Project Development Plan
04
Lots 1-8 & 13- 1 Q, Block 33
a Fort Collins, Colorado
Project Information
Designer / Developer
Coburn Development Inc.
1811 Pearl Street
Boulder, Colorado 80302
p:303-442-3351
f: 303-447-3933
Civil Engineering / Landscape
Jim Sell Design
153 West Mountain Avenue
Fort Collins, Colorado 80524
p: 970-484-1921
f: 970-484-2443
City of Fort Collins, Colorado
PROJECT DEVE MEJ PLAN APPROVAL
APPROVED: 09
DIR OR OF CURRENT PLANNING DATE
City of Fort Collins, Colorado
THE UNDERSIGNED CERTIFIES THAT IT IS THE LAWFUL FEE
OWNER OF REAL PROPERTY DESCRIBED ON THIS SITE PLAN AND
HEREBY CERTIFIES THAT IT ACCEPTS THE CONDITIONS AND
RESTRICTIONS SET FORTH ON THIS SITE PLAN
ACCEPTED:
DA ATTESERRY, CITYMAN
CITY OF FORT COLLINS, COLORADO
ACKNOWLEDGMENT:
STATE OF COLORADO )
COUNTY OF LARIMER )
TE FOREGOING INSTRUMENT WAS ACKNOWLEDGED BEFORE ME ON THE
k� DAY OF =w—p4eklot C— 2007BY DARIN ATTEBERRY, AS
CITY MANAGER OF THE CITY OF FORT COLLINS, COLORADO
WITNESS MY HAND AND SEAL
MY COMMISSION EXPIRES 7/6— 1-3
DATE NOTARY PUBLIC
Penny Flats, LLC
THE UNDERSIGNED CERTIFIES THAT IT IS THE EQUITABLE OWNER
AND DEVELOPER OF REAL PROPERTY DESCRIBED ON THIS SITE
PLAN AND HEREBY CERTIFIES THAT IT ACCEPTS THE CONDITIONS
AND RESTRICTIONS SET FORTH ON THIS SITE PLAN
JOHN K M VAL, MANAGER,
PENNY FLATS, LLC
ACKNOWLEDGMENT:
STATE OF COLORADO )
COUNTY OF LARIMER )
THE FIOREGOING INSTRUMENT WAS ACKNOWLEDGED BEFORE ME ON THE
Z& 1.1• DAY OF PVAVSrF 2004BY JOHN KOVAL, AS
MANAGER OF PENNY FLATS, LLCM DO LIMITED LIABILITY COMPANY.
WITNESS MY HAND AND SEAL
MY COMMISSION EXPIRES S OI I ,5'&/ ► fagc-
DA E NOTARY PUBLIC
�NpTARY
V
NPUBL1G:e
Drawing List 11�0 CO.
�xxunnx
ARCHITECTURAL:
15
3 SA1 Cover sheet
5 SA2 Composite Site Plan
3 SA3.1 Parking/ Access Horizontal Control Plans
3 SA3.2 Underground Parking Garage Plan
3 SA4 Architectural Elevation
SA5 Architectural Elevations & Site Section
SA6 Phasing Plan
21SA7 Shadow Analysis
LANDSCAPE
L1 Landscape Plan
L2 Landscape and Tree Mitigation Plan
ROW LOFTS PRO
TRANSITION FR(
MIXED USE BL
PEDESTRIAN ORIE
ALONG PEDESI
MID BLOCK C
FROM MASON STIR
SPINE AND FUTUF
BARI
SMALLER SCALE R
USES TRANSITION l
BARN AN[
NEIGI
Context Dia
Scale: 1 "=300'-0"
Electrical Engineer
RJMcNutt & Associates, Inc.
5587 W. 19th Street
Greeley, Colorado 80524
p:970-686-5678
f: 970-330-3667
CIVIC CENTER.
PENNY�FLATS
Geotechnical Engineer
Terracon Consultants, Inc.
301 North Howes
Fort Collins, Colorado 80521
p: 970-484-0529
f: 970-484-0454
Transportation Engineer
Eugene Copola
P.O.Box 260027
Littleton, Colorado 80163
p: 303-792-24
f: 970-484-0454
Legal Description
Lots 1-8 & 13-16, Block 33, And Vacated Public
Alley Right of Way, Located In The Northeast
Quarter of Section 11, Township 7 North, Range
69 West Of The 6th P.M., City Of Fort Collins,
Country Of Larimer, State Of Colorado.
1ARY PROJECT FRONTAGE WHEN
ROACHING FROM DOWNTOWN
3EST STRUCTURES + COMMERCIAL
S LOCATED IN THIS AREA TO MITIGATE
1CT OF TRAFFIC AND TRAIN AND
VIDE SCALE TRANSITION TO LARGER
IMERCIAL + CIVIC USES EXISTING AND
ELOPING TO SOUTH AND EAST.
