HomeMy WebLinkAboutTHUNDERBIRD ESTATES SIXTH - Filed CS-COMMENT SHEETS - 2004-09-036 Project Comments Sheet
Selected Departments
City of Fort Collins
Department: Engineering
Date: August 26, 2003
-COLLEGE &DRAKE -TYPE II (LUC)
Project: ECKERD DRUG PDP
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
August 20, 2003
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore
Topic: Drainage design Created: 8/19/2003
Number: 31
How much water is flowing from the parking lot west over the public sidewalks to the frontage road?
Number: 32 Created: 8/19/2003
Please provide a minimum of 2' of additional plate beyond the back of walk covering the under -walk drains.
Topic: General Created: 8/1912003
Number: 22
Please dedicate Right of Way to standard on Drake (51' from centerline, constrained arterial) and on College Avenue
(70.5' from centerline plus 2-12' turn lanes, minus 6' because there is no bike lane on College= 88.5' from centerline of
College). Please dedicate utility easements to standard (15' along Drake and College, 9' along Thunderbird). With this
ROW dedication on College, it also eliminates the requirement for a turnaround at the end of the dead-end frontage road
(LUC 3.6.2 Q. One item that might be of concern regarding ROW and easement dedications in the vicinity of the gas
Station s that then so1me sorthofclean up wound be needed prioreto City acceptanceofstandards, theROW and/or easement dedif the soil,
dedication.
Number: 23 Created: 8/19/2003
Parking75 feet, whileoes not
the setbacks alon'gghetrontage road and Thunderback requirements under ird should be 50'ASS Figure f romThe
the flow) ne of thhetback from artoad to thee should
edge of the first parking stall.
Number: 24 Created: 8/19/2003
Please use radius -style driveways on arterials (Drake and College). Please use standard driveway cuts on all other streets
(frontage road and Thunderbird) unless there are 350+ trips through each, in which case, please use the radius -style
driveways here as well. Please label the radii and ensure that they match the standard values.
Number: 26 Created: 8/19/2003
Due to the proximity of the frontage road intersection with Thunderbird to the College intersection with Thunderbird, it is
strongly suggested that the frontage road access to Thunderbird be removed. If the closing does not occur with this
l Dale
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat X Site Drainage Report Other
Utility_ Redline Utility Landscape
Page 1
Fire hydrants are required with a maximum spacing of 600 feet along an approved roadway.
Fach hydrant must be capable of delivering 1500 gallons of water per minute at a residual
pressure of 20 psi. 1997 UFC 901.2.2.2
Fire hydrants will be located properly.
Number: 53 Created: 8/25/2003
WATER SUPPLY: Commercial
No commercial building can be greater then 300 feet from a fire hydrant.
Fire hydrants are required with a maximum spacing of 600 feet along an approved roadway.
Each hydrant must be capable of delivering 1500 gallons of water per minute at a residual
pressure of 20 psi. 1997 UFC 901.2.2.2
Repeat comment
Department: Police
Topic: Transportation
Number: 44
Issue Contact: Joseph Gerdom
Created: 8/20/2003
Would suggest some modifications to luminaires along east property line to reduce FC values
on adjacent properties.
Luminaires have been adjusted in accordance with the comments and standards.
Department: Stormwater Utility
Topic: Drainage design
Number: 1 I
Issue Contact: Basil Hamdan
Created: 8/14/2003
The proposed design allows a good portion of the site to drain directly out of the parking area
and into existing streets with no water quality treatment. The City understands that this is an
iniill site and that not all the requirements can be met, however the plans as presently
designed do not make a serious attempt at meeting these criteria. It is recommended that
something be done to treat the drainage going out through the south side of the site, if no
water quality pond can be designed there due to the lack of a storm sewer system nearby,
then maybe a swale or another treatment option can be explored.
There is an existing monitoring well in the proposed water quality pond area. Show that well
on the grading plan_ Please discuss/clarify how will the grading of the water quality pond
affect that exising well.
Drainage going to the south side of the site is going through a grass swale at the
southeast corner. We are currently exploring the moving of the monitoring well out of
the water quality pond.
Topic: Easements
Number: 21
Created: 8/ 19/2003
The water quality pond should be placed within a drainage easement, if the site is not being
replatted this should be done by separate document.
Easements shall be dedicated by separate document.
Topic: Erosion Control
Number: 12
Page 4
Created: 8/18/2003
August 1, 2003
Plan is OK. Thank you.
Topic: Grading Plan
Number: 13 Created: 8/18/2003
The plan seems to create a low area in the front of the building, please correct as per redlines
to ensure that a minimum .5% grade is maintained.
There is no curb cut to allow drainage from the west side of the north parking lot entrance to
get into the water quality pond. Also, elevations along that entrance suggest that this area
will not drain well, as the called out elevations are the same at both ends of that entrance.
The proposed grades along the south side entrance into the parking lot may allow water to
drain freely into Thunderbird Drive without routing water through the proposed sidewalk
drain. Please correct or clarify.
The landscaped area on the east side of the parking lot will drain onto the existing wall and
fence. This could create problems especially when the landscaping in that area is watered. It
is suggested that a trench drain system be designed at the bottom of that area to capture any
runoff that would otherwise be trapped.
Please provide some erosion control fabric or concrete protection at the points of infall from
the parking lot into the water quality pond.
A curb cut is provided at the southwest corner of the north parking lot for drainage
into the water quality pond. A portion of the frontage road is being re -graded to
accommodate drainage. A perforated pipe is being added along the existing wall to
allow for drainage. Erosion control fabric will be used along the water quality pond.
Topic: Site Plan
Number: 16 Created: 8/ 19/2003
The contour elevations shown for the water quality pond on the site plan do not agree with
the ones shown on the grading plan. Please revise and correct.
