HomeMy WebLinkAboutLIND PROPERTY - Filed DCP-DEV. CONSTRUCTION PERMIT - 2004-08-16City of Fort Collins
Transportation Services
Engineering Department
DEVELOPMENT CONSTRUCTION PERMIT
Permit Number: 04-06 Issuance Date: ---:2,/?� I lo41"
Project Name:
Project A.K.A.:
Project Location: Northeast corner of CR I 1 and 52
Permittee: Scott Jones qO CC rr6x IJOWS5
City and developer contacts: See attached Exhibit "A" for names and phone numbers of all
contact persons for this project.
Fees: Permit Application Fee (paid at the time of application) $ PAID
Construction Inspection Fee (paid prior to issuance of this permit) $ 31.S16.80
Total $ 31,816.80
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 918,119.63
Form of security deposited with the City:ix''�It�
PERFORMANCE REQUIREMENTS OF THIS PERMIT:
1. The Permittee shall be responsible to require their Project Engineer to incorporate into all design
drawings and specifications the certification of all materials testing by an Engineer. The Permittee
shall have an Engineer prepare revised design drawings and secure City approval for all revisions to
the Utility Plans and related docuwnents. The Permittee shall have an Engineer represent, as required
by the City in the Development Agreement, that the improvements are constructed in conformance
with the approved Utility Plans and the standards and specifications of the City. The Permittee shall
provide "as -constructed" plans prepared by an Engineer prior to the City's acceptance of the
constructed public improvements. (All references above to the terms "Project Engineer' and
"Frigineer" shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
281 North College Avenue • Po. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 • FAX (970) 221-6378
www.fcgov.com
BuND No. SO 5006455
DEVELOPMENT BOND
KNOW ALL MEN BY THESL PRESENTS, that we
CENTEX HOMES, a Nevada General Partnership as Principal, hereinafter
referred to as the "Develops:' and
ARCH INSURANCE COMPANY a corporation organized under the laws of the
State of i $$-Puri as Surety, hereinttr3er referred to as "Suretv', are held and firmly hound
unto the Cam' OF FORT COLLINS, COLORADO, atllurticipalcorporatiou,hcrcivaftcrrefeircd to
as the "City„ in the sum O1
Nine Hundred Eighteen Thousand* Dollars(S 918,119.63----- ),tobepaid totheCity, for
which payment well and trulyto be made, we bind o,_rrselves, our hcir', ex=utors aid administrators.
successor, and assigns, firmlybythese presents. * one Hundred Nineteen and 63/1UO
«IHERE.hS, the Developer has submitted to the Ciry for its approval of the following
development project:
Lind Property Phase 1 ;and
WHEREAS„ the Cityhas approved said developmentproject and the Developer and the City
Have executed a Devclopment Agrc=eat dated pertaining to
the development project (the "Development Agree nerC) a copy of Which is by reference made a
part hereof: and
W1iF_REAS, the City Code requires that the Developer post a bond equal to the total cost to
construct the Devedoper's portion of the public infrastructure (which, upon completion and
acceptancc by the City shall bccome the proncrtY of the City), which for the above -described
development proVet shall be
Nine Hundred Eighteen Thousand Dollars($ 918,119.63 ----- ) with such Sureryto be
upon condition that the bond remain in full force and effect until such time as the City rcleases such
bond, which rcicase shall occur upon (1) issuance to the Developer of anotice of final acceptance
stating that all of the public infrastructure improvements have been cernplemd in accordance with the
approved -Plans for said developmentproiectand the specifications and standards of the City; and(—)
,ie;ivory to the Clty by ;he Developer of a bond, cash or other secunng deposit in a form acceptable
to The C;ty to guarantee `hat the Developer shall maintain and repair all of said public infzastructure
improvemenvsinaccordancewith the City Code. *One Hundred Nineteen and 63/100
NOW, 7T=? ZFORE,thecondition ofthisobligationissuch thatiftheDevelopershalltruly
and taithfully pert= to the sarisfaetion of the City its obligations in constructing,:naintaining ana
repairin F_ the public infrastructurc constrt:cted in ruocctien withthe aforesaid developmentproject
n accorda ce w rh ale ty Code iiucludin_� the I Use Code old Tzansitionai Land Cse
Rcgu',aticns. as atplicabie), :uid die Dcvciopmem Agrecrnent, then this obligation shall be void:
otherwisc to remain in full force and effect_
In Testimony Whereof, the Company has caused this instrument to be signed and its corporate seal to be affixed by their
authorized officers, this 24th day of November , 2003
Arch Insurance Company
Attested and Certified
53 �eae C
n
f
Joseph S_ L he'i. Corporate Secretar.,
STATE OF CONNECTICUT SS
COUNTY OF FAIR7IELD SS
Thomas P. Luckstone, Vice President
I Melissa E. Gill can, a Notary Public, do hereby certify that Thomas P. Luckstone and Joseph S. Labell personally known
to me to be the same persons whose names are respectively as Vice President and Corporate Secretary of the Arch
Insurance Comoany, a Corporation ordanizec and existing under the laws of the State of Missouri, subscribed to the
foregorng instru Tent, appeared before me this day in person and severally acknowledged that they being thereunto duly
authorized signed, sealed with the corporate seal and delivered the said instrument as the free and voluntary act of said
corporation and as their own free and voluntary acts for the uses and purposes therein set forth.
jO�FF7KC311& SEALMELI, tlotary ReStic �/ /.�/[/Z./�xne::ticul Melissa l3.Gilligan, Notary Public
MY Caes Fe
28, 2005 My commission expires 2-2M5
CERTIFICATION
I, Joseph S. Label], Corporate Secretary of the Arch Insurance Company, do hereby certify that the attached Power of
Attorney dated November 24, 2003 on behalf of the person(s) as listed above is a true and correct copy and that
the same has been in full force and effect since the date thereof and is in full force and effect on the date of this certificate,
and I do further certify that the said Thomas P. Luckstone, who executed the Power of Attorney as Vice President, was on
the date of execution of the attached Power of Attorney the duly elected Vice President of the Arch Insurance Company.