STRIAN CIRCULATION
RANSIT CENTER
1ARY PEDESTRIAN CIRCULATION TO
TOWN
Nort
Zoning Criteria
Zone District ........................... Downtown District (D)Civic Center Sub -District.
TotalParcel Area .................. ......................................................
122,099 s.f.
Total Parcel Acreage..............................................................+/-2.803
Acres
Total Proposed Building Footprint.................................................64,884
s.f.
Total Percentage of Parcel Covered Above Grade................................53
%
3
Aggregate Floor Area to Parcel Area Ratio (U.G. parking not incl.)....... 1.83
3
Floor Area to Parcel Area Ratio for Residential Uses (incl.
circulation)..1.62
3
Floor Area to Parcel Area Ratio for Commercial Uses............................0.21
3
Residential Density ...................................................................61
Units/Acre
3
Maximum Proposed Building Height.....................................................84'-0"
3
Total Driveway Area on Parcel (covered parking not included) .... 21,879 s.f.
Total Landscaped Area on Parcel (paved and unpaved)..............35,336 s.f
Floor Area Summary
Building 1....................................12,384
s.f.
Building 2....................................13,018
s.f.
Building 3....................................21,313
s.f.Z
Building 4....................................34,539
s.f.,
Building 5....................................38,933
s.f.,
Building 6....................................42,506
s.f.
Building 7....................................23,115
s.f.
Buildina 8....................................37,023
s.f.
Total Habitable Floor Area ......... 222,831 s.f
Floor Area Totals By Use:
170 Residential Units................177,938 s.f.
Commercial Core & Shell ............ 25,400 s.f.
Common Area/Circulation ........... 19,675 s.f.
Underground Parking Structure ... 86,243 s.f.
Detached Parking Garage ............ 1,920 s.f.
Building 4 At Grade Storage ............ 432 s.f.,
2000
UCT
)N TYP.
UVER
- Ar11 jri�
i
Cn: UE'ZN
Planners - Designers • Builders
1811 Pearl Street
Boulder, Colorado
303-442-3351
Penny Flats
Fort Collins,
Site Design
Disclaimer:
These documents are provided by Coburn
Development Inc., for the design intent
of this specific project and only this
project. The contractor shall be res—
ponsible for all construction coordination,
methods and materials required for the
successful completion of the project.
This includes but is not limited to the
quality of workmanship and materials
required for execution of these doc—
uments and work or materials supplied
by any subcontractors. All work shall
comply with governing codes and ordi—
nances. The contractor shall review
and understand all documents and shall
notify the Architect immediately of any
discrepancies in the drawings, field con—
ditions or dimensions.
Revisions
Issue Dare
1QMason St. Curb Rev. 10-08-07
2'\MinorAmendment 11-29-08
33MajorAmendment 04-16-09
4QM. Amend. Response 06-10-09
5QM. Amend. Hearing 07-20-09
Fajor Amendment
SAI
