Request for Modification of Standard
Reduction of Buffer width along a portion of the Cooper Slough
December 3, 2002
A three hundred foot buffer is currently required along the entire length of the Cooper
Slough within the city limits of Fort Collins as per section 3.4.1(E) (3) of the Fort Collins
Land Use Code. The applicant, Western VII Investment, LLC, is requesting a
Modification of Standard for the buffer imposed along a remnant portion of Cooper
Slough existing on and adjacent to the Interstate Land property.
The applicant's project, Interstate Land, is located within the northwestern quadrant of
the intersection of Prospect Road and Interstate 25. The applicant's environmental and
ecological consultant, Wildland Consultants, Inc. has identified and mapped wetlands
within a remnant section of the Cooper Slough along the projects western boundary.
Specifically, the applicant is proposing a buffer of 50' from wetlands less than 1/3
acre in size and a 100' average — 50' minimum - buffer from wetlands over one-
third (1/3) acre that do not have significant waterfowl or waterbird habitat.
Based upon criteria provided in the Land Use Code (L.U.C.) Section 2.8.2(H), the
applicant maintains that the proposed decrease in buffer is not detrimental to the public
good and promotes the general purpose of the standard equally as well or better than a
plan that complies with the standards.
The proposed decrease in buffer width is not detrimental to the public good because:
• Section :3.4.1 (E) (3) of the Fort Collins Land Use Code establishes identical
buffers around wetlands that are similar to the size and habitat quality as the
wetlands found along this remnant section of Cooper Slough.
• Unlike the sections of Cooper Slough north of Highway 14, this remnant of
Cooper Slough does not provide the high quality wildlife habitat that would justify
the protection of a 300-foot buffer. (From the Ecological Characterization Study
completed by Wildland Consultants, Inc. - attached)
No flowing water is present along this remnant section of Cooper Slough. (From
the Ecological Characterization Study completed by Wildland Consultants, Inc. -
attached)
THE LAKE CANAL COMPANY
THE LAKE CANAL RESERVOIR COMPANY
(970) 352-0222
August 22. 2003
Steve Olt
City of Fort Collins Planning
P O Box 580
Ft Collins, Co 80522-0580
RE: #49-02A Interstate Land ODP
Steve:
The canal for The Lake Canal Company is located along the north boundary of the
property. The canal is fumed over Boxelder Creek.
Access is the major issue for the canal. The request for platting the canal right-of-way
will be in general terms 50 feet south and west from the center of the canal. The right-of-
way for the flume will need to be greater. There is an expectation that the City of Fort
Collins may have interest in replacing the flume with a siphon to facilitate storm drainage
in the area. Access in the area of Boxelder Creek will be need special consideration. It is
not apparent at this stage of planning whether these conditions have been met.
The plans show a trail parallel to the canal and a pedestrian crossing over the canal. The
trail, landscaping and improvements will need to be placed out of the canal right-of-way.
A crossing agreement will need to be executed for this crossing or any utilities that will
need to cross the right-of-way. The one crossing is located near the entrance to the
siphon. Public safety needs to be carefully considered when planning and designing
development in the vicinity of canals.
The Lake Canal Company has no objections at this time. It would seem that the needs of
the canal can be met within the scope of this proposal. The Board of Directors will meet
in September. I will pass on any additional comments they may have.
Sincerely,
4071
Don Magnuson
Superintendent
33040 Railroad Avenue • P.O. Box 104 • Lucerne, Colorado 80646
RECEIVED
AUG 2 6 2003
CURRENT PLANNING
Mere ^
THE LAKE CANAL COMPANY
THE LAKE CANAL RESERVOIR COMPANY
(970) 352-0222
August 22, 2003
Steve Olt
City of Fort Collins Planning
P O Box 580
Ft Collins, Co 80522-0580
RE: 449-02A Interstate Land ODP
Steve:
The canal for The Lake Canal Company is located along the north boundary of the
property. The canal is flumed over Boxelder Creek.