IN TESTIMONY X-fEREOF, I have hereunto subscribed my name and affixed the corporate seal of the Arch Insurance
Company on this _25TH day of RARCH , 20 04.
Joseph S 60ell, Corporate Secretary
This Power of Attorney limits the acts of those named therein to the bonds and undertakings specifically named therein
and they have no authority to bind the Company except in the manner and to the extent herein stated.
Home Office: Kansas City, MO
OOML0013 00 03 03
Page 2 of 22 Prtnted In U.S.A.
DATED this . 25th day of March 1 2004
DEVELOPER:
SURL-TY,
CENTEX HOMES, a Nevada General Partnership
nntee amei
By:
By:
ARCH INSURANCE COMPANY
'Tmrce4 Name \
Allyson Dean
d�'1d�C7F.9 )N/_£:1.'_=/C,£:.� h00i W( _) I26c5La0E);�WOH XaIJ_2 .vOE�
DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(2/ 16/99)
For City use on(e: Application Number: F' c' Application Datec
Permit application fee: $ 300.00
INSTRUCTIONS
I Complete [his form (some questions may not apply to you) and attach all necessary documents and
submit to the Dcyclopmcut Engineering Section of the City-
2. If Non hayr. am questions contact the Development Engineer ; xf,t��1 _��L'� at221-6750-
Submit the Application and pay the Application Fee at the fee at the Engineering couttter at 291 No.
('ollcgc Aycritic
PROJECT INFORMATION:
Project Name (as approved by the City):
Project A.K.A. (Marketing name if different from Project Name)-
--�C-_
Project Location: e' 1' A 11 A f _ C- IJ - Cj G h Dj2-A-t�_
Property Owner(At the time of this permit issuance):
Individual Name-
Conipam Name GENTt=X I TOMES
Address 6Z2,,1F0 C. COG _rt-t-A Ave 4f 200�DENMI co 90//2
Phonc nuniber(s)-
Office 30_3- 1-1 171 -BffB 9 Gouc.DEP, o3--7oS--S219 DE Vtv p-
Collphonc-'o3, 931-`1gLf2
Fax number 3d3 -�{9� -I F fS'�3 74a -9iSll
Email _,12A;M E-2. Lj-.Ck,! EST',N
Applicant/Project Manager (The primary contact person for all matters regarding this project, and the
person responsible for all matters referencing "the Developer" in the Development Agreement for this
project).
Individual Name PAT
CompanyNanic C(=t.f-r'EX t-I-SMES
Address- 1-2SD GLhG(c 2 FLAB-E i36 6e_pErZ �o v3n3
Phonc uumbcr(s)_
Office-'3
Cellphonc:'�o3- 4Y
Fax number 303 -
Email KR/sMLt 7GST. t,�Ei
Permittee (Person who is to sign the Development Construction Permit).
Individual
Company
Address
Phone numnerts)
Office �P3 -_7US1-1
Ccllphone_ 303 - 141 R -5-Lt 3
Fax number. 9
Email SA JUr�CSC�Ki{pa r�S, Cagy
11 2
Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person.
responsible for the design of this project_ responsible for certification that improvements are constructed
in accordance with approved plans_ responsible for making revisions to plans with City approval and for
providing as -constructed plans).
Individual Name � I M aLUEAJ M DiZ L.EY
Company Name )e-NP- L'5(4trtAlw
Address _;Li:)g S. MCLDGG1-9 Pr "LC.tn)Sr co "S1I
Phone number(s)
Otticc 47O - Li 82 'SG 22
Ccllphone:
Fax number L3G$
Email WW(tJ SEAR _fSQajaLJ,_CbM
Professional License Number -1 • -53 6
Architect/Planner (The person responsible for the site design of this project)
Individual Namc ': kskMC f-33VF-f
Company Namc
Address.
Phone number(s)
Office
Ccllphone _
Fax number
Email
Developer (The party or parties referenced in the Development Agreement who arc responsible for the
Developer's obligations contained in the Agreement -add additional names below)
Individual Naine Y'Vo"KIE SE?'%He,4
Compam Name C Ten ±ItOr ti 5
Address AIS0 L' C-OS.-M-e-A AVM -:L�-)-00 I)tKVE"l2 c-b
Phone numbcr(s)-
Office3p, --?PS
Ccllphone.2,o:5 -, L4 Lq
Fax number-jo3 -"2 -9 ✓f 11
Email �r�Eh Mott GC�I�CEXH01 t�5. GoM
General Contractor (The contractor in overall charge of the public infrastructure construction):
Individual Name.
Compam Name
Address. _
Phone number(s)-
Office.
Ccllphone
Fax number.
Email
If you have no General Contractor, list all other contractors below.
Grading contractor:
Individual Name rpp'1 f�<c�41
Compam Name !✓ M A 5 ' ZC GAv�7,oN
Address (v b'-ii o 5. TLt S Lh U W f
Phone numbcr(s)-
Office-3 o'j - (,62 - 1877
Ccllphonc _ 3og - H72 - 9Y3o
Fax number 3og - 662. - L87b"
Email
Utility contractor
IndividualNamc RYAA1 CA�Kin75
Companc Name SCAT CO&rJRA-C-Y?APC
Address: `�(.7- 43etcK;'gRID CIR� GaLpe-�) C-0 8-64v3
Phone number(s)
Offia�o327 -040 a
Ccllphonc_ -220 - 219 - 904 1
Fax number 3° S ' ti-7 9 - O9oi
Email.