September 6, 2006
Site Plan
p-144 2495
Q
N
4
0
0
2
2
____________________________ ____
4g83
e7
+
Composite
Scale: 1 "=30-0a
Site Plan
A9�
2
ADDRESS KIOSK FOR
UNITS ACCESStD FROM
PEDESTRfAN SPINE wr. cTR
i,MEDIANCHERRY STREET
MAPLE STREET
------------------------
FLOODPLAIR (TYP)-�
9
CP
4gj9-
F_
N 0
Z
BUILDING 1
Floor
UNIT TYPE
TOTAL
COMMERCIAL
FLOOR AREA
RESIDENTIAL
FLOOR AREA
BEDROOMS
1 at THRU 3rd
MULTIFAMILY
2064
2064
4BDRM
1 at THRU 3rd
MULTIFAMILY
2064
2064
4BDRM
1 at THRU 3rd
MULTIFAMILY
2064
2064
4BDRM
1 at THRU 3rd
MULTIFAMILY
2064
2064
4BDRM
let THRU 3rd
MULTIFAMILY
2064
2064
4BDRM
1st THRU 3d
MULTIFAMILY
2064
2064
4BDRM
BUILDING 1 TOTALS
12384
0
12384
12384
BUILDING2
Floor
UNIT TYPE
TOTAL
COMMERCIAL
FLOOR AREA
RESIDENTIAL
FLOOR AREA
BEDROOMS
1st 82nd
MULTIFAMILY
1418
1418
3BDRM
1st 82nd
MULTIFAMILY
1118
1118
2BDRM
tat It 2nd
MULTIFAMILY
1118
1118
2BDRM
let 82nd
MULTIFAMILY
1118
1118
2BDRM
let 82nd
MULTIFAMILY
1126
1126
2BDRM
3rd 84th
MULTIFAMILY
1544
1544
3 BDRM
3rd 841h
MULTIFAMILY
1250
1250
2 BDRM
3rd Roth
MULTIFAMILY
1250
1250
2 BDRM
3rd 84th
MULTIFAMILY
1250
1250
2 BDRM
3rd 84th
MULTIFAMILY
1326
1326
2 BDRM
ALL FLOORS
CIRCULATION
500
BUILDING 2 TOTALS
13018 1
0
1 12518
BUILDING 3
Floor
UNIT TYPE
TOTAL
COMMERCIAL
FLOOR AREA
RESIDENTIAL
FLOOR AREA
BEDROOMS
2nd
MULTIFAMILY
918
918
1+BDRM
2nd
MULTIFAMILY
918
918
1+BDRM
2nd
MULTIFAMILY
1050
1050
2 BDRM
2nd
MULTIFAMILY
1050
1050
2BDRM
3rd
MULTIFAMILY
787
787
1+BDRM
3d
MULTIFAMILY
787
787
1-BDRM
3d
MULTIFAMILY
957
957
2 BDRM
3d
MULTIFAMILY
957
957
2 BDRM
4th
MULTIFAMILY
787
787
1+BDRM
4th
MULTIFAMILY
787
787
1-BDRM
4th
MULTIFAMILY
957
957
2 BDRM
4th
MULTIFAMILY
957
957
2 BDRM
5th
MULTIFAMILY
787
787
1-BDRM
5th
MULTIFAMILY
787
787
1-BDRM
5th
MULTIFAMILY
1509
1509
2 BDRM
6h
MULTIFAMILY
787
787
1 BDRM
6th
MULTIFAMILY
787
787
1 BDRM
6th
MULTIFAMILY
754
754
1 BDRM
61111
MULTIFAMILY
754
754
1 BDRM
ALL FLOORS
CIRCULATION
4236
BUILDING 3 TOTALS
21313
0
17077
2 Unit Floor Area
SA2 No Scale
RESIDENTIAL LAND USE SUMMARY
BUILDING #
1
2
3
4
5
1 6
7
8
1 BDRM
0
0
4
0
2
6
0
8
1 +BDRM
0
0
8
11
7
2
0
0
2 BDRM
0
8 7
7
14
13
12
16
23
3BDRM
0
2
0
1
3
5
2
0
4 BDRM
6
0
0
0
0
0
0
Total Per Bldg.
6
10
19
26
25
35
18
31
COMMERCIAL LAND USE SUMMARY
BUILDING#
1
2
3
4
5
6
7
8
1st FI Commercial:
Retail, Office
0
0
0
2998
0
7722
0
7281
let FI Commercial:
Retail, Office, Restaurant
0
0
0
0
7399
0
0
0
2nd FI: Office
0
0
0
0
0
0
0
0
Total Per Bldg.
0
0
2998
7399
7722
0
7281
3 Land Use
SA2 No Scale
BUILDING 6
Floor
UNIT TYPE
TOTAL
COMMERCIAL
FLOOR AREA
RESIDENTIAL
FLOOR AREA
BEDROOMS
1st
COMMERCIAL
7722
7722
2nd
MULTIFAMILY
700
700
1 BDRM
2nd
MULTIFAMILY
700
700
1 BDRM
2nd
MULTIFAMILY
700
700
1 BDRM
2nd
MULTIFAMILY
700
700
1 BDRM
2nd
MULTIFAMILY
882
882
1+BDRM
2nd
MULTIFAMILY
882
882
I+BDRM
2nd
MULTIFAMILY
882
882
1+BDRM
2nd
MULTIFAMILY
882
882
1+BDRM
2nd
MULTIFAMILY
950
950
2BDRM
2nd
MULTIFAMILY
950
950
2BDRM
2nd
MULTIFAMILY
950
950
2BDRM
2nd
MULTIFAMILY
950
950
2BDRM
2nd
MULTIFAMILY
950
950
2BDRM
2nd
MULTIFAMILY
950
950
2BDRM
3rd
MULTIFAMILY
700
700
1 BDRM
3rd
MULTIFAMILY
700
