive one with this submittal
Response A soils roper has been included with this submittal
Number Created: 11/25/2003
[11/25/03] Final Development Plan Documents will require more detail such as storm sewer profiles, and etc.
Resocnse Noted. final pla-a will show the requi,ed nformatiion
Number: 9 Created: 11/25/2003
[11/25/031 If you are design curb, gutter and walk with this project provide complete design with profile of flow line.
Elevations and street cross -sections with Final submittal
Response. Noted. FCP'final plans will show the requred information
Number: 10 Created: 11 /25/2003
(11/25/03J Who and when will rails to trail be vacated?
Response A later of commitment for the vacation of the rails 'c !rails easement will be provided by the time of the
hear ng.
Number: ll Created: 11/25/2003
[11/251031 Engineering ready for hearing
Response. Noted
Number: 24 Created: 12/3/2003
(12/3/031 Need to verify that there are existing easements for off -site storm sewer as shown. Will need construction
easements for this work
Response. Notes
Number: 25 Created: 12/3/2003
[12/3103] refer to Larimer County Urban Area Street Standards for scanning requirements for all plan sheets
Res)onse Noted
Department: Light & Power Issue Contact: Doug Martine
Topic: Light & Power
Number: 1 Created: 11/24/2003
[11/24/03] The developer needs to coordinate a transformer location, electric system requirements, and electric
Development Charges with L&P Engineering (221-6700).
Response: Ron Kechter will get w th Doug 'o coordl.nate this
Department: Natural Resources Issue Contact: Doug Moore
Topic: General
Number: 15 Created: 11/28/2003
01 /28/03) Outlet Drain to Poudre River - We need to see a detail of want this Is proposed to look like. The
disturbance caused by the outlet will need to be design to minimize and mitigate any impacts.
Fort Collins Land Use Code
3.4.1(E)(2)(b)
(b) If the development causes any disturbance within the buffer zone, whether by approval of the decision
maker or otherwise, the applicant shall undertake restoration and mitigation measures within the buffer zone
such as regrading and/or the replanting of native vegetation. The applicant shall undertake mitigation
measures to restore any damaged or lost natural resource either on -site or off -site at the discretion of the
decision maker. Any such mitigation or restoration shall be at least equal in ecological value to the loss
suffered by the community because of the disturbance, and shall be based on such mitigation and
restoration plans and reports as have been requested, reviewed and approved by the decision maker.
Unless otherwise authorized by the decision maker, if exi'Ing vegetation (whether native or non-native) is
destroyed or disturbed, such vegetation shall be replaced with native vegetation and landscaping.
3A 1(G)(2)
(2) Streambonk Stabilization, When the Stormwater Master Plans and the Storm Drainage Design Criteria and
Construction Standards of the city require streambank stabilization, native vegetation shall be utilized for such
purpose, and engineered stabilization techniques such cis exposed rip rap shall be avoided, to the maximum
extent feasible. The use of native vegetation shall be the principal means of sireambank stabilization, and the
use of rip -rap for sireambank stabilization shall be resh,cted to locations where the use of vegetation
techniques is not reasonably feasible.
Page 2
3.4.1(t)(1)
(1) Project design. Projects in the vicinity of large natural habitats and/or natural habitat corridors, including,
but not limited to, the Poudre River Corridor and the Spring Creek Corridor, shall be designed to complement
the visual context of the natural habitat. Techniques such as architectural design, site design, the use of
native landscaping and choice of colors and build.ng matecals shall be utilized in such manner that scenic
views across or through the site are protected, and manmade facilities are screened from off -site observers
and blend with the natural visual character of the area. These requirements shall apply to all elements of a
project, including any aboveground utility Installations.
Rest;.,r i,f, Drrjin i lr, Jr Iti 1 1 ce c , oa ac or ' , : EC :;r,c 3ea. resign N II work v,rth Na'�°al
PP, ijr , ,na S' ,ri• Ant,f ; c. If i) _ '-,rr- r ,r r , i' -ts
Department: PFA Issue Contact: Ron Gonzales
Topic: Fire
Number: 32 Created: 12/9/2003
[12/9/03] Building addresses shall be visible from the street on which they front, and on the fire lane side of the bldgs.
Numerals are required to be posted on a contrasting background and shall be a minimum of 6" numerals.
Response Numerals vAl meet the above s:ardards
Number: 33 Created: 12/9/2003
[12/9/031 A fire lane is required to be able to access the two buildings in the back. A fire lane plan shall be submitted
prior to installation for review and approval. The fire lane shall be shown on the plat and dedicated as an "Emergency
Access Easement." The fire lane shall connect and or terminate at the public right of way.
Response. Emergency VehiGe - pnmen be pr,;v e., o e c dray, nos and ded�catec before FCP apprev v
Number: 34 Created: 12/9/2003
[12/9/031 The fire hydrant in the middle of the 3 clogs is in the wrong place. There must be emergency access to the
hydrant.
Response. The fire hydra`, loca- _n has cee^ adjusted
Department: Police Issue Contact: Joseph Gerdom
Topic: General
Number: 3 Created: 11/24/2003
(1 1 /24/03) Landscape: Use of generic symbols (even though somewhat scaled) make It difficult to determine
plant selection/location issues.
Lighting. Even though there will be limited ped & bike traffic, there should be better lighting at the two
eastern access points.
