HomeMy WebLinkAboutSOUTH GLEN PUD SECOND REPLAT - Filed CS-COMMENT SHEETS - 2004-11-08PROJECT COMMENT SHEET City of Fort Collins Current PlanninE DATE: July 22, 2002 TO: Technical Services PROJECT: #31-99A Southglen P.U.D. 2nd Filing, Replat — Major Amendment All comments must be received by Steve Olt no later than the staff review meeting: Si August 21, 2002 Note - PLEASE identify your redlines for future reference Z :�J3 Tim« v� ��r Lei/2u�I�jt1i55/ 3 (✓ /� VAa T«� /VJ V7C L.v _ sty �T o L/N, Name (please print) CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat Site _Drainage Report _Other _Utility _Redline Utility _Landscape t -ry City of F.� Collins changed to provide a location for the electric line. Also, the developer will be responsible for replacement of landscaping as necessary on 333 Albion Way. 2 The water service to lot #3 must be moved to be a minimum of 6 ft. from the side lot line to allow for installation of an electric vault. 3 The transformer at the apartments to the west (adjacent to building F) was sized to also serve future buildings E, L, and a clubhouse within that development. Since these buildings will now not be constructed, this developer will be responsible for costs to downsize this transformer to the correct size (approximately $400.00), in addition to normal L&P Development Charges. Department: Natural Resources Topic: General 46 No Issues. Department: Stormwater Utility Issue Contact: Doug Moore Issue Contact: Wes Lamarque Topic: Drainage 42 A 20-foot drainage easement is required between lots 1 and 2 for the 15-inch stormsewer. 43 Please add corner lot spot elevations for the 3 lots on the grading plan. 44 An easement is needed for the new stormsewer in front of Lot 1. Please see redlined plat. 51 A drainage pan is not needed along the south side of Lot 3 for side lot swales with a slope of at least 1%. Page 6 52 Is drainage from the multi -family site entering Lots 2 and 3 from the west? Flows need to be directed to the stormsewer or tract between Lots i and 2. If this can not be accomplished, than a drainage easement would be required for the off site flows to pass through these lots. 53 The drainage plan does not match in all areas the grading of the site. On Lot 3, there was a pan directing flow down the side of this lot when the drainage plan shows a basin boundary coming across this swale. Please revise all basin lines to reflect the grading of the site. Department: Transportation Planning Issue Contact: Tom Reiff Topic: General 47 Identify Tract A as an access easement on the replat. On the landscape plan include a 5 foot walkway connection from the sidewalk on Albion Way to the walkway in front of Bldg. E, while preserving the existing trees. Department: Water Wastewater Issue Contact: Jeff Hill Topic: Landscape plan 38 Show all water and sewer services on landscape plans. See site, landscape and utility plans for other comments. Department: Water Wastewater Issue Contact: Roger Buffington Topic: Utility 45 Locate water services near center of lot (but not in drives) and sewer services 10 feet north of water services.. Department: Water Wastewater Issue Contact: Jeff Hill Topic: Utility 27 Show and label all existing water and sewer mains and services in this developments vicinity. Page 7 28 Clearly define all abandonment procedures for existing water and sewer mains and service. All water and sewer services must be used or abandoned at the main. 29 Place a fire hydrant at the termination point of the existing 6-inch water main in the south west portion of this site. Provide the standard fire hydrant and thrust block detail on the detail sheets. 34 If meter pits are being installed then show and label locations of meter pits/curb stops. Provide sufficient utility easement for gas main, storm sewer, electric main and curb stop on lot 3. 35 Maintain 10 feet of separation between water/sewer services and side lot property lines. 36 Label sizes of all proposed water and sewer services. 37 Provide stationing of all sewer services (from downstream manholes). ********************************************************************** The following comments and concerns were expressed at staff review on August 21, 2002: Zoning 1. Add a street tree in front of Lot 1. Page 8 Transportation Planninq 1. Make the walkway in Tract A a hard surface walk from Albion Way to the parking lot in the South Glen, Second Filing multi -family area. It should be 5' wide. Stormwater 1. Tract A has to be 20' wide to accommodate the storm drainage facility. 2. A drainage easement is needed in Lot 1 for the storm sewer. 3. The basin drainage map does not match the contours shown on this site. Engineering 1. Show all utilities and easements on the Landscape Plan. 2. A required street tree is missing on Lot 1. 3. Change Tract A to a Public Access Easement. 4. The easement vacation note on the subdivision plat is wrong. 5. There must be a minimum of 20' from the back of sidewalk along Albion Way to the garage doors. This completes staff comments at this time. Additional comments may be forthcoming. This; development request is subject to the 90-day revision re - submittal (from the date of this comment letter) as set forth in Section 2.2.11(A) of the: Land Use Code. Be sure and return all of your reclined plans when you re -submit. Page 9 If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6341. Yours Truly, *eve lt, City Planner Page 10 January 29, 2003 Steve Olt Planning Department 281 N. College Avenue P.O. Box 580 Fort Collins, CO 80522 RE: South Glen PUD 2"" Filing Replat/Major Amendment #31-99A Project # 2223 Steve Olt, This letter is in response to the comment letter from the City of Fort Collins staff dated September 3, 2002..Jim Sell Design has modified the plans and provided to the City other documents as required to address these comments, as described below. ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: Drainage 56 Tract A, between Lots I & 2, needs to be 20' wide to accommodate the necessary storm drainage easement. Response: Tract A has been widened from 10' to 20'. Topic: Landscape plan 57 The 2 trees in Tract A shown to be relocated can be preserved in their present location if the tract is widened per Stormwater's requirement. Response: With the widening of Tract A, the southernmost of these two trees can stay, but the northernmost tree has a proposed storm line running underneath it. This northernmost tree will need to be relocated to the rear of Lot 2 as shown on the Landscape Plan. 58 The existing tree on Lot 2 shown to be removed may be a significant tree. Has the City Forester been to the site to evaluate the tree? Some mitigation may be required. Response: This tree is a mature sized Russian Olive. A phone conversation on 12-16-02 with Tim Buchanan confirmed that this tree is on a strongly discouraged landscape list and does not need to be evaluated by the City Forester and can be removed without mitigation. 59 A street tree is needed somewhere along the street frontage of Lot 1. Response: We are unable to fit a tree on the frontage of Lot 1 with the driveway, specified utility separations, and the location of the existing storm manhole. Rather, we have provided an extra street tree in front of Lot 3. 61 The Landscaping — Assurances note on the Landscape Plan is not complete. Please see the enclosed red -lined plan. Response: Assurance note has been modified per the Fort Collins Land Use Code 3.2.1.1.4. 62 Additional information is needed on the Landscape Plan. Please see the enclosed plan. Response. The landscape plan has been modified in response to the comments. Topic: Utility 54 Dennis Greenwalt of AT&T Broadband (cable TV) indicated that they have existing cable facilities that run through this area to provide service to the South Glen PUD, Second Filing. At this time they will not vacate their easement with the management of South Glen PUD, Second Filing. Please contact Reneta Santro, at 970-491-3106, about the process of changing AT&T Broadband's agreement with the management of South Glen PUD, Second Filing. Response: We talked to Reneta Santro on 12-16-02. She stated that AT&T has a blanket access easement and if there are no physical lines that need to be moved then the proposed amendment to the plat would be acceptable to them without modifying the agreement. After talking with Dennis Greenwalt with AT&T a utility locate was ordered for Wednesday 1 R°i, 2002. The utility locate was performed as scheduled and no existing cable facilities were found in the area. 55 Len Hilderbrand of Excel Energy offered the following comments: Any relocation, cutoffs, or abandoning of existing facilities will be at the developer's expense. 2. Any extension of gas facilities will be in accordance with the extension policy on file with the Colorado Public Utilities Commission. 3. No trees may be planted within 4' of any gas lines. Response: So noted. 60 A 13' wide utility easement, not 9' wide, is needed along the front of the lots for electrical service and stop locations. Response: A 13' wide utility easement has been added along the front of Lots 1, 2 and 3. Department: Engineering Issue Contact: Susan Joy Topic: Lan dscape plan 49 Show and label all easements and utilities. Response: All easements and utilities have been shown and labeled. 50 Remove the contour lines for legibility. Response: The contour lines have been removed. Topic: Plat From Technical Services: Boundary and legal closes. Response: So noted. 32 From Technical Services: Subtitle of Plat wrong/missing. See redlines. Response: The subtitle was re -worded per redline comment. 33 From Technical Services: Easement vacation note wrong - see redlines. Response: The casement vacation note has been re -worded per reline comment. 39 Correct the plat language under Statement of Ownership and Subdivision. See attached. Response: The plat language referred to has been re -worded per the redline comment. 40 Correct the Engineering and Planning Certificate. See attached. Response: The certificates have been modified per attached format. 48 Change the "Pedestrian" access casement to read "Public" access easement. Response: Access easement changed per comment. Topic: Utility 4 Title of Utility Plans should read "Utility Plans For...........". Response: The title on of the plan set has been changed to "Utility Plans For South Glen P.U.D. 2"" Filing Replat". 5 Provide the legal description of the project below the project name. Response: The legal description has been added. 6 Vicinity map is shown in the wrong size and the wrong scale. Please scale to 1" =1000 - 1500' and map should be IWx10". Response: The vicinity map has been changed to the proper dimensions. 7 Do not number the plat or landscape plan in the index. You may include these plan sheets with the set but do not number as part of the utility plans. Response: The plat and landscape plan numbers have been taken offthe Cover Sheet. 8 Title: Provide the current date (month and year) under the legal description. Response: The current date has been added tinder the legal description. 9 Update the General and Construction Notes, see appendix El and E2 and fill in the appropriate blanks. I can email these does to you at your request. Email me at s uw(affcuo\.com Response: The updated General and Construction Notes have been added. 10 Provide 2 project benchmarks where req'd in the General Notes. Response: The two benchmarks have been added to the General Notes. 11 Provide a soils report for the project. Response: A copy of the project's previous soils report is attached. 12 Reference the soils report where req'd in the General Notes. Response: This preference has been added. 13 Provide the statement shown in Appendix E4 (checklist), section I, item J. Response: The statement has been added to the Cover Sheet. 14 Complete and submit the Checklist, Appendix E4 with the next submittal. Response: The completed checklist is attached. 15 Provide the indemnification statement, LCUASS 3.3.1.F. Response: This statement has been added to the Cover Sheet. 16 Label the existing contour lines on the drainage sheet. Response: Contour labels have been added. 17 Provide finish grade elevations for all lot corners. Response: Lot corner spot elevations have been added to the Grading Plan. 18 Provide the statement shown in Appendix F4, II, E on the grading sheet. Response: ']his statement has been added to the Grading Plan. Project Comments Sheet S City of Fort Collins elected Departments Department: Engineering Date: August 22, 2002 Project: SOUTHGLEN PUD, 2ND FILING - MAJOR AMENDMENT - #31-99 All comments must be received by TROY JONES in Current Planning no later than the staff review meeting: ReviewDate Note - Please identify your redlines for future reference Issue Contact: Susan Joy Topic: Landscape plan 49 Show and label all easements and utilities. 