HomeMy WebLinkAboutSAINT ELIZABETH SETON CATHOLIC CHURCH PUD - Filed CS-COMMENT SHEETS - 2004-08-30PROJECT
(isr. COMMENT SHEET
City of Fort Collins
Current PlanninE
DATE: July 30, 2002 TO: Engineering
PROJECT: #28-84C St. Elizabeth Ann Seton Catholic Church —
Major Amendment — Type I (LUC)
All comments must be received by Ted Shepard no later than the staff
review meeting:
August 28, 2002
Note - Pr rASF identify your redlines for future reference
Nance (please print)
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site _Drainage Report _Other.
_Utility Redline Utility Landscape
Action: The building envelope has been identified and dimensioned on the site
plan. Distances from the building envelope to Scion Street, Lemay Avenue, and So.
Ridge Greens Blvd. have been revised. The lot lines have also been more clearly
identified and labeled on the site plan.
Comment: Building can't encroach into existing easements. It is hard to tell if it does
or doesn't.
Action: The utility easement, reflecting proposed adjustments as per submittal
documents by Ayres and Associates, is shown on the site plan. The relationship of the
parish center addition to this easement should now clearly indicate that there is no
encroachment.
Comment: Be sure and return all of your redlined plans when you re -submit.
Clarification: There were no redlines returned to us for the architectural portion of this
submittal. The only redlines we received were for the engineering portion of the
submittal. We have asked Ayres and Associates to return all redlines to you.
We hope that we: have addressed all of the comments to the satisfaction of each
department. Please feel free to contact us for any additional clarification.
Thank you,
Gerfe Dane
Project Manager
John Dengler & Associates
REVISION
COMMENT SHEET
DATE: October 7, 2002 TO: Engineering
PROJECT: #28-84C St. Elizabeth Ann Seton Church —
Major Amendment — Type II(LUC)
All comments must be received by Ted Shepard no later than the
staff review meeting:
October 30, 2002
No Comment
❑ Problems or Concerns (see below or attached)
**PLEASE IDENTIFY YOUR REDLINES FOR FUTURE
REFERENCE**
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Dm*e Report Other
Da�S
,:. --
alii-��ifii bmdsWe —Signature:
Project Comments Sheet
Selected Departments
SiK:t iiart C:oiliaa
Department: Engineering
Date: October 29, 2002
Project: ST. ELIZABETH ANN SETON CATHOLIC CHURCH
All comments must be received by TED SHEPARD in Current Planning no later than
the staff review meeting:
October 30, 2002
Note - Please identify your redlines for future reference
Issue Contact: (Marc Virata
Topic: General
23
It appears that there is a portion of sidewalk along Southridge Greens Boulevard that is
outside of public right-of-way. This portion of sidewalk needs to be dedicated as an
access easement by separate document (this will be processed in conjunction with the
easement vacation.) Please provide a legal description and complete a deed of
dedication form.
Topic: Utility Plans
22
There are missing items under the General Notes. It is acknowledged that some of
these notes do appear elsewhere on the sheet and other missing notes are not really
revelant, however, some of the missing remaining notes are viewed as revelant. Please
put all missing notes back on.
24
Please include LCUASS detail 7-20B, which illustrates the detail for driveover curb with
attached sidewalk. This is required for the street patching shown on Seton Street.
(Adjust the width of the sidewalk to match existing. The depth shall of the new portion
shall remain at 6".)
.Signature Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility Redline Utility Landscape
gage 1
Project Comments Sheet
Selected Departments
Department: Transportation Planning
Date: October 31, 2002
Project: ST. ELIZABETH ANN SETON CATHOLIC CHURCH
All comments must be received by TED SHEPARD in Current Planning no later than
the staff review meeting:
October 30, 2002
Note - Please identify your redlines for future reference
Issue Contact: Tom Reiff
Topic: Transportation
25
Please consider adding an additional bike rack closer to the new Parrish and
classroom facilities.