Concrete contractor for Flat work:
Individual Name. Anq
Compan} Name
Address
Phone number(s)
Office
Ccllphonc-
Fax number.
Email.
Concrete contractor for structures:
Inds-idual Name_ '>A A4
Companc Name.
Address
Phone number(s)
Ofticc.
Ccllphonc-
Fax number
Email
Paving contractor:
Individual Name_ _
Company Name —
Address _
Phone nuntbcr(s)-
Ofticc:
Ccllphonc
Fax number
Email
Landscape contractor:
Individual Name_
Company Name _
Address _
Phone numbcr(s)-
Email_
/Q07' SC tzC-TKD
Office.
Ccllphonc-
Fax number.
Other contractors and parties involved in the project:
TLG — poor 1E 105-1 AL Ai—ft0n1 fO R QW�
SUBMIT THE FOLLOWING ITEMS (Required for all projects):
• R 1/2"x I I" cope of the Site Plan
• Proposed Project Schedule
• Project quantities and cost estimate for all of the public improvements to be constructed- In
addition. include all private improvements that are required to be inspected by the City
Construction Inspectors- This information must be submitted in the format shown on the
attached form titled "Project Quantities and Cost Estimate Slicer"
ADDITIONAL SUBMITTALS (Required if checked):
❑ Traffic control plan(s) for the project
❑ Proposed haul routes shoNNn on a City map
❑ Shop drawings
❑ Other
CONSTRUCTION COORDINATION MEETING: A construction coordination meeting to discuss
plans and special requirements for your project. is required for all development projects. The people
required to attend the meeting are the Project Manager, Project Engineer_ Developer_ Architect[Land
Planner and Gcncral Contractor (if no General Contractor, representatives for each of the contractors
expected to work on this project)
People to Attend: List the peoples names and titles for those who Neill attend the pre -
construction meeting
Name Title
AL4enJ WkLtY ScAt2-r32a.a�J
(p-lr&t� GatKIn75 sc-6i t cona i
M! I rI t_ t- ti14 C ehYL Z rzv t-,) .1 S to 2 v c r
r✓t_Iz r �rF1 3_�'lLnnl _ ccrJ-7-15x Ht -tz!5
_ZtM _I°h�uc.. _._ _t3i✓MR _..—C1Cc,tvAT/N�
titi t lC C� 'j L V-f�o�co
ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of
all public infrastructure improvements that will be constructed and accepted bN the Citv to own and
maintain In addition provide the value of all private infrastructure improvenicnts that the City will
inspect and require certification for The estimate shall be in the same format as the attached sheet titled
"Project Quantities and Cost Estimate Sheet_"
Public infrastructure, estimated cost:
Private infrastructure, estimated cost: $_
1 certify that the information on this permit application along with the required additional submittals arc
true and correct to the best of my knowledge_ and that in filing this application I am acting with the
knowledge. consent- and authoritc of the owners of the propertv (including all owners having legal or
equitable iutcrest in the real properh _ as dcfinod in Section 1-2 of the Cite Code_ and including common
areas Icgalk connected to or associated with the property which is the subject of this application) without
whose consent and audioritc the requested action could not lawfully be accomplished- Pursuant to said
authorih_ I hCCebN permit Cite officials to enter upon the propem for purposes of inspection and_ if
necessary_ to enter upon such propertN to perform work required of the applicant if the applicant were to
fail to perform the required work
Applicant Signature L'_�� �1, ��� Date
�f
DCP PRECONSTRUCTION MEETING ATTENDANCE SHEET
Contact name
9
Company Name
C
CCt� CCFC rlC
Address
Phone Number
y VCq "e :�ak VV\Ck✓-\
n
�-j
- I�"\-e\ oa"Q-sf
C' I ly S
qC-1.
1 2tDo
�' ��`�
ZZZ-
Ci�`QQVi VJOrX�� V �. 11 o.N-2 N C O gp �
00
cz
jc��nna fir I"<7,i �y
CcNTLx r ,,i,tyr� �,�.<<_�s<<:,_F.
Jt-evv 6Ae�!ELsAJA
,,,��C
-;�672/eT
232 S. LI/ut` LANs
FT COL4INS cc) goSIL
SeL\fL
ck
�.
x(J
YW
% JX
'17cl,
,I C.., S
i
DCP PRECONSTRUCTION MEETING ATTENDANCE SHEET
Contact name
Company Name
Address
Phone Number
y
Td� 9u
P.�ernas Go.�s"
8"P
L'NGL�Woop,�,o 80�12
��-3 66Z-,i�7
Development Construction Permit, Page 2/6
3. Construction time restrictions:
4. The applicant understands that additional permits maybe required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. This permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat easements and any other official documents), shall be kept on the
development site available for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 of the Transitional Land Use Regulations or
Section 2.6.3(K) of the Land Use Code, whichever is applicable):
a. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this permit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon the applicant must re -apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at least two weeks prior to the expiration date.
Such application shall contain information sufficient to justify the granting of the extension.
An extension may be granted for up to six months.
7. Building permits, and certificates of occupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) of the Land Use Code or Sections 29-
678 and 29-679 of the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specifytimes for completion of public improvements, or if there is
no Development Agreement, then the improvement requirements specified in Section 24-95 of the
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance of the first building permit.
8. Acceptance by the City of the public improvements shall be after(]) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City; and (3) required certifications from the licensed professional engineer that improvements
are completed to City standards, specifications and approved Utility Plans; and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date of acceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Land Use Regulations and/or Sections 2.2.3(C)(3)(g), 3.3.1(C)(2), and 3.3.2(C) of the Land Use
Code, as applicable.