50 Remove the contour lines for legibility. Topic: Plat 31 From Technical Services: Boundary and legal closes. 32 From Technical Services: Subtitle of Plat wrong/missing. See redlines. 33 From Technical Services: Easement vacation note wrong - see redlines. 39 Correct the plat language under Statement of Ownership and Subdivision. See attached. 40 Correct the Engineering and Planning Certificate. See attached. 48 Change the "Pedestrian" access easement to read "Public" access easement. Topic: Utility 4 Title of Utility Plans should read "Utility Plans For...........". 5 Provide the legal description of the project below the project name. 6 Vicinity map is shown in the wrong size and the wrong scale. Please scale to 1" _ 1000 - 1500' and map should be 10"xl0". Date CnEU HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _L Plat Site Drainage Report �_ Other Utility �c Redline Utility __L_ Landscape Page 1 19 Show all ROW, property lines and easements with dimensions and labels. Response: ROW, property lines and easements have been labeled and dimensioned. 20 The City's signature block must be provided on each sheet in the lower right corner of each sheet. Each signature block must measure 3.5" high x 4.5" wide. Response: Signature blocks have been added to all sheets. 21 Please ghost existing features so that the proposed improvements are clearly defined. Right now all the line weights are the same and it's not clear what your construction limits are in the public ROW. Is the existing curb and gutter rollover or vertical? Response: The lineweights for existing features have been changed for clarity. The existing curb is rollover and has been noted in the plans. 22 Provide a legend, each sheet, that clearly defines existing and proposed features for that sheet. Response: A legend has been added to all sheets. 23 Show street names, each sheet. Response: Street names have been added to each sheet. 24 Areas of overlay, milling, pavement removal and/or reconstruction are not clearly defined. Please provide the street cut note where applicable: Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. Response: The above note has been added to the Utility Plans Sheet and additional notes have been added to clarify areas of overlay, milling and pavement removal. 25 Station all driveways from the centerline. Response: Driveways have been stationed from the centerline. 26 Driveways must be a minimum of 20' from BOW to the garage door, 3.5.2.D.2 of the Land Use Code. Two driveways do not meet this requirement. Response: We depict the building envelope on the plans, with required front, side and rear setbacks, including a minimum 15' from the ROW. A note has been added to refer to the Land Use Code for garage door setback of 20'. 30 Provide details 7-29B, 16-1, 16-2. Response: These have been added to the detail sheets. Department: Light & Power Topic: Electric Issue Contact: Doug Martine In order to install electric utility facilities to serve this replat, it will be necessary for L&P to trench across the front (behind the attached sidewalk) of 333 Albion Way as well as these lots. The storm sewer location shown will preclude the installation of electric facilities. The storm sewer must be changed to provide a location for the electric line. Also, the developer will be responsible for replacement of landscaping as necessary on 333 Albion Way. Response: We met with Doug on 12-16-02: the electric line will come under Albion Way from the cast side of the street to a vault on the north property line of Lot 3. 2 The water service to lot #3 must be moved to be a minimum of 6 ft. from the side lot line to allow for installation of an electric vault. Response: After meeting with Doug on 12-16-02, the water service will need to be a minimum of 9.5' from the north property line of Lot 3. This allows room for an electric vault. The transformer at the apartments to the west (adjacent to building F) was sized to also serve future buildings E, L, and a clubhouse within that development. Since these buildings will now not be constructed, this developer will be responsible for costs to downsize this transformer to the correct size (approximately $400.00), in addition to normal L&P Development Charges. Response: Per our meeting with Doug on 12-16-02, this comment can be disregarded. Department: Natural Resources issue Contact: Doug Moore Topic: General 46 No Issues. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage 42 A 20-foot drainage easement is required between lots I and 2 for the 15-inch stormsewer. Response: The drainage easement has been widened from 10' to 20'. 43 Please add corner lot spot elevations for the 3 lots on the grading plan. Response: Spot elevations have been added on the Grading Plan. 44 An easement is needed for the new stormsewer in front of Lot 1. Please see redlined plat. Response: This area has been designated as a "Utility Easement". This easement will be relabeled as a "Drainage and Utility Easement". 51 A drainage pan is not needed along the south side of Lot 3 for side lot swales with a slope of at least 1%. Response: The drainage pan has been removed. 52 Is drainage from the multi -family site entering Lots 2 and 3 from the west? Flows need to be directed to the stormsewer or tract between Lots 1 and 2. If this camiot be accomplished, than a drainage easement would be required for the offsite flows to pass through these lots. Response: A very small amount of drainage from the multi -family site enters lots 1, 2, and 3 and the drainage tract. The minimal drainage enters these lots as sheet flow. There is only 2500 sq. feet of offsite area contributing runoff to Lot 1. Similarly, there are only 850, 3200, and 830 sq. ft. of area contributing runoff to Lots 2, 3, and the drainage tract, respectively. The proposed lots are graded using standard FHA grading guidelines that ensure there is proper drainage around each building envelope. Spot elevations and drainage arrows shown on the grading plan illustrate that there is appropriate drainage around each building envelope. Locating a drainage easement on each lot for such a small amount ofoffsitc