HomeMy WebLinkAboutNORTH LEMAY SECOND - Filed GC-GENERAL CORRESPONDENCE - 2004-08-23January 2d, 1975
TO: Verna Lewis, City Clerk
FROM: Don Parsons, City Engineer
RE: North I.emay Subdivision 2nd Filing, Utility Agreement
This mcmorarCum is to inform the City Clerk's office that the exhibits referred
to in the North LemNy Subdivision 2nd Piling Utility Agreement are approved as
satisfactory and have hccn tiled as follows:
Exhibit A - The Subdivision Plat is filed under No. 763 in the
office of the City Engineer.
Exhibit B - The development master Plan is filed under No.
10o-74 in the office of the City Planner.
Exhibit C - The Subdivision Utility Plans are filed under
No. C3-336 in the office of the City Engineer.
Should you have questions or require additional information in this matter,
Please contact me.
Don Parsons
City Engineer
+s
.x t
(J�/f/�j
/Post Office Box 580
Fort Collins, Colorado 80521 Telephone 303 484-4220
July 14, 1975
i. 9—L Associates
Attn: Jim Cooper
Fort Collins, Colorado
Dear Sir:
This is to inform you that Curwell Construction has completed installation of
818 feet of 12" CIP, and 1405' of 6" CIP, with 2 to 6" gate valves and 2 fire
hydrants on your north Lemay Subdivision. These installations have been inspected
and accepted by the City pending the normal contractor's one year guarantee period.
Sincerely,
Donald M. Parsons
City Engineer
DMP:ke
GENERAL CONTRACTOR
K raush,aa r 3518 No. Prospect St./Colorado Springs, Colo. 80907/Phone 632-2639
.CC�SIl oO�fl Il0c 0 Leonard C. P'9s,hdaar
Pa s r
, ;/
� i l
RtiC�
5111 Pocking R. Drive
Colorado Springs, Colorado 80915
(303) 596-5819
.July.7, 1976
Mr. Uonald M. Parsons
City Engineer
300 LaPorte Avenue
Fort Collins, Colorado 80521
Dear Mr. Parsons,
[n June of 1975 Front Range Industries, Ltd. submitted a pro-
posal to your department and sister departments to build a milli -
warehouse at 1000 East Lincoln Avenue. We requested and received
a building permit for the project which included twelve buildings,
eight of which we built last summer.
At that time I understood that the flood -plain ordinance . which
had not been published would not affect our pro]ect. Accordingly,
we huilt the eight buildings as Phase I and Phase II of our planned
project.
We have now requested a building permit for the completion of
our project and I understand you have a hold on the permit because
or the now enacted flood -plain ordinance. It was my understanding
that our original proposal was considered as a complete package,
which it is, and that the flood -plain ordinance would not apply to
the entire project. It is in the 100 year possibility area. We wish
to finish the project and I now have been told tint a variance will
have to hp obtained in order to build the last four buildings on the
elcvnti,,ns submitted last year and again recently.
Will you please consider this letter a, request for a variance to
allow completion of our project as submitted to your office? It
would wort: an economic hardship on our organization to provide
fill I'or this section of four buildings, there are no people that will
be living in the proposed buildings as they are designed for storage
only, and it is pars: of the original proposal already approved.
Could you please insure that this is placed before the next meeting
of the City Council?
Sincerely yours,
Rihat A. Grham General Partner,
Front Mange Industries, Ltd.
CITY OF FORT C O L L I N S
MEMORANDUM
DATE: August 19, 1976
TO: Robert L. Brunton, City Manager
THRU: Roy A. Bingman, Engineering Services Director
FROM: Donald M. Parsons, City Engineer��
RE: North Lemay Subdivision Flood Plain Variance
The first filing of North Lemay Subdivision is a one lot subdivision
on the north side of Lincoln Avenue, 481 feet west of North Lemay Avenue.
It is partially developed with eight U-Store-It warehouses which were built
prior to the adoption of our flood plain ordinance. Richard Graham, a
general partner for the development group, has requested the necessary permits
to construct the remaining four U-Store-It warehouses on the site. Since this
subdivision is within the flood plain, a variance is necessary before building
permits can be issued.
The flood plain is comprised of a £loodway, the central area of the
flood plain where the majority of the water is carried, and the flood fringe
where the water is shallower and less turbulent. Filling is allowed in the flood
fringe to raise the ground or proposed building above the water surface
elevation. However, in order to build the structure within the flood fringe
the ground must be filled enough to raise the floor elevation of a building
1!7feet above the high water elevation. One foot of this 1 112 feet is
for free board (factor of safety), and the other six inches are to provide
for the increased water surface elevation from filling. The proposed floor
elevations of the U-Store-It warehouses are two feet below the high water
elevation. To attain compliance with our floor plain ordinance on this site,
the floor elevations would need to be raised 3 L12 feet.
Our recommendation is to raise the floor elevation two feet and allow
a variance from the flood plain ordinance for the following reasons:
I. The proposed development was begun before the adoption of
flood plain ordinance, and drastically revising the plans
for the remainder of this development seems excessive.
2. The existing buildings are upstream from the proposed
building sites and would provide .somewhat of a barrier to
these proposed buildings.
Page 2
8/19/76
3. This site is in a fairly wide area of the flood plain and
close to the outer limits of the flood fringe. It is
an area where there would be minimum flow and turbulence
during a flood.
4. The recommended filling of two feet would raise the build-
ings almost entirely out of the water during a 100 year
storm, but would not provide the requi5ed factor of safety.
We feel the above mentioned arguements reduce the need for
this large a factor of safety.
DMP : cb
Hue Is.
UTY OI 10R1 (OH INS P.O. BOX ENO, TORT COLLLNS, C-OI_ORADO 80522 PH (303) 484 4220
ENGINELRING DIVISION EXT. 728
February 4, 1980
Mr. James C. Woods
&3nkers National Mortgage Corporation
400 Remington
Fort Collins, Colorado
Mr. Woods:
The following is in response to our meeting of Wednesday, January 30, 1980.
After reviewing the North Ienay Subdivision drainage plans, it was aqreed
upon that your engineer is to revise the detention volumes to today's
standards and to show a master drainage plan for the subdivision.
Also, I have talked with Roy Bingman, and it was agreed that the on -site
detention 4x3nd.s could be located and designed helow the 100-year water
surface elevation of the Cache la Poudre floodplain.
If you have any questions, please advise.
Sincerely,
Pobert W. Smith
Assistant City Engineer - Drainage