Sigqrature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _ Site Drainage Report Other_
Utility _ Redline Utility Landscape
Project Comments Sheet
Selected F epartrients
Cihof hurt tnllirs
:)epart^icot: Stormwrter Utility
Date: November 1,2002
Project: ST. ELI!ABETH ANN SETC N CATHOLIC CHURCH
All comments must be received by TED SHEPARD in Current Planning no later than
the staff review meeting:
Octo;:)er 30, 2002
Note - Please identify your redlines for future reference
Issue Contact: Wes Lamarque
Topic: Drainage
28
Please see plans and report for grading comments and other minor redlines.
29
Please add a note on the plans and in the report that the private stormsewer is to be
maintained by the owner and accept liability.
Topic: Erosion/Sediment Control
27
1. Erosion control notes contradict themselves.
2. All BMP's are not shown on the plan.
3. Previous notes # 1 & 3 have not been addressed.
Please contact Bob Zakely at 221-6700 for any questions or clarifications regarding
erosion control.
Signature
1r/Vn-�-
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site ✓ Drainage Report Other
_ , Utility ✓ Redline Utility Landscape
LC T-e-d �helOn rL�
Page I
lflK v, e.s
FORT COLLINS-LOVELANDWATER DISTRICT v '`��
December 26, 2002
Mr. Ted Shepard, Planner
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80525
(0 SOUTH FORT COLLINS SANITATION DISTRICT
RE: #28-84C Saint Elizabeth Ann Seton Catholic Church
Dear Mr. Shepard,
ra-APdNicy,�
The Fort Collins - Loveland Water District and the South Fort Collins Sanitation District have reviewed
the above mentioned project and submit the following comments.
The general notes on sheet 2 of 10 need to be corrected to indicate that all water and sanitary sewer
construction shall conform to the most current Fort Collins — Loveland Water District and South
Fort Collins Sanitation District, respectively, specifications and requirements.
The minimum and maximum cover over water lines is 5 feet and 6 feet respectively.
The fire line must have a Back -Flow -Prevention -Device with flow detection on the riser insider the
building.
The proposed sanitary sewer line is considered a part of the owner's service line. The owner is
responsible fbr the service line. A grease trap/interceptor is required if food preparation is
anticipated.
The District's water and sanitary sewer typicals are to be included on the detail sheet.
Please do not hesitate; to contact me at 226-3104, ext. 14, if you have any questions or require additional
information.
Respectfully,
GU
Mr. Try W. Farrill
Systems Engineer
xc: Mr. Michael D. DiTullio, District Manager
Ayers Associates
5150 Snead Drive, Fort Collins, CO 80525
Phone (970) 226-3104 Fax (970) 226-0186
. Project Comments Sheet
I
Selected Departments
(itul Fort Collins
Department: Stormwater Utility
Date: December 27, 2002
Project: ST. ELIZABETH ANN SETON CATHOLIC CHURCH
All comments must be received by TED SHEPARD in Current Planning no later than
the staff review meeting:
October 30, 2002
Note - Please identify your redlines for future reference
Issue Contact: 'Wes Lamarque
Topic: Drainage
32
Please see reclined comment on grading plan. This can be done with the mylar
submittal.
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
_ Plat Site Drainage Report Other
✓_ Utility ✓ Redline Utility Landscape
C_L
Page 1 Pko-fc
d.IAsaoc-
00,00
lAtqm
FINAL COMPLIANCE
City of Fort COMM; COMMENT SHEET
Current Planning
DATE: December 11, 2002 TO: Engineering
PROJECT: 428-84C SAINT ELIZABETH ANN SETON CATHOLIC
CHURCH — MAJOR AMENDMENT — FINAL COMPLIANCE
A11 comments must be received by Ted Shepard no later than the staff
review meeting:
December 30, 2002
Note - Please identify your redlines for future reference
Name (please print)
CI IECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _Site Drainage Report _Other
Utility _Redline Utility _Landscape
Project Comments Sheet
ice' Selected Departments
City of Fort Collins
Department: Engineering
Date: January 2, 2003
Project: ST. ELIZABETH ANN SETON CATHOLIC CHURCH
All comments must be received by TED SHEPARD in Current Planning no later than
the staff review meeting:
December 30, 2002
Note - Please identify your redlines for future reference
Issue Contact: Marc Virata
Topic: General
23
It appears that there is a portion of sidewalk along Southridge Greens Boulevard that is
outside of public right-of-way. This portion of sidewalk needs to be dedicated as an
access easement by separate document (this will be processed in conjunction with the
easement vacation.) Please provide a legal description and complete a deed of
dedication form.