Grading plan and site plan shall be coordinated
Department: Traffic Operations
Topic: Traffic Dept
Number: 54
Issue Contact: Ward Stanford
Created: 8/26/2003
The north access this project is planning to utilize for the exit of its drive thru, is planned by
the Traffic Dept. to be closed with the redevelopment of the property to the north. This
project needs to provide for its drive thru and parking traffic to exit back to Thunderbird or
Drake.
Per the August 26, 2003 meeting, traffic is being redirected from the drive -through onto
the frontage road. The access onto College from the Eckerd site has been eliminated.
Number: 55
Created: 8/26/2003
The frontage rd in this area only serves the property south of this project. Since all properties
in this area could be served from Thunderbird, the Traffic Dept would like to close this leg of
the frontage road.
The frontage road shall remain open to serve the Eckerd site and the Moot House
Page 5
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Transportation
Number: 37 Created: 8/20/2003
The existing attached sidewalks along Thunderbird Drive and the College Ave. frontage road
are an acceptable alternative to the City's detached standard sidewalk, as long as they are 6
feet in width with ADA accessible crossings of the driveways.
Please see attached letter to Ted Shepard from Bob McDonaugh dated 9/19/03.
Number: 38
Created: 8/20/2003
It appears that the turning radius from the shared northern driveway off of College Ave. is
too tight to accommodate most turning vehicles without entering into the opposing traffic
lane. What alternative designs for this driveway have been explored?
The access onto College from the Eckerd site has been eliminated.
Number: 43
Created: 8/20/2003
The sidewalk along the north side of the bldg. is required to be a minimum of 6 feet in width
where cars are allowed to overhang by 2 feet to ensure a 4-Coot minimum clear space.
The parking angle has been changed to 30 degree parking to accommodate the 6'
sidewalk width.
Number: 45
Created: 8/21/2003
A meeting with CDOT, Engineering, Traffic and Transportation Planning is highly
recommended to discuss circulation within the site as well as to and from the surrounding
streets.
All parties have been discussing the circulation
Number: 46
Created: 8/21/2003
The walkway in front of the State Farm Insurance building will need to be connected to the
Drake sidewalk system.
The existing walk and concrete to the north shall remain and a crosswalk shall be
painted.
Number: 47 Created: 8/21/2003
Has the option of relocating the drive-thru facility to the east side of the building been
explored? This would facilitate a safer circualtion pattern for customers and create less of an
impact on College Ave.
The option has been explored.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Easements
Number: 17 Created: 8/19/2003
Provide a 15 foot utility easement along the east property for the existing sanitary sewer
main. Provide a copy of the offsite easements needed to construct the proposed sanitary
sewer service as well as the abandonment of the existing services.
Page 6
Easement shall be provided by separate document. See Engineering plans.
Topic: Utility Plans
Number: 18
Created: 8/19/2003
Cut a 6-inch by 6-inch tee or wye into the existing sanitary sewer main for the proposed
service connection.
See Engineering plans.
Number: 19
Created: 8/19/2003
Use a tapping saddle on the existing water main for the proposed fire hydrant connection.
See Engineering plans.
Number: 20
Created: 8/19/2003
There are several sanitary sewer services which exist on this site. Some field investigation is
required to determine the number of services and the location of each. All existing water and
sewer services must be used or abandoned at the main. Clearly define all aspects of the
sanitary sewer abandonment's.
See site, landscape and utility plans for other comments.
When found, sanitary sewer services will be abandoned properly.
Department: Zoning
Topic: zoning
Number: 1
Issue Contact: Peter Barnes
Created: 8/6/2003
It's not clear to me if this project includes the Moot House. Their Land Use Data includes the
Moot House in their Floor Area calculation. If the Moot House is part of this PDP, then the
"proposed land use" on the site plan needs to be changed from "retail drug store" to "retail
store and standard restaurant". It would appear that it is part of the PDP since a new trash
enclosure is proposed and the parking seems to take the restaurant into account. If the Moot
House isn't part of it, then correct the floor area to include just the retail building and change
the proposed land use to "retail store". There is no such defined use as a "retail drug store" in
our Code.
The Moot House floor area has been included and the proposed land use has been
revised.
Number: 2
Created: 8/6/2003
Need to dimension the building envelope or footprint, and show distances to lot lines.
Dimensions have been added.
Number: 3
Created: 8/6/2003
The site plan indicates that a letter was provided regarding the shared park i ng/altemative
compliance. The only letter in my packet was the statement of planning objectives. If that's
the letter they're refcring to, it's not adequate to make their alternative compliance case under
3.2.2(K)(3). A more detailed explanation is necessary. The square footage of the Moot
House needs to he provided in order to accurately analyze the shared park ing/altemative
compliance proposal. Without the square footage, we can't really determine how many
spaces would normally be allowed.
Page 7
The alternative compliance letter shall be provided with the resubmittal.
Number: 4
Created: 8/6/2003
The landscape buffer along the east lot line adjacent to the residential is not adequate
screening. Per Scc. 3.2. 1 (E)(4)(a) of the LUC, a 6' high fence or wall is required in addition
to the plantings.
There is an existing 5' to 6' high concrete wall that will remain with this development.
The plantings shall be adjusted.
Number: 5 Created: 8/6/2003
A minimum 5' wide landscape strip is required along the east side of the parking lot adjacent
to the existing commercial at the north end per 3.2.2(J) and 3.2.] (E)(4)(a).
A 5' wide grass strip has been provided.
Number: 6
Created: 8/6/2003
A tree needs to be planted in the "turf' island at the west end of the parking row directly on
the south side of the building.
A proposed fire hydrant is located in the parking island. Separation requirements from
utilities prevent the planting of a tree in the island.
Number: 7 Created: 8/6/2003
The north arrow on the landscape plan is pointing east instead of north.
North arrow adjusted.
Number: 8
Created: 8/6/2003
landscape note #10 needs to be changed from "the valuation of the materials" to the
"valuation of the materials and labor".
Note changed.
Number: 9
Created: 8/6/2003
The west lot line appears to be on the west side of the frontage road, or does the frontage
road end south of the building? If it does end, are they going to dedicate frontage road ROW
to extend the frontage road?