contributing area is not necessary due to the negligible amount of sheet flow entering the lots. 53 '['he drainage plan does not match in all areas the grading of the site. On Lot 3, there was a pan directing now down the side of this lot when the drainage plan shows a basin boundary coming across this swale. Please revise all basin lines to reflect the grading of the site. Response: The drainage basin boundary lies on the property boundary of Lot 3. The previously proposed pan had directed runoff near the south property line to Albion Way. Although it may have appeared that the grading plan and drainage plan were in conflict with each other, the spot elevations on the pan illustrated that positive drainage was achieved despite the close drainage divide. The pan has been since been removed (please see comment 51.) Department: Transportation Planning Issue Contact: Tom Reiff Topic: General 47 Identify Tract A as an access easement on the replat. On the landscape plan include a 5 foot walkway connection from the sidewalk on Albion Way to the walkway in front of Bldg. E, while preserving the existing trees. Response: We believe that a sidewalk connection from the existing Albion Way, with sidewalks on both sides of the street, through the tract to the parking lot of the existing apartment complex will not provide a pedestrian friendly alternative to the existing sidewalk network. Moreover, the existing sidewalk system on Albion Way and Manhattan Avenue provides adequate pedestrian connectivity for residents along Albion Way to access Lopez Elementary School, Troutman Parks and neighborhoods to the west. For these reasons, we have not included a sidewalk through the tract. Department: Water Wastewater Issue Contact: Jeff Hill Topic: Landscape plan 38 Show all water and sewer services on landscape plans. See site, landscape and utility plans for other comments. Response: Water and sewer services have been added to the landscape plan. Department: Water Wastewater Topic: Utility 45 Issue Contact: Roger Buffington Locate water services near center of lot (but not in drives) and sewer services 10 feet north of water services. Response: Water services have been located near the center of the lots. Sanitary services for Lots I and 3 are located approximately 20 feet to the north of the water services due to conflicts with street trees. The sanitary service for Lot 2 is located approximately 20 feet to the south of the water service due to conflicts with the driveway, gas service and street tree locations and separations. Department: Water Wastewater Issue Contact: Jeff Hill Topic: Utility 27 Show and label all existing water and sewer mains and services in this developments vicinity. Response: Existing water and sanitary sewer location have been shown and labeled on the Utility Plan. 28 Clearly define all abandonment procedures for existing water and sewer mains and service. All water and sewer services must be used or abandoned at the main. Response: Abandonment notes have been added to the plans. 29 Place a fire hydrant at the termination point of the existing 6-inch water main in the southwest portion of this site. Provide the standard fire hydrant and thrust block detail on the detail sheets. Response: A fire hydrant has been added at the termination point of the 6-inch line and the additional details have been added to the detail sheets. 34 If meter pits are being installed then show and label locations of meter pits/curb stops. Provide sufficient utility easement for gas main, storm sewer, electric main and curb stop on lot 3. Response: The meter pit locations have been shown on the Utility Plan. Assuming this comment is directed toward Lot 1 and not Lot 3, a sufficient easement has been provided for gas and storm. The electric main will cross from the east side of Albion Way and service Lot 1 at the south property line. 35 Maintain 10 feet of separation between water/sewer services and side lot property lines. Response: 10 feet or more of separation has been allowed between water and sanitary services. 10 feet of separation from lot line to sanitary service was not possible on all lots due to separation specifications with trees and other utilities. 36 Libel sizes of all proposed water and sewer services. Response: All proposed service sizes have been identified. 37 Provide stationing of all sewer services (from downstream manholes). Response: Sewer services have been labeled from downstream manhole. The following comments and concerns were expressed at staff review on August 21, 2002: Zoning Add a street tree in front of Lot 1. Response: We are unable to fit a tree on the frontage of Lot 1 with the driveway, specified utility separations, and the location of the existing storm manhole. Rather, we have provided an extra street tree in front of Lot 3. Transportation ]'tanning Make the walkway in Tract A a hard surface walk from Albion Way to the parking lot in the South Glen, Second Filing multi -family area. It should be 5' wide. Response: We believe that a sidewalk connection from the existing Albion Way, with sidewalks on both sides of the street, through the tract to the parking lot of the existing apartment complex will not provide a pedestrian friendly alternative to the existing sidewalk network. Moreover, the existing sidewalk system on Albion Way and Manhattan Avenue provides adequate pedestrian connectivity for residents along Albion Way to access Lopez Elementary School, Troutman Parks and neighborhoods to the west. For these reasons, we have not included a sidewalk through the tract. Stormwater Tract A has to be 20' wide to accommodate the storm drainage facility. Response: Tract A has been widened from 10' to 20'. A drainage easement is needed in Lot I for the storm sewer. Response: A drainage easement has been combined with the utility easement to create a "drainage and utility easement". The basin drainage reap does not match the contours shown on this site. Response: Since the engineering design was for a re -plat, no additional field survey was conducted; existing topography shown on the plans was prepared from previous Stewart and Associates mapping for the project. Similarly, for the purpose of consistency with previous studies at the site, basin delineations were selected from the most recently submitted drainage report for the site, that being JR Engineering's report for Filing 5. While it is recognized that there is some discrepancy between the two sets of information, our field review of the site and our desire to remain consistent with previous work for the project led us to use the basin delineation as previously depicted. Engineering Show all utilities and easements on the Landscape Plan. Response: All utilities and easements have been shown on the Landscape Plan. A required street tree is missing on Lot 1. Response: We are unable to fit a tree on the frontage of Lot I with the driveway, specified utility separations, and the location of the existing storm manhole. Rather, we have provided an extra street tree in front of Lot 3. Change Tract A to a Public Access Easement. Response: Tract A has been identified as a Drainage and Access Easement. 