HomeMy WebLinkAboutPARK CENTRAL PUD PHASE III - Filed GC-GENERAL CORRESPONDENCE - 2004-08-25Larsen) Associates Profess oni Corpomron CONFLRENCE REPORT PROJECT: Park Central POD, Phase III JOB NO: 8515 PARTICIPANT'S: ,Sam Mutch Joe Frank Bonnie Tripoli Rick Ensdotff Tom Livingston Cathy Chianese John Merritt Randy Larsen Bob Mooney PLACE: City of Fort Collins Planning Office DATE: 5/20/85 771is is my understand of items discussed and decisions reached: 1. The purpose of the meeting was to go through the traffic comments regarding the site. 2. Pandy indicated that there would be no problem in preparing comparative data between the existing approved plan and the current submittal, as suggested in the staff comments. Rick suggested that it really should be done in order to provide comparative information and to show some perspective as to how the project had come from the previous submittal to where it is t Iola. 3. The traffic report will oe revised to indicate the 8-phase controller. 4. Rick suggested that the right -turn bays and other suggestions for Prospect need to be Looked at as far as what needs to be dooP -G a result of this protect. 5. The office parking at: Welsh and Prospect should be looked at a little harder. Cathy indicated that a 'count" of children walking to and from the school will be made, and that the sc::Iool had been notified regarding a date to do this. Rick also asked what amount of traffic might be diverted, by virtue of completing the project, onto Welsh, Stuart and then Lemay. Rick also asked that the traffic study show if Prospect is the only curb cut, how gnat has impact on stacking distance, etc. Randall E. Larsen, Principal Larry G. --rampe, Principal Member American Institute of Architects 7 Clock Tower Square 323 South College Avenue Fort Collins. Colorado 80524-2898 303 484-0126 Conference Report - Job No. 8515 may 20, 1985 Page Two 6. It is Rick's opinion that: a decel lane continuous from Lemay to the Health Club entrance be provided. 7. Tha plan specifics were discussed, particularly in the segregation of certain parking areas. Randy indicated that the segregation was purposeful, and explained the distribution patteri. The resubm:,ttal will indicate more traffic information by virtue of either the traffic study, or incorporation into the design objectives. 8. Rick felt that the entry areas should be revised, that there should be more parking for the Health Club, particularly around 160 to 170 spaces, exciu,aive of employee park u:g, diiectiy front of the building, and felt that more parking should be provided in front of the office areas. 9. Rick felt that the convenience store was a traffic circulation problem, specifically internal to the site. The moved entry would create a longer travel distance from the Prospect Street entrance to the convenience store. Rick felt that he needs to be convinced that this traffic works. 10. Rick wanted to make sure that it was understood that 7-11 would never get another curb cut on Prospect or Lemay if this plan were approved. Rick felt that it would be beneficial to break out the specific numbers for the convenience store in the traffic study. 11. Larsen Associates needs to get a copy of the Spring Creek Trail design standards in order to verify that the radii, etc. work on the relocated trail. 12. The point chart should be for a neighborhood shopping center. 13. The revisions are due Juue 5 at 12.00 at the Planning Office. 14. The School District ,3hould be contacted regarding the Welsh Street curb cut. 15. The new Spring Creek Trail should be constructed before closing off the portion of the existing portion to be removed. 16. Joe felt that he would have the other comments ready by Wednesday or Thursday. In response to Randy's question, Joe thought that it may not oe worthwhile to do a major redesign until the developer and applicant have seen the other comments in order to not create additional problems in the redesign that would be discussed i:-i the other City comments. Conference Report - Job No. 8515 May 20, 1985 Paye Three If you have any additions, deaetions, or modifications to the above, please do not hesitate to contact this office. Sincerely, Robert J. Mooney, A.I.A. Project Architect RjM: jds xc: Participants July 8, 1985 Re: Storm Drainage for Park Central Phase III Job No. 10-252-104 City of Fort Collins Engineering Department PO Box 588 Fort Collins, CO 80522 Attn: Bob Smith Dear Bob: This letter is intended to outline the strategy for drainage of the stormwater from Phase III of the Park Central project. The site is located on the southeast corner at the intersection of Lemay and Prospect streets. Presently, approximately 400 of the site is undeveloped. An asphalt parking lot, including curb and gutter, was constructed on the remaining 60% of the site during the construction of Phase II of the Park Central project. The Phase III site comprises 1.72 acres. A convenience store/gas station is being proposed for the tract. Stormwater runoff from the Phase III site will be routed into the surrounding parking areas and collected in existing inlets. These inlets are connected to an existing storm sewer which ultimately outlets into Spring Creek. Due to a revision in the parking lot layout, one of the existing inlets (No. 1-3) will be eliminated and replaced by a new inlet (No. 1-3a). Drainage calculations for the Phase III site were included in the drainage report prepared by TST Engineers for Phase II of the Park Central project and are on file with the City of Fort Collins. Enclosed is an exhibit which shows the proposed drainage patterns for the revised parking area layout as well as a print of the grading and drainage plan from the Phase II construction drawings. Basically, the drainage basins for the revised layout and the basins as they exist today are identical. There is one slight modification in that Basin No. 4 will gain approximately 0.10 acre from Basin No. 3. This will increase the detention depth at inlet No. 1-2 by approximately 0.05 feet. Flows from the site will remain the same and will not affect the 100 year flood level in Spring Creek. TARANTO, STANTON & TAGGE Consulting Engineers 748 Whalers Way • Building D • Fort Collins, CO 80525 (303) 776-0957 • Metro Denver Number (303) 595-9103 Page TwiD Bob Smith City of Fort Collins July 9, 1985 If you have any questions concerning the information presented above, please call me. Sincerely, Micheal R. Lawson` mj,"n..� T. Michael Carver, P TARANTO, STANTON & T. CONSULTING ENGINEERS MRL:sbr