The frontage road ROW ends south of the building and the property lines shall remain
the same.
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Page 8
m
d
0
a
W
�U
m
r
M
0 C
m
O Z W
W
9
n
�jo
ID/Z 3/63
Trans C7on
yr Project Comments Sheet
rt Selected Departments
City of Fort Collins
Department: Engineering
Date: October 30, 2003
Project: ECKERD DRUG PDP - COLLEGE & DRAKE - TYPE 11 (LUC)
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
October 29, 2003
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore
Topic: General
Number: 23 Created: 8/19/2003
[ 10/27/03] The variance requests for parking setbacks have resulted in the following: approval of the request for the
shown setback from Drake Road, and approval of a 20' setback from the frontage road ( 15' was requested, but
not approved).
Original comment:
Parking does not meet the parking setback requirements under LCUA55 Figure 19-6. The setback from Drake should be
75 feet, while the setbacks along the frontage road and Thunderbird should be 50' from the flowline of the road to the
edge of the first parking stall.
Number: 24 Created: 8/19/2003
[ 10/27/03] Please label the driveway radii and ensure they match the standard value of 20'.
Original comment.
Please use radius -style driveways on arterials (Drake and College). Please use standard driveway cuts on all other streets
(frontage road and Thunderbird) unless there are 350+ trips through each, in which case, please use the radius -style
driveways here as well. Please label the radii and ensure that they match the standard values.
Number: 26 Created: 8/19/2003
[10/27/03] Since the closure of the frontage road is not occurring at this time, please add the note to the plans that it maybe
closed in the future.
Original comment:
Due to the proximity of the frontage road Intersection with Thunderbird to the College intersection with Thunderbird, it is
strongly suggested that the frontage road access to Thunderbird be removed. If the closing does not occur with this
project, please note on the plans that it may happen in the future. If the closing occurs with this project, then the parking
setbacks from the frontage road will no longer be needed.
Number: 27 Created: 8/19/2003
(10/27/031 The sidewalks should be 6' from the back of walk to the back of curb, not to the flowline, when rollover curb is used.
Original comment:
Please provide extra sidewalk width to provide at least 6' where the walks are currently attached.
Signature
C: 3
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat ✓ Site Drainage Report Other_
Utility , Redline Utility t / Landscape
Page 1
Number: 30 Created: 8/19/2003
[10/27/031 The variance for this item was approved assuming that cross -access will be provided to the gas station. Please
note all variances in the general notes on the utility plans.
Original comment:
The driveway cut onto Drake does not meet the minimum separation distances both from the adjacent driveways and from
the nearest streets (the required distance is 460'). Please explore consolidation of the driveways on Drake to share access
with adjacent properties. The TIS says that the driveways will be consolidated (page 8 under paragraph 111).
Number: 36 Created: 8/19/2003
110/27/03]
Please see the redlines and the utility plan checklist for any additional comments.
Number: 49 Created: 8/22/2003
(10/28103] It is unclear whether this issue has been resolved. Have there been further discussions with CDOT? I am currently
waiting for Tess Jones to return my call.
Original comment:
Due to the Increase in traffic at both Thunderbird and the driveway access onto College, new/revised access permits will be
needed from CDOT.
Number: 57 Created: 10/27/2003
[ 10/27/031 Please provide signing and curb painting to prohibit parking on the frontage road. This is required due to the
narrower width of the road resulting from the sidewalk widening.
Number: 60 Created: 10/28/2003
[ 10128/03] The one-way drive for vehicles exiting the drive-thru should look and function as a one-way drive. Please
narrow the driving lane as It approaches the Frontage road ROW so that vehicles on the frontage road do not attempt to
drive the wrong way. (see redlines for suggestion). The use of glue -down curb would be acceptable in this location. Also,
please show how this lane is expected to function in the future, when the driveway onto College at the property line is shut
and the gas station takes access from the frontage road.
Number: 61 Created: 10/28/2003
[ 10/28/03] Please provide an access easement for the portion of the driveway that is on the Eckerd property and is
serving the gas station.
Topic: Utility Plans
Number: 58 Created: 10/27/2003
[ 10/27/031 Please provide a flowline profile for the new curb and gutter on the frontage road.
Number: 59 Created: 10/28/2003
It 0/28/031 It appears that the new pavement shown on the frontage road will not have a steep enough cross -slope. The
cross -slope of new pavement should be as steep or steeper than that of the existing pavement in this instance. Also, the
pavement cut should occur at the middle of the lane, approximately 6' from the curb, instead of 2' from the curb.
Number: 62 Created: 10/28/2003
[ 10/281031 Regarding the driveway onto Drake: The underwalk drains need to be moved outside of the curb returns and
the ramps need to be a minimum of 6' wide Instead of 4' wide.
Number: 63 Created: 10/28/2003
[ 10/28/031 Is afire lane (and accompanying emergency access easement) needed?
Number: 65 Created: 10/28/2003
[10/28/031 On the previous redlines on the detail sheet, I questioned whether the driveover curb detail should be added.
It was added, but the dimensions don't match the dimensions noted elsewhere on the plans. If this is not the correct detail,
please provide a detail of the curb that is existing and is to be matched. Also, please call out vertical curb where It is being
used and provide the detail for it. Please detail how the transition from vertical curb to the driveover curb will be made.
Number: 72 Created: 10/30/2003
[ 10/30/031 Please provide cross -access with the gas station to meet LUC 3.2.2 B. Please see redlines for the suggested
location.
Page 2
.
