Loading...
HomeMy WebLinkAboutPARK PLACE AT THE LANDINGS PUD - Filed GC-GENERAL CORRESPONDENCE - 2004-08-24CORNEA CONSUITINC1 COMPANY Po box 646 foRT C011INs, cokTRAdo 80522 ri+o^IE. (303) 482-6650 MANAIiEMENTA NGINEERING February 16, 1979 Mr. Mauri Rupel Development Engineer City Engineering Department City of Fort Collins P.O. Box 580 Fort Collins, Colorado 80522 Dear Mauri: This is to confirm our conversation held in your office Wednesday, February 14, 1979, where two (2) members of the Planning staff (John and Kathy) were present. It vas agreed that to be on the March 20, 1979 City Council agenda we would have to make submittal of final utility plans and final plat drawings to you for the Whaler's Cove, Park Place, and Wharf Phase II projects no later than February 27, 1979. This assumes an acceptable quality of plans with minimal conditions resulting. With reference to the Whaler's Cove project, we will be submitting final plans for all but Area C (see Preliminary Plan). We would prefer to do any necessary street design on Harmony Road adjacent to this project as a part of the Area C utility plans rather than as a part of the present utility plans. Please advise me should that not be acceptable to you. Thank you for your consideration. Very truly yours, CORNELL CONSULTING COMPANY Harry A� Cornell, P.E. ['resident HAC/fsr cc: R. Rosenthal F. Vaught CORN& CONSUITINCI COMPANY p-o- box 646 IoRT collnv colcwA& 80`i22 Pl+o^F (303) 482.6650 MANAGE W Pff hNGINEERINC, e;7 February 27, 1979 r' Mr. Don Parsons, City Engineer Mr. Mauri Rupel, Land Development Engineer City of Fort Collins P.O. Box 580 Fort Collins, Colorado 80522 Dear Don and Mauri: Submitted herewith are the necessary documents for your review and approval of the Park Place and Whalers Cove utility plans. Items speci- fically transmitted are as follows: 1. Six (6) copies of Whalers Cove at The Landings PUD utility plans; -- 2. Six (6) copies of Park Place at The Landings POD utility plans; � 77 3. Two (2) copies of a letter covering storm drainage/detention calculations showing compliance to the previously submitted Master Storm Drainage Report; and 4. One (1) copy of the Soils Report for The Landings IV/Park Place area. Field work has been completed for The Whalers Cove subsurface investigation and the laboratory tests are being run. Therefore, the Whalers Cove Soils Report will be available around March 7. Please note that copies of the plat are bound with their respective utility Plans. Mauri has requested we do this when possible. It is our understanding that this submittal is in time for these projects to be approved and placed on the March 20, 1979 City Council agenda. As this is tight timing for your staff, Dennis Donovan or I will be immedi- ately available to discuss or make any necessary changes or additions. Dennis will also be the contact in our office to coordinate utility agree- ment signature by the developer. Mr. Don Parsons Mr. Mauri_ Rupel February 27, 1979 Page 2 We thank you in advance for your cooperation in getting these projects on the March 20 Council agenda. Sincerely, CORNELL CONSULTING COMPANY Bill Blackwell, EIT i Larry d(. Cornell, P.E. President BB:HAC/fsr Enclosures