Loading...
HomeMy WebLinkAboutGREENBRIAR VILLAGE PUD FOURTH - Filed CS-COMMENT SHEETS - 2004-08-09Community Planning and Environmental Services Planning Department City of Fort Collins December 21, 1993 Ed Zdenek ZTI Group 1220 South College Avenue Fort Collins, CO. 80524 Dear Ed, Staff has reviewed your documents for Greenbrier Village P.D.D., Fourth Filing - Preliminary that were submitted on December 6, 1993, and would like to offer the following comments: 1. Public service Company has indicated that easement widths must be shown on the final plat. Fencing along Willox Lane must be located south of the existing PSCo 4" gas main at all times. PSCo has an existing 19' wide utility easement adjacent to the southerly right-of-way of Willox Lane. 2. The street, name for the cul-de-sac must not duplicate existing street names in the City of Fort Collins or in the fire district. 3. An additional fire hydrant must be provided at the east end of the cul-de-sac. 4. A copy of the comments received from the Engineering Department: is attached to this letter. 5. Two red -lined Preliminary Site & Landscape Plans with Planning comments are being forwarded to you with this letter. These plans mush be returned to the Planning Department with your revisions.. 6. A 5' wide detached sidewalk is required along Willox Lane. Also, additional right-of-way may be required for Willox Lane. This complete:: the review comments at this time. Additional comments may be forthcoming as the various departments and reviewing agencies continue to review this request. Please be aware of the followirLaa dates and deadlines to assure your ability to stay on schedule for the January 24, 1993 Planning and Zoning Board hearing: 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750 Plan revisions are due January 5, 1994. Please contact me for the number of ceded revisions required for each document. PMT's, renderings, and 8 folded copies of final revisions (for the Planning and Zoning Board packets) are due January 18, 1994. Final documents (including the signed development agreement, applicable mylars and utility plans) are due January 21, 1994. *****######**#*##*#*****####*#####***######*###******########***#* i will be out of my office until December 29, 1993. Please contact one of the other planners in Development Review if you have questions or concerns related to these comments. They will help you as best they can. The telephone number is 221-6750. 2ie4rely, _ e olt Project Planner xc: Kerrie Ashbeck Advance Planning Stormwater Utility Transportation file/Project Planner Commur,> Planning Department March 25, 1994 Ed Zdenek ZTI Group, Inc. 1220 South college Avenue Fort Collins, CO. 80524 Dear Ed, and Environmental . .vices Staff has reviewed your documents for the Greenbriar Village P.U.D., Fourth Filing - Final that were submitted on March 7, 1994, and would like to offer the following comments: 1. The comments received from Public Service Company (PSC) are as follows: a. Bullrush Court in Greenbriar Village, Fourth Filing could easily be confused with Bulrush Court in the Upper Meadow at Miramont, Second Filing. Greenbriar should change the street name to eliminate confusion. b. Fencing along Willox Lane must be located a minimum of 3' south of existing PSC 4" gas main so that PSC will have access to the main at all times. This includes the corners at the intersections of Willox/Bayberry and Willox/Redwood. C. A 31' wide strip west of and adjacent to Redwood Street should be dedicated as a utility easement. 2. A copy of the comments received from U.S. West is attached to this letter. 3. The Post Office has asked that an alternative name be selected for Bullrush Court. This name is already being used in Fort Collins. 4. The Platte River Power Authority has stated that they do not have any facilities in this area. 5. The Zoning Department has stated that Note #5 on the Final Site & Landscape Plan should be deleted. Signage is now regulated by the City's Zoning Code. 6. The Mapping and Drafting Department has indicated that the outer boundary monuments must be described on the subdivision plat. 281 Norrh. .-wenuc 1'.0. 13ki\ ;80 • Fort Collins, CO 80322-0780 • (303) 221-67-0 7. The Light & Power Department's planned street light locations are shown on a red -lined Landscape Plan (enclosed). The tree locations should meet the required street light/street tree separation standards. 8. The fire hydrants should be shown on the Site Plan. Hydrants must be located within 400' of all dwellings and be capable of delivering 1,000 gallons per minute, with 20 pounds per square inch of residual pressure. 9. The Engineering Department's comments are as follows: a. No soils report was submitted. Please submit a report that includes a pavement design. b. The design/scope of the plans for this filing is all based on the Greenbriar Village P.U.D., Second Filing being constructed. If the Second filing does not go in prior to this developer wanting to start work, the plans will need to be modified to include improvements necessary to build this filing as a stand-alone. Kerrie Ashbeck can be reached at 221-6750 if you have engineering -related questions. 10. The Site Plan should more clearly show the sidewalk connection from the cul-de-sac to Redwood Street. The cul-de-sac planting detail shows the sidewalk but the Site Plan is vague. 11. Parkland fees of $779 per dwelling unit will apply to this request and will be collected at the time of issuance of building permits. 12. The Water./Wastewater Departments comments are shown on a red - lined Landscape Plan (enclosed). This completes the review comments at this time. Additional comments may be forthcoming as the various departments and reviewing agencies continue to review this request. Please be aware of the following dates and deadlines to assure your ability to stay on schedule for the April 25, 1994 Planning and Zoning Board hearing: Plan revisions are due April 6, 1994. Please contact me for the number of folded revisions required for each document. PMT1s, renderings, and 8 folded copies of final revisions (for the Planning and :Zoning Hoard packets) are due by 3:00 p.m. on April 18, 1994. Please contact me at 221-6750 if you have questions or concerns related to these comments. I would like to schedule a meeting with you as soon as possible, if necessary, to discuss these comments. S' rely, Ate"Ot Project Planner xc: Ron Phillips Kerrie Ashbeck Advance ]Planning Stormwater Utility Transportation Parks & Recreation Stewart & Associates file/Project Planner