0
a
W0
U
c
co m=
o�
Zw
e
W
9
a
�wc dowA curh ek 46r wX --ktA4
• dsAcate fwb( t acce-SS ems'
OODT r?-rin 2 fi' Cis —access
o 3.2.2 S �fiiC� ConmUh 0 i �(
STAFF PROJECT REVIEW
BHA DESIGN
SCOTT SINN
4803 INNOVATION DR.
FT. COLLINS, CO 80525
RESPONSE TO COMMENTS
November 21, 2003
Date: 11 /05/2003
Staff has reviewed your submittal for ECKERD DRUG PDP - COLLEGE & DRAKE -
TYPE II (LUC), and we offer the following comments:
ISSUES:
Department: Engineering
Topic: General
Issue Contact: Katie Moore
Number: 23 Created: 8/19/2003
[10/27/03] The variance requests for parking setbacks have resulted in the
following: approval of the request for the shown setback from Drake Road,
and approval of a 20' setback from the frontage road (15' was requested, but
not approved).
Original comment:
Parking does not meet the parking setback requirements under LCUASS Figure 19-
6. The setback from Drake should be 75 feet, while the setbacks along the frontage
road and Thunderbird should be 50' from the flowline of the road to the edge of the
first parking stall.
Response: Parking stalls adjacent to the Frontage Road have been adjusted to
accommodate the approved 20'.
Number: 24
Created: 8/19/2003
[10/27/031 Please label the driveway radii and ensure they match the standard
values.
Original comment.
Please use radius -style driveways on arterials (Drake and College). Please use
standard driveway cuts on all other streets (frontage road and Thunderbird) unless
there are 350+ trips through each, in which case, please use the radius -style
driveways here as well. Please label the radii and ensure that they match the
standard values.
Response: We have changed the driveway to radius style on Drake (and have
labeled the radii which meet criteria) and deleted the connection to College.
The Thunderbird entrance has a standard drive.
Number: 26 Created: 8/19/2003
Page 1
project, please note on the plans that it may happen in the future. If the closing occurs with this project, then the parking
setbacks from the frontage road will no longer be needed.
Number: 27 Created: 8/19/2003
Please provide extra sidewalk width to provide at least 6' where the walks are currently attached.
Number: 28 Created: 8/19/2003
Will the existing stacking for SB left turns from College to Thunderbird be adequate for the new traffic volumes? Will a
waiver for this be required from CDOT?
Number: 29 Created: 8/19/2003
Please minimize (if not fully eliminate) the amount of vehicles from this site using the access onto College. This could be
helped by moving the drive -through lane from the north side of the building to the east side of the building.
Number: 30 Created: 8/19/2003
The driveway cut onto Drake does not meet the minimum separation distances both from the adjacent driveways and from
the nearest streets (the required distance is 460'). Please explore consolidation of the driveways on Drake to share access
with adjacent properties. The TIS says that the driveways will be consolidated (page 8 under paragraph 111).
Number: 35 Created: 8/19/2003
With the number of easements and ROW dedications needed, it might be beneficial to replat the property rather than rile
each dedication by separate document.
Number: 36 Created: 8/19/2003
Please see the redlines and the utility plan checklist for any additional comments.
Number: 49 Created: 8/22/2003
Due to the Increase in traffic at both Thunderbird and the driveway access onto College, new/revised access permits will be
needed from CDOT.
Number: 50 Created: 8/22/2003
Is there an existing cross -access easement or agreement with the gas station regarding the sharing of the driveway onto
College?
Topic: TIS
Number: 25 Created: 8/19/2003
Please revise the TIS to Include the access onto College that is shared with the gas station.
Topic: Utility Plans
Number: 33 Created: 8/19/2003
Driveways should be concrete to the ROW/Property line.
Number: 34 Created: 8/19/2003
Please use the standard details from the latest version of LCUASS.
Page 2
[10/27/031 Since the closure of the frontage road is not occurring at this time, please
add the note to the plans that it may be closed in the future.
Original comment:
Due to the proximity of the frontage road intersection with Thunderbird to the College
intersection with Thunderbird, it is strongly suggested that the frontage road access
to Thunderbird be removed. If the closing does not occur with this project, please
note on the plans that it may happen in the future. If the closing occurs with this
project, then the parking setbacks from the frontage road will no longer be needed.
Response: The note will not be added to the plans as the City of Fort Collins
has the ability to close any public road whenever there is a public danger. This
was agreed to by Tess Jones and Dave Stringer in separate meetings.
Number: 27 Created: 8/19/2003
[10/27/03] The sidewalks should be 6' from the back of walk to the back of curb, not
to the flowline.
Original comment:
Please provide extra sidewalk width to provide at least 6' where the walks are
currently attached.
Response: Sidewalks are 6' from the back of curb to the back of walk.
Number: 30 Created: 8/19/2003
[10/27/03] The variance for this item was approved. Please note all variances in the
general notes on the utility plans.
Original comment:
The driveway cut onto Drake does not meet the minimum separation distances both
from the adjacent driveways and from the nearest streets (the required distance is
460'). Please explore consolidation of the driveways on Drake to share access with
adjacent properties. The TIS says that the driveways will be consolidated (page 8
under paragraph III).
Response: Variances are noted on sheet 2.
Number: 36 Created: 8/19/2003
[10/27/03]
Please see the redlines and the utility plan checklist for any additional comments.
Number: 49 Created: 8/22/2003
[10/28/03] It is unclear whether this issue has been resolved. Have there been
further discussions with CDOT?
Original comment:
Due to the increase in traffic at both Thunderbird and the driveway access onto
College, new/revised access permits will be needed from CDOT.
Response: Access permits will be submitted at the appropriate time in the
review process.
Number: 57
Page 2
Created: 10/27/2003
[10/27/03] Please provide signing and curb painting to prohibit parking on the
frontage road. This is required due to the narrower width of the road resulting from
the sidewalk widening.
Response: See sheet 5
Number: 60 Created: 10/28/2003
[10/28/031 The one-way drive for vehicles exiting the drive-thru should look and
function as a one-way drive. Please narrow the driving lane as it approaches the
Frontage road ROW so that vehicles on the frontage road do not attempt to drive the
wrong way. (see redlines for suggestion)
Response: The frontage road has been narrowed and signed to prevent traffic
from driving the wrong way.