700
1 BDRM
3rd
MULTIFAMILY
700
700
1 BDRM
3rd
MULTIFAMILY
700
700
1 BDRM
3rd
MULTIFAMILY
882
882
1+BDRM
3rd
MULTIFAMILY
882
882
1+BDRM
3d
MULTIFAMILY
882
882
1+BDRM
3rd
MULTIFAMILY
882
882
1+BDRM
3rd
MULTIFAMILY
950
950
2BDRM
3rd
MULTIFAMILY
950
950
2 BDRM
3rd
MULTIFAMILY
950
950
2 BDRM
3rd
MULTIFAMILY
950
950
2 BDRM
3rd
MULTIFAMILY
950
950
2BDRM
3rd
MULTIFAMILY
950
950
2 BDRM
4th
MULTIFAMILY
882
882
I+BDRM
4th
MULTIFAMILY
882
882
1+13DRM
4th
MULTIFAMILY
882
882
I+BDRM
4th
MULTIFAMILY
882 1
882
1+BDRM
4th
MULTIFAMILY
1400
1400
3 BDRM
4th
MULTIFAMILY
1400
1400
3 BDRM
4th
MULTIFAMILY
1400
1400
3 BDRM
ALL FLOORS
CIRCULATION
3000
BUILDING 6 TOTALS
42506
7722
31784
BUILDING 7
Floor
UNIT TYPE
TOTAL
COMMERCIAL
FLOOR AREA
RESIDENTIAL
FLOOR AREA
BEDROOMS
tat 6 2nd
MULTIFAMILY
1418
1418
3 BDRM
let 82nd
MULTIFAMILY
1118
1118
2BDRM
let 82nd
MULTIFAMILY
1118
1118
2BDRM
tst82nd
MULTIFAMILY
1118
ills
2BDRM
tst82nd
MULTIFAMILY
1118
ills
2BDRM
tst82nd
MULTIFAMILY
1118
1118
2BDRM
1 at62nd
MULTIFAMILY
1118
1118
2BDRM
1 at 82nd
MULTIFAMILY
1118
1118
2BDRM
1 at 82nd
MULTIFAMILY
1126
1126
28DRM
3rd 84th
MULTIFAMILY
1544
1544
3BDRM
3d 84th
MULTIFAMILY
1250
1250
2BDRM
3rd 84th
MULTIFAMILY
1250
1250
2 BDRM
3d 84th
MULTIFAMILY
1250
1250
2 BDRM
3rd 84th
MULTIFAMILY
1250
1250
2 BDRM
3rd 84th
MULTIFAMILY
1250
1250
2 BDRM
3d 84th
MULTIFAMILY
1250
1250
2 BDRM
3d 84th
MULTIFAMILY
1250
1250
2 BDRM
3rd 84th
MULTIFAMILY
1326
1326
2 BDRM
ALL FLOORS
CIRCULATION
1125
BUILDING 7 TOTALS
23115 1
0
21990
BUILDING 8
Floor
UNIT TYPE
TOTAL
COMMERCIAL
FLOOR AREA
RESIDENTIAL
FLOOR AREA
BEDROOMS
1st
COMMERCIAL
7281
7281
2nd
MULTIFAMILY
700
700
1 BDRM
2nd
MULTIFAMILY
700
700
1 BDRM
2nd
MULTIFAMILY
700
700
1 BDRM
2nd
MULTIFAMILY
921
921
2BDRM
2nd
MULTIFAMILY
921
921
2BDRM
2nd
MULTIFAMILY
921
921
2 BDRM
2nd
MULTIFAMILY
921
921
2 BDRM
2nd
MULTIFAMILY
921
921
2 BDRM
2nd
MULTIFAMILY
921
921
2 BDRM
2nd
MULTIFAMILY
921
921
2 BDRM
2nd
MULTIFAMILY
921
921
2 BDRM
2rd
MULTIFAMILY
921
921
2BDRM
3d
MULTIFAMILY
700
700
1 BDRM
3d
MULTIFAMILY
700
700
1 BDRM
3d
MULTIFAMILY
700
700
1 BDRM
3d
MULTIFAMILY
921
921
2BDRM
3d
MULTIFAMILY
921
921
2BDRM
3d
MULTIFAMILY
921
921
2BDRM
3d
MULTIFAMILY
921
921
2BDRM
3d
MULTIFAMILY
921
921
2BDRM
3d
MULTIFAMILY
921
921
2BDRM
3d
MULTIFAMILY
921
921
2BDRM
3d
MULTIFAMILY
921
921
2BDRM
3d
MULTIFAMILY
921
921
2BDRM
4th
MULTIFAMILY
1050
1050
2 BDRM
4th
MULTIFAMILY
1050
1050
2BDRM
4th
MULTIFAMILY
700
700
1 BDRM
4th
MULTIFAMILY
750
750
l BDRM
4th
MULTIFAMILY
971
971
2BDRM
4th
MULTIFAMILY
971
971
2BDRM
4th
MULTIFAMILY
972
972
2BDRM
ALL FLOORS
CIRCULATION
2500
BUILDING 8 TOTALS
37023
7251
27242
Address Kiosk Concept
SA2 Scale: 318" = 1' - 0"
III
Planners • Designers • Builders
1811 Pearl Street
Boulder, Colorado
303-442-3351
Penny Flats
Fort Collins,
Site Design
Disclaimer:
These documents are provided by Coburn
Development Inc., for the design intent
of this specific project and only this
project. The contractor shall be res-
ponsible for all construction coordination,
methods and materials required for the
successful completion of the project.