10. The City Erosion Control Inspector must be notified at least twenty-four (24) hours prior to any
DEVELOPMENT CONSTRUCTION PERMIT
Perrnit Number: 05-08 Issuance Date:
Project Name:
hase 2
Project A.K.A.: _ Br4,htjvater Landing Filing 1
Project Location: -_Northeast corner of CR I t and 52 _
Permittee: Rodirep Muller
City and developer contacts: See attached Exhibit "A" for names and phone numhers of all
contact persons for this project.
Pees: Permit Application Fee (paid at the time of application) $ PAID
Construction Inspection Fee (paid prior to issuance of this permit) $ 4��189 30
Total $ 43.789.30
Development Bond or other approved security:
Amount of security deposited with the City to guarantee the completion of all public
improvements to be constructed as shown on the approved plans for the development.
$ 820,608.00
Form of security deposited with the City: __ Bond
PERFORMANCE. REQUIREMENTS OF THIS PERMIT:
1 . "I he Permittee shall be responsible to require their Project Engineer to incorporate into all design
dra%��in�-'s and specifications the certification ofall materials testing by an Engineer. The Permittee
shall hank an Engineer prepare revised design drawings and secure City approval for all revisions to
the t itility Plans and related documents. The Perm ittee shall have an Engineer represent, as required
by the City in the Development Agreement, that the improvements are consn-ucled in conformance
with the approved Utility Plans and the standar cis and specifications ofthe City. The Permittee shall
provide "as -constructed' plans prepared by an Engineer prior to the City's acceptance of the
constructed public improvenunls. (All references above to the terms "Project Engineer" and
" F112incer' shall mean a Professional Engineer licensed in Colorado.)
2. All contractors who perform work on this project must be bonded and licensed in conformance
with City requirements.
Development ConSaneUO❑ Permit, Page 2i5
3. Construction time restrictions:
4. The applicant understands that additional permits may be required for this development project
and the applicant shall secure those permits directly from the issuing departments.
5. phis permit, along with a complete set of all approved plans and documents for this project
(utility plans, site plan, landscape plan, development agreement, soils report, pavement design, traffic
study, drainage report, plat casements and any other official documents), shall be Ikept on the
development site availahlc for use by City staff doing inspections.
6. Permit Expiration (in accordance with Section 29-12 ofthe Transitional Land Use Regulations or
Section 2.6 3(K) of the Land Use Code, whichever is applicable):
❑. If construction has not begun within sixty (60) days from the date of issuance of this
permit, this ncnnit shall expire and the applicant will forfeit the permit fee paid for this
permit, whereupon die applicant most rc-apply for a new permit.
b. In addition, this permit shall expire one year from the date of issuance. The applicant
may apply for an extension by reapplication at (cast two weeks prior to the expiration date.
Such application shall contain information sufficient tojusti fy the granting oCthe cxtcnsion.
An cxtcnsion may be granted for up to six months.
7. Building permits and certificates Ofoecupancy will only be issued when all conditions contained
in the Development Agreement and Sections 3.3.2(C) and (D) ofill e Land Use Code or Sections 29-
678 and 29-079 of -the Transitional Land Use Regulations, whichever is applicable, are met. If the
Development Agreement does not specifytimes forcomplction ofpublic improvements, oriftherc is
no Development Agreement, then the improvement requirements specified in Section 24-95 ofthc
City Code shall apply, which provides that construction of all improvements shall be required prior
to the time of issuance ofthe first building permit.
S. Acceptance by the City of the public improvements shall be after (1) final inspection has been
conducted by the City; (2) punch list items from the final inspection are completed and accepted by
the City. and (3) req�.iired certifications from the licensed professional engineer that improvements
are completed to City standards, spcci fications and approved utility Plans: and the "as -constructed"
plans have been received and accepted by the City.
9. The warranty on street improvements is for five (5) years from the date ofacceptance by the City
of the completed improvements, in accordance with Sections 29-13 and 29-14 of the Transitional
Lind Ilse Regulations and/or Sections 2 2.3(C)(3)(g), 3.3.1(C)(2), and 33 2(C) of the Land Usc
Code, as applicable.
he City Erosion Control Inspector must be notified at least twenty-four (24) hotlr5 prior to am
D e%etopment Construction Permit t'8_e ,:;
planned (oil itnirtion on this project. All required perimeter silt fencing and other union sahment
cnntml hC�t pIucticc� (11, 11' ) that can he installed prior to amsn'tiction must be in
p!ticc Ind u1spu tcd by th : City Lrosion Cont.oi lnspcctor hctoic any land disturbing acts% it bc-'in,.
I I. No %roIk (iIACIudin, grading) shah! he started in State HigIi ty rn-,hI-of %say until it ImruII is
issued by the ('olorido I)cpartmcnt ofTransportation to allots" such wort: to bt"rin.
12, Uthcr conditions: I he Dcs c1OL'ci is red�d t1_use Mountain Vista Dried, ('punk Road
' ❑nd t tlnnl b' IZO ld �-' ;h t �: h1aU IOme for �On StI LiC LIOn C�Ul�IIll i[It gull I'1 lie lT dS. No ConStI UCL'OI1
uAI1-1 1s ai!oo.'ed cm (_'ount% Road 1 !.
Pa-mittee's acknowledgment signature:
By signmv Ihis pernut I ackno" ledges that I am acting with the knowledge, consent. and authoia'r of
he owners �>� the Illroperty (incluL Iin-all owners Kirov, legal or cquitab!e interest in dorm! propertti, as
1CI incd in Section 1-2 of the City ( ode: and uwludmg common areas legally connected to or associated
\+ith the propcnv ichoh is the subjcet of this application) without whose consent and authoiuv [he
rcyucsicd action could not lawfully be accomphshed. Pwsaant to said authority, 1 hereby permit it,,
oH-1ciat, to enter upon the propert for purposes of inspeetion and, if netcssarc. to enter upon such
prnpertc to pet Gn-ni dcnrk required of the applicant We applicant were to to to perTbnn the required
AW1:. I ❑I;o a�l_no�eledgc that t htr" read. this per;nit document with all its rednr remeuts and
aniduions. and I a unc to aP of the twns and conditions so stated in this permit.