[12/30] The deed of dedication will need to be received before the construction drawing
mylars can be signed off on. (Recording fees will also need to be collected, which will
be determined at the time of acceptance by the City and are payable to Larimer County
Clerk and Recorder).
31
Mylar submittal of drawings for signature is fine with Engineering, provided other
reviewing agencies concur. No additional formal reviews are needed.
33
A Development Construction Permit (DCP) is not needed for the project, given the lack of magnitude of public
improvements. The contractor will need to contact Engineering and complete an excavation permit (for the patching on
Seton Street) prior to the start of construction.
Topic: Utility Plans
30
Because a development agreement will not be required for the project, amend General
Note #17 as redlined (removes the reference to a development agreement and requires
certification prior to issuance of a certificate of occupancy).
Signature
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other
Utility Redline Utility Landscape
Page 1
April 25, 2003
Mr. Ted Shepard, Planner
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80525
Thank you for offering your latest round of review comments for St. Elizabeth Ann Seton Catholic
Church New Parish Center Major Amendment. The following are Ayres Associates responses to the
review comments.
General
23
It appears that there is a portion of sidewalk along Southridge Greeens Boulevard that is outside the
public right-of-way. This portion of the sidewalk needs to be dedicated as an access easement by
separate document (this will be processed in conjunction with the easement vacation.) Please
provide a legal description and complete a deed of dedication form.
An access easement has been provided for that section of sidewalk outside of the public right-of-way.
Please see the included legal description. The deed of dedication form will be filled out and submitted
by Elizabeth Seton Church with the mylars.
(12130] The deed of dedication will need to be received before the construction drawing mylars can be
signed off on. Recording fees will also need to be collected, which will be determined at the time of
acceptance by the City and are payable to Larimer County Clerk and Recorder).
31
Mylar submittal of drawings for signature is fine with Engineering, provided other reviewing agencies
concur. No additional formal reviews are needed.
33
A Development Construction Permit (DCP) is not needed for the project, given the lack of magnitude
of public improvements. The contractor will need to contact Engineering and complete an excavation
permit (for the patching on Seton Street) prior to the start of construction.
Utility Plans
30
Because a development agreement will not be required for the project, amend General Note #17 as
redlined (removes the reference to a development agreement and requires certification prior to
issuance of a certificate of occupancy).
Note #17 has been changed to reflex comment 30.
Drainage
32
Please see redline comment on grading plan. This can be done with the mylar submittal.
The grading on Sheet 4 has been changed to reflect comment 32.
Elizabeth Ann Seton 4/28/2003
Review Comments Ayres Associates
Project Comments Sheet
S
Ciry of Fort Collins Selected Departments
Department: Transportation Planning
Date: August 28, 2002
Project: ST. ELIZABETH ANN SETON CATHOLIC CHURCH
All comments must be received by TED SHEPARD in Current Planning no later than
the staff review meeting:
August 28, 2002
Note - Please identify your redlines for future reference
Issue Contact: Tom Reiff
Topic: General
10
Utility information is not necessary on the site plan, please remove.
Topic: Transportation
5
Please label the right of way for So. Ridge Green Blvd. and Lemay Ave. on all plans
including the site plan.
7
Please provide further information on the school operations, such as hours of
operation, the circulation pattern for school children and cars, and how students get
to and from school. This may require some intersection improvements at So. Ridge
Green and Lemay.
8
Identify and label all existing and proposed sidewalks, and associated access ramps
for the handicap and cyclists on all plans including the site plan.
9
Provide and show bike parking facilities near the building's entrance on all plans.