Number: 61 Created: 10/28/2003
[10/28/03] Please provide an access easement for the portion of the driveway that is
on the Eckerd property and is serving the gas station.
Response: The access easement will be dedicated by separate document.
Topic: Utility Plans
Number: 58 Created: 10/27/2003
[10/27/03] Please provide a flowline profile for the new curb and gutter on the
frontage road.
Response: See sheet 7.
Number: 59 Created: 10/28/2003
[10/28/031 It appears that the new pavement shown on the frontage road will not
have a steep enough cross -slope. The cross -slope of new pavement should be as
steep or steeper than that of the existing pavement in this instance. Also, the
pavement cut should occur at the middle of the lane, approximately 6' from the curb,
instead of 2' from the curb.
Response: Moved cut line. Revised cross slope.
Number: 62 Created: 10/28/2003
[10/28/03] Regarding the driveway onto Drake: The underwalk drains need to be
moved outside of the curb returns and the ramps need to be a minimum of 6' wide
instead of 4' wide.
Response: Ramps are 6' wide. Underwalk drains have been moved to the
greatest extent possible and a variance is attached.
Number: 63 Created: 10/28/2003
[10/28/031 Is a fire lane (and accompanying emergency access easement) needed?
Response: An emergency access easement has been provided along the east
side of the site running in a north -south direction. It will be dedicated by
separate document.
Number: 64
Page 3
Created: 10/28/2003
[10/28/031 Could a pedestrian ramp be provided to access the College sidewalk
from the north side of the Eckerd building?
Response: An access ramp has been provided to connect to College Ave.
Number: 65 Created: 10/28/2003
[10/28/03] On the previous redlines on the detail sheet, I questioned whether the
driveover curb detail should be added. It was added, but the dimensions don't
match the dimensions noted elsewhere on the plans. If this is not the correct detail,
please provide a detail of the curb that is existing and is to be matched.
Response: Added to Sheet 7.
Department: Stormwater Utility Issue Contact: Basil Harridan
Topic: Details
Number: 69 Created: 10/28/2003
[10/28/03] The detail for the perforated pipe calls for a 6" pipe while the plan calls
for a 4" line, please reconcile.
Response: It is 4" — see revised detail.
Topic: Easements
Number: 21
[10/28/031
Created: 8/19/2003
The water quality pond should be placed within a drainage easement, if the site is
not being replatted this should be done by separate document.
Response: The drainage easement will be platted by separate document.
Topic: Monitoring well
Number: 68 Created: 10/28/2003
[10/28/03] Please move monitoring well outside of the water quality pond.
Response: The monitoring well will be removed.
Department: Transportation Planning Issue Contact: Tom Reiff
Topic: Transportation
Number: 66 Created: 10/28/2003
[10/28/03] The new walkway connecting Thunderbird to the proposed Eckerd store
will need to be well marked where it crosses the drive aisles by using pavement
treatments, signs, striping, signals, lighting, etc... It is recommended that the drive
aisle crossings be striped to comply with this section of the code [LUC 3.2.2 (C.5.b)]
Please see red lines.
Response: The walkways crossing the drive -aisles have been striped and
labeled on sheet 5.
Number: 67
Page 4
Created: 10/28/2003
[10/28/03] An access ramp will need to be constructed to connect the walkway and
ramp along the north side of the proposed store to the College Ave. sidewalk.
Please see red lines.
Response: An access ramp has been provided to connect to College Ave.
Department: Water Wastewater Issue Contact: Jeff Hill
Topic: Easements
Number: 17 Created: 8/19/2003
[10/27/03]
Provide a 15-foot utility easement along the east property for the existing sanitary
sewer main. Provide a copy of the offsite easements needed to construct the
proposed sanitary sewer service as well as the abandonment of the existing
services.
Response: A utility easement has been provided and will be dedicated via
separate document.
Topic: General
Number: 56 Created: 10/27/2003
[10/27/03] Provide a 10 oft separation between the proposed fire line and the
proposed fire hydrant.
Show and label location of relocated curb stop and meter pit on the north end of this
project.
See site, landscape and utility plans for other comments.
Response: The separation has been provided and the curb stop and meter pit
relocated and labeled.
Department: Zoning Issue Contact: Peter Barnes
Topic: zoning
Number: 4 Created: 8/6/2003
[10/22/031 Their response letter points out that there is a 5' to 6' high wall that will
remain. However, Sec. 3.2.1(E)(4)(a) states that the screen wall SHALL be 6'
in height. Since they are proposing to keep a wall that is less than 6', a
modification will be required or alternative compliance per Sec. 3.2.1(N) must
be approved.
The landscape buffer along the east lot line adjacent to the residential is not
adequate screening. Per Sec. 3.2.1(E)(4)(a) of the LUC, a 6' high fence or wall is
required in addition to the plantings.
Response: The wall is 5'- 5" in height. Another solid block course will be
added making the wall 6'- 1".
Number: 5 Created: 8/6/2003
[10/22/03] They have provided a 5' wide strip of grass on the resubmittal. However,
grass alone does not satisfy the requirements of 3.2.1(E)(4).
Page 5
A minimum 5' wide landscape strip is required along the east side of the parking lot
adjacent to the existing commercial at the north end per 3.2.2(J) and 3.2.1(E)(4)(a).
Response: The existing Commercial building is located on the property line
and access to the building is through two doors located on the west side of
the building. Shrubs are shown on the plan up to the first building entrance.
The turf strip is in place to allow access to the building from the adjacent
parking stalls.
Page 6
1 � a
m
Z W
1p.
uj
9
a
'I -; ", y _
r kd
c-
✓1,I I c l /1 l l t G{ ��"
(�)�,(-�-E f;1�Ct1,'� ��.c.. �.c� �^.V��,('�yl'���;�CC 1✓li-Ge'�N�C'f-C`�� IC��Cv�
FLJ{ Iii ticRtLIE����j�
tLq cri�i tEC rfnCj
C—S' ( 117 r'7Jj�E,, tl-
e J I
Project Comments Sheet
Selected Departments
City of Fort Collins
Department: Engineering
Date: December 18, 2003
Project: ECKERD DRUG PDP - COLLEGE & DRAKE - TYPE II (LUC)
All comments must be received by Ted Shepard in Current Planning, no later than
the staff review meeting:
December 17, 2003
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore
Topic: Details
Number: 77 Created: 12/1212003
[12/121031
Please provide the standard details for vertical curb and gutter, outfall curb and gutter, and attached sidewalks.