Applicant Project y-lun;tuai'sSi`=nattue:�`���'K �;'u .# �' _ Date
I pprova! for iasuuece:
('itv iaigincer 1ppro,al: �--11 ��=mac -_ — Date:
(Permit Issuance Date)
Development Construction Pei mit, Page 4i5
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Lind I" Filing, Phase 2
Project A.K.A.: Brightwater Landing
City Staff Contact Persons:
Development Engineer: Susan ,toy, 281 N. College Ave., Fort Collins, CO 80521
Office970-221-0005 Fax970-221-6378
F.inail �jov,n fcgo%corn
Construction Inspector: Jeff Baldwin, 281 N. College Ave., Fort Collins, CO 80521
Office 970-221-0005 Cell 970 218-2157 Fax 970-221-6378
Email lbal(k%1wa Icgo_v coon
Current Planner: Bob Barkecn, 281 N. College Ave., Fort Collins, CO 80521
Officc 970-221-6750 Fax 970-416-2020
Gnrtil hbarltccu a Ic,_tn_,cgm
Water Utilities Engineer:
Fro sion Control Inspector: Bob Zakely, 700 Wood Street, Fort Collins, CO 80521
Oil ice 970-224-0063 Fax 970-221-6619
L:mail bial"']v Icgoc.crnn
Natural Resources: Doug Moore, 281 N. College Ave., Fort Collins, CO 80521
Office 970-221-6750 Fax 970-416-2020
Email: �inuw c(cciceov.com
Traffic Operations:
Street closures: Syl Mireles, 626 Linden Street, Fort Collins, CO
011ice 970-221-6815 Fax 970-6282
Fivail mmwlcaalc"tn,cow
Transportation Planning: David Averill, 215 N. Mason, Fort Collins, CO 80521
Oilice 970-41()-2143 Fax 221-6239
Email daccnllkt Ict_m,com
Development Construction Permit, Pace 5iti
Forestry: Ralph Zentr, 215 N. Mason, Fort Collins, CO S0521
Offcc 970-224-6302 Fax 970-221-6586
Finail: rien'r,afc,,w.com
Light and Power: Doug Martine, 700 Wood Street, Fort Collins, CO 80521
Office 970-224-6152 Fax 970-221-6619
Email. cimartim rife-t_.com
Developer' Contact Persons:
Project Manager: Rodney Mullcr, Centex Homes, 10333 E. Dry Creek Road, Suite 300,
Englewood, CO Sol 12
Office 303-792-9810 Cell 303-356-8944 Fax 303-792-9811
Email: rainuller(rilccntcxliomes.com
Owner(s): Centex Homes, 10333 E. Dry Creek Road, Suite 300, Englewood, CO 80112
Office 303-792-9810 Fax 303-792-981 1
Architect/Planner: Terence Hoagland, Vignette Studios, 144 N. Mason Street, Suite 2,
Fort Collins, CO S0524
Office 970-472-9125 Fax 970-494-0728
Email: NA
Project Engineer: Jim Allen Morley, Stantec Consulting, 209 S. Meldrum, Fort Collins,
CO 80521
Office 970-482-5922 Fax 970-482-6368
Email: jim.allen-morlcy�r?stantcc.com
General Contractor: Rodney Muller, Centex Homes, 10333 E. Dry Creek Road, Suite
300, F,n"lewood, CO Sol 12
Office 303-792-9810 Cell 303-356-8944 Fax 303-792-9811
Finail i,uniillci c ccn c homes_?m
Landscape Contractor: Rod Bryncr, RMV Landscape and Maintenance, 2138 East
.letters Frontage Road, Loveland, CO 80538
011ice: 970-278-9150 Cell: NA Fax: 970-500-6089
w
W
W
2
cn
F-
Q
H
(n
W
H
N
O
U
Z
Q
W
W
H
H
Z
Q
O
f-
U
W
0
O
a
� r� O N
9 fA m fA 63 EA ffJ (A EA EA
O m O
�
to
V O O M
�
W
co
r
Z
En fA kA EA
63
fA 69 fA fA fA 69
°i
J
Z
cW
w
a w
coo
m w
z
0
0 0 0 0 00 OC
O O O O O O O o O O
Y] ul O O O O�
J
z Z O!_-
1AfAFAeAo o
es (A«Ar r o r ch m M
(Arnva »e3e�FA
z+
O D W U
(»
fA Vt 1» fA v) 4v
N
u
L)
wa��
z
z
Ouj
w
co
_
�
w
O O O O O C
O O O O O O C O 0 0
O O N O O O O O O
N a
�
vootnoc
� fA EA 00 �
o00000000o
(A EA kA f.9 t9 H3 FA E9 fA EA
m�ma�om.-cnc
r r N m V OJ N �- N
CS'
Q._
U
�
W K
CIA
fA N O� c'1 c N m EA
co
'fQ ¢
NG d3 6A
z
Q N-j
m
a
F K U)
LL
O m O
W
F W Z U
w
w
x
o c o c o c
c c c o 0 0 0 coo
D o m (n o c G o c
3
w
K
W �-
000coc
o0 ocootn000
c�N �.-� vvvcc
o
�Z
r-p
1- }
Noo(noc
cfn en 10c to
ooiou(ooNONo
(aN (A o: rssvrA7 0�
��-moo'i�000>ai2
»w� �.-.-v�v3v
U"
U C) L (yJ
¢ m
UJ to G] e-
fA W O
(A M fn UJ EA
W.