11
The TIS failed to identify if there are bike lanes on So. Ridge Green Blvd. In order to
satisfy the bicycle Level of Service the street needs to have striped on -street bike
lanes. Please clarify for the next submittal. Cv
Signature Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
Utility Redline Utility Landscape
Page I
Fort Collins-LovelandWater District/South Fort Collins Sanitation District
1
The general notes on sheet 2 of 10 needs to be corrected to indicate that all water and sanitary sewer
construction shall conform to the most current Fort Collins -Loveland Water District and South Fort
Collins Sanitation District, respectively, specifications and requirements.
Sheet 2, General Note # 5 has been changed to reflect the statement above.
2
The minimum and maximum cover over water lines is 5 feet and 6 feet respectively.
Sheet 2, General Note # 13 has been corrected to reflect the statement above.
3
The fire line must have a Back -Flow -Prevention -Device with flow detection on the riser inside of the
building.
A Back- Flow- Prevetion-Device will be specified by others (mechanical Engineer) in the next phase of
this project.
4
The proposed sanitary sewer line is considered apart of the owner's service line. The owner is
responsible for the service line. A grease trap/interceptor is required if food preparation is anticipated.
General Note It 49 was added to clarify that the proposed sanitary sewer is privately owned and to be
maintained by the property owner.
There will be no food preparation facilities constructed with the Parish expansion.
5
The districts water and sanitary sewer typicals are to be included on the detail sheet.
The districts water and sanitary sewer typicals are located on Sheet 9 and Sheet 10.
If you have any questions regarding these responses to your comments please do not hesitate to call,
(970) 223-5556
Tha k you,
f�
Chris Longo, P.E.
Project Engineer — Ayres Associates
Elizabeth Ann Seton 4/28/2003
Review Comments Ayres Associates
Fort Collins -Loveland Water District
South Fort Collins Sanitation District
4700 South College Avenue
FORT COLLINS, COLORADO 80525
TELEPHONE 226-3104 — 669-4321
May 15, 1984
Bonnie Tripoli
City of Fort Collins
Development Center
P.O. Box 580
Fort Collins, CO 80522
Re: Saint Elizabeth Seton Catholic Church P.U.D.
Dear Bonnie,
MAY 17 1984
The District engineering staff has reviewed the above project and submits
the following comments:
1. The general notes on Sheet 1 should read:
2. All sanitary sewer construction shall conform to
the most current South Fort Collins Sanitation
District standards and specifications at time of
construction.
4. All water distribution construction shall conform to
the most current Fort Collins -Loveland Water District
standards and specifications at time of construction.
2. Fire flow requirements as determined by the Poudre Valley Fire
Authority are to be submitted to the District.
3. Ultimate domestic service requirements are to be submitted to the
District.
4. A backflow prevention device is required on the fire line, com-
plete with details.
5. Domestic service lines are to be indicated.
6. A utility plan identifying all sanitary sewer service and water
distribution lines and service for ultimate build -out is to be
submitted.
7. On Sheet 2, the transition from the 8-inch sanitary sewer line to
the 6-inch sanitary sewer line is to be detailed.
Letter to Bonnie Tripoli
May 1.5, 1984
Page 2
8. Generally, the District installs DR 18 PVC water pipe.
9. The Districts require a two -foot clear distance when water and
sewer lines cross.
10. Easements will be required for lines not located in public right-
of-way.
11. District standard details are to be used.
12. Sign -off blocks are required on all sheets.
13. Stationing is required for the water lines.
14. It is recommended that the engineer meet with the District to
discuss general requirements.
If you have any questions, please feel free to call Terry Farrill, systems
engineer for the District.
Sincerely,
Michael DiTullio
District Manager
MDT/lc
cc: Terry W. Farrill
DATE 4 MAY 84 rulE P A R T M E N T
#28-84 ST. ELIZABETH SETON CATHOLIC CHURCH PUD PREL1141NARY & FINAL
ITENIa N
y. <1
v
1 �
tREVISION
DATE: November 3, 1998 TO: Engineering
PROJECT: #28-8413 St. Elizabeth Ann Seton - Minor
Amendment - LDGS
All comments must be received by Mike Ludwig no later than the staff
review meeting:
Wednesday, November 18, 1998
❑ No Comment
❑ Problems or Concerns (see below or attached)
Date: Signature:
3
REVISION
�Csg COMMENT SHEET
DATE: September 22, 199S TO: Engineering
PROJECT: #28-84B St. Elizabeth Ann Seton Catholic
Church - Minor Amendment - Prelim/Final
LDGS
All comments must be received by Mike Ludwig no later than the staff
review meeting:
Wednesday, October 14, 1998
❑ No Problems
Problems or Concerns (see below or attached)
St Elizabeth Ann Seton Catholic Church
October 18, 1998
Revise general note 1 on the utility plans to reflect approval of the plans as there will not be a
development agreement with this project.