Access is the major issue for the canal. The request for platting the canal right-of-way
will be in general terms 50 feet south and west from the center of the canal. The right-of-
way for the flume will need to be greater. There is an expectation that the City of Fort
Collins may have interest in replacing the flume with a siphon to facilitate storm drainage
in the area. Access in the area ofBoxelder Creek will be need special consideration. It is
not apparent at this stage of planning whether these conditions have been met.
The plans show a trail parallel to the canal and a pedestrian crossing over the canal. The
trail, landscaping and improvements will need to be placed out of the canal right-of-way.
A crossing agreement will need to be executed for this crossing or any utilities that will
need to cross the right-of-way. The one crossing is located near the entrance to the
siphon. Public safety needs to be carefully considered when planning and designing
development in the vicinity of canals.
The Lake Canal Company has no objections at this time. It would seem that the needs of
the canal can be met within the scope of this proposal. The Board of Directors will meet
in September. I will pass on any additional comments they may have.
Sincerely,
4
Don Magnuson
Superintendent
RECEIVED
AUG 2 6 2003
CURRENT PLANNING
33040 Railroad Avenue • P.O. Box 104 • Lucerne. Colorado 80646
urban design, inc.
3555 stanford road, suite 105
fort collins, colorado 60525
(970) 226-4074
fax (970) 226-4196
e@cityscapeud.com
Request for Alternative Compliance
Reduction of intersections/connections to the 1-25 Frontage Road
October 24, 2003
The applicant is requesting alternative compliance for Land Use Code section 3.6.3 (D)
Street Pattern and Connectivity Standards with regard to connecting an additional road
from the 1-25 Frontage Road in the northeast corner of the site to the proposed
residential area west of Boxelder Creek.
Based upon criteria provided in the Land Use Code (L.U.C.) Section 3.6.3(H), the
applicant maintains that the proposed decrease in connecting intersections to the 1-25
Frontage Road is not detrimental to the public good and promotes the general purpose
of the standard equally as well or better than a plan that complies with the standards.
The applicant proposes no additional connections to the 1-25 Frontage Road.
The proposed decrease in connections to the 1-25 Frontage Road serves the site equally
as well or better than a plan because for the following reasons;
The proposed residential area located west of Boxelder Creek is adequately
served by the proposed road system. The traffic study determined that no
additional access points to the subdivision would be necessary from a traffic
operations standpoint.
Poudre Fire Authority indicated that the two currently proposed access points
from Prospect and the Frontage Road satisfy the separation requirements for
the code -required two points of access for emergency services to the
development.
Any proposed connection would need to cross a significant natural area that
is slated for preservation by the ODP. This natural area has stands of
existing trees, wetlands and wildlife habitat associated with Boxelder Creek
and the natural area buffers that provide wildlife habitat and wildlife corridors
paralleling both the Lake Canal and Cache La Poudre irrigation ditches.
These natural areas would be impacted by an additional connection.
The proposed connection would encourage road construction adjacent to or
within the F.E.M.A. 100-year floodplain.
The City of Fort Collins defined floodway associated with Boxelder Creek
exists in this area and is approximately 125' at its narrowest point. Any
additional connection would encourage development within and/or adjacent
to the floodway.
Twelve feet of grade change exists between the proposed residential
development and the 1-25 Frontage Road.
C OKY5@@ o
urban design, inc.
Bicycle and pedestrian connectivity will be provided by trails proposed by the
City of Fort Collins Parks and Recreation Policy Master Plan.
The applicant proposes for this portion of the site to remain a natural area, and
maintains this would be the most beneficial use. The applicant believes that a vehicular
connection wouild detract from this proposed natural area while providing minimal
benefits to vehicular circulation for the development.
urban design, inc.