uj
W U)
N w
7
°
,
¢waw
(yzv)
(n
C7U
=1z
0ai�
zL)0O
N!m
O O
W
N�
O
K
(") N (O N O r
to
N r GJ r V 0 C -
~
W Z
N N
Y�
r m Q6 m (V O N O
x z
W
Z
w
J
c
m
F-
w
w W
3
¢
z
z > 0
p
F¢�a
w Q
a
Q w
LL W
2 Z
° It
m
°m
S S x
S= 2 S S S-
z
(n N
LL LL} U U U
ll_ LL LL U U U U U U U
}} y} LL LL LL LL}
-� J U Q Q Q
J J J Q Q Q¢ Q Q Q
N to f0 U1 J J J J fn
H
Z W
p �
U LL
U'
Z N
w
O
6N
¢
a
Ow
Q
O
3
K
Q
dr
a
-a cN
c c -
zCX
z
z
trN a
i N
¢W
U
¢(y
>
>
0
N
p
m
tj 9
0
i-
N
3 3
2
v x
w
z p a
Oaf
o
dU � m Zm c
d N c
3 ^vU
v �Z
a J
a J h
a o
N �.
U U
~
R
d' Q¢
U U
or °i o
�' U .� s
s
N m G� N N N fJ @
taS
¢
Iz
y _ao v,
>
c c E Er et} a
m
> w
W N K
O N p m C c m
<c J N U 10
d D m>> m-2-E o
K H
J
in a.
t�x�U�Q� 3:iw3H
3: z > 'it
NU' O1LL000UU
LLz
No Text
DEVELOPMENT CONSTRUCTION PERMIT
APPLICATION
(2/ 16/99)
For City use only: Application Number: Application
Permit application fee: $ 300.00
INSTRUCTIONS:
I. Complete this form (some questions may not apply to you) and attach all necessary documents and
submit to the Development Engineering Section of the City.
2. 1 1-you have any questions contact the Development Engineer, _ , at 221-6605.
3. Submit the Application and pay the Application Fee at the fee at the Engineering counter at 281 N.
College Avenue.
PROJECT INFORMATION:
Project Name (as approved by the City):
Lind Property Filing 1 Phase 2
Project A.K.A. (Marketing name if different from Project Name):
Brightwater Landing Filing 1
Project Location: ___ NF, corner of CRl1 Jurnberry) and CR52 (Richards take Road)_ _
Property Owner(At the time of this permit issuance):
Individual Name:
Company Name : ('cmey I I A Nevada (;moral Partnership
Address: 10333 F. Div Creek Road, Suite 300, Englewood, CO 80112
Phonc numher(s):
Office: 303-792-9810
Cellphone: _303-356-8944
Fax number: _303-792-9811
Email: ramuller(oicentexhomes.com
Applicant/Project Manager (The primary contact person for all matters regarding this project, and the
person responsible for all matters referencing "the Developer" in the Development Agreement for this
project):
Individual Name: Rodney Muller
Company Name : Centey Flomoc A Nevada 6eneral Pgrinerchin
Address: 10333E Dry Creek Road, Suite 300, Enulewood. CO 80112
Phone mmriber(s):
Office: 303-792-9810
Cellphone: —
Fax number: 303-792-9811
1?mail: __rarriullerLcentexhomes.com
Permittee (Person who is to sign the Development Construction Permit):
Individual Name: Rodney Muller
Company Name : Cei ' Homes A NPvRd,i Ci,-n, rot Partnarchip
Address: 10333 F. Dry Creek Road Suite 300 Englewood CO 80112
Phone number(s):
Office: _303-792-9810
Cellphone: _303-356-8944
Fax number: 303-792-9811
Finaih ram ulIer n>centexhomes.com
Project Engineer (A Colorado licensed professional engineer who is the civil engineer, the person,
responsible for the design of this project, responsible for certification that improvements are constructed
in accordance with approved plans. responsible for making revisions to plans with City approval and for
providing as -constructed plans):
Individual Name: Jim Allen -Morley
Company Name : et. nwo Consulting
Address: 209 South Meldruui Street. Ft Collins. CO 80521-2603 _
Phone number(s):
Office: 970-482-5922
Cellphone: n/a
Fax number: 970-482-6368
Email: al hanmorley(wstamec.com__
Professional License Number: 24336
Architect/Planner (The person responsible for the site design of this project)
Individual Name: Terence I loa, land
Company Name : Viynelle Studios
Address: 144 N. Mason Street Suite 2 Ft Collins. CO 80524
Phone number(s):
Office: 970-472-9125
Cellphone: n/a
Fax number: 970-494-0728
Email: n/a
Developer (The party or parties referenced in the Development Agreement who are responsible for the
Developer's obligations contained in the Agreement —add additional names below):
Individual Name: N/A
Company Name
Address: _
Phone number(s):
Office:
Cellphone: _
Fax number:
Email:
General Contractor ('The contractor in overall charge of the public infrastructure construction)
Individual Name: R^ n y Muller
Company Narne : C'entpx H,)mf,q A N.Pvndn CwnorAl Pqrtuerghip
Address 10333E Dry Creek Road Suite 300 Ennlewood CO 80112
Phone number(s):
Office: _303-792-9810
Cellphone: _303-356-8944
Fax number: _303-792-981 1
Email: ramullergcentexhomes.com
If you have no General Contractor, list all other contractors below.
Grading contractor:
Individual Name:
Company Name
AArtrecs
Phone number(s):
Office:
Cellphone:
Fax number:
Email:
Utility contractor:
Individual Name: _
Company Name : —
Address: _
Phone number(s):
Office:
Cellphone:
Fax number:
Email:
Concrete contractor for flat work:
Individual Name:
Company Name
Address: _
Phone number(s):
Office:
Cellphone:
Fax number:
Email:
Concrete contractor for structures:
Individual Name:
Company Name:
Address: _
Phone number(s):
Office:
Cellphone:
Fax number:
Email:
Development Construction Permit, Page 3/6
planned construction on this project. All required perimeter silt fencing and other erosion/sediment
control best management practices (BMP's) that can be installed prior to construction must be in
place and inspected by the City Erosion Control inspector before any land disturbing activity begins.