Indicate that concrete is to be provided to the property line on the access drive detail.
The site plan is still showing off site grading on the east. The utility plans are now showing a
retaining wall in this location instead.
Date: 9 — _Signature:
X ��y
_k ��
JA@I"
City of Fort Collins
City of Fort Collins
Current Planning
DATE: 1 { i319
PROJECT: ST*
PROJECT
COMMENT SHEET
TO: LtI i- % e-Ep i( -
EL.J z AaECH SETbw Ca-n4010 c, CW)K4 PuD
42� mmoe p,MENDMEI�i�
All comments must be received by Mike Ludwig no later than the staff
review meeting: A&t*µs-r5, 1996
-N ks. is k QEWSSr -ro Pzx::, a \os sp$.CE paeK+Nv �.oT'
-M paiD Iis? 6 5,V of F11,y�-e kv-EA C33S S.F. cc NV--*j
gu►w►t' tG CovEepr,E� Ta i1{E EX►STtNC� UtvQ .
St. FIizabeth Seton Catholic Church PtD Minor amendment August 3, 1998
• Include all the General notes.
• Would prefer the title of the utility plans reads ST Elizabeth Seton catholic church pud
Parking facilities expansion minor amendment. "phis will make these plans easier to find
in the future when we are looking them up.
• Is there existing sidewalk on Seton Street on the South? If not provide 4.5 foot sidewalk
with a 6 loot parkway.
• Indicate the driveway location in relation to the property line.
• At the access drive provide concrete to property line. The property line should be 10.5
feet behind the tlowline.
• provide documents dedicating the Row and utility easement behind the Row.
• An off'site casement for grading is needed for this project on the golf course.
• Indicate where the retaining wall near the building stars and ends and what the x-section
with the sidewalk looks like. What is the width of his sidewalk. Needs to be a minimum
6 toot.
• provide driveway access detail, this should include a x-section that shows how gutter
flow is to be maintained.
Date: Provide Curh cutter and walk dctafl AiR9*9MiLa}Lra
8f3j?`13 �: k"
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat 4, k _ _ Offer
sfiJtiliiy iie Utility _ Iandsape
City of Fort Collins
Citv of Fort Collins
Current Planning
DATE: 111319
PROJECT: 'S T',
PROJECT
COMMENT SHEET
ELt B A$Er" SETow CkTNow c C"ZC-4 Pup
�2� M1NOQ p�M'EN�MEt�i'r
All comments must be received by Mike Ludwig no later than the staff
review meeting: AKS7' S, 1998
�[F4LS lS k 'ZEWes.r "� �� 4 laS SPAGE PAeKttJC� L.aT
'To ADD t,g2to S,F � Face p.¢Ep. (33S S.F o� ►�tvV
gww�Nt� CAVEQp6E� '� TFkE ExtSTtNC� G4kvQC.l� .
St. Elizabeth Seton Catholic Church PUD Minor amendment August 3, 1998
• Include all the General notes.
• Would prefer the title of the utility plans reads ST Elizabeth Seton catholic church pud
Parking facilities expansion minor amendment. This will make these plans easier to find
in the future when we are looking them up.
• Is there existing sidewalk on Scion Street on the South? If not provide 4.5 foot sidewalk
with a 6 foot parkway.
• Indicate the driveway location in relation to the property line.
• At the access drive provide concrete to property line. The property line should be 10.5
feet behind the flowline.
• Provide documents dedicating the Row and utility easement behind the Row.
• An off site easement for grading is needed for this project on the golf course.