This includes but is not limited to the
quality of workmanship and materials
required for execution of these doc—
uments and work or materials supplied
by any subcontractors. All work shall
comply with governing codes and ordi—
nances. The contractor shall review
and understand all documents and shall
notify the Architect immediately of any
discrepancies in the drawings, field con—
ditions or dimensions.
Revisions
Issue Date
1QMason St. Curb Rev. 10-08-07
2QMinorAmendment 11-29-08
33MalorAmendment 04-16-09
4QM. Amend. Response 06-10-09
5QM. Amend. Hearing 07-20-09
Major Amendment
SA2
September 6, 2006
Composite Site Plan
p_,,, 2495
2 Fire Truck
13' Scale:l"=30'-0"
Radius Study at Interior Drive Aisle No
W
0
0
Z
wU)
Qw
U
U
U) M
adz
LLJ --
LLa
0
I
Ln
m
I
0
I
00
IM
25'
C:::=�
10" II 12' I
CHERRY STR
5'-5" 21'-8" 30'
61'-5 IRE & SURFAC
PWR ING ACCE S
EET
71'-2"- 25 ,
(i y '
z \
RCY - RASH ?\'
Q
�I w
o r
U
o m Ld W
TROLLEY BARN I I °
Za ��
>v o�
a
r
IQ I w
$
o
-- w
zo J
� W � 19' TYP. �7
O I Z Q ?7 19' TYP.
Y M a c>
3 O
Ld
o Z ID O
24' } Q Z
DRIVE w
Q cn BRI PEDESTRIAN WALK _ —LUJ P L MAILBOX D.
ABOVE PHASE 2
cn a �i
Iu LU VERTICAL 19, TYP. 4 Y.
Q > CIRCULATIOfi 1-9 TYP. 4
NO COMMON cr EXTENDING
6' CIRCULATION 0 TO GARAGE W 4
IN BUILDING 1 Q 3< 9 TYE F
m e ; 19, TYP. o 0 a N tx
cD
O� g ARKING ACCESS AISLE19, TYP. U
Z p D z
H Uz a ° tdc1w
"f J W BUILDING 2 tfs
U z
p=p SECONDARY Q x m 19' TYP.
F' EGRESS VIA Li
HORIZONTAL it a a 4 _
EXIT TO >
Z BUILDING B COMPACT ao RTRI CY
BALCONY
TYP. w
PEDESTRIAN BRIDGE I m w I
—ABOVEo w 9 TY
ABOVE M (A f VERTI AL CIRCULATION
a � CENT RA ABOVE GARAGE EAST PRIVATE DRIVEV
f —7 9; TY�i WEST PRIVATE DRIVEWAY gg TY FIRE CONTROL BALCONY
2 — — y ROOM 9 N�'. ABOVE TYP.
a
TRASH'. RCY. j I j RCY YC
KG
RA P
N ERE
ELY
VERTICAL CIRCULATION V
VERTICAL WITH ELEVATOR VERTICAL
CIRCULATION EXTENDING TO 22' CIRCULATION
ABOVE GARAGE
e ABOVE GARAGE DR WE GARAGE DRIVE
rs TYP. ENTRY AT ZERO TYP. ENTRY AT ZERO
SETBACK CONDITION SETBACK CONDITION
FINAL LOCATION T.B.D. FINAL LOCATION T.B.D.
R7 �� BICYCLE PARKING
0' e e e m e f— TYP. OF 34 �' Q
0 o o R4 e e o e m e e
N A
----------- \--- —
NDERGRO ND LOW LEVEL LANDSCAP TR TMEN U DERGRO IND
P RKING AC ESS ADJACENT TO DRIVE ISLES TO P KING AC ESS
MITIGATE CAR/PFDEST IAN CONFI I J
Surface
22'
RIVE
I
ing, Access &
— 4"
Control
'-10"1�'—
MAP E STREET
5' 35'-9" 22' 70'-8"
—10"
25'
M
I
wUU))
aw
0
"U W
of
CD
Z W//
CL LLQ
in
'� a. F_
^^ rr
vJ
Z
0
Q
0
I
C
G
o)
uT
I
N
L.L
0
uJ
N
Z
Planners • Designers • Builders
1811 Pearl Street
Boulder, Colorado
303-442-3351
Penny Flats
Fort Collins,
Site Design
Disclaimer:
These documents are provided by Coburn
Development Inc., for the design intent
of this specific project and only this
project. The contractor shall be res—
ponsible for all construction coordination,
methods and materials required for the
successful completion of the project.