This remnant of Cooper Slough does not provide significant waterfowl or water
bird habitat. (From the Ecological Characterization Study completed by Wildland
Consultants, Inc. - attached)
The existing Box Elder Estates development borders the western boundary of
this remnant of Cooper Slough. In some areas, existing right-of-way and
developed lots are closer than 35' to the wetland edge.
A 300' buffer (or any buffer greater than 50' to 100') in impractical to the west of
this remnant of the Cooper Slough, due to the existing residential development in
that area. Imposing a large buffer to the east when no such buffer can be
implemented to the west does not accomplish the intent of the regulation.
Urban Design
Exhibit A — Location Map
Exhibit B — Wetland Buffer Zone Comparison Map
Exhibit C — Photographs of Cooper Slough adjacent to Project Site
Exhibit D — Photographs of Cooper Slough at Vine Drive
Ecological Characterization Study for Project Site
May 14 03 06:37a
MRTTHEW J DELICH 970 669 2061 p•2
0
0
0
U
0
a
LLI
K
d
O
W
a
7
�I
i■
r
MEMORANDUM
TO- Stan Whitaker, Western ProperLy Advisors
Joe Carter/F.1don Ward, CiLyscape urban Design
o Miko Brake, JR Rngineering
u7
Tess Jones, COOT Region 4
CiLy of Furl Collins
o
� FROM: Matt Delich
4 DATE: May 13, 2003
ur
SUBJECT: Intorntnto Land - West Frontage Road intersections
analyses, (File: 0311ME02)
In a meeting concerning the Interstate Land development, Tess
fD ,Tone. requested a preliminary determination of the left -turn
0
movement.;!; aL two key intersections along the We
t. h'rontayc Road
n (WFR). 'The key intersections are. shown in Figure 1. The expre:;sec
concern wan, would there be sufficient separation between these two
_w intersections to accommodate the southbound left turns at
o intersection A and the northbound left turns at intersection B. In
x
a order to do this, the compl etc transportation impact ::Ludy (TIS) is
not required. However, a trip gcnorat.ion ost.imat.e and a Lraffic
assignment of the generated peak hour trips is necessary.
As indir_•atcd in Figure 1., ttrere dr'e two distinct component3 of
the Interstate Land development. Tn the southeast portion of the
site (cast and south of the WFR), the land unr.:; are commercial.
(hotel, office, retail, etc.). West of the WFR, t.hc land user. are
residentiai with a small component of ofticc uses. It is expected
that. a I'igh distribution of son;c of the commerciai uses (hotCL,
retail, etc.) would be rclatrd Iso 1-25 and paassby traffic on Prospect
Road. The distribution for employment commercial uses (of.fire, etc.)
would be related to population centers in the Fort. Collins area. The
trip distribution for the residential land uses would be related to
job locations in Northern Colorado. Based upon this trip
O distribution, a traffic as.^.ignment of thr si.Le generated traffic was
z performed. Figure 2 show3 the forncant-ed peak hour movemer Ls aL Lhe
w key intersections. The only movements shown are those which are
z related to the cxpresscd concern. When the TIS is completed, all
c7 internee Lions and turning movements will be shown.
z
w
zo The distar:ce between intersections A and n is approximately 490
F feet, on -centers. The functional distance, available for vehicle
r.Loraye, is approx.ima Lcly 140 feet. At both of these intcrsecti.onn,
Othe WFR will be the through street. Therefore, delays to the major
a
w street left turns will be a function of the opposing through traffic
zd on the WI'R. A typical "rule of thumb" for vehicle storage is one
N
foot per left-Lurninq vehicle (25 feet). Since. Lhe posted speed is
� 30 mph, the 1 of t.-turn lane components should include storage and
O taper. At 30 mph, Lhe torpor is 5:1 or 96 feet for a 12 foot -
transition. Summing all of these components results in a total
a
length of 252 feet. This is less than the available 440 feet.
H Therefore, it is concluded that the separation between intersections
A and B is advquat.c.