• Indicate where the retaining wall near the building stars and ends and what the x-section
with the sidewalk looks like. What is the width of his sidewalk. Needs to be a minimum
6 foot.
• Provide driveway access detail, this should include a x-section that shows how gutter
flow is to be maintained.
Date: Provide Curb. a.ntter and walk detail AiY�st&
CHECK HERE IF YO UWISH TO RECM COPIES OF REVISIONS
Pik ✓�Sk , _ Ufaieport
� * R_Offer
tetWq V M= V# _ lm"'ap City of Fort Collins
PROJECT
COMMENT SHEET
TO: �.
LT: P/MT
5T ELF BAaETr+ S ' MINOQ AtMIZNDM �� C4TI40LiC r-gURC4+ PUp
All comments must be received b ��
review meeting: , received
, S. I99g Mike Ludwig no laterthan the staff
7VWCI is k z£DVEST -r ADD
� IISZG S,� of 4 10S SPp,CS p�eK1NC� LOT
�e a¢E� (335 s,
�VEeA6F� Tp T1�E CE}"1Q O Ntyt✓ I
�4.
of Fort C to 77
Current Pia
DATE: =�1�3
No C, ✓rl ALr&v -
Date: --ZI - S
—
CHI C HERE IF YOU Wo TO RBZT LOPES OF
g REVLSIONS
— U<il�y _Redline Utility — —-
Ci ofofF�
aProject Comments Sheet
`'''� Selected Departments
Citvof Port Collins
Department: Stormwater Utility
Date: September 4, 2002
Project: ST. ELIZABETH ANN SETON CATHOLIC CHURCH
All comments must be received by TED SHEPARD in Current Planning no later than
the staff review meeting:
August 28, 2002
Mote - Please identify your redlines for future reference
Issue Contact: Wes Lamarque
Topic: Drainage
12
The City does not recommend the storm sewer taking flows from Basin 70 to be routed
underneath the proposed building. Even though this will be a private storm sewer, if
failure of the pipe would accur, Basin 70 would not be able to drain.
14
Please revise the water quality outlet structure orifices to be constructed with a metal
plate instead of the PVC pipes per City standard. The 6-inch long PVC pipes will have a
higher tendency to clog.
20
Please revise water quality outlet structure grate. See redlined detail sheet.
Topic: Erosion/Sediment Control
19
1. Why are there two erosion control sections in the report (page 11 and page 9 at the
very end)? Which is the REAL report?
2. Where are the erosion control calculations?
3. Where is the erosion control note indicating that the City erosion control inspector is
to be notified at least 24 hours prior to any work start on the project?
4. The erosion control plan sheet must show all BMP's indicated in the report.
If you have any questions, please call Bob Zakely at 221-6700.
Signature j Date
CHECK HER IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site ✓ Drainage Report Other
✓ Utility ✓ Redline Utility ✓ Landscape �J
Page 1 C .L. Te I 3J et�
VA&rc. V:i.i.
VI -arcs
6aProject Comments Sheet
Selected Departments
City of Fort Collins
Department: Engineering
Date: September 4, 2002
Project: ST. ELIZABETH ANN SETON CATHOLIC CHURCH
All comments must be received by TED SHEPARD in Current Planning no later than
the staff review meeting:
August 28, 2002
Note - Please identify your redlines for future reference
Issue Contact: Marc Virata
Topic: Easement Vacation
16
The request to vacate an easement necessary for the expansion is currently under
review by the utilities.
Topic: General
18
In general, please ensure that existing improvements along the permiter public streets
are clearly shown and labeled (such as curb and gutter, sidewalk locations and width,
etc.)
Topic: Utility Plans
15
The utility plan cover sheet needs to be in conformance with LCUASS. (General Notes,
affirmation statement... see redlines.) In looking at previous emails, I realized that the
General Notes in electronic format were not mailed out correctly to the design engineer
as was requested.
17
The street patching limits shown may need to be shown as expanding to the centerline
of Seton Street. In order to determine this, the curb and gutter on both sides of the
street need to be shown in order to establish the flowline to flowline width. Street
patching limits are required to be shown at lane lines or in the middle of, which can't be
estimt,ed based upon the information presented.