This includes but is not limited to the
quality of workmanship and materials
required for execution of these doc—
uments and work or materials supplied
by any subcontractors. All work shall
comply with governing codes and ordi—
nances. The contractor shall review
and understand all documents and shall
notify the Architect immediately of any
discrepancies in the drawings, field con—
ditions or dimensions.
Revisions
Issue Date
1QMason St. Curb Rev. 10-08-07
EQMinorAmendment 11-29-08
93MajorAmendment 04-16-09
4QM. Amend. Response 06-10-09
5QM. Amend. Hearing 07-20-09
Major Amendment 1
SA301
September 6, 2006
Scale: 1"=30'-O"
Parking/Access Plan
P-144 2495
Parkin Anal sis:
3
Residential Parking Need Assumption
58 - 1 BR Units x 1........................................58
Spaces
87 - 2 SR Units x 1.5...................................140
Spaces
13 - 3 BR Units x 2.........................................26
Spaces
6 - 4 BR Units x 2.5........................................
- Spaces
Total Residential Parking Need ...................262
Spaces
Commercial Parking Need Assumption
29,247 s.f. Commercial x 2/1000....................51
Spaces
Assumed Maximum Parking Need:
Total Residential + Commercial Parking ......
313 Spaces
Parking Provided:
Surface Parking.... ...... m ...................................
102 Spaces
Underground Parking......................................221
Spaces
Total Parking Provided.................................323
..
Spaces
Tandem paces Inclu ed in Total .................... 7 Spaces
Total Spaces Provided Less Tandem.............306
Spaces
Total Parking Demand Per T.I.S.....................254
Spaces
* Total spaces provided, less tandem spaces exceeds T.I.S.
parking demand calculation by 18%
Total Compact Car Spaces Provided...............45
Spaces
* Compact car spaces are 15'x8' and <15%
of the total spaces
provided less the tandem spaces. All spaces not listed as
compact spaces are either standard 19 'x 9'
spaces or
19' x 8' accessible spaces with an adjacent 8' access aisle
Total Accessible Spaces Required... ..... _m ......
8 Spaces
Total Accessible Spaces Provided...................10
Spaces
30'-7" 158'-9"
34'-9"
I 20'-2" 1638'-1"8'
_
9„
VERTICAL
CIRCULATION
F -
\ Ln
81 \�
32' 2�' 18 \
aoupecr Nl0 (4 COM.) (3 STD.) (2 STD. \ I N
crcr
001MNCt N \ r`
N i
TAB
o \.
(O N �N TAtWEII \ N
00 T_I
ITS —-
oTALI
t v
TM1pU
- 19, 24' 19' 19, 24 19, I -
i � a
TAMW
00
O I� N N TN�it
o n 1> VERTICAL
IL CIRCULATION
— I VERTICAIII
1 CIRCULATION °) I
""�� rn
,....�. p I BOLLrycDS L.^- ti 3 io M
PP
- I N ( PROTECTION N Q o
7
�, - - -
0) 19' 24' 19' 19' 24 19' 19
19' 24' 1 19' 9' 9' ^ o ^ - ILo
TANaLM
rn o 1 N� N�
o 27' 2 S D.) n TANOW
N1� `°- -- 1 r -
- N 00
N N fn TANOW
INN
D1 a1 p
T STD - I
0) — I 7 9 - C(2 )
N cn 27' 1 26' 27' N 18' rn
24' 19' - 22' 19, 25'� (3 STD.) (2 STD. 20'-5"
- J2 ACC. 22' II (3 STD.) I DRIVE 2 STD.)
o
°0 N ro N ` VERTICAL °' N
N I I of CIRCNLATION
_ COMPACT 1 — m caw ACT I iv LO M-
YI oo►wACT COMPdCI j .I I 27' 1 9' ELV aj 1 K �ry 8
(3 69M. yr N
COrPACt a. O%VACT. a 'n CCilo4 Ot It 0 d a 27' 8' 27' 18,
N N N 26'
M o 1n ,(2 ACC.) (3_ STD.) STD.)IJI (3 STD.) (2 STD.)