11. No work (including grading) shall be started in State Highway right-of-way until a permit is
issued by the Colorado Department of Transportation to allow such work to begin.
12. Other conditions:
Permittee's acknowledgment signature:
By signing this permit I acknowledges that I am acting with the knowledge, consent, and authority of
the owners of the property (including all owners having legal or equitable interest in the real property, as
defined in Section 1-2 of the City Code; and including common areas legally connected to or associated
with the property which is the subject of this application) without whose consent and authority the
requested action could not lawfully be accomplished. Pursuant to said authority, I hereby permit City
officials to enter upon the property for purposes of inspection and, if necessary, to enter upon such
property to perform work required of the applicant if the applicant were to fail to perform the required
work. I also acknowledge that I have read this permit document with all its requirements and
conditions, and 1 agree to all of the terns and conditions so staled in this permit.
Applicant/Project Manager' s Signature: Date: 3 - 3 (- O4-
4440 V V6ZOI-F14/A-67Z
Approval for issuance:
City Engineer Approval Date:
(Permit Issuance Date)
Paving contractor
Individual Name: _
Company Name : —
Address: _
Phone number(s):
Office:
Cellpinone:
Fax number:
Email:
Landscape contractor:
Individual Name: R
Company Name : o""v I ^na p � NAgintennore
Address: 2138 Fast Jeffers Fronta,e Rd.
Phone number(s):
Office: 970-278-9150
Cellphone: n/a
Fax number: 970-566-6089
Email: n/a
Other contractors and parties involved in the project:
SUBMIT THE FOLLOWING ITEMS (Required for all projects):
• 81/2"xl I" copy of the Site Plan
• Proposed Project Schedule
Project quantities and cost estimate for all of the public improvements to be constructed. In
addition, include all private improvements that are required to be inspected by the City
Construction Inspectors. -[']iis information must be submitted in the format shown on the
attached form titled "Project Quantities and Cost Estimate Sheet."
ADDITIONAL SUBMITTALS (Required if checked):
❑ Traffic control plants) for the project
J Proposed haul routes shown on a City map
J
Shop drawings
Other
CONSTRUCTION COORDINATION MEETING: A constriction coordination meeting to discuss
plans and special requirements for your project, is required for all development projects. The people
required to attend the meeting are the Project Manager, Project Engineer, Developer, Architect/Land
Planner and General Contractor (if no General Contractor, representatives for each of the contractors
expected to work on this project)
People to Attend: List the peoples names and titles for those who will attend the pre -
construction meeting:
Name
Title
_ _Rodncv Muller, Centex General Comr./Project Manager/Developer
__Elizabeth Brogan. Centex Field Manager
_Jim Allen -Morley, Stantec_ Project Engineer
'Terence Hoagland, Vignette Land Planner
John Friesem, American Infrastructure Wet utility contractor
ESTIMATED COST OF INFRASTRUCTURE IMPROVEMENTS: Provide the estimated value of
all public infrastructure improvements that will be constructed and accepted by the City to own and
maintain. In addition provide the value of all private infrastructure improvements that the City will
inspect and require certification for. The estimate shall be in the same format as the attached sheet titled
"Project Quantities and Cost Estimate Sheet."
Public infrastructure, estimated cost: S_826,608.1
Private infrastructure, estimated cost:
I certify that the information on this permit application along with the required additional submittals are
true and correct to the best of my knowledge, and that in filing this application 1 am acting with the
knowledge, consent, and authority of the owners of the property (including all owners having legal or
equitable interest in the real property, as defined in Section 1-2 of the City Code: and including common
areas legally connected to or associated with the property which is the subject of this application) without
whose consent and authority the requested action could not lawfully be accomplished. Pursuant to said
authority, I hereby permit City officials to enter upon the property for purposes of inspection and, if
necessap, to enter upon such property to perform work required of the applicant if the applicant were to
tail to perform the required work.