D Ie
CHECK HE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat _� Site Drainage Report Other
✓ Utility _ ✓ Redline Utility -Landscape
Page 1
AfRES
,ASSOCIATES
October 7, 2002
Mr. Ted Shepard, Planner
City of Fort Collins
P.O. Box 580
Fort Collins, Colorado 80525
Re: St. Elizabeth Ann Seton New Parish Center Major Amendment
Thank you for offering the review comments for St. Elizabeth Ann Seton Catholic Church New
Parish Center Major Amendment. The following are Ayres Associates responses to the review
comments.
Engineering Department
In general, please ensure that existing improvements along the perimeter public streets are
clearly shown and labeled (such as curb and gutter, sidewalk locations and width, ect.)
Existing improvements along public streets have been labeled and dimensioned on the drawing
set where applicable.
The utility cover sheet needs to be in conformance with LCUASS. (General Notes, affirmation
statement... see redlines.)
The necessary notes have been added to the drawing set on the second sheet. This required
an additional sheet to be added to the plan set.
The street patching limits shown may need to be shown as expanding to the centerline of Seton
Street. In order to determine this, the curb and gutter on both sides of the street needs to be
shown in order to establish the flowline to flowline width. Street patching limits are required to
be shown at lanes lines or in the middle of, which can't be estimated based upon the information
presented.
The street patch is now shown to the middle of Seton Street with necessary dimensions and
callouts to properly establish the limits of the proposed street patch (Sheet 5).
PFA Department
The fire service water line has been up sized to a 6-inch line (Sheet 5, Sheet 10)
Stormwater Utility Department
The City does not recommend the storm sewer taking flow from Basin 70 to be routed
underneath the proposed building. Even though this will be a private storm sewer, if failure of
the pipe would occur. Basin 70 would not be able to drain.
Enginee rs/ScienIisIs/ Surveyors
SHEPIOLT.DOC
.. - 32-0589.00
Mr. Ted Shepard, Planner
Page Two
October 7, 2002
The parties involved understand the risks in taking this route. The mechanical and structural
engineers will further address this issue by taking the necessary precautions in the foundation
design and the thru pipe stabilization design.
Please revise the water quality outlet structure orifices to be constructed with a metal plate
instead of the PVC pipe per City standard. The 6-inch long PVC pipes will have a higher
tendency to clog.
The outlet structure has been redesigned for a steel plate instead of the PVC pipes (Sheet 9).
Please revise water quality outlet structure grate. See relined detail sheet.
The outlet structure grate has been redesigned to addressed the reline comments (Sheet 9).
Erosion/Sediment Control Department
Why are there two erosion control sections in the report (page 11 and page 9 at the very end)?
Which is the REAL report.
Since this is an addendum to an existing drainage report the previous drainage report is
included in the appendix section. The erosion control section on page 9 at the very end is in the
old report presented in the Appendix section. The REAL report is found on page 11 and 12 of
the drainage report, as stated in the Table of Contents.
Where is the erosion control note indicating that the City erosion control inspector is to be
notified at least 24 hours prior to any work start on the project?
The note is located on Sheet 1, Note 19 of the first submittals General Notes. The note has
been moved to Sheet 2 Note 21 of the General Notes for this submittal.
The erosion control plan sheet must show all BMP's indicated in the report.
The Erosion Control sheet (Sheet 4) shows the silt fence and the approximate are designated
for straw mulch.
Transportation and Planning Department
Please table the right of way for So. Ridge Green Blvd. and Lemay Ave. on all plans including
the site plan.
Right-of-way lines have been indicated on plans where applicable (Sheet 3).
Identify and label all existing and proposed sidewalks, and associated access ramps for the
handicap and cyclists on all plans including the site plan.
SHEPIOLT.DOC
32-0589.00
Mr. Ted Shepard, Planner
Page Three
October 7. 2002
Items have been label where applicable.
Provide and show bike parking facilities near the building's entrance on all plans.
Bike parking has been identified plan set (Sheet 5).