4. The easement vacation note on the subdivision plat is wrong. Response: The easement vacation note on the subdivision plat has been corrected. There must be a minimum of 20' from the back of sidewalk along Albion Way to the garage doors. Response: We depict the building envelope on the plans, with required front, side and rear setbacks, including a minimum 15' from the ROW. A note has been added to refer to the Land Use Code for garage door setback of 20'. Redlined plans have been returned with this resubmittal. If you have any questions regarding this project, please don't hesitate to call me. Sincerely, Kent Bruxvoort, P.E. Senior Engineer REVISION COMMENT SHEET DATE: January 30, 2003 TO: Technical Services PROJECT: #31-99A SOUTH GLEN P.U.D., 2ND FILING — REPLAT/MAJOR AMENDMENT — TYPE II (LUC) All conunents must be received by Steve Olt no later than the staff review meeting: February 26, 2003 S No Continent Problems or Concerns (see below or attached) **PLEASE IDENTIFY YOUR REDLINES FOR FUTURE REFERENCE** - C k-e Q � � I1'1,- j c•iN r�9 CHU HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat Site _ Drainage Report Other Date__ _a�r� ru�� _ r,na�F _Signature:_ Project Comments Sheet City of Fort Collins Selected Departments Department: Engineering Date: March 3, 2003 Project: SOUTHGLEN PUD, 2ND FILING REPLAT-MAJOR AMENDMENT All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: February 26, 2003 Note - Please identify your redlines for future reference Issue Contact: Susan Joy Topic: Landscape Plan Number: 16 Created: 2/25/2003 Show all easements as shown on the Plat. Number: 17 Created: 2/25/2003 Correct the Existing Chainlink Fence label in the Legend. Should it be Proposed Underground Electric? Topic: Plat Number: 14 Created: 2/25/2003 From Technical Services: Legal matches plat. Plat closes. See redlines on plat. Number: 15 See redlines. Topic: Soils Report Created: 2/25/2003 Number: 28 Created: 2/25/2003 In accordance with 5.6.1, a subsurface water investigation report shall be submitted for approval by the Local Entity Engineer if groundwater is encountered within 5 feet of the original surface. The soils report submitted, dated August 28, 1979, states that groundwater was encountered at 4.5 feet. Please provide an updated soils report as well as a subsurface water investigation report if still applicable. Topic: Utility Plans Number: 6 Created: 2/25/2003 Correct the legal description to match the plat and place above the date in the title. Number: 7 Created: 2/25/2003 Correct the vicinity map to show the culdesac. Number: 8 Created: 2/25/2003 Signature Date CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat __ Site Drainage Report Other Utility __ Redline Utility Landscape Page 1 Manholes are not allowed in sidewalks or wheelpaths. Will need to relocate the manhole into the proposed 20' drainage easement or an acceptable location in the street - or see redlines for another suggestion. Also, show how the remaining portion of the existing storm pipe will tie into the proposed manhole. Suggest a utility coordination meeting prior to your next submittal., please contact me to set up a date. They are held every Wednesday, starting times beginning at 1:30pm to 3prn in half hour increments. Number: 9 Created: 2/25/2003 Per Lance Newlin, Chief Inspector, the street patch/overlay must extend the full width of the street. Number: 10 Created: 2/25/2003 Show all easements on all sheets as shown on the plat. Number: 11 Created: 2/25/2003 Correct the Existing Chainlink Fence label in the Legend. Should it be "Proposed Underground Electric"? Number: 12 Created: 2/25/2003 A drainage easement is required for the off site storm sewer work. Is the existing tract from the multifamily units already designated as such? If not, you will need to provide the off site drainage easement. If the easement already exists, then you will need to show this on the plan with the reception number and provide a letter from the neighboring property owner saying that they are aware of the proposed work on their site and grant permission to enter. Number: 13 Created: 2/25/2003 Update all details to the current details shown in LCUASS. Provide details 702, 706, 1601, 1602, and 2201. Number: 18 Created. 2/25/2003 Provide a Temporary Construction Easement to move the existing fire hydrant. Page 2 7 Do not number the plat or landscape plan in the index. You may include these plan sheets with the set but do not number as part of the utility plans. 8 Title: Provide the current date (month and year) under the legal description. 9 Update the General and Construction Notes, see appendix E1 and E2 and fill in the appropriate blanks. I can email these docs to you at your request. Email me at sjoy@fcgov.com 10 Provide 2 project bench marks where req'd in the General Notes. 11 Provide a soils report for the project. 12 Reference the soils report where req'd in the General Notes. 13 Provide the statement shown in Appendix E4 (checklist), section I, item J. 14 Complete and submit the Checklist, Appendix E4 with the next submittal. 15 Provide the indemnification statement, LCUASS 3.3.1.F. 16 Label the existing contour lines on the drainage sheet. 17 Provide finish grade elevations for all lot corners. 18 Provide the statement shown in Appendix E4, II, E on the grading sheet. 19 Show all ROW, property lines and easements with dimensions and labels. 