May 14 03 06:37a MATTHEW J DELICH 970 669 20GI
p.3
Ctlf OF COflib�M. `�
•�.avKi:f A. t:erviN MM�
1 '
KEY )N`r'ERSECTIONS
Fj vRB J
May 14 03 06:38a
MATTHEW J DELICH
970 688 20GI
p.4
26SI OB,UTIAL
A � A
PEdK Hour- LEF'i TURNS
AMIKM
FIGURE 12
Co�M@@o
urban design, inc.
Interstate Land
Overall Development Plan
Statement of Planning Objectives
August 13, 2003
Interstate Land is located on +177.15 acres at the intersection of Interstate 25 and Prospect
Road and represents the implementation of a "Low Density Mixed Use Neighborhood" district,
Commercial Corridor District, Employment District and Urban Estate District as defined in City Plan.
The proposed uses are consistent with the adopted Structure Plan, and other City Plan elements
as indicated below. All uses proposed are 'Type 1" or "Type 2" uses as defined in the Land Use
Code.
City Plan Principles and Policies
Interstate Land is consistent with the applicable Land Use Principles and Policies adopted
by the City of Fort Collins. The site is designed to contribute positively to the type of neighborhoods
found in the City, and will promote a compact development pattern by encouraging development in
a mixed -use neighborhood, conducive to bicycle, pedestrian, and transit use. The plan proposes
transitions of higher density development closer to 1-25 and lower density single-family detached
development adjacent to existing large lot single-family residential along the western boundary of the
property.
Adequate public facilities are available, or are anticipated to serve the proposed
development, and the development is proposed at the densities encouraged in City Plan. Several
natural areas exist within this site and are shown on the ODP. Natural areas have been preserved
and buffers from these areas are proposed. Common active open space is provided within a small
neighborhood park, other parks and detention areas and a future city park.
Transportation principles and policies promote development designs that are pedestrian and
transit friendly, provide easy access to "multi -modal" streets, and allow easy connections to the
planned, community wide, pedestrian network; while recognizing that private automobiles will
continue to be an important means of transportation. At Interstate Land, emphasis has been placed
on providing a strong pedestrian connection throughout the community as evident by the internal
pedestrian circulation patterns shown on the plan. City of Fort Collins proposed trail sections have
been shown along Box Elder Creek and the Cache la Poudre ditch.
'Y The 1-25 Subarea Plan has not been adopted at the time of this submittal and was not referenced when creating this
ODP.
Community Appearance and Design related principles and policies describe elements such
as street design, layout and appropriate public spaces that are reflected in the plans for Interstate
Land. The Interstate Land project, by its proximity to 1-25, acts as a gateway into the City of Fort
Collins. Natural area preservation adjacent to Prospect Road and Boxelder Creek enhances this
gateway.
A variety of housing types (multi -family buildings, townhomes, small lot single-family, and
standard single-family lots) and densities are planned within Interstate Land.
The vehicular and pedestrian circulation system is designed to reduce potential VMTs by
creating direct pedestrian routes to multi -modal streets, parks, employment, future commercial
development, and other common destinations.
Interstate Land is planned as a walkable, livable and varied neighborhood. An
interconnected network of streets and walkways lead to common destination in and near the
neighborhood. Edges of the neighborhood are clearly defined by major streets, open space and
natural areas and features.
A mix of housing types and lot sizes is proposed within the Development. The LMN Zone
district will have a density over five (5) units per acre. Standard lot single-family houses, small lot
single-family houses and multi -family units are anticipated. The Employment Zone district is
expected to have 25% of it area dedicated to secondary uses and a minimum density of 7 dwelling
units per net acre. Additional residential development is allowed within the Commercial District
although none is planned at this time.
II. Open Space & Circulation Systems
Open space areas and major circulation corridors, as defined on the Structure Plan, are
major factors influencing the design. As indicated above, the neighborhood is planned to provide
easy pedestrian access to the internal neighborhood parks and open spaces, the proposed city park,
natural areas, the proposed commercial development, the future neighborhood center within this
development, and the multi -modal streets along the east and south property lines; as well as
allowing convenient connections between on -site dwellings.