COMiACr U COMPAICr ' (%M/hMC'f
Cc~ 15 i �~
I'
-.+ , p5 yh
I
«» N /"; "
CENTRAL FIRE i D
IPUMP ROOM I
184' �4' 47' 4- " 151'
Cn:UF'ZN
Planners • Designers • Builders
1811 Pearl Street
Boulder, Colorado
303-442-3351
Penny Flats
Fort Collins,
I Site Design
Disclaimer:
These documents are provided by Coburn
Development Inc., for the design intent
of this specific project and only this
project. The contractor shall be res-
ponsible for all construction coordination,
methods and materials required for the
successful completion of the project.
This includes but is not limited to the
quality of workmanship and materials
required for execution of these doc-
uments and work or materials supplied
by any subcontractors. All work shall
comply with governing codes and ordi-
nances. The contractor shall review
and understand all documents and shall
notify the Architect immediately of any
discrepancies in the drawings, field con-
ditions or dimensions.
Revisions
Issue
Date
1QMason St. Curb Rev.
10-08-07
2QMinorAmendment
11-29-08
33MaiorAmendment
04-16-09
4QM. Amend. Response
06-10-09
5QM. Amend. Hearing
07-20-09
Major Amendment
SA302
September 6, 2006
Underground Garage Plan
p-144 2495
METAL SIDING -----.-I
STUCCO--Ia . 1
am
z
STONE
STUCCO
BRICK- MASONRY CORNICE
_STEEL -I - -- -
-t I-- --
- p -
LILA
---
Iding 6: Mixed Use, Residential / Office / Ret
ne, Brick, Stucco, & Metal Siding
rvra ►V vuUcL L-1IVVC rr
sA4 Scale: 1/16" = Vi
METAL SIDING
STEEL CORNICE
BRICK
:r-STEEL
2
■II
Iding 5: Mixed Use, Residential / Office / Ret
.k, Stucco, & Metal Siding
North Mason Street Elevation
Scale: 1116" = Vi
STEEL—-
STONE—
BRICK-
,,-,.,
`STONE -
a
METAL SIDING
�i
MET
SIDIN
- BRICK STUCCO _
y
�E MASONRY--- -=�_
CORNICE -_I--L - -
BRICK
AWNIN
OPTIONAL
BY TEN
T
r
\
STEEL
Tin
BRICK
STUCCO
STONE
METAL -
SIDING
I T STUCCO -
BRICK
Iding 8: Mixed Use, Residential / Offlce / R_e1
ie, Brick, Stucco, Steel, Glass, & Metal Siding
Cherry Street Elevation
Scale: 1116" = Vi
North Howes Street Elevation
Scale: 1116" = Vi
-STONE STEEL "
BASE
C M U
r
BRICK
STEEL.>•-
_'J
I�
STONE
METAL- - - --
SIDING
BRICK
STEEL
A
7
7
MASONRY CORNICE-
-- - - - SID NG
! 77_ ---- METAL
SIDING
olio hull
' -
ONE
l
IN
Building 5: Mixed Use, Residential / Office / Retail
Brick, Stucco, & Metal Siding
s
1�
are.�.Mrwia i . � I
r�lloll — — — II■Ili 1■II _III�II �IIrI,
�I III • 'A1■ u■ LOW II
Iding 4: Mixed Use, Residential / Office / Ret
k, Stucco, & Metal Siding
--C M U
t
_ STEEL
Li
Building 7: Rowlofts
Split Face Concrete Block, Standard
Concrete Block, Stucco, & Metal Siding
Building 1: Townhouses
Brick, Stucco, Cement Board Siding, & Metal Siding
IdinA1_8: Mixed _Useli-Residential / Office / Ret
ne, Brick, Stucco, Steel, Glass, & Metal Siding
Note:
Depicted Facade treatment and materials anticipate
D.D.A. funding support for facade material upgrade
in exchange for facade easement.
Colors shall be consistent with the traditional building
colors found in the adjacent Civic Center and
historic Old Town Fort Collins as depicted in the
rendering submitted for PDP hearing.
,r
STEEL-,
STUCCO
y
i
]Li --BRICK
11C
AWNINGS OP`IONAL
BY TENANT
__ST
L
t.
CMU _ - -1
Building 6: Mixed_Use, Residential / Office / Retail
Stone, Brick, Stucco, & Metal Siding
BRICK
-STONE
BRICK
'
a
-STONE
COOBUI�1N
Planners • Designers • Builders
1811 Pearl Street
Boulder, Colorado
303-442-33$1
Penny Flats
Fort Collins,
Site Design
Disclaimer:
These documents are p,ovlded by Coburn
Development nc., for tie design intent
of this sbecific project and only th's
project. The contactor shallbe as-
ponsib e for all construction coordinallon,
methods and materials required for the
successful competion of the project.