20 The City's signature block must be provided on each sheet in the lower right corner of each sheet. Each signature block must measure 3.5" high x 4.5" wide. 21 Please ghost existing features so that the proposed improvements are clearly defined. Right now all the line weights are the same and it's not clear what your construction limits are in the public ROW. Is the existing curb and gutter rollover or vertical? 22 Provide a legend on each sheet that clearly defines existing and proposed features for that sheet. 23 Show street names, each sheet. 24 Areas of overlay, milling, pavement removal and/or reconstruction are not clearly defined. Please provide the street cut note where applicable: Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. 25 Station all driveways from the centerline. Page 2 '-' - STAFF PROJECT REVIEW Cityof Port Collins Jim Sell Design Date: 3/7/2003 C/o Kent Bruxvoort 153 West Mountain Avenue Fort Collins, CO. 80524 Staff has reviewed your submittal for SOUTHGLEN PUD, 2ND FILING REPLAT - MAJOR AMENDMENT, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Susan Joy Topic: Landscape Plan Number: 16 Created: 2/25/2003 Show all easements as shown on the Plat. Number: 17 Created: 2/25/2003 Correct the Existing Chain Link Fence label in the Legend. Should it be "Proposed Underground Electric"? Topic: Plat Number: 14 Created: 2/25/2003 From Technical Services: Legal matches plat. Plat closes. See redlines on plat. Number: 15 From Engineering: See redlines. Created: 2/25/2003 Topic: Soils Report Number: 28 Created: 2/25/2003 In accordance with :5.6.1, a subsurface water investigation report shall be submitted for approval by the Local Entity Engineer if groundwater is encountered within 5 feet of the original surface. The soils report submitted, dated August 28, 1979, states that groundwater was encountered at 4.5 feet. Please provide an updated soils report as well as a subsurface water investigation report if still applicable. Topic: Utility Plans Number: 6 Created: 2/25/2003 Correct the legal description to match the plat and place above the date in the title. Number: 7 Created: 2/25/2003 Correct the vicinity map to show the cul-de-sac. Number: 8 Created: 2/25/2003 Manholes are not allowed in sidewalks or wheel paths. Will need to relocate the manhole into the proposed 20' drainage easement or an acceptable location in the street - or see redlines for another suggestion. Also, show how the remaining portion of the existing storm pipe will tie into the proposed manhole. Suggest a utility coordination meeting prior to your next submittal, please contact me to set up a date. They are held every Wednesday, starting times beginning at 1:30pm to 3pm in half hour increments. Page 1 Number: 9 Created: 2/25/2003 Per Lance Newlin, Chief Inspector, the street patch/overlay must extend the full width of the street. Number: 10 Created: 2/25/2003 Show all easements on all sheets as shown on the plat. Number: 11 Created: 2/25/2003 Correct the Existing Chain Link Fence label in the Legend. Should it be "Proposed Underground Electric"? Number: 12 Created: 2/25/2003 A drainage easement is required for the off site storm sewer work. Is the existing tract from the multifamily units already designated as such? If not, you will need to provide the off site drainage easement. If the easement already exists, then you will need to show this on the plan with the reception number and provide a letter from the neighboring property owner saying that they are aware of the proposed work on their site and grant permission to enter. Number: 13 Created: 2/25/2003 Update all details to the current details shown in LCUASS. Provide details 702, 706, 1601, 1602, and 2201. Number: 18 Created: 2/25/2003 Provide a Temporary Construction Easement to move the existing fire hydrant. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage Number: 34 Created: 2/26/2003 There needs to be a drainage easement for the storm sewer behind Lot 2. The easement needs to be 20 feet ,vide (10 feet each side of the sewer pipe). Topic: Sediment/Erosion Control Number: 35 Created: 2/27/2003 1. The erosion control notes on sheet 2 are Larimer County notes. Please delete these and put the City of Fort Collins erosion control notes on the erosion control plan, sheet 5. 2. There is no note on the erosion control plan (sheet 5) stating that minimizing overlot grading is to be the primary form of erosion control (pre your letter). 3. What will protect the lot north of Lot 1? Department: Light & Power Issue Contact: Doug Martine Topic: Electric Number: 63 Created: 12/16/2002 Light and Power will need to cross Albion Way at Lots 2/3. The developer will need to provide a street cut permit, pay all associated street cut fees, and repair asphalt as required by Engineering. Page 2 Department: Transportation Planning Topic: General Number: 29 No comments Department: Water Wastewater Issue Contact: Tom Reiff Created: 2/26/2003 Issue Contact: Jeff Hill Topic: General Number: 30 Created: 2/26/2003 Proposed fire hydrant must be located within a utility easement? Number: 31 Created: 2/26/2003 Place the gate valve for the proposed fire hydrant within the asphalt/drive area and the fire hydrant 2 feet behind the curd. Number: 32 Created: 2/26/2003 Clearly define all aspect of water and sewer abandonment's (i.e. remove curb stop box/meter pits, fill ends of water mains with non -shrink grout, etc.). All water and sewer services must be abandoned at the mains. Include a note on the utility plans to "Coordinate abandonment's with the City of Fort Collins Utilities at 221-6700". Number: 33 Created: 2/26/2003 Provide inverts and top of pipe at the areas where water, sanitary sewer and storm sewers cross. The Current Planning Department comments are on a red -lined Landscape Plan that is enclosed with this comment letter to the applicant. This completes staff comments at this time. Additional comments may be forthcoming. This development request is subject to the 90-day revision re -submittal (from the date of this comment letter) as set forth in Section 2.2.11(A) of the Land Use Code. Be sure and return all of your redlined plans when you re -submit. The number of copies of each document to resubmit is indicated on the attached Revision Routing Sheet. If you have any questions regarding these issues or any other issues related to this project, nlease feel free to call me at 221-6341. Yours Truly, Steve Olt, City