A variety of open space areas will be available to the residents including the proposed small
neighborhood park, open spaces, the city park and the natural areas surrounding the residential
development. All of these areas are within easy walking distance of the majority of the dwellings in
the neighborhood.
III. Ownership & Maintenance
Privately owned open spaces within the Limits of Development at Interstate Land will be
owned and maintained by owners' associations. All detached dwellings are planned to be platted on
fee simple lots, and are anticipated to be individually owned. The future City Park will be owned and
maintained by the City of Fort Collins.
IV. Estimated Employment
Primary and secondary employment uses are planned on site as well as approximately
22 acres of commercial development. The neighborhood is well located to provide housing
opportunities in close proximity to the expanding employment along the 1-25 corridor, Highway 14
Corridor, the Prospect employment district and downtown Fort Collins.
V. Planning Rationale & Assumptions
Interstate Land is planned as a walkable, livable, and varied neighborhood. An
interconnected network of streets and walkways lead to common destinations (future neighborhood
center, future city park, small neighborhood park) within the neighborhood. Housing types are
located so as to minimize traffic conflicts, form transitions to existing and future development, work
with the existing topography, maximize solar orientation of single-family lots, and optimize resident
access to common elements.
VI. Applicable Criteria
The uses proposed at Interstate Land are:
- Standard and small lot single-family detached dwellings
- Multifamily dwellings
- A small neighborhood center
- Commercial Development
- Primary and Secondary Employment Zone district uses
- A 10 t0 14 acre city park with possible expansion opportunity
- Passive recreation within natural areas
The residential density within the LMN Zone of 5 to 8 dwelling units per acre is proposed.
The LMN zone accounts for approximately sixty-five percent (67%) of the total density of the site.
The residential density of the Employment Zone of a minimum of 7 dwelling units is proposed. The
Employment district will support approximately thirty-five percent (33%) of the total residential density
of the site. No residential development is expected within the UE (Urban Estate Zone) at this time.
A neighborhood center serving Interstate Land is planned as a part of this development and
is located near Prospect Road. No known existing neighborhood centers are within 3,960 feet of the
proposed center. Approximately twenty-two acres of commercial development are proposed at the
northwest quadrant of 1-25 and Prospect Road between the 1-25 Frontage Road and the highway.
The proposed small neighborhood park is within 1/3rd mile of over 90% of the anticipated
dwellings at Interstate Land.
No residential blocks at Interstate Land are greater than 12 acres in size without including
a park; and no blocks exceed 700 feet in length without a green space area to break up the block
length.
Street Pattern and Connectivity Standards are not met on the proposed plan due "...to
unusual topographic features... or a natural area or feature." as per the Land Use Code. Cooper
Slough prevents the connectivity between the proposed residential development and Box Elder
Estates. The Land Use Code requires a 240' to 300' buffer from the edge of Cooper Slough, which
is also in conflict with connectivity requirements.
Access to the site is from Prospect Road and the 1-25 Frontage Road. At the neighborhood
meeting, residents of Box Elder Estates expressed adamant opposition to the concept of any
vehicular connection to their neighborhood. No vehicular connection has been shown on this ODP
and Alternative Compliance to this Land Use Code standard is expected to be submitted.
Compact Urban Growth Standards are met with the proposed plan.
VII. Conflict Mitigation
Natural areas will be enhanced where required. A 100' buffer along Boxelder Creek and a
50' buffer along the Cache la Poudre ditch have been created per the land use code. The buffer
along Cooper Slough has been reduced to an average of 254' per code standards. The buffer area
will be enhanced with additional landscape plantings. No connectivity across Cooper Slough is
proposed.
Vill. Development Phasing
Development of the site is scheduled begin in 2004 and will continue through 2008.