Date:
Applicant Signature:,' I��
CENTEX HOMES No. 237441 Gil
COLORADO . Apr. 25, 2005
10333 E DRY CREEK ROAD DATE:
SUITE 300
ENGLEWOOD, CO 301 i� €
$4.3,139.30
Fortv 'rrusand One Hundred Eiahty Nine-0oilars =ind 30 Cams- -
Bank of Am": ica N.A. Atlanta, Dekalb County, Georgia
RAY TO THE CI Y `'F FORT COLLINS
CRDER OF !/ -�f: r• �'
`htjt Ye P. fJ SiCNATLNE
FU rHOHIZSD 91GNA TG4E
7Ni/• iI T'/..'7TfaT..1�1/1%/�rlf•7u^.."d:'�'7'T.T3 TZ,.-_T=, t T.rjra: T.: fc�.-7�•-yq; TyP 4rt/�b4t79/:d$ .'y'{%A'.. `:t•J7r�t9 i►'/:9":/
,I-ei?itif.d" I:D6::`s27$8i: 32999?:ES?bill
...'.. -_ .. ..... .. B. - OfISGIN4 PQW ENT. RPR+iEQ QM QKWOAL, n94aPrE v4PVR 4Rnb A 4M.nP?RMEQ QaAQEA , w
1, EMIT X 4I M ►y+l N S
C'OLORAD
1C333 E AI I CREE,< F C 4 U
Till E 3UC
PPVGLEV1001), 1171) '31),
"Fr=e -lunrlreci Co Ii�rs a 1,1 09 Cent,
— - - - � -
---------------�-----'-----------
3k,nk or A,yi^iica N.A. it alto, M ka{5 Co.nt . Ce.)ig a
00. 237124 ak.-1273
611
CF-1- 4-,_. C4,_2005-------
i
Pl.A" -0 Fi, 73 CCLL
r ' r
11"23''a21,ii' +:1,51ILA27Fif3+: 121�9974137�I"
Development Construction Permit, Page 4/6
EXHIBIT "A"
DEVELOPMENT PROJECT CONTACT PERSONS
Project Name: Lind Property
Project A.K.A.: NA
City Staff Contact Persons:
Development Engineer: Susan Joy, 281 N. College Ave., Fort Collins, CO 80521
Office 970-221-6605 Fax 970-221-6378
Email: sjoyci f, ceov_cgm
Construction Inspector: Jeff Baldwin, 281 N. College Ave., Fort Collins, CO 80521
Office 970-221-6605 Cell 970-218-2157 Fax 970-221-6378
Email: jbaldw_in rlifcdo�-,_com
Current Planner: Bob Barkeen, 281 N. College Ave., Fort Collins, CO 80521
Office 970-2.21-6750 Fax 970-416-2020
Email: bbarkeen a`fcUov.com
Water Utilities Engineer:
Erosion Control Inspector: Bob Zakely, 700 Wood Street, Fort Collins, CO 80521
Office 970-224-6063 Fax 970-221-6619
Email: hrakcUy�,(Jcgyv om
Natural Resources: Doug Moore, 281 N. College Ave., Fort Collins, CO 80521
Office 970-221-6750 Fax 970-416-2020
Email: din-oorc ajcgov ccxn
Traffic Operations:
Street closures: Syl Mireles, 626 Linden Street, Fort Collins, CO
Office 970-221-6815 Fax 970-6282
Email: smiicl_csa'Icvov.com
Transportation Planning: Tom Reiff, 215 N. Mason, Fort Collins, CO 80521
Office 970-416-2040 Fax 221-6239
Email trcif1'(�:fciov.com
Development Construction Permit, Page 5/6
Forestry: Ralph Zentz, 215 N. Mason, Fort Collins, CO 80521
Office970-224-6302 Fax 970-221-6586
Email: rzentz cd/[cLrov.com
Light and Power: Doug Martine, 700 Wood Street, Fort Collins, CO 80521
Office 970-224-6152 Fax 970-221-6619
Email: dmartinc i?fceov.com
Developer' Contact Persons:
Project Manager: Pat Kramer, Centex Homes, 1250 Glacier Place, Boulder, CO 80303
Office 303-499-8889 Cell 303-931-4442 Fax 303-494-1445
Email krannerllc@gwest.com
Developer: Yvonne Seaman, Centex Homes, 9250 E. Costilla Avenue, Suite 200,
Denver, CO 80112
Office 303-705-5219 Cell 303-419-5433 Fax 303-792-9811
Email: ysea.man@centexhomes.com
Owner(s): Centex Homes, 9250 E. Costilla Avenue, Suite 200, Denver, CO 80112
Office 303-705-5219 Fax 303-792-9811
Architect/Planner: Jim Allen Morley, Sear Brown, 209 S. Meldrum, Fort Collins, CO
80521
Office 970-482-5922 Fax 970-482-6368
Email: jim.allen-morley@searbrown.com
Project Engineer: Jim Allen Morley, Sear Brown, 209 S. Meldrum, Fort Collins, CO
80521
Office 970-482-5922 Fax 970-482-6368
Email: jim.allen-morley@searbrown.com
Grading Contractor: Tom Paul, Bemas Construction Inc, 6890 S. Tucson Way, Suite 105
Englewood, CO 80112
Office 303-662-0645 Cell 303-472-9830 Fax 303-662-1878
Email tspaul abemas.net
Utility Contractor: Ryan Calkins, Scott Contracting, 862 Brickyard Circle, Golden, CO
80403
Office 303-279-0900 Cell 720-219-9041 Fax 303-279-0901
Development Construction Permit, Page 6/6
Concrete Contractor for Flat Work: Ryan Calkins, Scott Contracting, 862 Brickyard
Circle, Golden, CO 80403
Office 303-279-0900 Cell 720-219-9041 Fax 303-279-0901
Concrete Contractor for Structures: Ryan Calkins, Scott Contracting, 862 Brickyard
Circle, Golden, CO 80403
Office 303-279-0900 Cell 720-219-9041 Fax 303-279-0901
Paving Contractor: TBD
Landscape Contractor: TBD
Other Contractors involved with this Project:
TEC — Phone installation for Qwest
\§
��i$
k
aaaaa
Qom(
;m2
\
In
"
�.4
!§k8
§`u§[
§§rm
}§#LU3
��0
`
/)
G
,j 0.
§/
_cn
\
22
r«
:�[j
�° �`®
(E
§w
oF-
)\
k
W§
()
0w
`
§§
!§
3m
\3
z�
{}
wi
`
kk
§(
0IL
2\
zU)
:g:);
(7r,±,E
a
�-
�)�
}/t)�
§
]\
�?
§\(
)}})\
k/
/3f/\/\
§{._..�f
5
Y
! r:
I I I Y � •. �') I
Il
T
w
w
I I I li i
�i
6
III
FX
VJ
I
I
X
X
dl
a
I
xl
IX
XI1
X
>
X
j
I
X
XI
I
I'x
xx
lc
xlx
�Ix
II
�
xi
I
x
II
i
x
�;
III
I
II
x
I
x1
�I
a Ila
x
II
I
x
�
x
I
I
I
i
I
W
Z a N Z
o W UwC�z �
a 0ix ~f o,zi <Q
¢
wwK � U
a w Z Q O z a a Y z z
00wR:WUU3:=<m-