Topic: Flowline profile
Number: 76 Created: 12/12/2003
[ 12/ 12/031 Please label all pc's and pt's on the flowline profile. Also, It appears that what is shown is not true lengths
around the curves, so please label the true lengths of any segments not parallel to the centerline. It appears that the
segment of curb and gutter just north of the bumpout will not meet minimum flowline grade when the true length of the
curb is taken Into account.
Topic: General
Number: 36 Created: 8/19/2003
[12/12/031
[12/41031
[10/27/031
Please see therecilines and the utility plan checklist for any additional comments.
Number: 83 Created: 12/18/2003
[ 12/ 18/031 Please see the redlines for the suggested relocation of the ped ramp on the northwest corner of the site. If
the ramp cannot be shifted, it will need to be a different style of ramp, following the detail for a mid -block ramp.
Topic: Utility Plans
Number: 65 Created: 10/28/2003
[12/121031 New vertical curb in the ROW needs to match the standard detail with a 2' pan (currently called out as a 1' pan in
the plans). Repeat: Please detail how the transition from vertical curb to the driveover curb will be made.
[ 10/28/031 On the previous redlines on the detail sheet, I questioned whether the driveover curb detail should be added.
It was added, but the dimensions don't match the dimensions noted elsewhere on the plans. If this is not the correct detail,
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat / Site Drainage Report Other,
L_ Utility Redline Utility Landscape
Page 1
please provide a detail of the curb that is existing and is to be matched. Also, please call out vertical curb where It Is being
used and provide the detail for it. Please detail how the transition from vertical curb to the driveover curb will be made.
Number: 74 Created: 12/4/2003
[ 12/4/031 A comment made on the redlines last round but not included in the letter was not addressed. The comment
was that the extension of the frontage road/private drive running parallel to College in front of Eckerd should be dedicated
as an access easement. Language will be written Into the Development Agreement stating that Eckerd will dedicate that
access easement at such time as the gas station redevelops.
Number: 75 Created: 12/12/2003
[ 12/ 12/03[ The ped ramp on the west side of the driveway onto Thunderbird doesn't meet standards. It appears that
the section of sidewalk directly adjacent to the driveway in the ROW could be re -graded to meet standards. Please see
redlines and revise plans or submit a variance request.
Page 2
SINCLAIR REDEVELOPMENT P.U.D.
Engineering Department Comments
August 20, 1996
* Prior to construction/reconstruction of the new curb cut location on South
College Avenue, C.D.O.T. needs to approve a State Highway Access Permit
Form 138e . The City prepares the Permit and submits it to C.D.O.T. for
their approval, however, the Permit application must be signed by both
property owners. The City intends to prepare and submit the Permit to
C.D.O.T. the first week in September, so both Sinclair and the motel should
be prepared to have a representative sign the Permit at that time. Please
call Kerrie Ashbeck at (970) 221-6750 with any questions.
• The project manager for the City's capital project, Rusty McDaniel, has been
made aware of some concerns the property owner to the east has regarding how
drainage patterns on his property will be affected by the proposed shared curb
cut on Drake Road. The concerns were raised some time ago, and may have
been resolved. To avoid disputes during or after the Planning and Zoning Board
hearing, please make sure this issue has been resolved to the satisfaction and
agreement of the property owner to the east. The City Stormwater utility will be
forwarding their comments on the drainage report under separate cover on or
before September 6.
• There is an existing phone booth located where the proposed shared curb cut on
College Avenue is to be constructed. It is the responsibility of the developer to
coordinate with US West to remove and relocate the phone booth. The
developer is responsible for all costs associated with the removal/relocation of
telephone facilities on the site and/or due to the site redevelopment.
• Please provide a title sheet or label the first sheet of the plan set as "Utility
Plans" and add the City's General Notes - see the handout on Final Utility Plan
submittals that was sent out with the last review comments
• Utility Plan set mylars and Drainage Report must be signed and approved by the
City prior to recording the final P.U.D. and prior to any sitework (other than
capital project work) taking place. It is likely a development agreement will not
be necessary for this site unless the Stormwater or Water and Wastewater
Utilities need one.
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: June 25, 1996 DEPT: Engineering - Ping
PROJECT: #20-96 Sinclair Redevelopment PUD - Preliminary
& Final
PLANNER: Ted Shepard
All comments must be received by: July 5, 1996
SINCLAIR REDEVELOPMENT P.U.D.
1st Submittal - Engineering Department Comments
July 9, 1996
Utility Plans:
See the attached handout for submittal requirements for final utility plans. The plans
submitted are adequate for preliminary, but are not adequate for final utility plans. The
Stormwater Utility has a checklist for final drainage report requirements. A separate
resubmittal must be made for the Final P.U.D. on one of the regularly scheduled
submittal dates.
Plat:
• No plat was received. Is the property going to be replatted to dedicate new
easements/vacate old easements, show new r.o.w. line, etc. Suggest replatting
as part of the P.U.D. process to "clean up" the property. See Development
Manual for final plat submittal requirements.