Fort Collins-Lovelaind Water District & South Fort Collins Sanitation District
The District's standard approval block should be used.
The districts standard approval block has been added to the plan set where applicable.
Clay barriers need to be installed along the sanitary sewer line to impede move of groundwater.
Clay barriers have been added to the sanitary sewer design (Sheet 6 and Sheet 10).
If you have any comments or questions regarding the above comments please give me a call at
(970) 224-5556.
Sincerely,
Owen Ayres & Associates, Inc.
Chris Longo, .E. s
Project Engineer
CL:sp
Enclosure
SHEPIOLT.DOC
32-0589.00
1
john dengler ®13h ant) associares. P.c.
ARCHITECTS
E PLANNERS
October 7, 2002
Ted Shepard
Chief Planner
City of Ft. Collins
281 N. College Ave
Ft. Collins, Colorado 80522
(970)221-6750
Ted,
Thank you for the comments back regarding our submittal for St. Elizabeth Ann Seton
Catholic Church / New Parish Center, dated September 6, 2002. We have coordinated
with Avres and ,Associates to address comments from each department. The following is
a summary of actions taken by our office to those comments specific to the architectural
portion ofthc submittal:
Department: Natural Resources
Comment: The City of Ft. Collins Natural Resources Department requests that
adequate space be provided in the dumpster area to allow recycling services. The
addition of a walkway door into the dumpster helps to provide easier access for the users.
Action: Vie have added a dumpster / recycle enclosure as per specifications
provided by the City of Ft. Collins Natural Resources Department. The new dumpster /
recycle enclosure is located in the north-west portion of the existing parking lot where it
will provide easy access to trash /recycle collection vehicles and offer minimal
disruption to Parish Center activities. The existing dumpster area on the south side of the
existing facility behind a fenced area should offer adequate trash / recycle storage for the
entire facility. The addition of the new dumpster area should provide additional trash
capacity and should address any concerns of the Natural Resources Department.
Department: Transportation Planning
Comment: Utility information is not necessary on the site plan, please remove.
Action: Utility information has been removed from the site plan.
Comment: Please label the right of way for SO. Ridge Green Blvd. and Lemay Ave.
on all plans including the site plan.
Action: Right of ways have been labeled for both streets on the site plan and
landscape plan.
Comment: Please provide further information on the school operations, such as
hours of operation, the circulation pattern for school children and cars, and how students
get to and from school. This may require some intersection improvements at SO. Ridge
Green and Lemay.
Clarification: It is important to note that this is not a school. The classrooms, which are
a part of the parish center addition, will be used for religious education purposes, mostly
occurring during "off-peak" hours (after school and after dinner on weekdays, and during
Saturday evening and Sunday Masses.).
Both entrances to the site are utilized for parents driving to and from the parish center,
which would affect the Seton Street / Lemay Avenue intersection and the So. Ridge
Greens Blvd. / Lemay Avenue intersection. It was assumed that since these occurrences
are at "off-peak" hours it was not necessary to include their impact on these two
intersections in the traffic study.
Comment: Identify and label all existing and proposed sidewalks, and associated
access ramps for the handicap and cyclists on all plans including the site plan.
Action: Sidewalks and access ramps have been identified on the site plan and
landscape plan.
Comment: Provide and show bike parking facilities near the buildings entrance on all
plans.
Action: The existing bike parking will continue to service the existing facility as
well as the parish center addition. The location of the existing bike parking has been
noted on the landscape plan and the site plan.
Comment: The TIS failed to identify if there are bike lanes on SO. Ridge Green Blvd.
In order to satisfy the bicycle Level Of Service the street needs to have striped on -street
bike lanes. Please clarify for the next submittal.
Clarification: There are no striped on -street bike lanes on SO. Ridge Green Blvd.
Department: Zoning
Comment: Indicate building height on elevation drawings
Action: Building elevations have been revised to indicate overall height of the
parish center addition. The dimensions provided show the relationship of the parish
center addition to the existing facility and finished grade.
Comment: Label and dimension the building envelope. Also, the distances that are
shown from the building to Seton and to Lemay must be distances to lot lines. They need