J. T. ROSE'S AUTOMOBILE BATH PUD - Preliminary
i
i
Provide an access easement for the pedestrian spine on the south side of the building and for the
parking lot. Also, provide a stubbed sidewalk. The access easements shall be dedicated by
separate document:. A letter of intent will be needed prior to public hearing. At the west end of the
parking lot, provide a two scenario alternative:
1. Show that the driveway does not connect. Provide landscaping per current planning
requirements.
2. Show the driveway connecting to the adjacent parking lot.
Per Land Use Code Section 3.6.2(L)(2)(f), drainage from a private can not be channeled or directed
to over the public sidewalk. Please divert the storm flow away from the access point.
Site and Landscape Plan Comments
• See pertinent utility plan comments.
• The appropriate parking stall setback can not be determined without a traffic impact study. I would
assume that the average daily traffic (ADT) on Remington Street is over 100 and the ADT for the
parking lot will be over 100. If those conditions are true, the parking stall setback should be 40 feet
per Table 5 in the street design manual.
Development Review Comments — Page 2
6 June 1985 ;L.J 1 r j i i N IN 7
#35-85 J. T. ROSE'S AUTOMOBILE BATH PUD - Preliminary
j ' 6 June 1985 IEP r F3TjA",��" � T
�wsw.n
I ty` #35-85 J. T. ROSE'S AUTOMOBILE BATH PUD - Preliminary
8 3/4" water service and 4" sewer service are currently stubbed on to
this site. The 3/4" water service is probably too small for a car
wash. It will have to be removed and replace with a larger tap at the
Point of connection on the water main.
Water rights have been satisfied for this site on a residential basis,
so the raw water allocation will be fairly low. To avoid a surcharge,
the developer may want to consider turning in additional raw water.
Project Comments Sheet
(�+' Selected Departments
City of Fort Collins
Department: Engineering
Date: May 21, 2002
Project: SWALLOW APARTMENTS - AMENDED P.D.P.
All comments must be received by TED SHEPARD in Current Planning no later than
the staff review meeting:
May 08, 2002
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore
Topic: General
16
Please bring cover sheet and details sheet up to the Larimer County Urban Area
Street Standards.
AAi7
Signature
Oz
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS
Plat Site Drainage Report Other_
_ Utility Redline Utility Landscape
Page 1
DATE: April 9, 2002 TO: Engineering
PROJECT: P45-OOB Swallow Apartments — Amended PDP — Type I
(LUC)
A11 comments must be received by Ted Shepard no later than the staff
review meeting:
May 8, 2002
Note - Please identify your redlines for future reference
f ' �
Name (please print)
CHECK I IERE IF YOU wisi rO RECEIVE COPIES OF REVISIONS
Plat —Site Drainage Report _Other
_Utility _Redline Utility Landscape
6aProject Comments Sheet
- Selected Departments
City of Fort Collins
Department: Engineering
Date: October 22, 2001
Project: SWALLOW OFFICE BUILDING, PDP, #45-00
All comments must be received by TED SHEPARD in Current Planning no later than
the staff review meeting:
-Jupy7
Note - Please identify your redlines for future reference
Issue Contact: Katie Moore
19
Site plan: Please remove crosswalk stripes from driveway access. The City will not
maintain them.
20
Utility plan: Please provide an expansion joint in the concrete driveway at the ROW line.
21
Utility plan: Shouldn't the existing sanitary sewer service be shown as a dotted line?
22
Utility plan: Will fire service have to be abandoned? (repeat)
23
Landscape plan: Please add note for removal of landscaping on west edge of property
per current planning comments (repeat).
24
Please submit deeds of dedication for the access easement and the pedestrian access
easement
J
/C. 2-Z" C'
Date
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISION
Plat Site Drainage Report Other L/ .� 1 v,i-q
Utility :;;�; Rcdlinc Utility Landscape "J
Page 1
REVISION
COMMENT SHEET
EAK-rII LRX1WC=1
DATE: March 21, 2001 DEPT: TYPE DE T—
PROJECT: #45-00 Swallow Office Building —121 E. Swallow
Road — Type I (LUC)
PLANNER: Ted Shepard
ENGINEER: Katie Moore
All comments must be received by: April 4, 2000
❑ No Problems
21 Problems or Concerns (see below or attached)
General Comments:
• See redlined comments on all sheets of the utility, site and landscape plans. More specific
comments will be .mentioned below.
• Provide the access easement documents prior to public hearing.
Utility Plan Comments:
■ Show how the sidewalk transitions through the driveway cut. The flares on the driveway are
not appropriate for an attached sidewalk.
• Extend the internal sidewalk to the west properly line.
• The driveway shall be constructed with concrete within the right-of-way.
• Will you have to abandon the fire main to the structure? Will you have to cut the street?
• The parking lot drainage is not clear. Please provide more information and spot elevations.
The Engineering Dept. is concerned with storm flows crossing a public sidewalk at the
driveway. It appears you have corrected that issue with a chase at the southeast comer of the
parking lot, however, it does not appear that all the water can get to the outlet.
i
Date: April 2, 2001 Signature:_ - <1
PLEASE SEND COPIES OF MARKED REVISIONS
0 Plat [!Site ❑Utility El Landscape ❑ Drainage Report 0 NO COMMENTS -SUBMIT MYLARS
►PROJEc r
i.... COMMENT SHEET
City of Fort Collins
Current Planning
DATE: December 27, 2000 TO: Engineering Pavement
PROJECT: #45-00 SWALLOW OFFICE BUILDING
(121 E. SWALLOW ROAD) PDP - TYPE II (LUC)
All comments must be received by Ted Shepard in Current Planning no
later than the staff review meeting:
January 24, 2001
Note- Please identify your redlines for future reference
NO c� 1/1-1 llz-2e�,�
signature
CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS��,
_Plat Site Drainage Report _Other
_Utility _Redline Utility _Landscape Cityof Fort Collins
PROJECT
COMMENT SHEET
City of Fort Collins
Current Planning
DATE: December 27, 2000 DEPT: Engineering
PROJECT: #45 Swallow Office Building (121 E. Swallow Road)
PDP -11
PLANNER: Ted Shepard
ENGINEER: Mark McCallum
All comments must be received by: January 24, 2001
O No Problems
0 Problems or Concerns (see below or attached)
General Comments
• See redlined comments on all sheets of the utility, plat, site, and landscape plans. More speck
comments will be mentioned below.
• Please submit a traffic impact study or provide a letter from Traffic Operations and Transportation
Planning stating that one is not needed.
Utility Plans Comments
Cover Sheet; Sheet 1 of 5:
• Minor revisions to the General Notes.
Utility Plan and Water Plan; Sheet 2 of 5:
• Please show the curb, gutter and sidewalk clearly. Also, make sure all lines are shown.
• Please show the offsite conditions for 150 feet. In particular the intersection of Remington Street
and Swallow Road.
• Please show all street cuts and curb and gutter removal. The street cuts should be made in
accordance with the city's "Street Repair and Reconstruction Standards and Guidelines'. Also,
provide a minimum street cut and repair width per the aforementioned standards.
• Add the following note (as shown as #8 on the redlined utility plans):
All street work necessitating the need to cut into the street shall be done in accordance with the
City's "Street Repair and Reconstruction Standards and Guidelines." The City Inspector and/ or the
City Engineer has final authority over the street repair limits.