Date: -1 Signature
CHECK IF YOU WISH TO RECEIVE
COPIES OF REVISIONS
�. PLAT
SITE
LANDSCAPE
UTILITY
PROJECT
ir.■ COMMENT SHEET
City of Fort Collins
Current Plannintl REC.D
DATE: July 23, 2003 TO: Engineering Pavement
PROJECT: #25-03 ECKERD DRUG PDP - COLLEGE & DRAKE
- TYPE II (LUC)
All comments must be received by Ted Shepard no later than the staff
review meeting:
August 20, 2003
Note - PLEASE identify your redlines for future reference
No (fot-m
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_Plat _Site _Drainage Report _Other
_Utility _Redline Utility _Landscape C ty of Fort Collins
2:3
Traffic Study:
• After discussions with the City Forester and Planning staff, it has been
determined that the removal of the existing trees, caused by the addition of the
new curb cut along the motel site and associated extension of the right turn lane,
is unacceptable. Instead, Staff will be discussing the possibility of Sinclair and
the motel sharing the existing curb cut on the motel property, leaving the
frontage road as existing, and leaving the improvements to College Avenue as
designed with the City's capital project. The traffic study will need to be updated
to reflect the ultimately approved access points. In addition, the City Traffic
Engineer expressed concerns that the traffic study underestimates the intensity
of the redeveloped. He also noted that vehicles making the southbound double
left turn from College onto Drake may rear -end vehicles turning right into the
Sinclair site due to the short distance from the intersection to the access point on
Drake.
Site/Landscape Pllan:
• The removal of the existing driveways along College Avenue creates room for
additional street tree grates. The City Engineering Department's capital project
is willing to install additional tree grates when the sidewalk is poured.
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planninii
DATE: July 23, 2003 TO: Technical Services
REC.D
PROJECT: #25-03 ECKERD DRUG PDP — COLLEGE & DRAKE
— TYPE II (LUC)
All comments must be received by Ted Shepard no later than the staff
review meeting:
August 20, 2003
Note --PLEASE identify your redlines for future reference
J
Name (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site Drainage Report Other
Utility Rcdlinc Utility Landscape
4a
City of Fort Collins
2:1
Katie Moore - eckerd comments 8 20 03.doc Page 1
Project Comments Sheet
Selected Departments
C i ty o f ha r l l o l tuts
Department: Engineering
Date:
Project:
August 22, 2003
ECKERD DRUG PDP - COLLEGE & DRAKE - TYPE II (LUC)
All comments must be received by Ted Shepard in Current Planning, no later than the
staff review meeting:
August 20, 2003
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore
Topic: General
Number: 22 Created: 8/19/2003
Please dedicate Right of Way to standard on Drake (57.5' from centerline) and on College Avenue (70.5' from centerline
plus 2-12' turn lanes, minus 6' because there is no bike lane on College= 88.5' from centerline of College). Please dedicate
utility easements to standard (15' along Drake and College, 9' along Thunderbird). With this ROW dedication on College, it
also eliminates the requirement for a turnaround at the end or the dead-end frontage road (LUC 3.6.2 C). One item that
might be of concern regarding ROW and easement dedications in the vicinity of the gas station is that the property dedicated
needs to meet environmental standards, so if there is any contamination of the soil, then some sort of clean up would be
needed prior to City acceptance of the ROW and/or easement dedication.
Number: 23 Created: 8/19/2003
Parking does not meet the parking setback requirements under LCUASS Figure 19-6. The setback from Drake should be 75
feet, while the setbacks along the frontage road and Thunderbird should be 50' from the flowline of the road to the edge of
the first parking stall.
Number: 24 Created: 8/19/2003
Please use radius -style driveways on arterials (Drake and College). Please use standard driveway cuts on all other streets
(frontage road and Thunderbird) unless there are 350+ trips through each, in which case, please use the radius -style
driveways here as well. Please label the radii and ensure that they match the standard values.
Number: 26 Created: 8/19/2003
Due to the proximity of the frontage road intersection with Thunderbird to the College intersection with Thunderbird, it is
strongly suggested that the frontage road access to Thunderbird be removed. If the closing does not occur with this project,
please note on the plans that it may happen in the future. If the closing occurs with this project, then the parking setbacks
from the frontage road will no longer be needed.
Number: 27 Created: 8/19/2003
Please provide extra sidewalk width to provide at least 6' where the walks are currently attached.
Signature Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility Redline Utility Landscape
Page I
Katie Moore - eckerd comments 8 20 03 doc Page 2
Number: 28 Created: 8/19/2003
Will the existing stacking for SB left turns from College to Thunderbird be adequate for the new traffic volumes? Will a
waiver for this be required from CDOT?
Number: 29 Created: 8/19/2003
Please minimize (if not fully eliminate) the amount of vehicles from this site using the access onto College. This could be
helped by moving the drive -through lane from the north side of the building to the east side of the building.
Number: 30 Created: 8/19/2003
The driveway cut onto Drake does not meet the minimum separation distances both from the adjacent driveways and from
the nearest streets (the required distance is 460'). Please explore consolidation of the driveways on Drake to share access
with adjacent properties. The TIS says that the driveways will be consolidated (page 8 under paragraph III).
Number: 35 Created: 8/19/2003
With the number of easements and ROW dedications needed, it might be beneficial to replat the property rather than file
each dedication by separate document.
Number: 36 Created: 8/19/2003
Please see the reclines and the utility plan checklist for any additional comments.
Number: 49 Created: 8/22/2003
Due to the increase in traffic at both Thunderbird and the driveway access onto College, new/revised access permits will be
needed from COOT.
Number: 50 Created: 8/22/2003
Is there an existing cross -access easement or agreement with the gas station regarding the sharing of the driveway onto
College?
Topic: TIS
Number: 25 Created: 8/19/2003
Please revise the TIS to include the access onto College that is shared with the gas station.
Topic: Utility Plans
Number: 33 Created: 8/19/2003
Driveways should be concrete to the ROW/Property line.
Number: 34 Created: 8/19/2003
Please use the standard details from the latest version of LCUASS.
Topic: Drainage design
Number. 31 Created: 8/19/2003
How much water is flowing from the parking lot west over the public sidewalks to the frontage road?
Number: 32 Created: 8/19/2003
Please provide a minimum of 2' of additional plate beyond the back of walk covering the under -walk drains.