Rest, n,r SI ,'i9 r -.7r' Sf n rn.l _zi a o� from the bull fir,, mr,i.,•..'t-a
lights I f r,le tr r. , n tt r cf' , >'= wi :, _ ..n'; res 7r:d t.-.' the s to and eni-rarr-es m^Ile
_ > rd r _ x e�ang the lghtn,i�awr=,merits
eSLit iShed t>y ft e L rr 1 Use ;e3
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
Number: 26 Created: 12/4/2003
Please revise the SWMM analysis using the City's standard of Mod SWMM per phone conversation. The hydraulic
analysis also needs to inc ude an Extran input file that can be run with software in our office.
Responsp. a revised SWMM ana psis has a ready beer scbmctec' Storm wate�
Number: 27 Created: 12/4/2003
Please provide rnore detail for the outfall into the Poudre River and Include all proposed construction details
like flared -end sections, riprap, etc.
A 20-foot wide off -site drainage easement is also required for the outlet storm sewer. If there is already on
easement for the existing storm sewer, it would have to provide 10-feet on either side of the proposed storm
sewer to be used. This scenario is unlikely and a new easement is probably required.
On -site drainage easements are also required for all drainage structures including storm sewers and
detention ponds up to the 100-year WSEL.
R,,f ,ri,, Nntr i, ruliuslme r*, riiii t,„ r--i 1c en FCP Fu.,jl r, jrs
Page 3
Number: 28 Created: 12/5/2003
Please show the floodplain that is mostly located on Lot 2 on the overall drainage plan that was located in the back of
the report. This is more for documentation purposes and affects Lot 2 when it develops. Included is an aerial photo of
the floodplain for reference.
R.ap r v `.; ." a:ljustrnur•, w,-ill dex r-rade on FCP Fnal pars
Number: 29 Created: 12/5/2003
Please provide details for all drainage improvements including inlets, manholes, outlet structures, valley pans, etc. at
final plan review.
Response Nored ✓ _justrne is whl be made or, FCP/Fnal plans
Number: 30 Created: 12/5/2003
Please provide F.F. elevations for all proposed buildings, more spot elevations to the grading plan, and slopes for all
swales and valley pans at final plan review.
Res,,, is, Nate . aap,stmn is ::'ll be made on FCP F rral psis
Number: 31 Created: 12/5/2003
Before hearing, the revised modeling should be submitted and reviewed. Once City staff is comfortable with
the modeling and feels the ouffall off -site easement to the Poudre is obtainable, the hearing can take place.
RPcfq,r Sa %V ,I-d, uajustrrer 'n , I ae n'a 1e on FCP r rii C an<
Additional comments may follow once more Information is submitted at final review,
Department: Traffic Operations Issue Contact: Eric Bracke
Topic: traffic
Number: 2 Created: 1 1 /24/2003
[11/24/031 No problems or concerns
Department: Transfort Issue Contact: Garold Smith
Topic: General
Number: 4
111/25103] No comments
Created. 11/25/2003
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: General
Number: 20 Created: 12/1 /2003
[1211/031 The existing and proposed future 6' attached sidewalk needs to be labeled on all plan sets.
Number: 21 Created: 12/1 /2003
[12/1/03] Why are the Wood Street right of way improvements on the NE edge of the property not being completed with
this project? This does not seem to be consistent with how the City approaches street frontage improvements for new
development - public or private? If the improvements are not going to take place with this project than how will the
funding for the future right of way improvements be handled?
Response. The mprevemenrs or the NE edge of the prclect are now shown as :ncluded with this POP
-
Number: 22 Created: 12/ 1 /2003
[12/1/031 Use directional access ramps across the south driveway, which directly align with each other. Please note
that the driveway crossing will need to meet ADA accessible standards.
Response. We are no longer creaung a oew curb cut. Tie project will utilize the existing curb cuts and access ramps.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: General
Number: 17 Created: 12/1 /2003
[12/1/03] Show and label all fittings, valves and lengths of pipe between fittings/valves for the water mains. Show and
label location of curb stops and meter pits. Provide utility easements/alignments for the water mains, fire hydrants and
curb stops.
RE sr,urnr . Nohra n1lusLnr "s v✓ill be r urge en FC , Final f,lars
Number: 18 Created: 12/ 1 /2003
[12/1/03] Maintain the required landscape/utility separation distances on the landscape plans.
Response The landscape plan has been adjusted to provide tl-e required utility and landscape separations
Number: 19
Page 4
Created: 12/1 /2003
[1211/03] Provide all details for the water and sewer construction (i, e. meter pit, typ water/sewer service fire hydrant,
thrust block, etc.).
Rt�u ,n,E 'Nola t vl;_ zpr• ,'s , I te, i
Number: 23 Created: 12/1/2003
(12/l/03) Provide proNes of all sewer mains which show existing and proposed Inverts, slopes, manholes,
cleunouts, etc.
Resf,,, r )y �ti..rt,:.,1 '1, li is'- r is ben j.+e r;r F.. G r::'.: Crs
See site, landscape and utility plans for other comments
Department: Zoning
Topic: zoning
Issue Contact: Jenny Nuckols
Number: 13 Created: 11/28/2003
[11/28/031 Show and label building footprint, envelope, dimensions and distance to property lines for each building
Response:
Bw,dmg envelopes and dPns,oss have been show, or. the s:e p an.
Number: 14 Created: 11/28/2003
[11/28/03] The site needs to comply with site and landscape requirements in article 3
Response. Nctea. see alternative c-m(,! arce 'eques!
Number: 16 Created: 11/28/2003
[11/28/03] On the landscape plan, need a note regarding installation of landscaping prior to issuance of a CO
Response Note has been adder!
If you have any questions please feel free to call me at (970) 223-7577.
Thanks,
Russell Lee,
BHA Design,
970-223-7577
Page 5