Tnis includes but is not limited to the
quality of workmanship and materials
required for execution of these doc-
uments cnd work or materials suoo'a
by any subcontractors. All work shall
comply with governing codes and ordi-
nances. The contractor shall review
aid understand all documents and sial
notify the Architect imn adely of any
discrepancies in the crcwiri field con-
ditions o, dimensions.
Revisions
Issue
Dare
i Mason St. Curb Rev.
10-08-07
2LMinorAmendment
11-29-08
33MaiorAmendment
04-16-09
44M. Amend. Response
06-10-09
5�M. Amend. Hearing
07-20-09
MajorAmendlment
SA4
September 6, 21006
Wilding Elevations
P-144 2495
Q
CL
N. HOWES
(STREET
METAL SIDING
STUCCO
STEEL -
STUCCO
STEEL
CMU —
Pedestrian Spine West Elevation
sA5 Scale: 1/16" = T-0"
STUCCO --
MASONRY — - — — - --
CORNICE - -
C E a 1 C
BRICK
ILL]8 �o 0
STEEL
0
STUCCO
�. STEEL
t I
uilding 6: Mixed Use, Residential / Office / Retai
tone, Brick, Stucco, & Metal Siding
Pedestrian
Scale: 1/16" = 1'-0"
METAL SIDING—
MASONRY —
CORNICE
STUCCO
STEEL
c„-
' f
Scale: 1116" = Vl
East Elevation
MULTIFAMILY
CMU
_ .
F7
- -- - l_ -- srucco
�n C'__ 7-7`- --
- — STEEL
CMU
Building 2: Row Lofts
Split Face Concrete Block, Standard
Concrete Block, Stucco, & Metal Siding
CEMENT BOARD
��
II �_
-_
s --
-- - -
MULTIFAMILY
Note:
Depicted Facade treatment and materials anticipate
D.D.A. funding support for facade material upgrade
in exchange for facade easement.
Colors shall be consistent with the traditional building
colors found in the adjacent Civic Center and
historic Old Town Fort Collins as depicted in the
rendering submitted for PDP hearing.
--- --� METAL
'I _= SIDING
MASONRY
CORNICE
N. MASON
STREET
C0BURN
Planners • Designers • 8uilders
1811 Pearl Street
Boulder, Colorado
303-442-3351
Penny Flats
Fort Collins,
Site Design
Disclaimer.
These documents ere providec oy Coburn
Deve opment Inc., for the design Intent
of this specific project and any this
project. The contractor shall ae res-
ponsible for all construction coordination,
methocs and mdteria s required for the
successfu completion of the project.
This inc uses but is not limited to the
quality of workmanshla and moteric s
required for execution of these doc-
uments one work or materials supped
by any subcontractors All work she
comply with governing codes and orci-
nances. The contractor shall review
end understand all documents ano she
notify the Arcnitect immediately of any
discrepancies 'n the drew'ngs, field con-
ditions or dimensions.
Revisions
issue
Date
1�Mason St Curb Rev.
10-08-07
2�Minor Amendment
11-29-08
33MajorAmendment
04-16-09
4�M. Amend. Response
06-10-09
5�M. Amend. Hearing
07-20-09
Major Amendment
SA5
September 6, 2006
Site Section
Scale: 1/16" = Vl
Bldg. Elev. & Section
p-144 2495
;raphic Key
hatched area indicates actual
shadows cast by the proposed
Structure at 10 am. noon 12 pm.
and 2 pm on December 21st.
Additional Shadow Area due
to Major Amendment
modification: Hatched area
ndicates actual shadows cast by
the proposed structure at 10 am.
ioon 12 pm. and 2 pm on
December 21st.
4
Planners • Designers • Builders
1811 Pearl Street
Boulder, Colorado
303-442-3351
Penny Flats
Fort Collins, C
Site Design
Disclaimer:
These documents are provided by Coburn
Development Inc., for the design intent
of this specific project and only this
project. The contractor shall be res—
ponsible for all construction coordination,
methods and materials required for the
successful completion of the project.
This includes but is not limited to the
quality of workmanship and materials
required for execution of these doc—
uments and work or materials supplied
by any subcontractors. All work shall
comply with governing codes and ordi--
nonces. The contractor shall review
and understand all documents and shall
notify the Architect immediately of any
discrepancies in the drawings, field con—
ditions or dimensions.
Revisions
Issue Date
1QMason St. curb Rev. 10-08-07
2QMinorAmendment 11-29-08
33MaiorAmendment 04-16-09
4QM. Amend. Response 06-10-09
5QM. Amend. Hearing 07-20-09
Major Amendment
SA7
September 6, 2006
Shadow
Scale: 1 "=30'-0"
Shadow Analysis