Page 2
STAFF PROJECT REVIEW
Comment Response: October 13, 2003
BHA DESIGN Date: 8/26/2003
SCOTT SINN
4803 INNOVATION DR.
FT. COLLINS, CO 80525
Staff has reviewed your submittal for ECKERD DRUG PDP - COLLEGE & DRAKE -
TYPE 11 (LUC), and we offer the following comments:
ISSUES:
Department: Engineering
Topic: Drainage design
Number: 31
Issue Contact: Katie Moore
Created: 8/19/2003
How much water is flowing from the parking lot west over the public sidewalks to the
frontage road?
Less than 500 sf is draining over the sidewalk. See Grading Plan.
Number: 32
Created: 8/19/2003
Please provide a minimum of 2' of additional plate beyond the back of walk covering the
under -walk drains.
See revised detail on Sheet 7 of the engineering drawings.
Topic: General
Number: 22 Created: 8/19/2003
Please dedicate Right of Way to standard on Drake (51' from centerline, constrained arterial)
and on College Avenue (70.5' from centerline plus 2-12' turn lanes, minus 6' because there is
no bike lane on College— 88.5' from centerline of College). Please dedicate utility easements
to standard (15' along Drake and College, 9' along Thunderbird). With this ROW dedication
on College, it also eliminates the requirement for a turnaround at the end of the dead-end
frontage road (LUC 3.6.2 Q. One item that might be of concern regarding ROW and
casement dedications in the vicinity of the gas station is that the property dedicated needs to
meet environmental standards, so if there is any contamination of the soil, then some sort of
clean up would be needed prior to City acceptance of the ROW and/or easement dedication.
Right-of-way and easement dedications are being provided by separate document.
Number: 23 Created: 8/19/2003
Parking does not meet the parking setback requirements under LCUASS Figure 19-6. The
setback from Drake should be 75 feet, while the setbacks along the frontage road and
Thunderbird should be 50' from the flowline of the road to the edge of the first parking stall.
See variance request
Number: 24 Created: 8/19/2003
Please use radius -style driveways on arterials (Drake and College). Please use standard
driveway cuts on all other streets (frontage road and Thunderbird) unless there are 350+ trips
Page I
through each, in which case, please use the radius -style driveways here as well. Please label
the radii and ensure that they match the standard values.
Radius -style driveways shall be used and labeled.
Number: 26
Created: 8/19/2003
Due to the proximity of the frontage road intersection with Thunderbird to the College
intersection with Thunderbird, it is strongly suggested that the frontage road access to
Thunderbird be removed. If the closing does not occur with this project, please note on the
plans that it may happen in the future. If the closing occurs with this project, then the
parking setbacks from the frontage road will no longer be needed.
Per our meeting on August 26, 2003 with Cam McNair, Ted Shepard, Ward Stanford
and other City officials, the frontage road shall remain open and access onto College
from the Eckerd site shall be eliminated. A variance request for the parking setback
from the frontage road is being provided with this resubmittal.
Number: 27
Created: 8/19/2003
Please provide extra sidewalk width to provide at least 6' where the walks are currently
attached.
Please see attached letter to Ted Shepard from Bob McDonaugh dated 9/19/03.
Number: 28
Created: 8/19/2003
Will the existing stacking for SB left turns from College to Thunderbird be adequate for the
new traffic volumes? Will a waiver for this be required from CDOT?
Please see the Traffic Study. Stacking distance is adequate and no waiver will be
required from CDOT.
Number: 29 Created: 8/19/2003
Please minimize (if not fully eliminate) the amount of vehicles from this site using the access
onto College. This could be helped by moving the drive -through lane from the north side of'
the building to the east side of the building.
The access onto College from the Eckerd site has been eliminated.
Number: 30 Created: 8/19/2003
The driveway cut onto Drake does not meet the minimum separation distances both from the
adjacent driveways and from the nearest streets (the required distance is 460'). Please
explore consolidation of the driveways on Drake to share access with adjacent properties.
The TIS says that the driveways will be consolidated (page 8 under paragraph III).
Per the August 26, 2003 meeting, the driveways shall not be consolidated. A variance
request is being submitted on the separation distances.
Number: 35 Created: 8/19/2003
With the number of easements and ROW dedications needed, it might be beneficial to replat
the property rather than file each dedication by separate document.
Easements are being dedicated by separate document. Right-of-way dedication is not
necessary.
Page 2
Number: 36
Created: 8/19/2003
Please see the redlines and the utility plan checklist for any additional comments.
Comments have been addressed
Number: 49
Created: 8/22/2003
Due to the increase in traffic at both Thunderbird and the driveway access onto College,
new/revised access permits will be needed from CDOT.
The access onto College from the Eckerd site has been eliminated. Permits will not be
necessary.
Number: 50
Created: 8/22/2003
Is there an existing cross -access easement or agreement with the gas station regarding the
sharing of the driveway onto College'?
The access onto College from the Eckerd site has been eliminated.
Topic: T/S
Number: 25
Created: 8/19/2003
Please revise the TIS to include the access onto College that is shared with the gas station.
The access onto College from the Eckerd site has been eliminated.
Topic: Utility Plans
Number: 33 Created: 8/19/2003
Driveways should be concrete to the ROW/Property line.
Comment addressed.
Number: 34 Created: 8/19/2003
Please use the standard details from the latest version of LCUASS.
See Engineering plans.
Department: PFA
Topic: General
Number: 51
ADDRESS NUMERALS:
Issue Contact: Michael Chavez
Created: 8/25/2003
Address numerals shall be visible from the street fronting the property, and posted with a
minimum of 6 inch numerals on a contrasting background. (Bronze numerals on brown brick
are not acceptable). 1997 UFC 901.4.4
NOTE: An addressing scheme shall be submitted to the fire department for approval prior to
being posted on the building.
Addressing will be submitted to the fire department.
Number: 52
WATER SUPPLY: Commercial
Created: 8/25/2003
No commercial building can be greater then 300 feet from a fire hydrant.
Page 3