Planner cc: Susan Joy, Erigineering Department Ed Stoner. Owner Page 3 Project Comments Sheet Selected Departments Department: Engineering Date: May 7, 2003 Project: SOUTHGLEN PUD, 2ND FILING REPLAT-MAJOR AMENDMENT All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: May 07, 2003 Note - Please identify your redlines for future reference Issue Contact: Susan Joy Topic: General Number: 38 Created: 5/7/2003 The plans are in great shape and aside from a few relatively minor comments, we're ready for mylars after the hearing. Jonathan Sweet did a wonderful job addressing all the comments from the utility coordination meeting and previous rounds. Topic: Landscape Plan Number: 40 Created: 5/7/2003 Label Tract A - Drainage, Utility, and Public Access Easement. Number: 41 Created: 5/7/2003 What is the dashed line shown? See redlines. Topic: Plat Number: 39 Created: 5/7/2003 Change the "Drainage, Utility and Access Easement" to read "Drainage, Utility and Public Access Easement". Topic: Site Plan Number: 46 Created: 5/7/2003 1 did not receive a Site Plan with this submittal but if you could send over a copy anytime in the next couple of weeks, I'll look at it so that you can still go straight to mylars. Thanks! Topic: Utility Plans Number: 42 Created: 5/7/2003 Corrections to the legal description. See redlines. Number: 43 Created: 5/7/2003 Sheet 3 - What is the dashed line for? See redlines. Sigira «re Date� CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS Plat _� Site Drainage Report Other_ Utility Redline Utility _I Landscape Page 1 454ro-1 Wl"iAe-bE Number: 44 Created: 5/7/2003 Label Tract A - Drainage, Utility, and Public Access Easement, all sheets. Number: 45 Created: 5/7/2003 Label (all sheets) the existing Tract with the type of easements it has on the adjoining property where the storm sewer is tying in. There should be an existing drainage easement there which gives you the ability to install your connection. Page 2 Project Comments Sheet 1(0s�ml Selected Departments CitV of Fort Collins Department: Engineering Date: May 9, 2003 Project: SOUTHGLEN PUD, 2ND FILING REPLAT-MAJOR AMENDMENT All comments must be received by Steve Olt in Current Planning, no later than the staff review meeting: May 07, 2003 Note - Please identify your redlines for future reference Issue Contact: Susan Joy Topic: General Number: 38 Created: 5/7/2003 The plans are in great shape and aside from a few relatively minor comments, we are ready for mylars after the hearing provided the remaining comments are addressed. Topic: Landscape Plan Number: 40 Created: 5/7/2003 Label Tract A - Drainage, Utility, and Public Access Easement. Number: 41 Created: 5/7/2003 What is the dashed line shown? See redlines. Topic: Plat Number: 39 Created: 5/7/2003 Change the "Drainage, Utility and Access Easement' to read "Drainage, Utility and Public Access Easement'. Topic: Utility Plans Number: 42 Created: 5/7/2003 Corrections to the legal description. See redlines. Number: 43 Created: 5/7/2003 Sheet 3 - What is the dashed line for? See redlines. Number: 44 Created: 5/7/2003 Label Tract A - Drainage, Utility, and Public Access Easement, all sheets. Number: 45 Created: 5/7/2003 Label (all sheets) the existing Tract with the type of easements it has on the adjoining property where the storm sewer is tying in. There should b n existing drainage easement there which gives you the ability to install your connection. Sign ttre Da CHI Plat IF YOU WISH TO RECEIVE COPIES OF REVISIONS Site Drainage Report Other, —_ Utility _Y, Redline Utility �_ Landscape Page 1 STAFF PROJECT REVIEW City of [art Collino Jim Sell Design Date: 5/19/2003 c/o Kent Bruxvoort: 1 53 West Mountain Avenue Fort Collins, CO 80524 Staff has reviewed your submittal for SOUTHGLEN PUD, 2ND FILING REPLAT-MAJOR AMENDMENT, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: Landscape Plan Number: 50 Created: 5/14/2003 On the previous Landscape Plan there was one additional Pinion Pine and a variety of deciduous shrubs to be included in Tract "A", the drainage, utility, and public access easement. They have been removed from the current Landscape Plan without explanation. What is the reason and justification for eliminating the plant materials? City staff would like to see the additional plant materials previously shown in this area. Number: 51 Created: 5/ 14/2003 The Plant List on the Landscape Plan includes a Plant List containing 'Marshall Seedless' Green Ash canopy shade trees. There are no new trees being proposed on this plan. What is the purpose of the Plant List? Department: Engineering Topic: General Number: 38 Issue Contact: Susan Joy Created: 5/7/2003 The plans are in great shape and aside from a few relatively minor comments, we are ready for mylars after the public hearing, provided the remaining comments are addressed. Topic: Landscape Plan Number: 40 Created: 5 / 7/2003 Label Tract "A" - Drainage, Utility, and Public Access Easement. Page l Number: 41 Created: 5/7/2003 What is the dashed line shown? See redlines. Topic., Plat Number: 39 Created: 5/7/2003 Change the "Drainage, Utility and Access Easement" to read "Drainage, Utility and Public Access Easement". Topic: Utility Plains Number: 42 Created: 5/7/2003 Corrections to the legal description. See redlines. Number: 43 Created: 5/7/2003 Sheet 3 - What is the dashed line for? See redlines. Number: 44 Created: 5/7/2003 Label Tract A - Drainage, Utility, and Public Access Easement, all sheets. Number: 45 Created: 5/7/2003 Label (all sheets) the existing Tract with the type of easements it has on the adjoining property where the storm sewer is tying in. There should be an existing drainage easement there which gives you the ability to install your connection. Department: Water Wastewater Issue Contact: Jeff Hill Topic: Utility Plans Number: 47 Created: 5/8/2003 Meter pits may not be placed in basements only the meter may be installed in basement. Correct the general note on sheet 3 to reflect this. Provide interior meter setter detail if meter are being installed inside. Number: 48 Created: 5/8/2003 The water tap for lot 2 and the sanitary sewer tap for lot 3 will be almost impossible to install directly under the existing storm sewer. Perhaps the storm sewer should be removed to facilitate the installation of the services. See site, landscape and utility plans for other comments. Page 2 This development proposal has been scheduled for an administrative (Type 1) public hearing. It will be held on the evening of Thursday, June 12, 2003, beginning at 6:00 p.m. in a conference room at 281 North College Avenue. The issues expressed in this comment letter must be addressed and resolved or staff will have to be assured that they can and will be resolved prior to the item going to public hearing. This major amendment to a previously approved development plan does not require a Final Compliance submittal to the City. Please be sure and return all of the City staff red -lined plans when you submit the final plans for review prior to recording. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6341. Yours Truly, i Steve Olt, City Planner Page 3 26 Driveways must be a minimum of 20' from BOW to the garage door, 3.5.2.D.2 of the Land Use Code. Two driveways do not meet this requirement. 30 Provide details 7-29B, 16-1, 16-2. Page 3 Lma.--aam) STAFF PROJECT REVIEW C itvol Fort Collins Jim Sell Design Inc. Date: 9/3/2002 c/o Brad Saucerman 153 West Mountain Ave. Fort Collins, CO. 80524 Staff has reviewed your submittal for SOUTH GLEN PUD, 2ND FILING - REPLAT/MAJOR AMENDMENT - #31-99A, and we offer the following comments: ISSUES: Department: Current Planning Topic: Drainage 56 Issue Contact: Steve Olt Tract A, between Lots 1 & 2, needs to be 20' wide to accommodate the necessary storm drainage easement. Topic: Landscape plan 57 The 2 trees in Tract A shown to be relocated can be preserved in their present location if the tract is widened per Stormwater's requirement. 58 The existing tree on Lot 2 shown to be removed may be a significant tree. Has the City Forester been to the site to evaluate the tree? Some mitigation may be required. 59 A street tree is needed somewhere along the street frontage of Lot 1. 61 The Landscaping -- Assurances note on the Landscape Plan is.not complete. Please see the enclosed red -lined plan. Page 1 vfG 62 Additional information is needed on the Landscape Plan. Please see the enclosed plan. Topic: Utility 54 Dennis Greenwalt of AT&T Broadband (cable TV) indicated that they have existing cable facilities that run through this area to provide service to the South Glen PUD, Second Filing. At this time they will not vacate their easement with the management of South Glen PUD, Second Filing. Please contact Reneta Santro, at 970-491-3106, about the process of changing AT&T Broadband's agreement with the management of South Glen PUD, Second Filing. 55 Len HiIderbrand of Excel Energy offered the following comments: 1. Any relocation, cutoffs, or abandoning of existing facilities will be at the developer's expense. 2. Any extension of gas facilities will be in accordance with the extension policy on file with the Colorado Public Utilities Commission. 3. No trees may be planted within 4' of any gas lines. 60 A 13' wide utility easement, not 9' wide, is needed along the front of the lots for electrical service and stop locations. Department: Engineering Issue Contact: Susan Joy Topic: Landscape plan 49 Show and label all easements and utilities. 50 Remove the contour lines for legibility. Page 2 Topic: P/at 31 From Technical Services: Boundary and legal closes. 32 From Technical Services: Subtitle of Plot wrong/missing. See redlines. 33 From Technical Services: Easement vacation note wrong - see redlines. 39 Correct the plat language under Statement of Ownership and Subdivision. See attached. 40 Correct the Engineering and Planning Certificate. See attached. 48 Change the "Pedestrian" access easement to read "Public" access easement. Topic: Utility 4 Title of Utility Plans should read "Utility Plans For...........". 5 Provide the legal description of the project below the project name. 6 Vicinity map is shown in the wrong size and the wrong scale. Please scale to i" _ 1000 - 1500' and map should be 10"x10". 7 Do not number the plat or landscape plan in the index. You may include these plan sheets with the set but do not number as part of the utility plans. 8 Title: Provide the current date (month and year) under the legal description. Page 3 9 Update the General and Construction Notes, see appendix E1 and E2 and fill in the appropriate blanks. I can email these docs to you at your request. Email me at sjoy@fcgov.com 10 Provide 2 project bench marks where req'd in the General Notes. 11 Provide a soils report for the project. 12 Reference the soils report where req'd in the General Notes. 13 Provide the statement shown in Appendix E4 (checklist), section I, item J. 14 Complete and submit the Checklist, Appendix E4 with the next submittal. 15 Provide the indemnification statement, LCUA55 3.3.1.F. 16 Label the existing contour lines on the drainage sheet. 17 Provide finish grade elevations for all lot corners. 18 Provide the statement shown in Appendix E4, II, E on the grading sheet. 19 Show all ROW, property lines and easements with dimensions and labels. 20 The City's signature block must be provided on each sheet in the lower right corner of each sheet. Each signature block must measure 3.5" high x 4.5" wide. Page 4 21 Please ghost existing features so that the proposed improvements are clearly defined. Right now all the line weights are the same and it's not clear what your construction limits are in the public ROW. Is the existing curb and gutter rollover or vertical? 22 Provide a legend, each sheet, that clearly defines existing and proposed features for that sheet. 23 Show street names, each sheet. 24 Areas of overlay, milling, pavement removal and/or reconstruction are not clearly defined. Please provide the street cut note where applicable: Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. 25 Station all driveways from the centerline. 26 Driveways must be a minimum of 20' from BOW to the garage door, 3.5.2.D.2 of the Land Use Code. Two driveways do not meet this requirement. 30 Provide details 7-29B, 16-1, 16-2. Department: Light & Power Issue Contact: Doug Martine Topic: Electric 1 In order to install electric utility facilities to serve this replat, it will be necessary for L&.P to trench across the front (behind the attached sidewalk) of 333 Albion Way as well as these lots. The storm sewer location shown will preclude the installation of electric facilities. The storm sewer must be Page 5